Atch_29_Follow_on_Q&As_23APR19.pdf

PDF 38 KB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA469019RA003
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains questions and answers related to a federal construction contract opportunity. The opportunity involves installing a flushing hydrant near a bathhouse at Ellsworth Air Force Base in South Dakota. It seeks clarification on utilizing service lines versus mains for water and sewer connections, requests information on available fault current for a 75KVA transformer, and confirms a panel has a main breaker.

The related federal contract opportunity is a Multiple Award Construction Contract solicitation to provide construction, renovation, alteration, demolition and repair services at Ellsworth Air Force Base through June 2021. The minimum value is $500 and maximum is $18 million. Only Service-Disabled Veteran, 8(a), and HUBZone small businesses may apply. The NAICS code is 237990 and size standard is $36.5 million annually. The solicitation will be issued on www.fbo.gov on or around November 14, 2018. Services include trades like carpentry, electrical, and HVAC for new and existing facilities.

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Atch_31_Follow_on_Q&As_26APR19.pdf PDF
Atch_30_Follow_on_Q&A_25APR19.pdf PDF
Atch_20b_SOW_Updated_23APR19.pdf PDF
Solicitation_Amendment_FA469019RA0030009_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030008_SF_30.pdf PDF
Atch_28_-_Follow_on_Q&As.pdf PDF
Solicitation_Amendment_FA469019RA0030005_SF_30.pdf PDF
Atch_26_X-XX_PROJECT_TITLE.dwg DWG drawing
Atch_25_Site_Vist_Q&As_14FEB19.pdf PDF
Atch_24_Site_Visit_Minutes_24JAN19.pdf PDF
Solicitation_Amendment_FA469019RA0030003_SF_30.pdf PDF
Atch_23_Site_Visit_Minutes.pdf PDF
Solicitation_Amendment_FA469019RA0030001_SF_30.pdf PDF
Atch_20_FOPR_Construct_Bath_House_3JAN19.pdf PDF
Atch_18_Past_Performance_Information.docx DOCX document
Atch_22,_SECTION_M_-_EVALUATION_BASIS_FOR_AWARD_2JAN19.pdf PDF
Atch_5_Spec_Section_01800_-20_Aug_15.pdf PDF
Atch_11_Underground_Electrical_20Aug15.pdf PDF
Atch_16a_-_WD_SD180002_Residental-Penn_5_Jan_18.pdf PDF
Atch_1_Utility_Outages.pdf PDF
Atch_12_General_Provisions_-_8NOV18.pdf PDF
Atch_16b_-_WD_SD180006_Residental-Meade_5_Jan_18.pdf PDF
Atch_20b_SOW_6NOV18.pdf PDF
Atch_17_Determination_of_Resp.pdf PDF
Atch_20_FOPR_Construct_Bath_House.pdf PDF
Atch_20c_Drawing_1_Track_Utilities_Latrine_6NOV18.pdf PDF
Atch_15_Non-Nuclear_Intrusion_Det.pdf PDF
Atch_20g_AF_Form_3052.xls XLS spreadsheet
Atch_4_Spec_Section_01000_-20_Aug_15.pdf PDF
Atch_20d_RMD_KTR_to_Complete.pdf PDF
DRAFT_Atch_20f_Bid_Schedule-17_Oct_18.doc DOC document
DRAFT_Atch_13_NAFGeneral_Provisions-21Jan15.pdf PDF
DRAFT_Atch_16e_-_WD_SD180035_Building-Penn_5_Jan_18.pdf PDF
DRAFT_Atch_20_FOPR_Construct_Bath_House.docx DOCX document
DRAFT_Atch_18_Past_Performance_Information.docx DOCX document
DRAFT_Atch_17_Determination_of_Resp.pdf PDF
DRAFT_Atch_4_Spec_Section_01000_-20_Aug_15.pdf PDF
DRAFT_Atch_20d_RMD_KTR_to_Complete.pdf PDF
DRAFT_Atch_21_SECTION_L_Instructions,_Conditions,_and_Notices_to_Offerors.pdf PDF
DRAFT_Atch_12_General_Provisions_-_8NOV18.pdf PDF
DRAFT_Atch_16b_-_WD_SD180006_Residental-Meade_5_Jan_18.pdf PDF
DRAFT_Atch_20b_SOW_6NOV18.pdf PDF
DRAFT_Atch_16c_-_WD_SD180001_Heavy-Highway_6_Apr_18.pdf PDF
DRAFT_-_FA469019RA003.pdf PDF
DRAFT_Atch_8_Exterior_Signs_-_10_Jun_05.pdf PDF
DRAFT_Atch_19_PPQ.docx DOCX document
DRAFT_Atch_7_Ellsworth_Fire_Protection.pdf PDF
DRAFT_Atch_16d_-_WD_SD180033_Building-Meade_5_Jan_18.pdf PDF
DRAFT_Atch_20e_6_Percent_Limit_on_Design_Fee_for_Contractors.pdf PDF
DRAFT_Atch_20c_Drawing_1_Track_Utilities_Latrine_6NOV18.pdf PDF
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 50: Follow on to Question 27 - With a long water service line or small main from the water tie-in, does the government want a fire hydrant or flushing hydrant near the bathhouse? Especially if this building will not be used during winter months.

Answer 50: Please install a flushing hydrant near the bathhouse.

Question 51: Follow on to Question 34 - Is it the Government’s intent to allow long service lines (1”-2” water and 4”-6” sewer) instead of utilizing standard mains (4”-6” water and 8” sewer)? With the connection lengths needed, typically mains would be required per local criteria instead of service lines.

Answer 51: Please utilize whichever size is most appropriate to meet the required pressures and demand for the facility, the flushing hydrant, and to prevent the lines from plugging. It is preferred to use the service lines as appropriate, but it is up to the engineer/designer to determine which size is most appropriate.

Question 52: What is the available fault current at the 75KVA transformer that is adjacent to the football field?

Answer 52: The available fault current at the 75KVA transformer is 8.67KA

Question 53: Does the 250A panel have a main breaker or main lugs only?

Answer 53: The panel has a main breaker