Atch_28_-_Follow_on_Q&As.pdf

PDF 40 KB Posted

Attached to
Multiple Award Construction Contract (MACC)
Solicitation number
FA469019RA003
Issued by

About this file

This document contains questions and answers related to a solicitation for a Multiple Award Construction Contract (MACC) On-Ramp at Ellsworth Air Force Base. The solicitation will provide for indefinite delivery indefinite quantity construction contracts with a target of awarding to three small businesses. Work will include new construction, renovation, alteration, demolition, and repair on a design-build or design-bid-build basis. The contract period is from date of award to June 2021, with a minimum value of $500 and maximum of $18 million. The North American Industry Classification System code is 237990 and annual size standard is $36.5 million. This is a service-disabled veteran-owned small business, SBA 8(a), and HUBZone set-aside. The solicitation will be issued on the Federal Business Opportunities website.

Attachment 28 Q&As

View the file

Other files

File Type Posted
Atch_32_-_Follow_on_Q&A_Updated_1MAY19.pdf PDF
Solicitation_Amendment_FA469019RA0030013_SF_30.pdf PDF
Atch_31_Follow_on_Q&As_26APR19.pdf PDF
Atch_20f_Bid_Schedule-25_Apr_19.doc DOC document
Solicitation_Amendment_FA469019RA0030012_SF_30.pdf PDF
Atch_30_Follow_on_Q&A_25APR19.pdf PDF
Solicitation_Amendment_FA469019RA0030011_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030010_SF_30.pdf PDF
Atch_20b_SOW_Updated_23APR19.pdf PDF
Atch_20a_GIPR_23APR19.pdf PDF
Atch_29_Follow_on_Q&As_23APR19.pdf PDF
Solicitation_Amendment_FA469019RA0030009_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030008_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030007_SF_30.pdf PDF
Attach_27_bTrack_with_Contours_and_Utilities.pdf PDF
Attach_27_c_CE_Track_Manholes.pdf PDF
Solicitation_Amendment_FA469019RA0030006_SF_30.pdf PDF
Attach_27_a_Site_Vist_QAs_as_of_6_Mar_19.pdf PDF
Solicitation_Amendment_FA469019RA0030005_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030004_SF_30.pdf PDF
Atch_25_Site_Vist_Q&As_14FEB19.pdf PDF
Atch_26_X-XX_PROJECT_TITLE.dwg DWG drawing
Atch_24_Site_Visit_Minutes_24JAN19.pdf PDF
Solicitation_Amendment_FA469019RA0030003_SF_30.pdf PDF
Atch_23_Site_Visit_Minutes.pdf PDF
Solicitation_Amendment_FA469019RA0030002_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030001_SF_30.pdf PDF
Atch_20_FOPR_Construct_Bath_House_3JAN19.pdf PDF
Atch_20e_6_Percent_Limit_on_Design_Fee_for_Contractors.pdf PDF
Atch_13_NAFGeneral_Provisions-21Jan15.pdf PDF
Atch_16c_-_WD_SD180001_Heavy-Highway_6_Apr_18.pdf PDF
Atch_16a_-_WD_SD180002_Residental-Penn_5_Jan_18.pdf PDF
Atch_1_Utility_Outages.pdf PDF
Atch_7_Ellsworth_Fire_Protection.pdf PDF
Atch_10_Electrical_Systems-15_Jan_15.pdf PDF
Atch_20a_GIPR_6NOV18.pdf PDF
Atch_12_General_Provisions_-_8NOV18.pdf PDF
Atch_20b_SOW_6NOV18.pdf PDF
Atch_16b_-_WD_SD180006_Residental-Meade_5_Jan_18.pdf PDF
Atch_11_Underground_Electrical_20Aug15.pdf PDF
Solicitation_-_FA469019RA003.pdf PDF
Atch_22,_SECTION_M_-_EVALUATION_BASIS_FOR_AWARD_2JAN19.pdf PDF
Atch_20g_AF_Form_3052.xls XLS spreadsheet
Atch_20c_Drawing_1_Track_Utilities_Latrine_6NOV18.pdf PDF
Atch_20_FOPR_Construct_Bath_House.pdf PDF
Atch_20d_RMD_KTR_to_Complete.pdf PDF
Atch_4_Spec_Section_01000_-20_Aug_15.pdf PDF
Atch_9_Submittal_Form_3000-1_Sep_03.pdf PDF
Atch_19_Past_Performance_Questionairre.docx DOCX document
Atch_18_Past_Performance_Information.docx DOCX document
Show 40 more

Latest 50 of 96 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 45: What is the minimum and maximum value of the MACC on-ramp?

Answer 45: See block 10 of the solicitation for the minimum and maximum value of the MACC on-ramp.

Question 46: How long is the MACC on ramp period of performance? Will contractors who are on-ramped need to recompete at the next MACC?

Answer 46: See block 10 of the solicitation for the period of performance. Yes, contractors who are on-ramped will need to compete for the next MACC contract.

Question 47: For the sample project, will the Government please provide an AutoCAD title block drawing?

Answer 47: This was included as attachment 26 to the solicitation in Amendment 4.

Question 48: Is the Government requiring a bid bond or just payment and performance bonds after award?

Answer 48: No, the Government is NOT requiring bid bond for proposal submission. Regarding payment and performance bonds, that is only required for the company that is awarded the task order. We do not require payment and performance bonds on the IDIQ, just individual task orders.

Question 49: Section L, paragraph 2.2 says that each page with proprietary information should be marked. Each page should contain the following legend at the bottom of each sheet: SOURCE SELECTION INFORMATION-- SEE FAR 2.101 and 3.104 FOR OFFICIAL USE ONLY. Does every page require this footer, or just the pages with proprietary information? If it is every page, how does that apply to our SF sheets, 65% plans and specs, and other forms that are prefilled but do not have this?

Answer 49: 1.) If your proposal has proprietary information on a specific page, that page should be marked identifying it as containing proprietary information. It is up to you to determine how you mark it as such. 2.) All pages should contain the legend at the bottom of the sheet as outlined in Section L, 2.2.

Note: This legend is not an evaluation criteria. If there are pages that you cannot edit the source selection information legend due to the formatting of the document (i.e. the design, etc.), your proposal will not be rejected simply for not including the legend at the bottom of the page.

File details come from the government source that posted it. Updated .