Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx

Air Force Form XLSX spreadsheet 43 KB Posted

Attached to
PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
Solicitation number
FA330024R0022
Issued by

About this file

This document contains a cost estimate breakdown for the federal contract opportunity solicitation number FA330024R0022 to connect fire mains at Buildings 849 and 1143 located at Maxwell Air Force Base and Gunter Annex in Montgomery, Alabama. The work includes furnishing all labor, materials, equipment and performance of work to connect the fire mains in accordance with attached specifications and drawings. A site visit is scheduled on March 13, 2024 at 10:00 AM CST for Building 849 and 1:00 PM CST for Building 1143, with attendees required to submit their names by March 12, 2024 at 12:00 PM CST. The cost estimate breakdown provides detailed estimates for materials, equipment, labor rates and costs for tasks involved in the work at each building location.

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
AF Form 3052 (BLANK).xlsx Revision not stated Solicitation for LPS Bldg 5415
Show all 20

Who attaches AF Form 3052

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTORDATEADDRESS
XXX400 Cannon Street Maxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Connect Fire Mains - SUMMARY SHEET$0.00
LOCATION (Work to be performed)PROJECT NUMBER/WORK ORDERWORK LOCATION
B849 MAFB; B1143 GunterPNQS 23-0379See Below
ITEMUNIT OF MEASUREQUANTITYMATERIAL/EQUIP. COSTSLABOR RATESOTHER
UNITAVERAGEDIRECTLINE
TOTALRATETOTALCOSTSTOTAL
SUMMARY$0.00$0.00
B1143 at Gunterlot1.0$0.00$0.00$0.00
$0.00
B849 at Maxwelllot1.0$0.00

0.0

$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00
$0.00$0.00
I acknowledge the above cost estimate has been estimated to the best of my ability and means.

PIV & TS G1143

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTORDATEADDRESS
XXX400 Cannon Street Maxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
B1143$0.00
LOCATION (Work to be performed)PROJECT NUMBER/WORK ORDERWORK LOCATION
B849 MAFB; B1143 GunterPNQS 23-0379Gunter B1143
ITEMUNIT OF MEASUREQUANTITYMATERIAL/EQUIP. COSTSLABOR RATESOTHER
UNITAVERAGEDIRECTLINE
TOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
Project Manager/superintendentMH$0.00$0.00$0.00
Pickup truckMO$0.00$0.00$0.00
Small toolsMO$0.00$0.00$0.00
ExcavatorMO$0.00$0.00
BackhoeMO$0.00$0.00
compactorMO$0.00$0.00
2T truckMO$0.00$0.00
Daily cleanupMH$0.00$0.00
$0.00$0.00
$0.00$0.00
DIVISION 13 (SPECIAL CONSTRUCTION)$0.00
NFPA 25 testing and inspectionMH$0.00$0.00$0.00
BlockingEA$0.00$0.00$0.00
6" Gate valve with PI at B1143EA$0.00$0.00$0.00
6" flanges, mech jointEA$0.00$0.00$0.00
6" bolt and gasket kitsEA$0.00$0.00$0.00
12x12x6 DI teeEA$0.00$0.00$0.00
12" flanges, mech jointEA$0.00$0.00$0.00
12" bolt and gasket kitsEA$0.00$0.00$0.00
Tamper switch and connection to FACPEA$0.00
$0.00$0.00
$0.00$0.00$0.00
6" PVC PipeLF$0.00$0.00$0.00
45-deg elbow, 6" PVCEA$0.00$0.00$0.00
Machine and hand Dig 30' trench
8hr/dig x 5 menMH$0.00$0.00$0.00
BeddingCY$0.00$0.00$0.00
Backfill and compact, new fill
with 25% shrinkCY$0.00$0.00$0.00
Waste soil to haul off Base (20 mi, 12 CY tk)CY$0.00$0.00$0.00
Topsoil, stockpileMH$0.00$0.00$0.00$0.00
Topsoil, place from stockpileMH$0.00$0.00$0.00$0.00
SeedingLot$0.00$0.00$0.00
MulchingLot$0.00$0.00$0.00
Trace Wire, #12Lf$0.00$0.00$0.00
sidewalk demoMH$0.00$0.00$0.00
concrete formsLot$0.00$0.00$0.00
concreteLot$0.00$0.00$0.00
$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00$0.00
$0.00$0.00$0.00
Material Costs$0.00$0.00
Tax on Materials10%$0.00$0.00
TOTAL MATERIAL COST$0.00$0.00
$0.00$0.00$0.00
Labor Cost$0.00$0.00
Insurance & Tax on Labor$0.00$0.00
TOTAL LABOR COST$0.00$0.00
$0.00$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00
Total Material, Labor, Tax & Insurance$0.00$0.00
TOTAL DIRECT COSTS$0.00$0.00$0.00
$0.00$0.00$0.00
Overhead$0.00$0.00$0.00
Subtotal$0.00$0.00$0.00$0.00
Profit$0.00$0.00$0.00
Sub Total$0.00$0.00
TOTAL$0.00$0.00$0.00
Bonds$0.00$0.00
TOTAL$0.00$0.00$0.00
$0.00$0.00

