AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
Solicitation number
FA330023R
Issued by

About this file

This document is a Construction Cost Estimate Breakdown (AF Form 3052) related to a federal contract opportunity. The contract is for the construction of a Command Suite at Building 832, Gunter Annex, Maxwell Air Force Base, Alabama. The estimated total contract price is provided, along with a detailed breakdown of the construction costs by division, including materials, labor, and other direct costs. The related federal contract opportunity is a solicitation (FA330023R) for a contractor to modify the command section area of Building 832 at Gunter Annex. The project requires the removal of a wall/door in the hallway to access the Command Suite room 171. The estimated magnitude of the construction project is between $25,000 and $100,000, and performance and payment bonds are mandatory.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

CONSTRUCTION COST ESTIM ATE BREAK DOWN
CONTRACTORDATEADDRESS
400 Cannon Street Maxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Construct Command Suite
LOCATION (Work to be performed)PROJECT NUMBER/WORK ORDERWORK LOCATION
Building 832 GumterWO # 12435811Gunter Annex
ITEMUNIT OF MEASUREQUANTITYMATERIAL/EQUIP. COSTSLABOR RATESOTHER
UNITTOTALAVERAGETOTALDIRECTLINE
RATECOSTSTOTAL
DIVISION 1 (General Requirements)
Project Manager
Superintendent
Storage Containers
Port O lets
Pickup/Disposal
DIVISION 2 (Site Work)
Demolition Walls/ Patach and restore
DIVISION 8 (DOORS AND WINDOWS)
Install doors

DIVISION 9 (FINISHES)

Paint/sheetrock/Refinish walls/baseboards
Install Carpet
DIVISION 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS)
Fire systems/evaluate/relocate equipment
Electrical systems/relocate/install

TOTAL

Material Costs
Tax on Materials
TOTAL MATERIAL COST
Labor Cost
Insurance & Tax on Labor
TOTAL LABOR COST
ITEMUNIT OF MEASUREQUANTITYMATERIAL/EQUIP. COSTSLABOR RATESOTHER DIRECT
COSTSLINE TOTAL
UNITTOTALAVERAGE
RATETOTAL
Total Other Direct Costs
Total Material, Labor, Tax & Insurance

TOTAL DIRECT COSTS

Overhead
Subtotal
Profit
Sub Total
TOTAL
Bonds
TOTAL
I acknowledge the above cost estimate has been estimated to the best of my ability and means.
Signature: Gov't Coord