31 - AF Form 3052 Cost Estimate Template.xlsx

Air Force Form XLSX spreadsheet 74 KB Posted

Attached to
SABER IDIQ
Solicitation number
FA486125R0003
Issued by

About this file

This is an Air Force Form 3052 Cost Estimate Template for construction projects, specifically designed for detailed cost breakdown at Creech Air Force Base. The multi-sheet Excel template provides a structured format for contractors to itemize costs across material, labor, and other direct cost categories, with columns for line items, unit of measure, quantity, unit costs, and total costs. The template includes comprehensive instructions for completing each column, specifying how to document materials, labor hours, equipment, and other project-specific expenses.

The template is linked to the SABER IDIQ (Simplified Acquisition for Base Engineering Requirements) solicitation, which is a competitive HUBZone procurement for design and construction projects at Nellis Air Force Base and associated locations. The IDIQ contract has a maximum ceiling of $185 million over five years, with individual task orders ranging from $15,000 to $4,000,000. Task orders will cover a wide range of construction and repair activities including carpentry, road repair, roofing, electrical, HVAC, plumbing, demolition, and infrastructure alterations. The solicitation is limited to qualified HUBZone firms, with proposals due by 11 November 2025.

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Same revision and size as this file Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
AF Form 3052 (BLANK).xlsx Revision not stated Solicitation for LPS Bldg 5415
Show all 20

Who attaches AF Form 3052

Other files

File Type Posted
Solicitation Amendment FA486125R00030017 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030017.pdf PDF
Atch 80_ RFI Response Log_General Solicitation 9 March 2026.xlsx XLSX spreadsheet
Solicitation Amendment FA486125R00030016 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030016.pdf PDF
Solicitation Amendment - FA486125R00030015.pdf PDF
Solicitation Amendment FA486125R00030015 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030014.pdf PDF
3 - Self Scoring Matrix 17 Feb 26.xlsx XLSX spreadsheet
Solicitation Amendment FA486125R00030014 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030013.pdf PDF
Solicitation Amendment FA486125R00030013 SF 30.pdf PDF
Attach 79 RFI Log SABER Seed 29 Jan 2026_.xlsx XLSX spreadsheet
Att 78 RFI Log Additional Responses General Solicitation 27 Jan 2026_.xlsx XLSX spreadsheet
Att 3 -Self Scoring Matrix 3_Feb_2026.xlsx XLSX spreadsheet
44- SABER SOO RKMF240010 Renovate Honor Guard 99 FSS B10250_28January2026 (003).pdf PDF
Solicitation Amendment FA486125R00030012 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030012.pdf PDF
Solicitation Amendment FA486125R00030011 SF 30 .pdf PDF
1 - SABER SOW 7 Jan 2026.pdf PDF
Solicitation Amendment - FA486125R00030011.pdf PDF
2 - Price Schedule _13 Jan 2026.xlsx XLSX spreadsheet
3 - Self Scoring Matrix 7_Jan 26.xlsx XLSX spreadsheet
77 - RFI Response Log SABER Seed Related _ 13_Jan 2026.xlsx XLSX spreadsheet
Solicitation Amendment - FA486125R00030010.pdf PDF
44 -Statement of Objectives (SOO) for RKMF 240010 20 Nov 25.pdf PDF
Attach 75 SABER Seed Attachment 19 - B10250 comm room.pdf PDF
Attach 74 SABER Seed Attachment 18 - Knox Box Location.pdf PDF
73 - Task Order Pricing Letter _ Gordian System Licens Fees 5 percent and 1.95 percent.pdf PDF
1- SABER SOW 7 Jan 2025 .pdf PDF
76 - RFI Response Log General Solicitation 13_Jan 26.xlsx XLSX spreadsheet
Solicitation Amendment FA486125R00030010 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030009.pdf PDF
Solicitation Amendment FA486125R00030009_SF 30.pdf PDF
Solicitation Amendment FA486125R00030007 SF 30.pdf PDF
Solicitation Amendment FA486125R00030006 SF 30.pdf PDF
(Attachment 65) SABER Seed SOO Honor Guard Building 10250 Attachment 12 - Mech. Room Report.pdf PDF
(Attachment 66) SABER Seed SOO Honor Guard Building 10250 Attachment 13 - Asbestos and Lead testing building history.xlsx XLSX spreadsheet
Solicitation Amendment - FA486125R00030006.pdf PDF
Attachment 72 SABER IDIQ Preproposal Sign In Sheet 29 October 2025 FA486125R0003.pdf PDF
(Attachment 63) SABER Seed SOO Honor Guard Building 10250 Attachment 10 - Asbestos and Lead testing dated 24 February 2014.pdf PDF
(Attachment 68) SABER Seed SOO Honor Guard Building 10250 Attachment 15 - B10250 room numbers.pdf PDF
(Attachment 55) SABER Seed SOO Honor Guard Building 10250 Attachment 1 - HAZMAT Results 10250 Restrooms Part 1.pdf PDF
(Attachment 58) SABER Seed SOO Honor Guard Building 10250 Attachment 5 - Attachment 5 AFGIMS Utilities Snapshot.pdf PDF
(Attachment 69) SABER Seed SOO Honor Guard Building 10250 Attachment 16 - 10250 BFP Device replacement.png PNG image
(Attachment 57) SABER Seed SOO Honor Guard Building 10250 Attachment 3 - As-Builts 65 LOCATION and GRADING.pdf PDF
(Attachment 70) SABER Seed SOO Honor Guard Building 10250 Attachment 17 - Double Check Valve Assembly.pdf PDF
(Attachment 60) SABER Seed SOO Honor Guard Building 10250 Attachment 7 - Sewer Line with Measurements and Pictures.pdf PDF
Attachment 71 SABER IDIQ Preproposal Conference Slides 29 October 2025 FA486125R0003.pptx PPTX presentation
(Attachment 61) SABER Seed SOO Honor Guard Building 10250 Attachment 8 - Asbestos and Lead testing of entire building dated 7 July 2007.pdf PDF
Show 40 more

Latest 50 of 126 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sht16

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht15

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht14

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00

SUBTOTALS $0.00 $0.00 $0.00 $0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht13

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00

SUBTOTALS $0.00 $0.00 $0.00 $0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht12

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht11

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht10

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht09

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht08

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht07

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht06

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht05

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht04

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht03

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht02

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht01

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

BACK

INSTRUCTIONS FOR COMPLETING Project Number & Project Title

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples-square yards-SY, cubic yards-CY, square
feet-SF, linear feet-LF, board feet-BF, each-EA, pound-LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be
furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract
will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for the item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract
and of significant dollar value.

Col 10 Line Total. Self-explanatory.

NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows.
TOTAL MATERIAL COSTS$0.00
SALES TAX ON MATERIALS8.25%$0.00
TOTAL LABOR COSTS$0.00
TOTAL OTHER DIRECT COSTS$0.00
TOTAL DIRECT COSTS$0.00
OVERHEAD%$0.00
PROFIT%$0.00
SUBTOTAL$0.00
BOND%$0.00
TOTAL PROJECT COST$0.00

DATE FIRM NAME 99 CES/CENMP

TITLEBY
(Signature)

INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data
(see ASPR 3-807.3(e) and 3-807.4).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and
analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate).
and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants the contracting officer, or his designated representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection
with any negotiations prior to contract award.

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .