AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- FA487724R0022
About this file
This document is an AF Form 3052, which is a Cost Estimate Breakdown template for a federal contract to replace cathodic protection at multiple facilities on Davis-Monthan AFB. The related federal contract opportunity is for Solicitation FA487724R0022, titled "FBNV240026 Replace Cathodic Protection Test Points DMAFB".
The contractor will be responsible for replacing the cathodic protection systems and performing cathodic protection tests at each facility by a certified technician or specialist, to provide a fully functional corrosion protection system. The work location is Davis-Monthan AFB in Arizona, and the agency involved is the Department of the Air Force Air Combat Command. The Cost Estimate Breakdown template provides line items for labor, materials, and associated costs, but does not include any pricing details or the total contract value. Additional details can be found in the attached Statement of Work dated 10 April 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA487724R00220001 SF 30.pdf | ||
| Portfolio - Test Records.pdf | ||
| Portfolio - Test Point Locations.pdf | ||
| Copy of FBNV24-0026 RFI LOG.xlsx | XLSX spreadsheet | |
| AF Form 66_Cathodic Protection.xlsx | XLSX spreadsheet | |
| 01- Full Specifications - Copy FBNV240026.pdf | ||
| Solicitation - FA487724R0022.pdf | ||
| Wage Determinations.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rplace Cathodic Protection
| COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACT FOR(WORK TO BE PERFORMED) | W.T. #: FBNV 240026 | FBNV 240026 Replace Cathodic Protection at Multiple Facs | WORK LOCATION | DAVIS-MONTHAN AFB, AZ 85707 | ||||||
| LINE NO. | ITEM DESCRIPTION | UNIT OF ISSUE | MATERIAL / EQUIPMENT | LABOR / MANPOWER | LINE TOTAL | |||||
| QTY | UNIT COST | TOTAL | WAGE RATE | HRS | PERSONS | TOTAL |
| 1 | LABOR: | ||||||
| 2 | Mobilization, management, set up, video, & cleanup | ||||||
| 3 | Electrician HOURLY RATE : | $89.90 | (1 person x10hr day x30 days =300 hrs) | ||||
| 4 | LS | $0.00 | |||||
| 5 | LS | $0.00 | |||||
| 6 | LS | $0.00 | |||||
| 7 | MATERIAL: | $0.00 | |||||
| 8 | Feeders Protection Relay | EA | 0 | 1500.00 | $0.00 | $0.00 | |
| 8 | EA | $0.00 | $0.00 | ||||
| 9 | EA | $0.00 | $0.00 | ||||
| 10 | EA | $0.00 | $0.00 | ||||
| 11 | LS | $0.00 | $0.00 | ||||
| 12 | EA | 1450.00 | $0.00 | $0.00 | $0.00 | ||
| LINE TOTALS | $0.00 |
| SUBTOTAL | $0.00 |
| OVERHEAD %-age | $0.00 |
| $0.00 | |
| PROFIT %-age | $0.00 |
| SUBTOTAL | |
| TAX %-age | $0.00 |
| BOND %-age | $0.00 |
| TOTAL PROJECT PRICE | $0.00 |
NAME: DATE:
| AF Form 3052 (Computer Generated) | &"Univers (WN)"&8 |
| &10*FOR OFFICIAL USE ONLY* | &"Univers (WN)"&8 |
&10PAGE &P OF &N
File details come from the government source that posted it. Updated .