31 - AF Form 3052 Cost Estimate Template.xlsx
XLSX spreadsheet 74 KB Posted
- Attached to
- SABER IDIQ
- Solicitation number
- FA486125R0003
About this file
The file is an AF Form 3052 Cost Estimate Template related to the SABER IDIQ solicitation (FA486125R0003) issued by the 99th Contracting Squadron at Nellis Air Force Base. This is a competitive HUBZone procurement for an Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for base engineering and construction projects across multiple Air Force locations, including Nellis Air Force Base, Creech Air Force Base Range 63, Point Bravo, and Nellis Test And Training Range.
The contract has a maximum ceiling amount between $100M and $250M (specifically noted as $185M in later description), with a five-year period of performance. Individual task orders will range from $15,000 to $4,000,000 and cover diverse construction and engineering services such as carpentry, road repair, roofing, electrical work, HVAC, plumbing, demolition, and infrastructure alterations. Contractors must have in-house or readily accessible design capabilities. The solicitation is estimated to be issued electronically on SAM.gov around 15 August 2025, with proposals due by 12 November 2025 at 1430, and is limited to qualified HUBZone firms with a $40M bonding capability requirement.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sht16
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| CONTRACTOR | ADDRESS | ||||||||
| Government Estimate | 0 | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| 0 | $0 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||
| RKMF 0 | Creech Air Force Base | ||||||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | UOM | QTY | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | |
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | ||
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
Sht15
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| CONTRACTOR | ADDRESS | ||||||||
| Government Estimate | 0 | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| 0 | $0 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||
| RKMF 0 | Creech Air Force Base | ||||||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | UOM | QTY | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | |
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
Sht14
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| CONTRACTOR | ADDRESS | ||||||||
| Government Estimate | 0 | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| 0 | $0 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||
| RKMF 0 | Creech Air Force Base | ||||||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | UOM | QTY | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | |
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 |
SUBTOTALS $0.00 $0.00 $0.00 $0.00
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
Sht13
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| CONTRACTOR | ADDRESS | ||||||||
| Government Estimate | 0 | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| 0 | $0 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||
| RKMF 0 | Creech Air Force Base | ||||||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | UOM | QTY | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | |
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 |
SUBTOTALS $0.00 $0.00 $0.00 $0.00
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
Sht12
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| CONTRACTOR | ADDRESS | ||||||||
| Government Estimate | 0 | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| 0 | $0 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||
| RKMF 0 | Creech Air Force Base | ||||||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | UOM | QTY | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
Sht11
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| CONTRACTOR | ADDRESS | ||||||||
| Government Estimate | 0 | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| 0 | $0 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||
| RKMF 0 | Creech Air Force Base | ||||||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | UOM | QTY | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | |
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
Sht10
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| CONTRACTOR | ADDRESS | ||||||||
| Government Estimate | 0 | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| 0 | $0 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||
| RKMF 0 | Creech Air Force Base | ||||||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | UOM | QTY | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | |
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
Sht09
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| CONTRACTOR | ADDRESS | ||||||||
| Government Estimate | 0 | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| 0 | $0 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||
| RKMF 0 | Creech Air Force Base | ||||||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | UOM | QTY | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | |
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
Sht08
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| CONTRACTOR | ADDRESS | ||||||||
| Government Estimate | 0 | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| 0 | $0 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||
| RKMF 0 | Creech Air Force Base | ||||||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | UOM | QTY | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | |
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
Sht07
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| CONTRACTOR | ADDRESS | ||||||||
| Government Estimate | 0 | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| 0 | $0 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||
| RKMF 0 | Creech Air Force Base | ||||||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | UOM | QTY | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | |
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | |||||||
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
Sht06
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| CONTRACTOR | ADDRESS | ||||||||
| Government Estimate | 0 | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| 0 | $0 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||
| RKMF 0 | Creech Air Force Base | ||||||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | UOM | QTY | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | |
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
Sht05
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| CONTRACTOR | ADDRESS | ||||||||
| Government Estimate | 0 | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| 0 | $0 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||
| RKMF 0 | Creech Air Force Base | ||||||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | UOM | QTY | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | |
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
Sht04
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| Government Estimate | 0 | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| 0 | $0 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| RKMF 0 | Creech Air Force Base | |||||||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | |||||||
| LINE NO. | ITEM | UOM | QTY | UNIT | TOTAL | UNIT | TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | ||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
Sht03
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| CONTRACTOR | ADDRESS | ||||||||
| Government Estimate | 0 | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| 0 | $0 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||
| RKMF 0 | Creech Air Force Base | ||||||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | UOM | QTY | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | |
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
Sht02
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||
| CONTRACTOR | ADDRESS | ||||||||
| Government Estimate | 0 | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| 0 | $0 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||
| RKMF 0 | Creech Air Force Base | ||||||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | UOM | QTY | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | |
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
Sht01
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |
| $0 | ||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION |
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | UOM | QTY | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | |
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | |||||||
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
BACK
INSTRUCTIONS FOR COMPLETING Project Number & Project Title
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to |
| permit itemizing of all direct costs. |
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples-square yards-SY, cubic yards-CY, square |
| feet-SF, linear feet-LF, board feet-BF, each-EA, pound-LB). |
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be |
| furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract |
| will be issued. Otherwise, the contractor is responsible for determining quantity estimates. |
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for the item listed in column 1.
| Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. |
| Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost. |
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract |
| and of significant dollar value. |
Col 10 Line Total. Self-explanatory.
| NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | ||||
| page as follows. | ||||
| TOTAL MATERIAL COSTS | $0.00 | |||
| SALES TAX ON MATERIALS | 8.25 | % | $0.00 | |
| TOTAL LABOR COSTS | $0.00 | |||
| TOTAL OTHER DIRECT COSTS | $0.00 | |||
| TOTAL DIRECT COSTS | $0.00 | |||
| OVERHEAD | % | $0.00 | ||
| PROFIT | % | $0.00 | ||
| SUBTOTAL | $0.00 | |||
| BOND | % | $0.00 | ||
| TOTAL PROJECT COST | $0.00 |
DATE FIRM NAME 99 CES/CENMP
| TITLE | BY | |
| (Signature) |
INSTRUCTIONS TO OFFERORS
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and |
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from |
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data |
| (see ASPR 3-807.3(e) and 3-807.4). |
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this |
| form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and |
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of |
| a. The existing, verifiable data. |
| b. The judgmental factors applied in projecting from known data to the estimate, and |
| c. The contingencies used by the offeror in his proposed price. |
In short, the offeror's estimating process itself needs to be disclosed.
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate). |
| and made available to the contracting officer or his authorized representative upon request. |
| 4. By submission of this proposal the offeror grants the contracting officer, or his designated representative, the right to examine, for the |
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate |
| evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection |
| with any negotiations prior to contract award. |