Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx

Air Force Form XLSX spreadsheet 19 KB Posted

Attached to
Repair Battery Room - Maxwell AFB, AL (Solicitation)
Solicitation number
FA330024R
Issued by

About this file

This document contains a federal contract opportunity solicitation and related construction cost estimate breakdown for repair work at Maxwell Air Force Base. The Air Force is seeking proposals to upgrade the battery room ventilation system in Building 1456 to meet safety standards, which will require extending the exhaust ducts to the exterior and following the shortest discharge route. The work has an estimated value between $100,000 and $250,000, and performance and payment bonds are mandatory. A site visit is scheduled for March 11, 2024, with proposals due by March 25, 2024. The cost estimate breakdown provides details on the ductwork, fans, controls, electrical work, and other materials and labor needed for the project.

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
AF Form 3052 (BLANK).xlsx Revision not stated Solicitation for LPS Bldg 5415
Show all 20

Who attaches AF Form 3052

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Battery Room Ventilation

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTORDATEADDRESS
RTA400 Cannon Street Maxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Ventilation per Code for Battery Room
LOCATION (Work to be performed)PROJECT NUMBER/WORK ORDERWORK LOCATION
BUILDING 1456PNQS 23-7219 / 12462773Maxwell AFB, AL
ITEMUNIT OF MEASUREQUANTITYMATERIAL/EQUIP. COSTSLABOR RATESOTHER
UNITMAN HOURSAVERAGEDIRECTLINE
TOTALMAN DAYSRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
Project MgrWEEK12
Rental EquipmentWEEK12
EngineeringLS1.0
DIVISION 2 (Site Work)

Demolition LS 1

DIVISION 3 - DIVISION 22 - Not Used

DIVISION 23 (MECHANICAL)

DUCTWORK: EXHAUST, INSULATED GALVLB500.00
EXHAUST FANEA1
OA LOUVEREA1
MANUAL DAMPERSEA2

INSULATION SUBCONTRACTOR

FLEXIBLE DUCT WRAP, 2"SQ.FT.425
Insulation Contractor OH&P

TEST & BALANCE SUBCONTRACTOR LS 1

CONTROLS SUBCONTRACTOR

Controller & EMCS Tie-inEA1
Miscellaneous Sensors, Devices, Wiring, Etc.LS1

DIVISION 26 (ELECTRICAL)

Disconnect & Re-work EF CktEa.1
New EF CktLf.100
New Circuit Breaker for FanEa.1
SUBTOTAL
ELECTRICAL OH&P

TOTAL

Material Costs
Tax on Materials10%
TOTAL MATERIAL COST
Labor Cost
Insurance & Tax on Labor20%
TOTAL LABOR COST
Total Other Direct Costs
Total Material, Labor, Tax & Insurance

TOTAL DIRECT COSTS

Overhead10%
Subtotal
Profit10%
Sub Total
TOTAL
Bonds2.5%
TOTAL
$0.00$0.00
I acknowledge the above cost estimate has been estimated to the best of my ability and means.

Signature: ______________________________________ 8/21/23 Gov't Coord___________________________________