This document is an AF Form 3052, which is a Cost Estimate Breakdown template for a federal contract to replace cathodic protection at multiple facilities on Davis-Monthan AFB. The related federal contract opportunity is for Solicitation FA487724R0022, titled "FBNV240026 Replace Cathodic Protection Test Points DMAFB".

The contractor will be responsible for replacing the cathodic protection systems and performing cathodic protection tests at each facility by a certified technician or specialist, to provide a fully functional corrosion protection system. The work location is Davis-Monthan AFB in Arizona, and the agency involved is the Department of the Air Force Air Combat Command. The Cost Estimate Breakdown template provides line items for labor, materials, and associated costs, but does not include any pricing details or the total contract value. Additional details can be found in the attached Statement of Work dated 10 April 2024.

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
AF Form 3052 (BLANK).xlsx Revision not stated Solicitation for LPS Bldg 5415
Show all 20

Who attaches AF Form 3052

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rplace Cathodic Protection

COST ESTIMATE BREAKDOWN
CONTRACT FOR(WORK TO BE PERFORMED)W.T. #: FBNV 240026FBNV 240026 Replace Cathodic Protection at Multiple FacsWORK LOCATIONDAVIS-MONTHAN AFB, AZ 85707
LINE NO.ITEM DESCRIPTIONUNIT OF ISSUEMATERIAL / EQUIPMENTLABOR / MANPOWERLINE TOTAL
QTYUNIT COSTTOTALWAGE RATEHRSPERSONSTOTAL
1LABOR:
2Mobilization, management, set up, video, & cleanup
3Electrician HOURLY RATE :$89.90(1 person x10hr day x30 days =300 hrs)
4LS$0.00
5LS$0.00
6LS$0.00
7MATERIAL:$0.00
8Feeders Protection RelayEA01500.00$0.00$0.00
8EA$0.00$0.00
9EA$0.00$0.00
10EA$0.00$0.00
11LS$0.00$0.00
12EA1450.00$0.00$0.00$0.00
LINE TOTALS$0.00
SUBTOTAL$0.00
OVERHEAD %-age$0.00
$0.00
PROFIT %-age$0.00
SUBTOTAL
TAX %-age$0.00
BOND %-age$0.00
TOTAL PROJECT PRICE$0.00