Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx
Air Force Form XLSX spreadsheet 43 KB Posted
- Solicitation number
- FA330024R0022
About this file
This document contains a cost estimate breakdown for the federal contract opportunity solicitation number FA330024R0022 to connect fire mains at Buildings 849 and 1143 located at Maxwell Air Force Base and Gunter Annex in Montgomery, Alabama. The work includes furnishing all labor, materials, equipment and performance of work to connect the fire mains in accordance with attached specifications and drawings. A site visit is scheduled on March 13, 2024 at 10:00 AM CST for Building 849 and 1:00 PM CST for Building 1143, with attendees required to submit their names by March 12, 2024 at 12:00 PM CST. The cost estimate breakdown provides detailed estimates for materials, equipment, labor rates and costs for tasks involved in the work at each building location.
View the file
Other versions and copies of AF Form 3052
Show all 20
Who attaches AF Form 3052
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
CONSTRUCTION COST ESTIMATE BREAKDOWN
| CONTRACTOR | DATE | ADDRESS | ||||||
| XXX | 400 Cannon Street Maxwell Air Force Base Alabama | |||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Connect Fire Mains - SUMMARY SHEET | $0.00 | |||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| B849 MAFB; B1143 Gunter | PNQS 23-0379 | See Below | ||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | AVERAGE | DIRECT | LINE | |||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL |
| SUMMARY | $0.00 | $0.00 | |||
| B1143 at Gunter | lot | 1.0 | $0.00 | $0.00 | $0.00 |
| $0.00 | |||||
| B849 at Maxwell | lot | 1.0 | $0.00 |
0.0
| $0.00 | $0.00 | $0.00 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | |||
| I acknowledge the above cost estimate has been estimated to the best of my ability and means. |
PIV & TS G1143
CONSTRUCTION COST ESTIMATE BREAKDOWN
| CONTRACTOR | DATE | ADDRESS | |||||||
| XXX | 400 Cannon Street Maxwell Air Force Base Alabama | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| B1143 | $0.00 | ||||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | |||||||
| B849 MAFB; B1143 Gunter | PNQS 23-0379 | Gunter B1143 | |||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | ||||
| UNIT | AVERAGE | DIRECT | LINE | ||||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | |||||
| DIVISION 1 (General Requirements) | |||||||||
| Project Manager/superintendent | MH | $0.00 | $0.00 | $0.00 | |||||
| Pickup truck | MO | $0.00 | $0.00 | $0.00 | |||||
| Small tools | MO | $0.00 | $0.00 | $0.00 | |||||
| Excavator | MO | $0.00 | $0.00 | ||||||
| Backhoe | MO | $0.00 | $0.00 | ||||||
| compactor | MO | $0.00 | $0.00 | ||||||
| 2T truck | MO | $0.00 | $0.00 | ||||||
| Daily cleanup | MH | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | ||||||||
| DIVISION 13 (SPECIAL CONSTRUCTION) | $0.00 | ||||||||
| NFPA 25 testing and inspection | MH | $0.00 | $0.00 | $0.00 | |||||
| Blocking | EA | $0.00 | $0.00 | $0.00 | |||||
| 6" Gate valve with PI at B1143 | EA | $0.00 | $0.00 | $0.00 | |||||
| 6" flanges, mech joint | EA | $0.00 | $0.00 | $0.00 | |||||
| 6" bolt and gasket kits | EA | $0.00 | $0.00 | $0.00 | |||||
| 12x12x6 DI tee | EA | $0.00 | $0.00 | $0.00 | |||||
| 12" flanges, mech joint | EA | $0.00 | $0.00 | $0.00 | |||||
| 12" bolt and gasket kits | EA | $0.00 | $0.00 | $0.00 | |||||
| Tamper switch and connection to FACP | EA | $0.00 | |||||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | |||||||
| 6" PVC Pipe | LF | $0.00 | $0.00 | $0.00 | |||||
| 45-deg elbow, 6" PVC | EA | $0.00 | $0.00 | $0.00 | |||||
| Machine and hand Dig 30' trench | |||||||||
| 8hr/dig x 5 men | MH | $0.00 | $0.00 | $0.00 | |||||
| Bedding | CY | $0.00 | $0.00 | $0.00 | |||||
| Backfill and compact, new fill | |||||||||
| with 25% shrink | CY | $0.00 | $0.00 | $0.00 | |||||
| Waste soil to haul off Base (20 mi, 12 CY tk) | CY | $0.00 | $0.00 | $0.00 | |||||
| Topsoil, stockpile | MH | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Topsoil, place from stockpile | MH | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Seeding | Lot | $0.00 | $0.00 | $0.00 | |||||
| Mulching | Lot | $0.00 | $0.00 | $0.00 | |||||
| Trace Wire, #12 | Lf | $0.00 | $0.00 | $0.00 | |||||
| sidewalk demo | MH | $0.00 | $0.00 | $0.00 | |||||
| concrete forms | Lot | $0.00 | $0.00 | $0.00 | |||||
