Attachment E - Blank Sample AF Form 3052.xls
XLS spreadsheet 41 KB Posted
- Attached to
- Robins AFB Paving Multi-Award IDIQ
- Solicitation number
- FA850126R0004
About this file
This is a blank template for AF Form 3052, which is a Construction Cost Estimate Breakdown form used for federal construction contracting. The form provides a standardized structure for contractors to submit detailed cost estimates for construction projects at Robins Air Force Base. It includes line items for breaking down costs by discipline or work category, with columns for material costs, labor costs (measured in man-hours and man-days with average rates), other direct costs, and calculations for material tax, labor burden, overhead, and profit. The form culminates in a grand total that accounts for sales tax, labor burden, overhead, profit, and bonding/insurance costs (P&P Bonds). As a blank template document, it serves as an appendix to the solicitation (FA850126R0004 for Robins AFB Paving Multi-Award IDIQ) to guide contractors on the required cost estimation format and level of detail expected in their proposals, but contains no filled-in data or specific pricing information.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gen Cond 2
| CONSTRUCTION COST ESTIMATE BREAKDOWN | Page 1 | |||||||||
| CONTRACTOR: | GOVERNMENT ESTIMATE | ADDRESS | ||||||||
| CONTRACT FOR: | ||||||||||
| PROJECT NUMBER: | ||||||||||
| Discipline/Item #/Option#: | WORK LOCATION | Robins Air Force Base | ||||||||
| Material Tax: | Labor Burden: | *Overhead: | *Profit: | |||||||
| UNIT | MATERIAL COST | LABOR COST | OTHER | |||||||
| LINE | OF | PER | MAN-HOURS | AVERAGE | DIRECT | LINE | ||||
| NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | MAN-DAYS | RATE | TOTAL | COSTS | TOTAL |
| DIVISION | ||||||||||
| 1.0 | ||||||||||
| 2.0 | ||||||||||
| 3.0 | ||||||||||
| 4.0 | ||||||||||
| 5.0 | ||||||||||
| 6.0 | ||||||||||
| 7.0 | ||||||||||
| 8.0 | ||||||||||
| 9.0 | ||||||||||
| 10.0 | ||||||||||
| 11.0 | ||||||||||
| 12.0 | ||||||||||
| 13.0 | ||||||||||
| 14.0 | ||||||||||
| 15.0 | ||||||||||
| 16.0 | ||||||||||
| 17.0 | ||||||||||
| 18.0 | ||||||||||
| 19.0 | ||||||||||
| 20.0 | ||||||||||
| 21.0 | ||||||||||
| 22.0 | ||||||||||
| 23.0 | ||||||||||
| 24.0 | ||||||||||
| 25.0 | ||||||||||
| *NOTE: ITEMS ABOVE DO NOT SHOW LATEST MARKET PRICES, BUT THEY ARE GIVEN TO ENSURE THE DESIGNERS CONSIDER THEM ON EACH PROJECT. Edit/Delete for your Project. | $0 | $0 | $0 | $0 | ||||||
| Sales Tax | $0 | Labor Burden | $0 | |||||||
| Subtotal | $0 | Subtotal | $0 | $0.00 | $0 | |||||
| OverHead | $0 | |||||||||
| SubTotal | $0 | |||||||||
| Profit | $0 | |||||||||
| P&P Bonds | ||||||||||
| Grand Total | $0 | |||||||||
| AF Form 3052 Gen Conditions Page 1 |
&L&D &T&C&F
File details come from the government source that posted it. Updated .