This document contains questions and answers regarding a federal construction contract solicitation. The solicitation is for several indefinite delivery indefinite quantity construction contracts for facilities work at Ellsworth Air Force Base in South Dakota. Services will include new construction, renovation, alteration, demolition, and repair. The North American Industry Classification code is 237990 and the annual size standard is $36.5 million. The contract period is from date of award to June 2021. The minimum value is $500 and maximum is $18 million. The solicitation targets awarding to three small disadvantaged, HUBZone, or service-disabled veteran-owned small businesses. The document provides clarification on storage building requirements and extends the proposal due date by seven days.
Questions and Answers
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question 55: Will the Government be sending out a new bid schedule for the add option to have the building connect to the existing pad?
Answer 55: See the revised bid schedule dated 25APR19.
Question 56: Can the Government clarify if the requested 10’x15’ storage building is to fit into the 20’x30’ footprint already identified in the previous SOW?
Answer 56: See Amendment 11.
Question 57: Please clarify if the storage room needs to be 10’x15’ or just 150 square feet within the design.
Answer 57: The Government prefers 10’x15’ to allow for UTV storage.
Question 58: What size OH door is required and will it be operated manually or with a powered operator?
Answer 58: The OH door shall be large enough for a UTV to drive in and out of the storage area. It will be powered operation with the ability for manual operation if power is lost.
Question 59: Will there be any vehicles or equipment being stored in the space?
Answer 59: The area will be used for storage of field equipment and an UTV.
Question 60: If there are vehicles or equipment stored in the space, will an exhaust fan be required or requested?
Answer 60: The Government does not anticipate a requirement for nor is requesting an exhaust fan.
Question 61: Would the Government consider leaving the SOW/design as is and change the SOW/design during the 65% design review with the awarded contractor/design team?
Answer 61: No, the Government will not consider this. Contractors shall use the SOW dated
23APR19.
Question 62: Can there be additional time added to the proposal due date if the government is intending on keeping the new SOW with the changes? A minimum of 30 day extension would be preferred as this alteration to the SOW will more than likely require a complete redesign architecturally and structurally as well as impact MEP and civil. We will also need to get pricing for the newly requested item
Answer 62: The Government will provide an additional seven calendar days. The Government believes that is sufficient time to incorporate all the necessary changes.
Question 63: Please clarify how many amendments there are. In FBO, there are only 9 Amendments listed. Amendment 9 folder has amendment 0010 inside. There was one mislabeled or missing somewhere along the way in FBO.
Answer 63: There was an error while posting to FBO on solicitation amendment 3 dated 25 January 2019 which caused all subsequent amendment numberings to be incorrect. There are twelve (12) amendments to the solicitation to include this most recent amendment.