05. FBNV230009_AF Form 3052 (Blank).xlsx
Air Force Form XLSX spreadsheet 24 KB Posted
- Solicitation number
- FA487724B0002
About this file
This document appears to be an AF Form 3052 (Blank) Construction Cost Estimate Breakdown template related to a federal contract opportunity.
The key details of the related federal contract opportunity are: The project is to repair the Command Post in Building 2300 at Davis-Monthan Air Force Base, with an estimated project magnitude between $1,000,000 and $3,500,000. The acquisition is a 100% woman-owned small business set-aside under NAICS code 236220. The period of performance is 330 calendar days after notice to proceed. Key dates include: site visit on 26 July 2024, RFI due on 30 July 2024, and bids due on 08 August 2024. Bids must include a bid bond of 20% of the bid price or $3,000,000, whichever is less. The contract will be awarded to the lowest total contract price. The procuring agency is the Department of the Air Force, Air Combat Command.
View the file
Other versions and copies of AF Form 3052
Show all 20
Who attaches AF Form 3052
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3052_B4455
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR(WORK TO BE PERFORMED) | REPAIR COMMAND POST, BLDG 2300 | PROPOSED TOTAL CONTRACT PRICE | 0 | |||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | FBNV 230009 | WORK LOCATION | DAVIS-MONTHAN AFB, AZ 85707 | ||||||
| LINE | UNIT OF | MATERIAL COST | LABOR COST | DIRECT | LINE | |||||
| NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS | RATE | TOTAL | COSTS | TOTAL |
| SUMMARY | ||||||||||
| 1 | SUBTOTAL DIVISION 01 GENERAL CONDITIONS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||
| 2 | SUBTOTAL DIVISION 02 EXISTING CONDITIONS/ DEMO | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||
| 3 | SUBTOTAL DIVISION 03 CONCRETE | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||
| 4 | SUBTOTAL DIVISION 04 MASONRY | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||
| 5 | SUBTOTAL DIVISION 07 THERMAL AND MOISTURE PROTECTION | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||
| 6 | SUBTOTAL DIVISION 08 OPENINGS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||
| 7 | SUBTOTAL DIVISION 09 FINISHES | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||
| 8 | SUBTOTAL DIVISION 21 FIRE SUPPRESSION | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||
| 9 | SUBTOTAL DIVISION 22 PLUMBING | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||
| 10 | SUBTOTAL DIVISION 23 HVAC | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||
| 11 | SUBTOTAL DIVISION 26 ELECTRICAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||
| 12 | SUBTOTAL DIVISION 27 COMMUNICATIONS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| LINE TOTALS OVERALL | 0.00 | 0.00 | 0.00 | 0.00 |
| OVERHEAD TOTAL OVERALL (10%) | 0.00 | |||
| SUBTOTAL OVERALL W/ OVERHEAD | 0.00 | |||
| PROFIT TOTAL OVERALL (10%) | 0.00 | |||
| SUBTOTAL OVERALL W/ OVERHEAD AND PROFIT | 0.00 | |||
| TAX OVERALL 3.97% (6.11% of 65%) | 0.00 | |||
| BOND OVERALL (2.0%) | 0.00 | |||
| TOTAL OVERALL PROJECT PRICE | 0.00 |
| DATE: | xx/xx/xxxx | FIRM NAME: | |
| TITLE: | BY: | xxxx |
File details come from the government source that posted it. Updated .