This document is a Construction Cost Estimate Breakdown using the AF Form 3052 for the project to Replace Localizer Pad under Solicitation FA330024R0039 for the Department of the Air Force, Air Education and Training Command.
The Construction Cost Estimate Breakdown details the estimated material, labor, and other direct costs for the project, with line items for Mobilization, Site Survey, Slab Construction, and Excavate Cable Trench. The total estimated cost is $0.00. The solicitation requires responses to be submitted via email to SSgt Khadijah Jones by 4:30 PM CDT on Friday, 26 July 2024. A site visit is scheduled for 9:00 AM CDT on Monday, 22 July 2024 at Building 2067, Maxwell Air Force Base.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193
| CONTRACTOR | DATE | ADDRESS | 400 Cannon Street | |||||||
| Maxwell Air Force Base Alabama | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| Replace Localizer Pad | $0.00 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||||
| PNQS 24-3992 | Maxwell AFB | |||||||||
| UNIT | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||||||
| LINE | ITEM | OF | QUANTITY | AVERAGE | DIRECT | LINE | ||||
| NO. | MEASURE | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| DIVISION 1 (General Requirements) | ||||||||||
| Mobilization | LS | $0.00 | $0.00 | |||||||
| Superintendent | WK | $0.00 | $0.00 | |||||||
| DIVISION 2 (Site Work) | $0.00 | |||||||||
| Site Survey | LS | $0.00 | $0.00 | |||||||
| Slab Construction | SF | $0.00 | $0.00 | |||||||
| Excavate Cable Trench | CY | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | |||||||||
| TOTAL | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| Material Costs | $0.00 | $0.00 | ||||||||
| Tax on Materials | 10% | $0.00 | $0.00 | |||||||
| TOTAL MATERIAL COST | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| Labor Cost | $0.00 | $0.00 | ||||||||
| Insurance & Tax on Labor | 20% | $0.00 | $0.00 | |||||||
| TOTAL LABOR COST | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| Total Other Direct Costs | $0.00 | $0.00 | $0.00 | |||||||
| Total Material, Labor, Tax & Insurance | $0.00 | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | |||
| Overhead | 10% | $0.00 | $0.00 | $0.00 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |
| Profit | 10% | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | $0.00 | |||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| Bonds | 2.5% | $0.00 | $0.00 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 |