Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx
Air Force Form XLSX spreadsheet 32 KB Posted
- Attached to
- Repair Rooms, Building 1410 Gunter
- Solicitation number
- FA330024R0004
About this file
This document contains a construction cost estimate breakdown for repair work at Building 1410 on Maxwell Air Force Base. The estimate provides unit costs and quantities for removing carpeting and installing luxury vinyl tile flooring in one dormitory room. It includes costs for removing baseboards, installing new baseboards and corners, flooring adhesive, and labor. The total estimated cost for the flooring replacement is $1,981. The related federal contract opportunity is solicitation number FA330024R0004 to repair rooms at Building 1410 on Gunter Air Force Base. The solicited work includes repairing dormitory rooms and replacing flooring. The soliciting agency is the Department of the Air Force Air Education and Training Command.
View the file
Other versions and copies of AF Form 3052
Show all 20
Who attaches AF Form 3052
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total
CONSTRUCTION COST ESTIMATE BREAKDOWN
| CONTRACTOR | DATE | ADDRESS | ||||||
| 181 East Maxwell Blvd, Maxwell Air Force Base, Alabama | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Repair Rooms, PP Dorm, Building 1410 | $0.00 | |||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| Gunter Building 1410 | JUBJ 23-4706 / 13406422 | Maxwell AFB | ||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | AVERAGE | DIRECT | LINE | |||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | ||||||||
| Dumpter, weekly rental, 1 dump/week, 40 CY | $0.00 | |||||||
| 40'x8' Storage Box, rent per month x each | ||||||||
| Remove Cove Base | LF | $0.00 | $0.00 | $0.00 | ||||
| Remove Molded Corners | EA | $0.00 | $0.00 | |||||
| Demolition in mold contaminated area, ceiling, gypsum board | SF | $0.00 | $0.00 | |||||
| Demolition in mold contaminated area | SF | $0.00 | $0.00 |
| DIVISION 2 (Site Work) | $0.00 | $0.00 | $0.00 | ||
| DIVISION 3 (CONCRETE | $0.00 | $0.00 | $0.00 | ||
| DIVISION 4 (MASONRY) | $0.00 | $0.00 | $0.00 | ||
| DIVISION 5 (METAL) | $0.00 | $0.00 | $0.00 | ||
| DIVISION 6 (WOOD AND PLASTICS) | $0.00 | $0.00 | $0.00 | ||
| DIVISION 7 (THERMAL AND MOISTURE PROTECTION) | $0.00 | $0.00 | $0.00 | ||
| DIVISION 8 (DOORS AND WINDOWS) | $0.00 | $0.00 | $0.00 | ||
| Pipe Chase Access Doors 18x18 | EA | $0.00 | $0.00 | $0.00 | $0.00 |
| Door seal | EA | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVISION 9 (FINISHES) | $0.00 | $0.00 | $0.00 | ||
| install 5/8" Type X Gyp. Bd. at walls, w/ compound skim coat (level 5 finish) | SF | $0.00 | $0.00 | $0.00 | $0.00 |
| install 5/8" Type X Gyp. Bd. at ceilings | SF | $0.00 | $0.00 | $0.00 | $0.00 |
