This document contains a cost estimate breakdown template and details of a federal contract solicitation for repair and construction work. The cost estimate template is for repairs and construction of primary electric distribution at Davis-Monthan Air Force Base in Arizona under solicitation number FA487724B0001. The project encompasses plans, specifications, and execution of repair, construction, and demolition activities to design and construct a switch house facility. All work must comply with base design guidelines, Air Force standards, and cybersecurity controls. The contractor will upgrade all facility systems to current codes and provide supervision to complete the project. Interested parties must submit an entry authorization letter by March 15, 2024 at 1:00pm local time for base access. Personnel changes will not be permitted after submission.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF Form 3052
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR(WORK TO BE PERFORMED) | Repair/Construct Primary Electric Distribution for Energy Resiliency, Contract A Substation Only | PROPOSED TOTAL CONTRACT PRICE | 0 | |||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | FBNV190002 | WORK LOCATION | DAVIS-MONTHAN AFB, AZ 85707 | ||||||
| LINE | UNIT OF | MATERIAL COST | LABOR COST | DIRECT | LINE | |||||
| NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS | RATE | TOTAL | COSTS | TOTAL |
| SUMMARY | ||||||||||
| 1 | SUBTOTAL DIVISION 01 GENERAL CONDITIONS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 2 | SUBTOTAL DIVISION 02 EXISTING CONDITIONS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 3 | SUBTOTAL DIVISION 03 CONCRETE | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 4 | SUBTOTAL DIVISION 31 EARTHWORK | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 5 | SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| LINE TOTALS OVERALL | 0.00 | 0.00 | 0.00 | 0.00 |
| OVERHEAD TOTAL OVERALL (____%) | 0.00 | |||
| SUBTOTAL OVERALL W/ OVERHEAD | 0.00 | |||
| PROFIT TOTAL OVERALL (____%) | 0.00 | |||
| SUBTOTAL OVERALL W/ OVERHEAD AND PROFIT | 0.00 | |||
| TAX OVERALL ____% | 0.00 | |||
| BOND OVERALL (____%) | 0.00 | |||
| TOTAL OVERALL PROJECT PRICE | 0.00 |
| DATE: | FIRM NAME: |
| TITLE: | BY: |
| DIVISION 01 GENERAL CONDITIONS | |
| 1 | *Provide Item Descriptions and Unit of Measures from IGE. Leave all else blank. |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| 14 | |
| 15 | |
| 16 | |
| 17 | |
| 18 | |
| 19 | |
| 20 | |
| 21 | |
| 22 |
SUBTOTAL DIVISION 01 GENERAL CONDITIONS 0.00 0.00 0.00 0.00 0.00
| DIVISION 02 EXISTING CONDITIONS | |
| 1 | |
| 2 | |
| 3 | |
| 4 |
SUBTOTAL DIVISION 02 EXISTING CONDITIONS 0.00 0.00 0.00 0.00 0.00
| DIVISION 03 CONCRETE | |
| 1 | |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 |
SUBTOTAL DIVISION 03 CONCRETE 0.00 0.00 0.00 0.00 0.00
| DIVISION 31 EARTHWORK | |
| 1 | |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 | |
| 7 |
SUBTOTAL DIVISION 31 EARTHWORK 0.00 0.00 0.00 0.00 0.00
| DIVISION 32 EXTERIOR IMPROVEMENTS | |
| 1 | |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 | |
| 7 |
SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS 0.00 0.00 0.00 0.00 0.00