Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx
Air Force Form XLSX spreadsheet 19 KB Posted
- Solicitation number
- FA330024R
About this file
This document contains a federal contract opportunity solicitation and related construction cost estimate breakdown for repair work at Maxwell Air Force Base. The Air Force is seeking proposals to upgrade the battery room ventilation system in Building 1456 to meet safety standards, which will require extending the exhaust ducts to the exterior and following the shortest discharge route. The work has an estimated value between $100,000 and $250,000, and performance and payment bonds are mandatory. A site visit is scheduled for March 11, 2024, with proposals due by March 25, 2024. The cost estimate breakdown provides details on the ductwork, fans, controls, electrical work, and other materials and labor needed for the project.
View the file
Other versions and copies of AF Form 3052
Show all 20
Who attaches AF Form 3052
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Battery Room Ventilation
CONSTRUCTION COST ESTIMATE BREAKDOWN
| CONTRACTOR | DATE | ADDRESS | |||||||
| RTA | 400 Cannon Street Maxwell Air Force Base Alabama | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| Ventilation per Code for Battery Room | |||||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | |||||||
| BUILDING 1456 | PNQS 23-7219 / 12462773 | Maxwell AFB, AL | |||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | ||||
| UNIT | MAN HOURS | AVERAGE | DIRECT | LINE | |||||
| TOTAL | MAN DAYS | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | |||||||||
| Project Mgr | WEEK | 12 | |||||||
| Rental Equipment | WEEK | 12 | |||||||
| Engineering | LS | 1.0 | |||||||
| DIVISION 2 (Site Work) |
Demolition LS 1
DIVISION 3 - DIVISION 22 - Not Used
DIVISION 23 (MECHANICAL)
| DUCTWORK: EXHAUST, INSULATED GALV | LB | 500.00 |
| EXHAUST FAN | EA | 1 |
| OA LOUVER | EA | 1 |
| MANUAL DAMPERS | EA | 2 |
INSULATION SUBCONTRACTOR
| FLEXIBLE DUCT WRAP, 2" | SQ.FT. | 425 |
| Insulation Contractor OH&P |
TEST & BALANCE SUBCONTRACTOR LS 1
CONTROLS SUBCONTRACTOR
| Controller & EMCS Tie-in | EA | 1 |
| Miscellaneous Sensors, Devices, Wiring, Etc. | LS | 1 |
DIVISION 26 (ELECTRICAL)
| Disconnect & Re-work EF Ckt | Ea. | 1 |
| New EF Ckt | Lf. | 100 |
| New Circuit Breaker for Fan | Ea. | 1 |
| SUBTOTAL |
| ELECTRICAL OH&P |
TOTAL
| Material Costs | |
| Tax on Materials | 10% |
| TOTAL MATERIAL COST |
| Labor Cost | |
| Insurance & Tax on Labor | 20% |
| TOTAL LABOR COST |
| Total Other Direct Costs |
| Total Material, Labor, Tax & Insurance |
TOTAL DIRECT COSTS
| Overhead | 10% | ||
| Subtotal | |||
| Profit | 10% | ||
| Sub Total | |||
| TOTAL | |||
| Bonds | 2.5% | ||
| TOTAL | |||
| $0.00 | $0.00 | ||
| I acknowledge the above cost estimate has been estimated to the best of my ability and means. |
Signature: ______________________________________ 8/21/23 Gov't Coord___________________________________