This document contains a Material Approval Submittal form and information about a Multiple Award Construction Contract opportunity. The Material Approval Submittal form is to be used by contractors for submitting shop drawings, equipment data, manufacturer's literature, certificates, and material samples to the government for approval in accordance with contract provisions. It requires the contractor to certify that submitted materials comply with all contract specifications.

The Multiple Award Construction Contract opportunity is a set-aside for Service Disabled Veteran Owned Small Businesses, SBA-certified 8(a) Small Disadvantaged Businesses, and HUBZone businesses. It will result in awards of indefinite delivery indefinite quantity contracts for new construction, renovation, alteration, demolition, and repair work at Ellsworth Air Force Base through June 2021. The solicitation NAICS code is 237990 with a $36.5 million size standard. The minimum guarantee is $500 per contract, with a maximum value of $18 million across all awards. The solicitation will be issued on or around November 14, 2018 via FBO; electronic submission is required.

FA469019RA003 Atch 9

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Atch_31_Follow_on_Q&As_26APR19.pdf PDF
Atch_30_Follow_on_Q&A_25APR19.pdf PDF
Atch_20b_SOW_Updated_23APR19.pdf PDF
Atch_29_Follow_on_Q&As_23APR19.pdf PDF
Solicitation_Amendment_FA469019RA0030009_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030008_SF_30.pdf PDF
Atch_28_-_Follow_on_Q&As.pdf PDF
Solicitation_Amendment_FA469019RA0030005_SF_30.pdf PDF
Atch_25_Site_Vist_Q&As_14FEB19.pdf PDF
Atch_26_X-XX_PROJECT_TITLE.dwg DWG drawing
Solicitation_Amendment_FA469019RA0030003_SF_30.pdf PDF
Atch_24_Site_Visit_Minutes_24JAN19.pdf PDF
Atch_23_Site_Visit_Minutes.pdf PDF
Atch_20_FOPR_Construct_Bath_House_3JAN19.pdf PDF
Solicitation_Amendment_FA469019RA0030001_SF_30.pdf PDF
Atch_12_General_Provisions_-_8NOV18.pdf PDF
Atch_16b_-_WD_SD180006_Residental-Meade_5_Jan_18.pdf PDF
Atch_20b_SOW_6NOV18.pdf PDF
Atch_17_Determination_of_Resp.pdf PDF
Atch_20_FOPR_Construct_Bath_House.pdf PDF
Atch_20c_Drawing_1_Track_Utilities_Latrine_6NOV18.pdf PDF
Atch_15_Non-Nuclear_Intrusion_Det.pdf PDF
Atch_20g_AF_Form_3052.xls XLS spreadsheet
Atch_4_Spec_Section_01000_-20_Aug_15.pdf PDF
Atch_20d_RMD_KTR_to_Complete.pdf PDF
Atch_18_Past_Performance_Information.docx DOCX document
Atch_22,_SECTION_M_-_EVALUATION_BASIS_FOR_AWARD_2JAN19.pdf PDF
Atch_5_Spec_Section_01800_-20_Aug_15.pdf PDF
Atch_11_Underground_Electrical_20Aug15.pdf PDF
Atch_16a_-_WD_SD180002_Residental-Penn_5_Jan_18.pdf PDF
Atch_1_Utility_Outages.pdf PDF
DRAFT_Atch_4_Spec_Section_01000_-20_Aug_15.pdf PDF
DRAFT_Atch_20d_RMD_KTR_to_Complete.pdf PDF
DRAFT_Atch_21_SECTION_L_Instructions,_Conditions,_and_Notices_to_Offerors.pdf PDF
DRAFT_Atch_12_General_Provisions_-_8NOV18.pdf PDF
DRAFT_Atch_16b_-_WD_SD180006_Residental-Meade_5_Jan_18.pdf PDF
DRAFT_Atch_20b_SOW_6NOV18.pdf PDF
DRAFT_Atch_16c_-_WD_SD180001_Heavy-Highway_6_Apr_18.pdf PDF
DRAFT_-_FA469019RA003.pdf PDF
DRAFT_Atch_8_Exterior_Signs_-_10_Jun_05.pdf PDF
DRAFT_Atch_19_PPQ.docx DOCX document
DRAFT_Atch_20f_Bid_Schedule-17_Oct_18.doc DOC document
DRAFT_Atch_13_NAFGeneral_Provisions-21Jan15.pdf PDF
DRAFT_Atch_16e_-_WD_SD180035_Building-Penn_5_Jan_18.pdf PDF
DRAFT_Atch_20_FOPR_Construct_Bath_House.docx DOCX document
DRAFT_Atch_18_Past_Performance_Information.docx DOCX document
DRAFT_Atch_17_Determination_of_Resp.pdf PDF
DRAFT_Atch_7_Ellsworth_Fire_Protection.pdf PDF
DRAFT_Atch_16d_-_WD_SD180033_Building-Meade_5_Jan_18.pdf PDF
DRAFT_Atch_20e_6_Percent_Limit_on_Design_Fee_for_Contractors.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For Evaluation and Action

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

Form Approved OMB No 9000-0062 Expires May 31, 2005

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCP, 1060 Air Force Pentagon, Washington DC 20330-1060.

TO: (Contracting Officer) FROM: (Contractor) DATE

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

NEW RESUBMITTAL

PREVIOUS SUBMISSION NUMBER PROJECT NUMBER

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

ITEM SPECIFICATION SECTION/ DESCRIPTION OF MATERIAL AP-

PROVED

DISAP-

PROVED

SEE

REVERSE INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.

DATE TYPE OR PRINT NAME AND TITLE SIGNATURE

FOR GOVERNMENT USE ONLY

TO: (Base Civil Engineering Officer)

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

TO: (AF Contracting Office)

RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

TO: (Contractor)

DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUEST

APPROVED

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN DAYS OF DATE SHOWN BELOW.

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE.

NO. PARA NO./DRAWING NO. (Include Type, Model Number, Catalog Number, Mfg., etc.)

COMMENTS

(Number to correspond with applicable Item Number on reverse)

INSTRUCTIONS TO CONTRACTORS

1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.

4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No.". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

AF IMT 3000, 20030901, V1 (REVERSE)