This document provides details for a Multiple Award Construction Contract solicitation. The solicitation will result in awarding indefinite delivery indefinite quantity construction contracts to three responsible offerors who provide the best value. Work will include new construction, renovation, alteration, demolition, and repair for facilities at Ellsworth Air Force Base in strict compliance with specifications, drawings, and task order requirements. Trades may include carpentry, roofing, excavation, electrical, plumbing, sheet metal, painting, demolition, concrete masonry, welding, HVAC, and asbestos removal. The contract period is from date of award to 29 June 2021, with a minimum guarantee of $500 and maximum value of $18,000,000. The solicitation will be issued via FBO on or about 14 November 2018 to Service Disabled Veteran Owned Small Businesses, SBA certified 8(a) Small Disadvantaged Businesses, and HUBZone businesses only under NAICS 237990 with a $36.5 million size standard.

Question and Revised Answer

View the file

Other files

File Type Posted
Solicitation_Amendment_FA469019RA0030013_SF_30.pdf PDF
Atch_31_Follow_on_Q&As_26APR19.pdf PDF
Atch_20f_Bid_Schedule-25_Apr_19.doc DOC document
Solicitation_Amendment_FA469019RA0030012_SF_30.pdf PDF
Atch_30_Follow_on_Q&A_25APR19.pdf PDF
Solicitation_Amendment_FA469019RA0030011_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030010_SF_30.pdf PDF
Atch_20b_SOW_Updated_23APR19.pdf PDF
Atch_20a_GIPR_23APR19.pdf PDF
Atch_29_Follow_on_Q&As_23APR19.pdf PDF
Solicitation_Amendment_FA469019RA0030009_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030008_SF_30.pdf PDF
Atch_28_-_Follow_on_Q&As.pdf PDF
Solicitation_Amendment_FA469019RA0030007_SF_30.pdf PDF
Attach_27_bTrack_with_Contours_and_Utilities.pdf PDF
Attach_27_c_CE_Track_Manholes.pdf PDF
Solicitation_Amendment_FA469019RA0030006_SF_30.pdf PDF
Attach_27_a_Site_Vist_QAs_as_of_6_Mar_19.pdf PDF
Solicitation_Amendment_FA469019RA0030005_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030004_SF_30.pdf PDF
Atch_25_Site_Vist_Q&As_14FEB19.pdf PDF
Atch_26_X-XX_PROJECT_TITLE.dwg DWG drawing
Atch_24_Site_Visit_Minutes_24JAN19.pdf PDF
Solicitation_Amendment_FA469019RA0030003_SF_30.pdf PDF
Atch_23_Site_Visit_Minutes.pdf PDF
Solicitation_Amendment_FA469019RA0030002_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030001_SF_30.pdf PDF
Atch_20_FOPR_Construct_Bath_House_3JAN19.pdf PDF
Atch_20e_6_Percent_Limit_on_Design_Fee_for_Contractors.pdf PDF
Atch_13_NAFGeneral_Provisions-21Jan15.pdf PDF
Atch_16c_-_WD_SD180001_Heavy-Highway_6_Apr_18.pdf PDF
Atch_16a_-_WD_SD180002_Residental-Penn_5_Jan_18.pdf PDF
Atch_1_Utility_Outages.pdf PDF
Atch_7_Ellsworth_Fire_Protection.pdf PDF
Atch_10_Electrical_Systems-15_Jan_15.pdf PDF
Atch_20a_GIPR_6NOV18.pdf PDF
Atch_12_General_Provisions_-_8NOV18.pdf PDF
Atch_20b_SOW_6NOV18.pdf PDF
Atch_16b_-_WD_SD180006_Residental-Meade_5_Jan_18.pdf PDF
Atch_11_Underground_Electrical_20Aug15.pdf PDF
Solicitation_-_FA469019RA003.pdf PDF
Atch_22,_SECTION_M_-_EVALUATION_BASIS_FOR_AWARD_2JAN19.pdf PDF
Atch_20g_AF_Form_3052.xls XLS spreadsheet
Atch_20c_Drawing_1_Track_Utilities_Latrine_6NOV18.pdf PDF
Atch_20_FOPR_Construct_Bath_House.pdf PDF
Atch_20d_RMD_KTR_to_Complete.pdf PDF
Atch_4_Spec_Section_01000_-20_Aug_15.pdf PDF
Atch_9_Submittal_Form_3000-1_Sep_03.pdf PDF
Atch_19_Past_Performance_Questionairre.docx DOCX document
Atch_18_Past_Performance_Information.docx DOCX document
Show 40 more

Latest 50 of 96 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 60: If there are vehicles or equipment stored in the space, will an exhaust fan be required or requested?

Answer 60: The Government does not anticipate a requirement for nor is requesting an exhaust fan.

Answer 60 Revised: Natural ventilation (simple vent, not mechanical) is sufficient for the UTV storage area. Additionally, the storage area will require a one hour fire barrier separation from the bathroom area. Contractors will ensure the bathroom and storage area do not share a common ventilation system.