Atch_20b_SOW_6NOV18.pdf

PDF 54 KB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA469019RA003
Issued by
Department of the Air Force Air Combat Command

About this file

This statement of work outlines requirements for a construction project at Ellsworth Air Force Base. The project consists of investigative, design, and construction services to build a new bath house facility near an outdoor running track. The bath house must include separate male and female areas, each with restrooms and sinks, as well as handicap accessibility and exterior site work. Additional requirements specify materials, utilities, landscaping, and winterization. Related design work includes surveying, soil testing, and connecting new infrastructure for water, sewer, and electricity. The solicitation seeks multiple award construction contracts through an indefinite delivery indefinite quantity vehicle. The procurement will award to three small disadvantaged, veteran, or HUBZone small businesses. Construction work may include trades such as carpentry, plumbing, electrical work, and more. The contract period is from award date to June 2021, with a minimum value of $500 and maximum of $18 million. The solicitation will be issued on the Federal Business Opportunities website.

FA469019RA003 Atch 20b

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Atch_32_-_Follow_on_Q&A_Updated_1MAY19.pdf PDF
Atch_31_Follow_on_Q&As_26APR19.pdf PDF
Atch_30_Follow_on_Q&A_25APR19.pdf PDF
Solicitation_Amendment_FA469019RA0030011_SF_30.pdf PDF
Atch_20b_SOW_Updated_23APR19.pdf PDF
Atch_20a_GIPR_23APR19.pdf PDF
Solicitation_Amendment_FA469019RA0030010_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030007_SF_30.pdf PDF
Attach_27_c_CE_Track_Manholes.pdf PDF
Atch_25_Site_Vist_Q&As_14FEB19.pdf PDF
Solicitation_Amendment_FA469019RA0030003_SF_30.pdf PDF
Atch_23_Site_Visit_Minutes.pdf PDF
Solicitation_Amendment_FA469019RA0030002_SF_30.pdf PDF
Atch_20_FOPR_Construct_Bath_House_3JAN19.pdf PDF
Atch_12_General_Provisions_-_8NOV18.pdf PDF
Atch_16b_-_WD_SD180006_Residental-Meade_5_Jan_18.pdf PDF
Atch_17_Determination_of_Resp.pdf PDF
Atch_20_FOPR_Construct_Bath_House.pdf PDF
Atch_20c_Drawing_1_Track_Utilities_Latrine_6NOV18.pdf PDF
Atch_15_Non-Nuclear_Intrusion_Det.pdf PDF
Atch_20g_AF_Form_3052.xls XLS spreadsheet
Atch_4_Spec_Section_01000_-20_Aug_15.pdf PDF
Atch_20d_RMD_KTR_to_Complete.pdf PDF
Atch_9_Submittal_Form_3000-1_Sep_03.pdf PDF
Atch_20a_GIPR_6NOV18.pdf PDF
Solicitation_-_FA469019RA003.pdf PDF
Atch_19_Past_Performance_Questionairre.docx DOCX document
Atch_2_AF_Form_103_Work__BCE_Clearance_Request_-_1_Aug_94.pdf PDF
Atch_16c_-_WD_SD180001_Heavy-Highway_6_Apr_18.pdf PDF
Atch_13_NAFGeneral_Provisions-21Jan15.pdf PDF
Atch_20e_6_Percent_Limit_on_Design_Fee_for_Contractors.pdf PDF
DRAFT_Atch_4_Spec_Section_01000_-20_Aug_15.pdf PDF
DRAFT_Atch_20d_RMD_KTR_to_Complete.pdf PDF
DRAFT_Atch_21_SECTION_L_Instructions,_Conditions,_and_Notices_to_Offerors.pdf PDF
DRAFT_Atch_12_General_Provisions_-_8NOV18.pdf PDF
DRAFT_Atch_16b_-_WD_SD180006_Residental-Meade_5_Jan_18.pdf PDF
DRAFT_Atch_20b_SOW_6NOV18.pdf PDF
DRAFT_Atch_16c_-_WD_SD180001_Heavy-Highway_6_Apr_18.pdf PDF
DRAFT_-_FA469019RA003.pdf PDF
DRAFT_Atch_8_Exterior_Signs_-_10_Jun_05.pdf PDF
DRAFT_Atch_19_PPQ.docx DOCX document
DRAFT_Atch_7_Ellsworth_Fire_Protection.pdf PDF
DRAFT_Atch_16d_-_WD_SD180033_Building-Meade_5_Jan_18.pdf PDF
DRAFT_Atch_20e_6_Percent_Limit_on_Design_Fee_for_Contractors.pdf PDF
DRAFT_Atch_20c_Drawing_1_Track_Utilities_Latrine_6NOV18.pdf PDF
DRAFT_Atch_5_Spec_Section_01800_-20_Aug_15.pdf PDF
DRAFT_Atch_2_AF_Form_103_Work__BCE_Clearance_Request_-_1_Aug_94.pdf PDF
DRAFT_Atch_11_Underground_Electrical_20Aug15.pdf PDF
DRAFT_Atch_20g_AF_Form_3052.xls XLS spreadsheet
DRAFT_Atch_3_Submittal_Schedule_-20_Aug_15.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Construct Bath House at Outdoor Running Track

Project Number: 1070287

1. The project consists of the investigative, design and construction services to construct a restroom facility at the approximate location shown near the running track south of building 8210. The facility shall house separate male and female areas.

2. The shall have the but not limited to the following features;

A. Bathroom to be handicap accessible B. a. Male area

a. 2 urinals

b. 1 water closet

c. 1 lavatory

d. Mirror, soap dispenser, towel dispenser, etc.

C. Female area

a. 2 water closets

b. 1 lavatory

c. Mirror, soap dispenser, towel dispenser, etc

D. Handicapped accessible sidewalk from bathroom to parking area.

E. All site work required so as to provide proper drainage F. Nominal 20’ by 30’ in area at location shown by attachment G. Storage area (nominal 2.5’ by 4’) within the building. Exterior access with locking door.

H. Exterior compatible with surrounding facilities (Prairie Style Architecture) I. Split faced block walls insulated J. Metal standing seam roof K. Heated interior L. Colored concrete floor M. Minimum of 4’ foundation walls with spread footings on select fill N. Connect facility to base water, electric, and sewer infrastructure O. Existing track may not be disturbed by construction. Athletic field if disturbed to be restored to original condition.

P. Exterior water fountain Q. Exterior light fixture R. Exterior electrical duplex outlet orientated toward the track S. Metal Doors T. Concrete stoop by doors U. Provisions to winterize the facility V. Finished interior walls and ceiling with insulation

W. Mirrors above sinks X. Soap dispensers Y. Electric hand dryers Z. Hot and cold water AA. Interior lighting with occupant sensor BB. Exhaust fan CC. Janitor’s closet with mop sink DD. Provide a chase or access to mechanical/plumbing items

3. Investigative/Design work for this project shall include the following:

a. Investigative services shall include all surveying, soil testing, site visits, records research, as needed to design the project

b. Design services shall include building plans, the installation supporting infrastructure to include but not limited to water service, sewer, manholes (if needed), connections, lift station (if need), and electrical service to the facility.

4. Continuity of Work: The contractor shall not begin work until he is certain the work will continue uninterrupted through completion except for weekends, holidays, or prohibitively adverse weather. There shall be no extended periods of delay in on-site work after work has begun.

5. Government Occupancy: The Government may occupy some of the site during the construction period. Cooperate with the Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with the Government and golf course operation.

6. Utility outages required to facilitate the work must be scheduled and coordinated per the general requirements of the MACC contract.

File details come from the government source that posted it. Updated .