| Paint Door Frames Only (Interior) | EA | $0.00 | $0.00 | $0.00 | $0.00 |
| Patch Walls | SF | $0.00 | $0.00 | $0.00 | $0.00 |
| Prepare Walls | SF | $0.00 | $0.00 | $0.00 | $0.00 |
| Cut-In Walls w/ Brush- Walls (2 Coats) | LF | $0.00 | $0.00 | $0.00 | $0.00 |
| Cut-In Walls w/ Brush- Ceilings (2 Coats), Add 25% | LF | $0.00 | $0.00 | $0.00 | $0.00 |
| Paint Walls (2 Coats) | SF | $0.00 | $0.00 | $0.00 | $0.00 |
| Paint Ceilings, Add 25% | SF | $0.00 | $0.00 | $0.00 | $0.00 |
| LVT Planks | SF | $0.00 | $0.00 | $0.00 | $0.00 |
| New 4" Cove Base | LF | $0.00 | $0.00 | $0.00 | $0.00 |
| Molded Corners, 4" Cove Base | EA | $0.00 | $0.00 | $0.00 | $0.00 |
| Flooring Adhesive for LVT, 4 gallon bucket | EA | $0.00 | $0.00 | $0.00 | |
| Cove Base Adjesive | EA | $0.00 | $0.00 | $0.00 | |
| Uninstall lavatory base cabinet | EA | $0.00 | $0.00 | ||
| Install lavatory base cabinet | EA | $0.00 | $0.00 | ||
| DIVISION 10 (SPECIALTIES) | $0.00 | $0.00 | $0.00 | ||
| DIVISION 11 (EQUIPMENT) | $0.00 | $0.00 | $0.00 | ||
| DIVISION 12 (FURNISHINGS) | $0.00 | $0.00 | $0.00 | ||
| DIVISION 13 (SPECIAL CONSTRUCTION) | $0.00 | $0.00 | $0.00 | ||
| DIVISION 14 (CONVEYING SYSTEMS) | $0.00 | $0.00 | $0.00 | ||
| DIVISION 15 (MECHANICAL) | $0.00 | $0.00 | $0.00 | ||
| Uninstall sink and facuet (min. charge) | LS | $0.00 | $0.00 | ||
| Install sink and facuet (min. charge) | LS | $0.00 | $0.00 | ||
| Pipe 1" | LF | $0.00 | $0.00 | $0.00 | |
| 1-1/2" ON 1" | LF | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVISION 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) | $0.00 | $0.00 | |||
| Install black cover plates | EA | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | |||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | |||
| Material Costs | $0.00 | $0.00 | |||
| Tax on Materials | 10% | $0.00 | $0.00 | ||
| TOTAL MATERIAL COST | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| Labor Cost | $0.00 | $0.00 | |||
| Insurance & Tax on Labor | 10% | $0.00 | $0.00 | ||
| TOTAL LABOR COST | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| Total Other Direct Costs | $0.00 | $0.00 | $0.00 | ||
| Total Material, Labor, Tax & Insurance | $0.00 | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | |||
| Overhead | 15% | $0.00 | $0.00 | $0.00 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |
| Profit | 10% | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | $0.00 | |||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| Bonds | 2.5% | $0.00 | $0.00 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| I acknowledge the above cost estimate has been estimated to the best of my ability and means. |
Signature: ______________________________________
Calcs to CE
| Renew dorm rooms | 0.0 | ||||||||||||||||
| Replace flooring (Per Dorm Room) | 1981.0 | ||||||||||||||||
| 20.0 | |||||||||||||||||
