Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
Solicitation number
FA330024R0039
Issued by

About this file

This document is a Construction Cost Estimate Breakdown using the AF Form 3052 for the project to Replace Localizer Pad under Solicitation FA330024R0039 for the Department of the Air Force, Air Education and Training Command.

The Construction Cost Estimate Breakdown details the estimated material, labor, and other direct costs for the project, with line items for Mobilization, Site Survey, Slab Construction, and Excavate Cable Trench. The total estimated cost is $0.00. The solicitation requires responses to be submitted via email to SSgt Khadijah Jones by 4:30 PM CDT on Friday, 26 July 2024. A site visit is scheduled for 9:00 AM CDT on Monday, 22 July 2024 at Building 2067, Maxwell Air Force Base.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193

CONTRACTORDATEADDRESS400 Cannon Street
Maxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Replace Localizer Pad$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBER/WORK ORDERWORK LOCATION
PNQS 24-3992Maxwell AFB
UNITMATERIAL/EQUIP. COSTSLABOR RATESOTHER
LINEITEMOFQUANTITYAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
MobilizationLS$0.00$0.00
SuperintendentWK$0.00$0.00
DIVISION 2 (Site Work)$0.00
Site SurveyLS$0.00$0.00
Slab ConstructionSF$0.00$0.00
Excavate Cable TrenchCY$0.00$0.00
$0.00$0.00
TOTAL$0.00$0.00$0.00
$0.00$0.00$0.00
Material Costs$0.00$0.00
Tax on Materials10%$0.00$0.00
TOTAL MATERIAL COST$0.00$0.00
$0.00$0.00$0.00
Labor Cost$0.00$0.00
Insurance & Tax on Labor20%$0.00$0.00
TOTAL LABOR COST$0.00$0.00
$0.00$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00
Total Material, Labor, Tax & Insurance$0.00$0.00
TOTAL DIRECT COSTS$0.00$0.00$0.00
$0.00$0.00$0.00
Overhead10%$0.00$0.00$0.00
Subtotal$0.00$0.00$0.00$0.00
Profit10%$0.00$0.00$0.00
Sub Total$0.00$0.00
TOTAL$0.00$0.00$0.00
Bonds2.5%$0.00$0.00
TOTAL$0.00$0.00$0.00
$0.00$0.00

Signature: ______________________________________

File details come from the government source that posted it. Updated .