The file is an Air Force Form 3052 Construction Cost Estimate Breakdown for the Maxwell Air Force Base Airfield Improvements project (Solicitation Number FA330026R0003). The document appears to be a blank pricing template with line items for site work including pavement pressure washing, runway marking replacements (paint and thermoplastic), and sinkhole repair, though all cost fields are currently populated with $0.00.
The related federal contract opportunity, issued by the Department of the Air Force Air Education and Training Command, involves airfield improvements at Maxwell AFB. Key dates include a site visit on 12 December 2025 at 1000am CST, with base access contingent upon pre-registration. The offer due date is 19 December 2025 at 1300pm CST, and the deadline for submitting questions is 16 December 2025 at 1300pm CST. Amendment 0002 added several attachments including construction cost estimate breakdown, drawings, and a site visit reservation form.
View the file
Other versions and copies of AF Form 3052
Show all 20
Who attaches AF Form 3052
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193
| CONTRACTOR | DATE | ADDRESS | 400 Cannon Street | |||||||
| 30-Sep-25 | Maxwell Air Force Base Alabama | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| Airfield Improvements | $0.00 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||||
| PNQS 24-4829 Airfield Improvements | Maxwell AFB | |||||||||
| UNIT | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||||||
| LINE | ITEM | OF | QUANTITY | AVERAGE | DIRECT | LINE | ||||
| NO. | MEASURE | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| DIVISION 1 (General Requirements) | ||||||||||
| Mobilization | LS | $0.00 | $0.00 | $0.00 | ||||||
| Superintendent | WK | $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 2 (Site Work) | $0.00 | $0.00 | $0.00 | |||||||
| 1.0 | Pavement Pressure Washing | SY | $0.00 | $0.00 | $0.00 | |||||
| 2.0 | Replace Markings (Paint) | LS | $0.00 | $0.00 | $0.00 | |||||
| 3.0 | Replace Markings (Thermoplastic) | LS | $0.00 | $0.00 | $0.00 | |||||
| 4.0 | Sinkhole Repair | EA. | $0.00 | $0.00 | $0.00 | |||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| Material Costs | $0.00 | $0.00 | ||||||||
| Tax on Materials | 10% | $0.00 | $0.00 | |||||||
| TOTAL MATERIAL COST | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| Labor Cost | $0.00 | $0.00 | ||||||||
| Insurance & Tax on Labor | 20% | $0.00 | $0.00 | |||||||
| TOTAL LABOR COST | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| Total Other Direct Costs | $0.00 | $0.00 | $0.00 | |||||||
| Total Material, Labor, Tax & Insurance | $0.00 | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | |||
| Overhead | 10% | $0.00 | $0.00 | $0.00 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |
| Profit | 10% | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | $0.00 | |||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| Bonds | 2.5% | $0.00 | $0.00 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 |
Signature: ______________________________________