31 - AF Form 3052 Cost Estimate Template.xlsx

XLSX spreadsheet 74 KB Posted

Attached to
SABER IDIQ
Solicitation number
FA486125R0003
Issued by

About this file

This is an Air Force Form 3052 Cost Estimate Template for construction projects, specifically designed for detailed cost breakdown at Creech Air Force Base. The multi-sheet Excel template provides a structured format for contractors to itemize costs across material, labor, and other direct cost categories, with columns for line items, unit of measure, quantity, unit costs, and total costs. The template includes comprehensive instructions for completing each column, specifying how to document materials, labor hours, equipment, and other project-specific expenses.

The template is linked to the SABER IDIQ (Simplified Acquisition for Base Engineering Requirements) solicitation, which is a competitive HUBZone procurement for design and construction projects at Nellis Air Force Base and associated locations. The IDIQ contract has a maximum ceiling of $185 million over five years, with individual task orders ranging from $15,000 to $4,000,000. Task orders will cover a wide range of construction and repair activities including carpentry, road repair, roofing, electrical, HVAC, plumbing, demolition, and infrastructure alterations. The solicitation is limited to qualified HUBZone firms, with proposals due by 11 November 2025.

View the file

Other files

File Type Posted
Atch 80_ RFI Response Log_General Solicitation 9 March 2026.xlsx XLSX spreadsheet
Solicitation Amendment FA486125R00030013 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030011.pdf PDF
Solicitation Amendment FA486125R00030010 SF 30.pdf PDF
Attach 74 SABER Seed Attachment 18 - Knox Box Location.pdf PDF
Attach 75 SABER Seed Attachment 19 - B10250 comm room.pdf PDF
76 - RFI Response Log General Solicitation 13_Jan 26.xlsx XLSX spreadsheet
(Attachment 63) SABER Seed SOO Honor Guard Building 10250 Attachment 10 - Asbestos and Lead testing dated 24 February 2014.pdf PDF
Attachment 71 SABER IDIQ Preproposal Conference Slides 29 October 2025 FA486125R0003.pptx PPTX presentation
Solicitation Amendment FA486125R00030006 SF 30.pdf PDF
Solicitation Amendment FA486125R00030005 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030005.pdf PDF
Solicitation Amendment FA486125R00030004 SF 30.pdf PDF
Solicitation Amendment - FA486125R00030002.pdf PDF
Attachment 54 Gordian SABER CTC.pdf PDF
Attachment 52 Nellis AFB Base Pass Request.xlsx XLSX spreadsheet
Atch 41 NV20250038 19Sep25 Bldg Clark.pdf PDF
Atch 43 NV20250001 1Aug25 NTTR.pdf PDF
1 - SABER SOW 25 Sep 25.pdf PDF
4 - PPQ _PAST_PERFORMANCE_QUESTIONNAIRE FA486125R0003.pdf PDF
7 - Nellis-Creech Electrical Req 2023-10-17.pdf PDF
10_Nellis-Creech Utility Meter Req 2019-09-13.pdf PDF
11_Nellis-Creech Plant List.pdf PDF
13 - Work Clearance Triggers.pdf PDF
16_USAF Integrated Cultural Resources Mgmt Plan 32-7065 ICRMP - 06 Nov 2019.pdf PDF
19_UF3.PC Concrete Pad for Three Phase Requirement - Aug 2016.pdf PDF
20_UT1-UT5 Modified Trenching Drawing - Aug 2016.pdf PDF
24_UG3.3 Three Phase Six Bushing Pad-mounted Transformer - Aug 2016.pdf PDF
35 - AF 66 Schedule of Material Submittals.xlsx XLSX spreadsheet
36 - AF 3000 Material Approval Submittal - 01 Sep 2003.pdf PDF
38_NTTR Automated Information System _AIS_ Equipment Form.pdf PDF
41 - General Decision Number_NV20240038 Building Clark County.pdf PDF
44- SABER SOO RKMF240010 Renovate Honor Guard 99 FSS B10250_14Feb2025.pdf PDF
45 - Attachment Contract Information Sheet.pdf PDF
46 - Example SABER Design Intent Drawing Set Level 1_20 Nov.pdf PDF
49 - As-Builts.pdf PDF
Solicitation - FA486125R0003.pdf PDF
8_Nellis-Creech Lighting Req 2019-01-22.pdf PDF
12 - Env Permit-ATP Guidance 2023.pdf PDF
15 - Hazardous Material Management Guidance Document 2023-06-03.pdf PDF
18 - Nellis Supplement to DAFI 31-218 Motor Vehicle Traffic Supervision - 23 Mar 2023.pdf PDF
23_Power Trench Sand and Backfill Requirements - Apr 2013.pdf PDF
27 - NTTR Visit Request - 27 Jan 2023.pdf PDF
28 - Nuclear Gauge Form 1.xlsx XLSX spreadsheet
29 - Nuclear Gauge Form 2.docx DOCX document
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf PDF
39 - Form SS-PER-007-003 Internal Combustion Engine Worksheet.pdf PDF
42 - General Decision Number NV20240001 Bldg NTTR.pdf PDF
47 - Example SABER Design Intent Drawing Set Level 2_20 Nov.pdf PDF
52 - 99 SFS - Mass Pass Request Template.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sht16

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht15

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht14

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00

SUBTOTALS $0.00 $0.00 $0.00 $0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht13

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00

SUBTOTALS $0.00 $0.00 $0.00 $0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht12

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht11

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht10

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht09

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht08

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht07

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht06

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht05

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht04

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht03

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht02

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Government Estimate0
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
0$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
RKMF 0Creech Air Force Base
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Sht01

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
$0
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMUOMQTYUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

BACK

INSTRUCTIONS FOR COMPLETING Project Number & Project Title

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples-square yards-SY, cubic yards-CY, square
feet-SF, linear feet-LF, board feet-BF, each-EA, pound-LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be
furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract
will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for the item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract
and of significant dollar value.

Col 10 Line Total. Self-explanatory.

NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows.
TOTAL MATERIAL COSTS$0.00
SALES TAX ON MATERIALS8.25%$0.00
TOTAL LABOR COSTS$0.00
TOTAL OTHER DIRECT COSTS$0.00
TOTAL DIRECT COSTS$0.00
OVERHEAD%$0.00
PROFIT%$0.00
SUBTOTAL$0.00
BOND%$0.00
TOTAL PROJECT COST$0.00

DATE FIRM NAME 99 CES/CENMP

TITLEBY
(Signature)

INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data
(see ASPR 3-807.3(e) and 3-807.4).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and
analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate).
and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants the contracting officer, or his designated representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection
with any negotiations prior to contract award.

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY