AF Form 3052.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- BLDG 4868 Additional Electrical Panel for DMAFB
- Solicitation number
- 24QA026
About this file
This document appears to be an AF Form 3052 - an IGE Design-Build Cost Estimate Breakdown for a federal contract opportunity. The contract is for furnishing labor, equipment, and materials to design and install a new 200 Amp, 120/208-volt, three phase Panel Board in Building 4868 at Davis-Monthan AFB, AZ. The solicitation number is 24QA026. Key details include:
The overall proposed total contract price is $0. The contract will be awarded by the Department of the Air Force Air Combat Command. A site visit is scheduled for July 25, 2024, and Expressions of Interest Letters are due by July 10, 2024 at 1:00 PM local time. The contract will involve design, construction, and installation work. The cost estimate breakdown provides detailed labor hours and material costs across various divisions of work including electrical, concrete, and earthwork.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 04868-001-001.PDF | ||
| DMAFB Design Compatibility Guidelines 2017.pdf | ||
| Solicitation - FA487724R0019.pdf | ||
| FBNV240023 - Statement of Work - Addl Elec Panel.pdf | ||
| Contractor EAL Template.xlsx | XLSX spreadsheet | |
| Construction AF Form 66.pdf | ||
| WD - AZ20240040 - 17 May 24.pdf | ||
| Contractor Environmental Guide .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF 3052 IGE
| DESIGN-BUILD COST ESTIMATE BREAKDOWN | ||||||||||||||
| CONTRACTOR | ADDRESS | |||||||||||||
| CONTRACT FOR(WORK TO BE PERFORMED) | Additional Electrical Panel for Building 4868 | PROPOSED TOTAL CONTRACT PRICE | 0 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | FBNV240023 | WORK LOCATION | DAVIS-MONTHAN AFB, AZ 85707 | ||||||||||
| LINE | UNIT OF | MATERIAL COST | LABOR COST | DIRECT | LINE | Bare Costs Per Labor-hour | ||||||||
| NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS | RATE | TOTAL | COSTS | TOTAL | Crew Code | Crew | Equipment | Labour-hours |
| SUMMARY | ||||||||||||||
| 1 | SUBTOTAL DIVISION 01 GENERAL CONDITIONS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 2 | SUBTOTAL DIVISION 03 CONCRETE | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 3 | DIVISION SPECIALTIES 10 FALL PROTECTION | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 4 | SUBTOTAL DIVISION 26 ELECTRICAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||||
| 5 | SUBTOTAL DIVISION 31 EARTHWORK | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| LINE TOTALS OVERALL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |
| OVERHEAD TOTAL OVERALL (10%) | 0.00 | |||||
| SUBTOTAL OVERALL W/ OVERHEAD | 0.00 | |||||
| PROFIT TOTAL OVERALL (10%) | 0.00 | |||||
| SUBTOTAL OVERALL W/ OVERHEAD AND PROFIT | 0.00 | |||||
| TAX OVERALL 3.97% (6.11% of 65%) | 0.00 | |||||
| BOND OVERALL (2.0%) | 0.00 | |||||
| TOTAL OVERALL PROJECT PRICE | 0.00 | 0 |
| DATE: | 21-Mar-24 | FIRM NAME: | Davis-Monthan AFB |
| TITLE: | PROJECT MANAGER | BY: |
| DIVISION 01 GENERAL CONDITIONS | ||
| 1 | ||
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | A-3A | |
| 9 | A-6 | |
| 10 | A-5 |
SUBTOTAL DIVISION 01 GENERAL CONDITIONS 0.00 0.00 0.00 0.00 0.00
| DIVISION 02 EXISTING CONDITIONS | |||||
| SUBTOTAL DIVISION 02 EXISTING CONDITIONS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| DIVISION 03 CONCRETE | |
| 12 | |
| 12 | |
| 12 | |
| 12 |
SUBTOTAL DIVISION 03 CONCRETE 0.00 0.00 0.00 0.00 0.00
DIVISION 10 SPECIALTIES Fall Protection
SUBTOTAL DIVISION 10 SPECIALTIES 0.00 0.00 0.00 0.00 0.00
| DIVISION 26 ELECTRICAL | |||
| Elec | $ - 0 | 32 | |
| Elec | $ - 0 | 16 | |
| Elec | 16 | ||
| Elec | 20 | ||
| Elec | 1 | ||
| Elec | 1 | ||
| Elec | 1.5 | ||
| Elec | 0.04 | ||
| Elec | 1 | ||
| Elec | 1 | ||
| Elec | 1.1 | ||
| Elec | |||
| Inspector | |||
| Elec | $ - 0 | 16 | |
| Elec | $ - 0 | 16 |
SUBTOTAL DIVISION 26 ELECTRICAL 0.00 0.00 0.00 0.00 0.00
| DIVISION 31 EARTHWORK | ||
| $ 27.62 | 24 | |
| $ 27.62 | 24 | |
| $ 27.62 | 24 | |
| $ 27.62 | 24 |
SUBTOTAL DIVISION 31 EARTHWORK 0.00 0.00 0.00 0.00 0.00
AF Form 3052 (Computer Generated) *FOR OFFICIAL USE ONLY* PAGE &P OF &N
Construction Schedule
| Construction Schedule | |||
| NTP/Contract Award | |||
| Project Mob | |||
| Blue Stake | 0 | ||
| Survey Pole locations | 0 | ||
| Shop Drawing 1 Submittal | |||
| Government Review | 0 | ||
| Ordering LPS Materials (Poles, etc.) | 60 | ||
| Digging Notification | 0 | ||
| Foundation Digging | 0 | ||
| Rebar Cage Setting | 0 | ||
| Concrete in drive way at | 0 | ||
| Concrete Cure Time | 0 | 28 days set include total duration time | |
| Electrical/Grounding/SPD Survey | 0 | ||
| Electrical Review of SPD | 0 | ||
| Grounding Welds | 0 | ||
| Ground Rods | 0 | ||
| Arrester installation | 0 | ||
| Air Terminal Installation | 0 | ||
| Misc. Electrical | 0 | ||
| Pre Final Inspection | 0 | ||
| Testing UL | 0 | ||
| 3rd Party Inspection | 0 | ||
| Final Inspection | 0 | ||
| Close out | 0 | ||
| Total Working Days: | 0 | ||
| Calendar Days: | 48 | Includes Lag time for Material (48 days) | |
| Max. Calendar days |
Design Sch
| NTP/Contract Award | 10 |
| Project Mob | 14 |
| Charrette/Field Investigation | 4 |
| Charrette Report Submission | 18 |
| Government Review | 14 |
| Charrette Review Meeting | 1 |
| 35% Conceptual Design | 21 |
| Government Review | 14 |
| 35% Design Review Meeting | 1 |
| Government Review | 14 |
| 65% Design Submission | 21 |
| Government Review | 14 |
| 65% Design Review Meeting | 1 |
| 95% Design Submission | 14 |
| Government Review | 14 |
| 95% Design Review Meeting | 1 |
Calendar Days: 176