17. AF Form 3052 (Blank) - FBNV190002.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Repair and Construct Primary Electric Distribution
Solicitation number
FA487724B0001
Issued by

About this file

This document contains a cost estimate breakdown template and details of a federal contract solicitation for repair and construction work. The cost estimate template is for repairs and construction of primary electric distribution at Davis-Monthan Air Force Base in Arizona under solicitation number FA487724B0001. The project encompasses plans, specifications, and execution of repair, construction, and demolition activities to design and construct a switch house facility. All work must comply with base design guidelines, Air Force standards, and cybersecurity controls. The contractor will upgrade all facility systems to current codes and provide supervision to complete the project. Interested parties must submit an entry authorization letter by March 15, 2024 at 1:00pm local time for base access. Personnel changes will not be permitted after submission.

View the file

Other files

File Type Posted
Solicitation Amendment - FA487724B00010003.pdf PDF
Solicitation Amendment FA487724B00010003 SF 30.pdf PDF
23. Wage Determination - AZ20240040.pdf PDF
Solicitation - FA487724B0001.pdf PDF
Solicitation Amendment FA487724B00010002 SF 30.pdf PDF
21. FBNV190002 RFI ANSWERS.xlsx XLSX spreadsheet
9. DMAFB Electrical Distribution - Drawing Set - 100 pct - REV 1.pdf PDF
8. DMAFB Electrical Dist - Design Analysis - 100 percent - REV 1.pdf PDF
6. 5015-21-3104 DMAFB Substation Specs - REV 1.pdf PDF
3. 5015-21-3104 DMAFB Substation - 100% Elec Calc Package - REV 1.pdf PDF
Solicitation Amendment FA487724B00010001.pdf PDF
2. 5015-21-3104 DMAFB Cutsheets -100pct - REV 1.pdf PDF
22. Sign-In Sheet (3-26).pdf PDF
Solicitation - FA487724B0001.pdf PDF
7. DMAFB Electrical Dist - Cx Plan REV 1.pdf PDF
4. 5015-21-3104 DMAFB Substation - 100% Structural Calcs - REV 1.pdf PDF
1. Specifications Package FBNV190002.pdf PDF
2. 5015-21-3104 DMAFB Cutsheets -100pct.pdf PDF
3. 5015-21-3104 DMAFB Substation - 100% Elec Calc Package.pdf PDF
13. Contractor Environmental Guide (15 May 2019).pdf PDF
14. DMAFB Design Compatibility Guidelines 2017.pdf PDF
20. Section B - Price Fill-In.pdf PDF
4. 5015-21-3104 DMAFB Substation - 100% Structural Calcs.pdf PDF
11. E-601 SINGLE LINE DIAGRAM.pdf PDF
12. DMAFB Installation Failure Action Plan.pdf PDF
15. 355 CS Base Design Guide 2021.pdf PDF
18. AF Form 66 FBNV190002.xlsx XLSX spreadsheet
Solicitation - FA487724B0001.pdf PDF
6. 5015-21-3104 DMAFB Substation Specs 1.19.2024.pdf PDF
7. DMAFB Electrical Dist - Cx Plan.pdf PDF
8. DMAFB Electrical Dist - Design Analysis - 100 percent.pdf PDF
10. E-101 E-HOUSE PLAN.pdf PDF
16. Cybersecurity of Facility-Related Control Systems (01-18-2017).pdf PDF
5. 5015-21-3104 DMAFB Substation P&C Report - 100%.pdf PDF
9. DMAFB Electrical Distribution - Drawing Set - 100 pct.pdf PDF
19. Template of Contractor EAL.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF Form 3052

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR(WORK TO BE PERFORMED)Repair/Construct Primary Electric Distribution for Energy Resiliency, Contract A Substation OnlyPROPOSED TOTAL CONTRACT PRICE0
PURCHASE REQUEST NUMBERPROJECT NUMBERFBNV190002WORK LOCATIONDAVIS-MONTHAN AFB, AZ 85707
LINEUNIT OFMATERIAL COSTLABOR COSTDIRECTLINE
NO.ITEMMEASUREQUANTITYUNITTOTALMANHOURSRATETOTALCOSTSTOTAL
SUMMARY
1SUBTOTAL DIVISION 01 GENERAL CONDITIONS0.000.000.000.000.00
2SUBTOTAL DIVISION 02 EXISTING CONDITIONS0.000.000.000.000.00
3SUBTOTAL DIVISION 03 CONCRETE0.000.000.000.000.00
4SUBTOTAL DIVISION 31 EARTHWORK0.000.000.000.000.00
5SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS0.000.000.000.000.00
LINE TOTALS OVERALL0.000.000.000.00
OVERHEAD TOTAL OVERALL (____%)0.00
SUBTOTAL OVERALL W/ OVERHEAD0.00
PROFIT TOTAL OVERALL (____%)0.00
SUBTOTAL OVERALL W/ OVERHEAD AND PROFIT0.00
TAX OVERALL ____%0.00
BOND OVERALL (____%)0.00
TOTAL OVERALL PROJECT PRICE0.00
DATE:FIRM NAME:
TITLE:BY:
DIVISION 01 GENERAL CONDITIONS
1*Provide Item Descriptions and Unit of Measures from IGE. Leave all else blank.
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

SUBTOTAL DIVISION 01 GENERAL CONDITIONS 0.00 0.00 0.00 0.00 0.00

DIVISION 02 EXISTING CONDITIONS
1
2
3
4

SUBTOTAL DIVISION 02 EXISTING CONDITIONS 0.00 0.00 0.00 0.00 0.00

DIVISION 03 CONCRETE
1
2
3
4
5
6
7
8
9
10

SUBTOTAL DIVISION 03 CONCRETE 0.00 0.00 0.00 0.00 0.00

DIVISION 31 EARTHWORK
1
2
3
4
5
6
7

SUBTOTAL DIVISION 31 EARTHWORK 0.00 0.00 0.00 0.00 0.00

DIVISION 32 EXTERIOR IMPROVEMENTS
1
2
3
4
5
6
7

SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS 0.00 0.00 0.00 0.00 0.00