Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx

Air Force Form XLSX spreadsheet 17 KB Posted

Attached to
Maxwell AFB - Airfield Repairs - Amendment 0006
Solicitation number
FA330026R0003
Issued by

About this file

The file is an Air Force Form 3052 Construction Cost Estimate Breakdown for the Maxwell Air Force Base Airfield Improvements project (Solicitation Number FA330026R0003). The document appears to be a blank pricing template with line items for site work including pavement pressure washing, runway marking replacements (paint and thermoplastic), and sinkhole repair, though all cost fields are currently populated with $0.00.

The related federal contract opportunity, issued by the Department of the Air Force Air Education and Training Command, involves airfield improvements at Maxwell AFB. Key dates include a site visit on 12 December 2025 at 1000am CST, with base access contingent upon pre-registration. The offer due date is 19 December 2025 at 1300pm CST, and the deadline for submitting questions is 16 December 2025 at 1300pm CST. Amendment 0002 added several attachments including construction cost estimate breakdown, drawings, and a site visit reservation form.

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
AF Form 3052 (BLANK).xlsx Revision not stated Solicitation for LPS Bldg 5415
Show all 20

Who attaches AF Form 3052

Other files

File Type Posted
Attachment 9 - Question and Answers.pdf PDF
Solicitation Amendment FA330026R00030004 SF 30.pdf PDF
Attachment 8 - PNQS 24-4829 Airfield Improvements - AF3052 - Blank IGE - Rev 2.xlsx XLSX spreadsheet
Solicitation Amendment - FA330026R00030004.pdf PDF
PNQS 24-4829 Drawings V2.pdf PDF
Solicitation Amendment - FA330026R00030003.pdf PDF
PNQS 24-4829 Airfield Improvements Specs V2.pdf PDF
SINKHOLE REPAIR.pdf PDF
Standard Specifications For Pressure Cleaning Concrete Pavement.pdf PDF
UFC 3-260-04 Airfield and Heliport Marking.pdf PDF
Solicitation Amendment FA330026R00030003 SF 30.pdf PDF
Solicitation Amendment FA330026R00030002 SF 30.pdf PDF
Site Visit - Sign in Sheet - Master - Airfield Improvements.xlsx XLSX spreadsheet
Attachment 2 - PNQS 24-4829 Airfield Improvements - Drawings - Original.pdf PDF
Solicitation Amendment - FA330026R00030001.pdf PDF
Attachment 4 - Site Visit Location - Maxwell AFB Airfield Improvements Original.pdf PDF
Attachment 6 - Site Visit Reservation - Amendment 0002.xlsx XLSX spreadsheet
Attachment 8 - Question and Answers.pdf PDF
Attachment 3 - Davis-Bacon Act WD AL20250115.pdf PDF
Attachment 1 - PNQS 24-4829 Airfield Improvements - Specifications - Original.pdf PDF
Attachment 7 - PNQS 24-4829 Airfield Improvements Drawings - Amendment 0002.pdf PDF
Site Visit Location - Maxwell AFB Airfield Imrovements.pdf PDF
Attachment 2 - PNQS 24-4829 Airfield Improvements - Specifications.pdf PDF
Attachment 3 - PNQS 24-4829 Airfield Improvements - Drawings.pdf PDF
Davis-Bacon Act WD AL20250115.pdf PDF
Solicitation - FA330026R0003.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193

CONTRACTORDATEADDRESS400 Cannon Street
30-Sep-25Maxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Airfield Improvements$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBER/WORK ORDERWORK LOCATION
PNQS 24-4829 Airfield ImprovementsMaxwell AFB
UNITMATERIAL/EQUIP. COSTSLABOR RATESOTHER
LINEITEMOFQUANTITYAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
MobilizationLS$0.00$0.00$0.00
SuperintendentWK$0.00$0.00$0.00
DIVISION 2 (Site Work)$0.00$0.00$0.00
1.0Pavement Pressure WashingSY$0.00$0.00$0.00
2.0Replace Markings (Paint)LS$0.00$0.00$0.00
3.0Replace Markings (Thermoplastic)LS$0.00$0.00$0.00
4.0Sinkhole RepairEA.$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00$0.00
$0.00$0.00$0.00
Material Costs$0.00$0.00
Tax on Materials10%$0.00$0.00
TOTAL MATERIAL COST$0.00$0.00
$0.00$0.00$0.00
Labor Cost$0.00$0.00
Insurance & Tax on Labor20%$0.00$0.00
TOTAL LABOR COST$0.00$0.00
$0.00$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00
Total Material, Labor, Tax & Insurance$0.00$0.00
TOTAL DIRECT COSTS$0.00$0.00$0.00
$0.00$0.00$0.00
Overhead10%$0.00$0.00$0.00
Subtotal$0.00$0.00$0.00$0.00
Profit10%$0.00$0.00$0.00
Sub Total$0.00$0.00
TOTAL$0.00$0.00$0.00
Bonds2.5%$0.00$0.00
TOTAL$0.00$0.00$0.00
$0.00$0.00

Signature: ______________________________________

File details come from the government source that posted it. Updated .