| 39620.0 | |||||||||||||||||
| 39620.0 | |||||||||||||||||
| LVT Flooring | |||||||||||||||||
| SF | |||||||||||||||||
| Typ. Dorm Rm | 206.0 | Sf | for flooring | 9.0 | |||||||||||||
| 9.0 | |||||||||||||||||
| 1854.0 | |||||||||||||||||
| Office | 207.0 | ||||||||||||||||
| Comm | 19.0 | ||||||||||||||||
| Storage 129 & 130 | 402.0 | ||||||||||||||||
| 2482.0 | |||||||||||||||||
| RB | LF | Corners | |||||||||||||||
| Typ. Dorm Rm | 73.0 | 18.0 | |||||||||||||||
| 9.0 | 9.0 | ||||||||||||||||
| 657.0 | 162.0 | ||||||||||||||||
| Office | 197.0 | 14.0 | |||||||||||||||
| Comm | 15.0 | 4.0 | |||||||||||||||
| Storage 129 & 130 | 109.0 | 25.0 | |||||||||||||||
| 978.0 | LF | 205.0 | |||||||||||||||
| Perimeter Wall | 80.5 | LF | for painting | ||||||||||||||
| Cut-In | |||||||||||||||||
| Cut-In/Wall Area from Flr | Dorm Rms | Area | Office | Comm | Storage | TLT RMS | |||||||||||
| Perimeter | 80.5 | 71.0 | 18.0 | 120.0 | 21.0 | ||||||||||||
| Height up to six feet | 6.0 | 483.0 | 6.0 | 426.0 | 6.0 | 108.0 | 6.0 | 720.0 | 6.0 | 126.0 | |||||||
| Number of corners | 18.0 | 14.0 | 4.0 | 25.0 | 6.0 | ||||||||||||
| 108.0 | 84.0 | 24.0 | 150.0 | 36.0 | |||||||||||||
| Total LF per Dorm Rm | 188.5 | 155.0 | 42.0 | 270.0 | 57.0 | ||||||||||||
| 9 rms | 9.0 | 9.0 | 6.0 | ||||||||||||||
| Total LF for Dorm Rms | 1696.5 | 4347.0 | 342.0 | ||||||||||||||
| LF to Cut-in | 2505.5 | 5727.0 | SF | ||||||||||||||
| Cut-In | |||||||||||||||||
| Cut-In/Wall Area on Ladder | Dorm Rms | Office | Comm | Storage | TLT RMS | ||||||||||||
| Perimeter per Dorm Rm | 80.5 | 71.0 | 18.0 | 120.0 | 21.0 | ||||||||||||
| Length above six feet | 3.0 | 241.5 | 3.0 | 213.0 | 3.0 | 54.0 | 3.0 | 360.0 | 3.0 | ||||||||
| Number of corners | 18.0 | 14.0 | 4.0 | 25.0 | 6.0 | ||||||||||||
| 54.0 | 42.0 | 12.0 | 75.0 | 18.0 | |||||||||||||
| Total LF per Dorm Rm on Ladder | 134.5 | 113.0 | 30.0 | 195.0 | 39.0 | ||||||||||||
| 9 rms | 9.0 | 9.0 | 6.0 | ||||||||||||||
| Total LF for Dorm Rms on Ladder | 1210.5 | 2173.5 | 234.0 | ||||||||||||||
| LF | 1782.5 | 2800.5 | SF | ||||||||||||||
| 120.0 | 120.0 | ||||||||||||||||
| 1902.5 | 120.0 | ||||||||||||||||
| 8527.5 | 2.0 | ||||||||||||||||
| 2.0 | |||||||||||||||||
| 244.0 | |||||||||||||||||
| paint clgs | 9.0 | ||||||||||||||||
| Dorm Rms | Area | Office | Comm | Storage | 2196.0 | ||||||||||||
| Area per Dorm Rm | 80.5 | 71.0 | 18.0 | 120.0 | 21.0 | ||||||||||||
| 6.0 | |||||||||||||||||
| 126.0 | |||||||||||||||||
| Flr Area for Flring | 2482.0 | ||||||||||||||||
| Paint Door Frames | Total Clgs to Paint | 2608.0 | |||||||||||||||
| Exterior Doors | 12.0 | ||||||||||||||||
| Bathroom Doors | 11.0 | ||||||||||||||||
| Comm | 1.0 | ||||||||||||||||
| Closet Doors | 18.0 | ||||||||||||||||
| 42.0 | |||||||||||||||||
| Total Gyp. Bd. Area to Replace | |||||||||||||||||
