This statement of work outlines requirements for a construction project at Ellsworth Air Force Base. The project consists of investigative, design, and construction services to build a new bath house facility near an outdoor running track. The bath house must include separate male and female areas, each with restrooms and sinks, as well as handicap accessibility and exterior site work. Additional requirements specify materials, utilities, landscaping, and winterization. Related design work includes surveying, soil testing, and connecting new infrastructure for water, sewer, and electricity. The solicitation seeks multiple award construction contracts through an indefinite delivery indefinite quantity vehicle. The procurement will award to three small disadvantaged, veteran, or HUBZone small businesses. Construction work may include trades such as carpentry, plumbing, electrical work, and more. The contract period is from award date to June 2021, with a minimum value of $500 and maximum of $18 million. The solicitation will be issued on the Federal Business Opportunities website.
FA469019RA003 Atch 20b
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Construct Bath House at Outdoor Running Track
Project Number: 1070287
1. The project consists of the investigative, design and construction services to construct a restroom facility at the approximate location shown near the running track south of building 8210. The facility shall house separate male and female areas.
2. The shall have the but not limited to the following features;
A. Bathroom to be handicap accessible B. a. Male area
a. 2 urinals
b. 1 water closet
c. 1 lavatory
d. Mirror, soap dispenser, towel dispenser, etc.
C. Female area
a. 2 water closets
b. 1 lavatory
c. Mirror, soap dispenser, towel dispenser, etc
D. Handicapped accessible sidewalk from bathroom to parking area.
E. All site work required so as to provide proper drainage F. Nominal 20’ by 30’ in area at location shown by attachment G. Storage area (nominal 2.5’ by 4’) within the building. Exterior access with locking door.
H. Exterior compatible with surrounding facilities (Prairie Style Architecture) I. Split faced block walls insulated J. Metal standing seam roof K. Heated interior L. Colored concrete floor M. Minimum of 4’ foundation walls with spread footings on select fill N. Connect facility to base water, electric, and sewer infrastructure O. Existing track may not be disturbed by construction. Athletic field if disturbed to be restored to original condition.
P. Exterior water fountain Q. Exterior light fixture R. Exterior electrical duplex outlet orientated toward the track S. Metal Doors T. Concrete stoop by doors U. Provisions to winterize the facility V. Finished interior walls and ceiling with insulation
W. Mirrors above sinks X. Soap dispensers Y. Electric hand dryers Z. Hot and cold water AA. Interior lighting with occupant sensor BB. Exhaust fan CC. Janitor’s closet with mop sink DD. Provide a chase or access to mechanical/plumbing items
3. Investigative/Design work for this project shall include the following:
a. Investigative services shall include all surveying, soil testing, site visits, records research, as needed to design the project
b. Design services shall include building plans, the installation supporting infrastructure to include but not limited to water service, sewer, manholes (if needed), connections, lift station (if need), and electrical service to the facility.
4. Continuity of Work: The contractor shall not begin work until he is certain the work will continue uninterrupted through completion except for weekends, holidays, or prohibitively adverse weather. There shall be no extended periods of delay in on-site work after work has begun.
5. Government Occupancy: The Government may occupy some of the site during the construction period. Cooperate with the Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with the Government and golf course operation.
6. Utility outages required to facilitate the work must be scheduled and coordinated per the general requirements of the MACC contract.
File details come from the government source that posted it. Updated .