The AF Form 3052 is a Construction Cost Estimate Breakdown template used for detailed cost projection and analysis in federal construction contracting. This blank form allows contractors to itemize costs across multiple categories including material costs, labor costs, manhours, average rates, and other direct costs, with columns for line-by-line breakdown of project expenses. The form includes instructions for completing each column, emphasizing the need for granular cost documentation, and provides space for calculating total material costs, labor costs, overhead, profit, bonding, and final total price. The instructions also outline the contractor's obligation to provide verifiable cost data and grant the government the right to examine supporting documentation for cost verification purposes.

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
AF Form 3052 (BLANK).xlsx Revision not stated Solicitation for LPS Bldg 5415
Show all 20

Who attaches AF Form 3052

Other files

File Type Posted
B4 WD MO20250089 Mod 8_20250613.pdf PDF
Solicitation - W50S8K25RA002.pdf PDF
B6 Task Order Proposal Coversheet (Template).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT

[4]

TOTAL

[5]

MANHOURS

[6]

AVERAGE

RATE

[7]

TOTAL [8]

1 $ - $ - $ - -$ 2 $ - $ - $ - -$ 3 $ - $ - $ - -$ 4 $ - $ - $ - -$ 5 $ - $ - $ - -$ 6 $ - $ - $ - -$ 7 $ - $ - $ - -$ 8 $ - $ - $ - -$ 9 $ - $ - $ - -$

10 $ - $ - $ - -$ 11 $ - $ - $ - -$ 12 $ - $ - $ - -$ 13 $ - $ - $ - -$ 14 $ - $ - $ - -$ 15 $ - $ - $ - -$ 16 $ - $ - $ - -$ 17 $ - $ - $ - -$ 18 $ - $ - $ - -$ 19 $ - $ - $ - -$ 20 $ - $ - $ - -$ 21 $ - $ - $ - -$ 22 $ - $ - $ - -$ 23 $ - $ - $ - -$ 24 $ - $ - $ - -$ 25 $ - $ - $ - -$ 26 $ - $ - $ - -$ 27 $ - $ - $ - -$ 28 $ - $ - $ - -$ 29 $ - $ - $ - -$ 30 $ - $ - $ - -$ 31 $ - $ - $ - -$ 32 $ - $ - $ - -$ 33 $ - $ - $ - -$ 34 $ - $ - $ - -$ 35 $ - $ - $ - -$

OTHER

DIRECT

COSTS

[9]

LABOR COSTS

LINE

NO.

MATERIAL COSTS

ITEM [1]

UNIT OF

MEASURE

[2]

QUANTITY

[3]

$0.00 CONTRACT FOR (Work to be performed ):

PURCHASE REQUEST NUMBER: PROJECT NUMBER: WORK LOCATION:

LINE TOTAL

[10]

CONSTRUCTION COST ESTIMATE BREAKDOWN OMB NO 9704-0193

Expires 31 October 1989

CONTRACTOR: ADDRESS:

PROPOSED TOTAL CONTRACT PRICE

AF Form 3052, JAN 88 (PREVIOUS EDITION IS OBSOLETE) FOR OFFICIAL USE ONLY

TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

SUBTOTAL

PROFIT

SUBTOTAL

BONDING

TOTAL PRICE

DATE FIRM NAME

TITLE BY

a. The existing, verifiable data.

b. The Judgmental factors applied in projecting from known data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

1. The purpose of this form is to provide a standard format by which the offeror submits to the government a summary of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a project resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3-807.4) .

2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and analysis in the light of of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of:

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computation and projections used therein. This right may be exercised in connection with any negotiations prior to the contract award.

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of significant dollar value.

Col 10 Line Total. Self-explanatory.

NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows.

Col 2 Unit of Measure. Description of the units in wich each item is to be estimated (examples-square yards-SY, cubic yards-CY, square feet-SF, linear feet- LF, board feet-BF, each-EA, pound-LB) .

Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column2). Items and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost..

INSTRUCTIONS FOR COMPLETING AF FORM 3052

INSTRUCTIONS TO OFFERORS

(Reverse of AF Form 3052, Jan 88) FOR OFFICIAL USE ONLY