| concrete | Lot | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||||
| Material Costs | $0.00 | $0.00 | |||||||
| Tax on Materials | 10% | $0.00 | $0.00 | ||||||
| TOTAL MATERIAL COST | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| Labor Cost | $0.00 | $0.00 | |||||||
| Insurance & Tax on Labor | $0.00 | $0.00 | |||||||
| TOTAL LABOR COST | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| Total Other Direct Costs | $0.00 | $0.00 | $0.00 | ||||||
| Total Material, Labor, Tax & Insurance | $0.00 | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | ||
| Overhead | $0.00 | $0.00 | $0.00 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0.00 |
| Profit | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | $0.00 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | |
| Bonds | $0.00 | $0.00 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 |
B849
CONSTRUCTION COST ESTIMATE BREAKDOWN
| CONTRACTOR | DATE | ADDRESS | |||||||
| XXX | 400 Cannon Street Maxwell Air Force Base Alabama | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| B849 | $0.00 | ||||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | |||||||
| B849 MAFB; B1143 Gunter | PNQS 23-0379 | Bldg 849 | |||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | ||||
| UNIT | AVERAGE | DIRECT | LINE | ||||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | |||||
| DIVISION 1 (General Requirements) | |||||||||
| Project Manager/superintendent | MH | $0.00 | $0.00 | $0.00 | |||||
| Pickup truck | MO | $0.00 | $0.00 | $0.00 | |||||
| Small tools | MO | $0.00 | $0.00 | $0.00 | |||||
| Excavator | MO | $0.00 | $0.00 | ||||||
| Backhoe | MO | $0.00 | $0.00 | ||||||
| compactor | MO | $0.00 | $0.00 | ||||||
| 2T truck | MO | $0.00 | $0.00 | ||||||
| Daily cleanup | MH | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||||
| DIVISION 13 (SPECIAL CONSTRUCTION) | $0.00 | ||||||||
| NFPA 25 Testing | MH | $0.00 | $0.00 | $0.00 | |||||
| Blocking | EA | $0.00 | $0.00 | $0.00 | |||||
| 6" Gate valve with PI | EA | $0.00 | $0.00 | $0.00 | |||||
| 6" flanges, mech joint | EA | $0.00 | $0.00 | $0.00 | |||||
| 6" bolt and gasket kits | EA | $0.00 | $0.00 | $0.00 | |||||
| 90-deg elbow, 6" DI | EA | $0.00 | $0.00 | $0.00 | |||||
| 6" PVC Pipe | LF | $0.00 | $0.00 | $0.00 | |||||
| 14" mech joint | EA | $0.00 | $0.00 | $0.00 | |||||
| 14" bolT and gasket kit | EA | $0.00 | $0.00 | $0.00 | |||||
| 14x14x6 DI tee | EA | $0.00 | $0.00 | $0.00 | |||||
| Remove 6" valve and black PI | MH | $0.00 | $0.00 | ||||||
| Remove 6" pipe section | MH | $0.00 | $0.00 | $0.00 | |||||
| 6" blind flanges | EA | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | |||||||
| Machine and hand Dig | |||||||||
| 8hr/dig x 5 men | MH | $0.00 | $0.00 | $0.00 | |||||
| Bedding | CY | $0.00 | $0.00 | $0.00 | |||||
| Backfill and compact, new fill | |||||||||
| with 25% shrink | CY | $0.00 | $0.00 | $0.00 | |||||
| Waste soil to haul off Base (20 mi, 12 CY tk) | CY | $0.00 | $0.00 | $0.00 | |||||
| Topsoil, stockpile | MH | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Topsoil, place from stockpile | MH | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Seeding | Lot | $0.00 | $0.00 | $0.00 | |||||
| Mulching | Lot | $0.00 | $0.00 | $0.00 | |||||
| Trace Wire, #12 | LF | $0.00 | $0.00 | $0.00 | |||||
| Saw cut ashpalt | LF | $0.00 | $0.00 | $0.00 | |||||
| asphalt demo | CY | $0.00 | $0.00 | $0.00 | |||||
| asphalt | CY | $0.00 | $0.00 | $0.00 | |||||
| Concrete Curb-and-gutter demo | MH | $0.00 | $0.00 | $0.00 | |||||
| Concrete Curb-and-gutter | LF | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||||
| Material Costs | $0.00 | $0.00 | |||||||
| Tax on Materials | 10% | $0.00 | $0.00 | ||||||
| TOTAL MATERIAL COST | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| Labor Cost | $0.00 | $0.00 | |||||||
| Insurance & Tax on Labor | $0.00 | $0.00 | |||||||
| TOTAL LABOR COST | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| Total Other Direct Costs | $0.00 | $0.00 | $0.00 | ||||||
| Total Material, Labor, Tax & Insurance | $0.00 | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | ||
| Overhead | $0.00 | $0.00 | $0.00 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0.00 |
| Profit | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | $0.00 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | |
| Bonds | $0.00 | $0.00 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 |