5. AF Form 3052-BLANK.xlsx

Air Force Form XLSX spreadsheet 27 KB Posted

Attached to
Replace Swamp Cooler B5045
Solicitation number
FA487724R0012
Issued by

About this file

This document is an AF Form 3052, Construction Cost Estimate Breakdown, which provides a detailed cost breakdown for a construction project. The form includes estimates for various construction divisions such as general requirements, existing conditions, concrete, masonry, metals, finishes, and more. It provides cost estimates for materials, labor, and other direct costs. The total overall project price is estimated at $0.

The related federal contract opportunity is for the Repair/Replace Swamp Coolers B5045 project at Davis-Monthan AFB. The project, valued between $100,000 and $250,000, involves removing and replacing one swamp cooler on Building 5045. This is a Woman-Owned Small Business Set-Aside under NAICS 238220. Key dates include the EAL submission deadline of April 24, 2024, site visit on May 2, 2024, RFI due date of May 8, 2024, and proposal due date of May 24, 2024.

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
AF Form 3052 (BLANK).xlsx Revision not stated Solicitation for LPS Bldg 5415
Show all 20

Who attaches AF Form 3052

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR GOVERNMENT ESTIMATEADDRESS
CONTRACT FOR
PROPOSED TOTAL CONTRACT PRICE$0
PURCHASE REQUEST NUMBERPROJECT NUMBER
FBNVWORK LOCATION

Davis-Monthan AFB, AZ

LINE NO.ITEMUNIT OF
MEASUREMATERIAL COSTLABOR COSTOTHER
DIRECT COSTLINE TOTALADDITIVE BID ITEMS
QUANTITYUNITTOTALQUANTITYAVERAGE RATETOTAL
Summary
1Division 1 - GENERAL REQUIREMENTS CONSTRUCTIONLS$0$0
2LS$0$0
3Division 2 - EXISTING CONDITIONS CONSTRUCTIONLS$0$0
4LS$0$0
5Division 3 - CONCRETE CONSTRUCTIONLS$0$0
6LS$0$0
7Division 4 - MASONRY CONSTRUCTIONLS$0$0
8LS$0$0
9Division 5 - METALS CONSTRUCTIONLS$0$0
10LS$0$0
11Division 6 - WOOD, PLASTICS, & COMPOSITES CONSTRULS$0$0
12LS$0$0
13Division 7 - THERMAL & MOISTURE PROTECTION CONSTLS$0$0
14LS$0$0
15Division 8 - OPENINGS CONSTRUCTIONLS$0$0
16LS$0$0
17Division 9 - FINISHES CONSTRUCTIONLS$0$0
18LS$0$0
19Division 10 - SPECIALTIES CONSTRUCTIONLS$0$0
20LS$0$0
21Division 11 - EQUIPMENT CONSTRUCTIONLS$0$0
22LS$0$0
23Division 12 - FURNISHINGS CONSTRUCTIONLS$0$0
24LS$0$0
25Division 13 - SPECIAL CONSTRUCTION CONSTRUCTIONLS$0$0
26LS$0$0
27Division 14 - CONVEYING SYSTEMS CONSTRUCTIONLS$0$0
28LS$0$0
29Division 21 - FIRE SUPPRESSION CONSTRUCTIONLS$0$0
30LS$0$0
31Division 22 - PLUMBING CONSTRUCTIONLS$0$0
32LS$0$0
33Division 23 - HVAC CONSTRUCTIONLS$0$0
34LS$0$0
35Division 25 - INTEGRATED AUTOMATION CONSTRUCTIONLS$0$0
36LS$0$0
37Division 26 - ELECTRICAL CONSTRUCTIONLS$0$0
38LS$0$0
39Division 27 - COMMUNICATIONS CONSTRUCTIONLS$0$0
40LS$0$0
41Division 28 - ELECTRONIC SAFETY AND SECURITY CONSLS$0$0
42LS$0$0
43Division 31 - EARTHWORK CONSTRUCTIONLS$0$0
44LS$0$0
45Division 32 - EXTERIOR IMPROVEMENTS CONSTRUCTIONLS$0$0
46LS$0$0
47Division 33 - UTILITIES CONSTRUCTIONLS$0$0
48LS$0$0
49$0
50Division Summary Totals Overall Project$0$0
51
52
53
54Total Overall Overhead (%)15.0%$0
55
56
57
58Total Overall Profit (%)10.0%$0
59
60
61
62Subtotal Overall w/ Overhead and Profit$0
63
64
65
66Total Overall Tax (%)3.970%$0
67
68
69
70Total Overall Bond (%)2.0%$0
71
72
73
74TOTAL OVERALL PROJECT PRICE$0
75
76
77
78
79TOTAL PROJECT PRICE$0
AF Form 3052, Jan 88