| Area of end walls | |||||||||||||||||
| length | 9.5 | ||||||||||||||||
| Ht | 8.5 | ||||||||||||||||
| 80.75 | |||||||||||||||||
| Total end walls | 5.0 | ||||||||||||||||
| Total Area of End Wall | 403.75 | ||||||||||||||||
| Closets | |||||||||||||||||
| length | 11.5 | SF of clg | 8.0 | ||||||||||||||
| Ht | 8.5 | 6.0 | |||||||||||||||
| 97.75 | 48.0 | ||||||||||||||||
| Total closets | 6.0 | ||||||||||||||||
| Total Area of Closets | 586.5 | Dorm rm 123 | |||||||||||||||
| 207.0 | |||||||||||||||||
| Side wall 1 | |||||||||||||||||
| length | 7.0 | ||||||||||||||||
| Ht | 10.0 | ||||||||||||||||
| 70.0 | |||||||||||||||||
| Total side wall 1 | 4.0 | ||||||||||||||||
| Total Area of Side wall 1 | 280.0 | ||||||||||||||||
| Side wall 2 | |||||||||||||||||
| length | 7.667 | ||||||||||||||||
| Ht | 10.0 | ||||||||||||||||
| 76.67 | |||||||||||||||||
| Total side wall 2 | 3.0 | ||||||||||||||||
| Total Area of Side Wall 2 | 230.01 | ||||||||||||||||
| Side wall 3 | |||||||||||||||||
| length | 20.0 | ||||||||||||||||
| Ht | 10.0 | ||||||||||||||||
| 200.0 | |||||||||||||||||
| Total side wall 3 | 3.0 | ||||||||||||||||
| Total Area of Side Wall 3 | 600.0 | ||||||||||||||||
| Tolet Rms | |||||||||||||||||
| length | 21.333 | TLT RM 123 | |||||||||||||||
| Ht | 8.5 | 21.0 | |||||||||||||||
| 181.33049999999997 | |||||||||||||||||
| Total closets | 1.0 | ||||||||||||||||
| Total Area of Closets | 181.33049999999997 | ||||||||||||||||
| 2281.5905000000002 | 276.0 | ||||||||||||||||
| Wall Area To Paint | Dorm Rms | Area | Office | Comm | Storage | TLT RMS | |||||||||||
| Perimeter | 80.5 | 71.0 | 18.0 | 120.0 | 21.0 | ||||||||||||
| Height up to six feet | 9.0 | 724.5 | 9.0 | 639.0 | 9.0 | 162.0 | 9.0 | 1080.0 | 8.0 | 168.0 | |||||||
| Number of corners | 18.0 | 14.0 | 4.0 | 25.0 | 6.0 | ||||||||||||
| 162.0 | 126.0 | 36.0 | 225.0 | 48.0 | |||||||||||||
| Total LF per Dorm Rm | 242.5 | 197.0 | 54.0 | 345.0 | 69.0 | ||||||||||||
| 9 rms | 9.0 | 9.0 | 6.0 | ||||||||||||||
| Total LF for Dorm Rms | 2182.5 | 6520.5 | 414.0 | ||||||||||||||
| LF to Cut-in | 3192.5 | 8569.5 | SF |
Unit Cost Per Dorm Rm for LVT
CONSTRUCTION COST ESTIMATE BREAKDOWN
| CONTRACTOR | DATE | ADDRESS | ||||||||
| 20230831 | 181 East Maxwell Blvd, Maxwell Air Force Base, Alabama | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| Unit Cost To Replace Carpet w/ LVT | $1,981.00 | |||||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||||
| Maxwell Building 1410 | PNQS 23-4706 / 13406422 | Maxwell AFB | ||||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||||
| UNIT | AVERAGE | DIRECT | LINE | |||||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||||
| DIVISION 1 (General Requirements) | ||||||||||
| Remove carpet, bonded, include surface scraping | SF | 207 | $0.25 | $51.75 | $5.18 | $56.93 | ||||
