This statement of work outlines requirements for a construction project at Ellsworth Air Force Base. The project consists of investigative, design, and construction services to build a new bath house facility near an outdoor running track. The bath house must include separate male and female areas, each with restrooms and sinks, as well as handicap accessibility and exterior site work. Additional requirements specify materials, utilities, landscaping, and winterization. Related design work includes surveying, soil testing, and connecting new infrastructure for water, sewer, and electricity. The solicitation seeks multiple award construction contracts through an indefinite delivery indefinite quantity vehicle. The procurement will award to three small disadvantaged, veteran, or HUBZone small businesses. Construction work may include trades such as carpentry, plumbing, electrical work, and more. The contract period is from award date to June 2021, with a minimum value of $500 and maximum of $18 million. The solicitation will be issued on the Federal Business Opportunities website.

FA469019RA003 Atch 20b

View the file

Other files

File Type Posted
Atch_32_-_Follow_on_Q&A_Updated_1MAY19.pdf PDF
Solicitation_Amendment_FA469019RA0030013_SF_30.pdf PDF
Atch_31_Follow_on_Q&As_26APR19.pdf PDF
Atch_20f_Bid_Schedule-25_Apr_19.doc DOC document
Solicitation_Amendment_FA469019RA0030012_SF_30.pdf PDF
Atch_30_Follow_on_Q&A_25APR19.pdf PDF
Solicitation_Amendment_FA469019RA0030011_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030010_SF_30.pdf PDF
Atch_20b_SOW_Updated_23APR19.pdf PDF
Atch_20a_GIPR_23APR19.pdf PDF
Atch_29_Follow_on_Q&As_23APR19.pdf PDF
Solicitation_Amendment_FA469019RA0030009_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030008_SF_30.pdf PDF
Atch_28_-_Follow_on_Q&As.pdf PDF
Solicitation_Amendment_FA469019RA0030007_SF_30.pdf PDF
Attach_27_bTrack_with_Contours_and_Utilities.pdf PDF
Attach_27_c_CE_Track_Manholes.pdf PDF
Solicitation_Amendment_FA469019RA0030006_SF_30.pdf PDF
Attach_27_a_Site_Vist_QAs_as_of_6_Mar_19.pdf PDF
Solicitation_Amendment_FA469019RA0030005_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030004_SF_30.pdf PDF
Atch_25_Site_Vist_Q&As_14FEB19.pdf PDF
Atch_26_X-XX_PROJECT_TITLE.dwg DWG drawing
Atch_24_Site_Visit_Minutes_24JAN19.pdf PDF
Solicitation_Amendment_FA469019RA0030003_SF_30.pdf PDF
Atch_23_Site_Visit_Minutes.pdf PDF
Solicitation_Amendment_FA469019RA0030002_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030001_SF_30.pdf PDF
Atch_20_FOPR_Construct_Bath_House_3JAN19.pdf PDF
Atch_20e_6_Percent_Limit_on_Design_Fee_for_Contractors.pdf PDF
Atch_13_NAFGeneral_Provisions-21Jan15.pdf PDF
Atch_16c_-_WD_SD180001_Heavy-Highway_6_Apr_18.pdf PDF
Atch_16a_-_WD_SD180002_Residental-Penn_5_Jan_18.pdf PDF
Atch_1_Utility_Outages.pdf PDF
Atch_7_Ellsworth_Fire_Protection.pdf PDF
Atch_10_Electrical_Systems-15_Jan_15.pdf PDF
Atch_20a_GIPR_6NOV18.pdf PDF
Atch_12_General_Provisions_-_8NOV18.pdf PDF
Atch_16b_-_WD_SD180006_Residental-Meade_5_Jan_18.pdf PDF
Atch_11_Underground_Electrical_20Aug15.pdf PDF
Solicitation_-_FA469019RA003.pdf PDF
Atch_22,_SECTION_M_-_EVALUATION_BASIS_FOR_AWARD_2JAN19.pdf PDF
Atch_20g_AF_Form_3052.xls XLS spreadsheet
Atch_20c_Drawing_1_Track_Utilities_Latrine_6NOV18.pdf PDF
Atch_20_FOPR_Construct_Bath_House.pdf PDF
Atch_20d_RMD_KTR_to_Complete.pdf PDF
Atch_4_Spec_Section_01000_-20_Aug_15.pdf PDF
Atch_9_Submittal_Form_3000-1_Sep_03.pdf PDF
Atch_19_Past_Performance_Questionairre.docx DOCX document
Atch_18_Past_Performance_Information.docx DOCX document
Show 40 more

Latest 50 of 96 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Construct Bath House at Outdoor Running Track

Project Number: 1070287

1. The project consists of the investigative, design and construction services to construct a restroom facility at the approximate location shown near the running track south of building 8210. The facility shall house separate male and female areas.

2. The shall have the but not limited to the following features;

A. Bathroom to be handicap accessible B. a. Male area

a. 2 urinals

b. 1 water closet

c. 1 lavatory

d. Mirror, soap dispenser, towel dispenser, etc.

C. Female area

a. 2 water closets

b. 1 lavatory

c. Mirror, soap dispenser, towel dispenser, etc

D. Handicapped accessible sidewalk from bathroom to parking area.

E. All site work required so as to provide proper drainage F. Nominal 20’ by 30’ in area at location shown by attachment G. Storage area (nominal 2.5’ by 4’) within the building. Exterior access with locking door.

H. Exterior compatible with surrounding facilities (Prairie Style Architecture) I. Split faced block walls insulated J. Metal standing seam roof K. Heated interior L. Colored concrete floor M. Minimum of 4’ foundation walls with spread footings on select fill N. Connect facility to base water, electric, and sewer infrastructure O. Existing track may not be disturbed by construction. Athletic field if disturbed to be restored to original condition.

P. Exterior water fountain Q. Exterior light fixture R. Exterior electrical duplex outlet orientated toward the track S. Metal Doors T. Concrete stoop by doors U. Provisions to winterize the facility V. Finished interior walls and ceiling with insulation

W. Mirrors above sinks X. Soap dispensers Y. Electric hand dryers Z. Hot and cold water AA. Interior lighting with occupant sensor BB. Exhaust fan CC. Janitor’s closet with mop sink DD. Provide a chase or access to mechanical/plumbing items

3. Investigative/Design work for this project shall include the following:

a. Investigative services shall include all surveying, soil testing, site visits, records research, as needed to design the project

b. Design services shall include building plans, the installation supporting infrastructure to include but not limited to water service, sewer, manholes (if needed), connections, lift station (if need), and electrical service to the facility.

4. Continuity of Work: The contractor shall not begin work until he is certain the work will continue uninterrupted through completion except for weekends, holidays, or prohibitively adverse weather. There shall be no extended periods of delay in on-site work after work has begun.

5. Government Occupancy: The Government may occupy some of the site during the construction period. Cooperate with the Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with the Government and golf course operation.

6. Utility outages required to facilitate the work must be scheduled and coordinated per the general requirements of the MACC contract.