B849

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTORDATEADDRESS
XXX400 Cannon Street Maxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
B849$0.00
LOCATION (Work to be performed)PROJECT NUMBER/WORK ORDERWORK LOCATION
B849 MAFB; B1143 GunterPNQS 23-0379Bldg 849
ITEMUNIT OF MEASUREQUANTITYMATERIAL/EQUIP. COSTSLABOR RATESOTHER
UNITAVERAGEDIRECTLINE
TOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
Project Manager/superintendentMH$0.00$0.00$0.00
Pickup truckMO$0.00$0.00$0.00
Small toolsMO$0.00$0.00$0.00
ExcavatorMO$0.00$0.00
BackhoeMO$0.00$0.00
compactorMO$0.00$0.00
2T truckMO$0.00$0.00
Daily cleanupMH$0.00$0.00
$0.00$0.00
DIVISION 13 (SPECIAL CONSTRUCTION)$0.00
NFPA 25 TestingMH$0.00$0.00$0.00
BlockingEA$0.00$0.00$0.00
6" Gate valve with PIEA$0.00$0.00$0.00
6" flanges, mech jointEA$0.00$0.00$0.00
6" bolt and gasket kitsEA$0.00$0.00$0.00
90-deg elbow, 6" DIEA$0.00$0.00$0.00
6" PVC PipeLF$0.00$0.00$0.00
14" mech jointEA$0.00$0.00$0.00
14" bolT and gasket kitEA$0.00$0.00$0.00
14x14x6 DI teeEA$0.00$0.00$0.00
Remove 6" valve and black PIMH$0.00$0.00
Remove 6" pipe sectionMH$0.00$0.00$0.00
6" blind flangesEA$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00$0.00
Machine and hand Dig
8hr/dig x 5 menMH$0.00$0.00$0.00
BeddingCY$0.00$0.00$0.00
Backfill and compact, new fill
with 25% shrinkCY$0.00$0.00$0.00
Waste soil to haul off Base (20 mi, 12 CY tk)CY$0.00$0.00$0.00
Topsoil, stockpileMH$0.00$0.00$0.00$0.00
Topsoil, place from stockpileMH$0.00$0.00$0.00$0.00
SeedingLot$0.00$0.00$0.00
MulchingLot$0.00$0.00$0.00
Trace Wire, #12LF$0.00$0.00$0.00
Saw cut ashpaltLF$0.00$0.00$0.00
asphalt demoCY$0.00$0.00$0.00
asphaltCY$0.00$0.00$0.00
Concrete Curb-and-gutter demoMH$0.00$0.00$0.00
Concrete Curb-and-gutterLF$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00$0.00
$0.00$0.00$0.00
Material Costs$0.00$0.00
Tax on Materials10%$0.00$0.00
TOTAL MATERIAL COST$0.00$0.00
$0.00$0.00$0.00
Labor Cost$0.00$0.00
Insurance & Tax on Labor$0.00$0.00
TOTAL LABOR COST$0.00$0.00
$0.00$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00
Total Material, Labor, Tax & Insurance$0.00$0.00
TOTAL DIRECT COSTS$0.00$0.00$0.00
$0.00$0.00$0.00
Overhead$0.00$0.00$0.00
Subtotal$0.00$0.00$0.00$0.00
Profit$0.00$0.00$0.00
Sub Total$0.00$0.00
TOTAL$0.00$0.00$0.00
Bonds$0.00$0.00
TOTAL$0.00$0.00$0.00
$0.00$0.00

File details come from the government source that posted it. Updated .