AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx
Air Force Form XLSX spreadsheet 14 KB Posted
- Solicitation number
- FA330023R
About this file
This document is a Construction Cost Estimate Breakdown (AF Form 3052) related to a federal contract opportunity. The contract is for the construction of a Command Suite at Building 832, Gunter Annex, Maxwell Air Force Base, Alabama. The estimated total contract price is provided, along with a detailed breakdown of the construction costs by division, including materials, labor, and other direct costs. The related federal contract opportunity is a solicitation (FA330023R) for a contractor to modify the command section area of Building 832 at Gunter Annex. The project requires the removal of a wall/door in the hallway to access the Command Suite room 171. The estimated magnitude of the construction project is between $25,000 and $100,000, and performance and payment bonds are mandatory.
View the file
Other versions and copies of AF Form 3052
Show all 20
Who attaches AF Form 3052
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| CONSTRUCTION COST ESTIM ATE BREAK DOWN | ||||||||
| CONTRACTOR | DATE | ADDRESS | ||||||
| 400 Cannon Street Maxwell Air Force Base Alabama | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Construct Command Suite | ||||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| Building 832 Gumter | WO # 12435811 | Gunter Annex | ||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | TOTAL | AVERAGE | TOTAL | DIRECT | LINE | |||
| RATE | COSTS | TOTAL | ||||||
| DIVISION 1 (General Requirements) | ||||||||
| Project Manager | ||||||||
| Superintendent | ||||||||
| Storage Containers | ||||||||
| Port O lets | ||||||||
| Pickup/Disposal | ||||||||
| DIVISION 2 (Site Work) | ||||||||
| Demolition Walls/ Patach and restore |
| DIVISION 8 (DOORS AND WINDOWS) |
| Install doors |
DIVISION 9 (FINISHES)
| Paint/sheetrock/Refinish walls/baseboards |
| Install Carpet |
| DIVISION 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) |
| Fire systems/evaluate/relocate equipment |
| Electrical systems/relocate/install |
TOTAL
| Material Costs |
| Tax on Materials |
| TOTAL MATERIAL COST |
| Labor Cost |
| Insurance & Tax on Labor |
| TOTAL LABOR COST |
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER DIRECT | ||
| COSTS | LINE TOTAL | ||||||
| UNIT | TOTAL | AVERAGE | |||||
| RATE | TOTAL | ||||||
| Total Other Direct Costs | |||||||
| Total Material, Labor, Tax & Insurance |
TOTAL DIRECT COSTS
| Overhead |
| Subtotal |
| Profit |
| Sub Total |
| TOTAL |
| Bonds |
| TOTAL |
| I acknowledge the above cost estimate has been estimated to the best of my ability and means. |
| Signature: Gov't Coord |
File details come from the government source that posted it. Updated .