| Remove Cove Base | LF | 63 | $0.00 | $0.96 | $60.48 | $6.05 | $66.53 | |||
| Remove Molded Corners | EA | 16 | $0.96 | $15.36 | $1.54 | $16.90 | 125000.0 | |||
| DIVISION 2 (Site Work) | $0.00 | $0.00 | $0.00 | 78.0 | ||||||
| DIVISION 3 (CONCRETE | $0.00 | $0.00 | $0.00 | 1602.5641025641025 | ||||||
| DIVISION 4 (MASONRY) | $0.00 | $0.00 | $0.00 | |||||||
| DIVISION 5 (METAL) | $0.00 | $0.00 | $0.00 | |||||||
| DIVISION 6 (WOOD AND PLASTICS) | $0.00 | $0.00 | $0.00 | |||||||
| DIVISION 7 (THERMAL AND MOISTURE PROTECTION) | $0.00 | $0.00 | $0.00 | |||||||
| DIVISION 8 (DOORS AND WINDOWS) | $0.00 | $0.00 | $0.00 | |||||||
| DIVISION 9 (FINISHES) | $0.00 | $0.00 | $0.00 | |||||||
| LVT Planks | SF | 207 | $1.90 | $393.30 | $2.00 | $414.00 | $80.73 | $888.03 | ||
| New 4" Cove Base | LF | 63 | $0.94 | $59.22 | $0.95 | $59.85 | $11.91 | $130.98 | ||
| Molded Corners, 4" Cove Base | EA | 16 | $2.70 | $43.20 | $0.95 | $15.20 | $5.84 | $64.24 | ||
| Flooring Adhesive for LVT, 4 gallon bucket | EA | 1 | $150.00 | $150.00 | $15.00 | $165.00 | ||||
| Cove Base Adjesive | EA | 2 | $5.25 | $10.50 | $1.05 | $11.55 | ||||
| DIVISION 10 (SPECIALTIES) | $0.00 | $0.00 | $0.00 | |||||||
| DIVISION 11 (EQUIPMENT) | $0.00 | $0.00 | $0.00 | |||||||
| DIVISION 12 (FURNISHINGS) | $0.00 | $0.00 | $0.00 | |||||||
| DIVISION 13 (SPECIAL CONSTRUCTION) | $0.00 | $0.00 | $0.00 | |||||||
| DIVISION 14 (CONVEYING SYSTEMS) | $0.00 | $0.00 | $0.00 | ERROR:#REF! | ||||||
| DIVISION 15 (MECHANICAL) | $0.00 | $0.00 | $0.00 | |||||||
| DIVISION 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| TOTAL | $656.22 | $616.64 | $127.29 | $1,400.15 | ||||||
| $0.00 | $0.00 | $0.00 | 18.0 | |||||||
| Material Costs | $0.00 | $656.22 | ||||||||
| Tax on Materials | 10% | $0.00 | $65.62 | |||||||
| TOTAL MATERIAL COST | $0.00 | $721.84 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| Labor Cost | $0.00 | $616.64 | ||||||||
| Insurance & Tax on Labor | 10% | $0.00 | $61.66 | |||||||
| TOTAL LABOR COST | $0.00 | $678.30 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| Total Other Direct Costs | $0.00 | $0.00 | $127.29 | |||||||
| Total Material, Labor, Tax & Insurance | $0.00 | $1,400.15 |
| TOTAL DIRECT COSTS | $0.00 | $0.00 | $1,527.43 | ||
| $0.00 | $0.00 | $0.00 | |||
| Overhead | 15% | $0.00 | $0.00 | $229.11 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $1,756.55 | |
| Profit | 10% | $0.00 | $0.00 | $175.65 | |
| Sub Total | $0.00 | $1,932.20 | |||
| TOTAL | $0.00 | $0.00 | $1,932.20 | ||
| Bonds | 2.5% | $0.00 | $48.31 | ||
| TOTAL | $0.00 | $0.00 | $1,981.00 | ||
| I acknowledge the above cost estimate has been estimated to the best of my ability and means. |
Signature: ______________________________________ Gov't Coord___________________________________