ATTACHMENT 3 MBMV222321 AF Form 66.pdf
Air Force Form PDF 66 KB Posted
- Attached to
- MBMV222321 Repair Emergency Power
- Solicitation number
- W50S84-22-B-0008
- Issued by
-
Department of the Army National Guard
About this file
This document includes a federal solicitation for repair and right-sizing of emergency power systems at a National Guard facility in Battle Creek, Michigan. The solicitation seeks bids for a small business set-aside contract with a value between $500,000 and $1,000,000 and a period of performance of 120 calendar days. Interested parties are encouraged to attend a pre-bid conference on August 17, 2022 to receive additional requirements information. Award will be made to the responsive bidder offering the lowest price that meets all terms and conditions. Funding is not presently available but is expected to be in place by September 30, 2022, at which time award will be made if prices are within an awardable range. The solicitation includes attachments specifying submittal requirements for schedules, safety plans, permits, and other documentation.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
MBMV222321
APPROVED DISAPPROVED
1 Submittal Schedule - AF Form 66 1 x
2 Transfer and Acceptance of DOD Real Property - DD Form 1354 1 x
3 Contractor Hazardous Material Identification 1 x
4 Solid Waste Recycling and Disposal Reporting Form 1 x
5 Affirmative Procurement Reporting Form 1 x
6 Construction Schedule 1 x
7 Construction Photos 1
8 Safety Documentation as stated 1 x
9 Permits, Licenses and Certificates 1 x
10 Quality Control Plan 1 x
11 Generators 1 1 1 1 12 Auto Transfer Switchs 1 1 1 1
SOLICITATION/CONTRACT NO.PROJECT TITLE
Repair /Rightsize Emergency Power
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L
O R
D
AT
A
SH
O
P D
R
AW
IN
G
S
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D
AT
IO
N
S
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U
T REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
File details come from the government source that posted it. Updated .