Atch 8 - AF Form 66 Submittal Register_MUHJ 24-4024 Repair MWD Kennel Interior Facility 1030.pdf
Air Force Form PDF 380 KB Posted
- Solicitation number
- FA480026B0001
About this file
This is a Submittal Register for the Repair of Military Working Dog Kennels Facility at Langley Air Force Base (Contract No. MUHJ 24-4024), dated 2 September 2025. The comprehensive 27-page document details the required submittals across multiple construction specification sections, including product data, shop drawings, samples, test reports, certificates, and closeout documents for various project components.
Key specification sections covered include concrete (03 30 00), masonry (04 20 00), metals (05 12 00), wood (06 10 00, 06 20 00), thermal and moisture protection (07 21 16, 07 24 00), doors and windows (08 11 13, 08 14 00), finishes (09 22 00, 09 29 00, 09 30 10), electrical (26 08 00, 26 12 19), HVAC (23 05 93, 23 07 00), and site work (31 00 00, 32 12 13). The register provides detailed tracking for contractor submittals, including government review and approval processes, with most items requiring review and approval before proceeding with work. Submissions are classified with specific codes indicating the type of review required, and each entry includes references to specific specification paragraphs.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 27 PAGES
MUHJ 24-4024
01 11 00 SD-03 Product Data
GMaterial Safety Data Sheet
(MSDS) for each item State and
EPA Region 3
GNotifications
GRecycling Report Trip Tickets
GAffirmative Procurement Report
GExemption Form, Annex B to
LAFB Affirmative Procurement
Plan 32-7080
GAll Employee Names and Social
Security Numbers Work Clearance
Requests (Air Force Form 103)
GQuality Control (QC) Report
GInitial and Interim DD Forms 1354
Acceptance and Transfer of Real
Property Facilities
SD-11 Closeout Submittals
GSurvey Report Metadata
GThree copies of Computer-Aided
Drafting and Design (CADD) digital final as-built drawings on CD's
GOne As-Built (Redline) Drawings
GTelecommunications As-Built
Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
REPAIR MILITARY WORKING DOG KENNELS FACILITY 1030 LANGLEY AFB, VA
2 September 2025
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 27 PAGES
01 11 00 GOne Telecommunications
As-Built CD-ROM in Microsoft
Visio format
GWarranty of Construction
Equipment
GWarranty Certificate
GEquipment Warranty/Guarantee
Record
GDD Form 1354 Acceptance and
Transfer of Real Property Facilities
01 33 00 SD-01 Preconstruction Submittals
1.7 GSubmittal Register
01 45 35 SD-01 Preconstruction Submittals
3.1.1 GProject Manual
SD-06 Test Reports
3.1.2Special Inspection Daily Reports
3.1.3Special Inspection Daily Reports
3.1.1Special Inspection Biweekly
Reports
3.1.2Special Inspection Biweekly
Reports
SD-07 Certificates
2.1AISC Certified Steel Fabricator
2.1Certificate of Compliance
1.5 GSpecial Inspector
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 27 PAGES
01 45 35 3.1.3 GComprehensive Final Report
01 57 13.00 22 SD-01 Preconstruction Submittals
1.4Construction Sequence Schedule
SD-03 Product Data
2.1Silt Fence
02 83 00 SD-01 Preconstruction Submittals
1.5.1.1Competent Person
1.5.1.2Training Certification
1.5.2.3Occupational and Environmental
Assessment Data Report
1.5.2.4Medical Examinations
1.5.2.8Lead, Cadmium, Chromium
Waste Management Plan
1.5.3Occupant Protection Plan
1.5.2.2 GLead, Cadmium, Chromium
Compliance Plan
3.5.2.1Written Evidence of TSD
Approval
SD-03 Product Data
1.6.1Respirators
1.6.4Vacuum Filters
2.1Materials and Equipment
2.1.1Expendable Supplies
SD-06 Test Reports
1.5.2.3Occupational and Environmental
Assessment Data Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 27 PAGES
REPAIR MILITARY WORKING DOG KENNELS FACILITY 1030
02 83 00 1.5.2.3Sampling Results
SD-07 Certificates
1.5.1.3Testing Laboratory
3.5.1.1Clearance Certification
SD-11 Closeout Submittals
3.5.2.1Hazardous Waste Manifest
02 85 00 SD-01 Preconstruction Submittals
1.2.26Ventilation System Mold
Remediator Qualifications
1.4.1.1 GPreliminary Visual Assessment
Report
1.4.1.2 GMicrobial Remediation Plan
1.4.1.3Respiratory Protection Program
1.4.1.4Worker Records
1.4.1.5Certified Industrial Hygienist
(CIH)/Industrial Hygienist (IH)
Qualifications
1.4.1.6Microbial Remediation Supervisor
Qualifications
SD-03 Product Data
1.2.11Disinfectants or Biocide
Sanitizing Solutions
1.2.14Fungicidal Agents, (EPA)
1.2.21Personal Protective Equipment
(PPE)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 27 PAGES
02 85 00 1.2.24Pressure Differential Measuring
Instrument
2.2Safety Data Sheets (SDS) for All
Materials
3.1.4Dehumidifiers
3.1.5Air Filtration Units
SD-06 Test Reports
1.4.3IH Daily Reports
SD-11 Closeout Submittals
1.4.4 GSubmittals at Completion of
Remediation Work
03 30 00 SD-01 Preconstruction Submittals
1.6.6 GQuality Control Program
1.6.7 GQuality Control Personnel
Certifications
1.6.7Quality Control Organizational
Chart
1.6.9 GLaboratory Accreditation
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.4.4Joint Filler
2.3.1Cementitious Materials
2.4.5Vapor Retarder
2.4.1Concrete Curing Materials
2.6Reinforcement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 27 PAGES
03 30 00 2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
2.2.2Biodegradable Form Release
Agent
2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
1.6.4.3Aggregates
3.12.3.3 GCompressive Strength Tests
3.12.3.5Unit Weight of Structural
Concrete
3.12.3.4Air Content
3.12.3.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.8Welder Qualifications
1.6.3.1Safety Data Sheets
1.6.7.2Field Testing Technician and
Testing Agency
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 27 PAGES
03 30 00 SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.1Curing Compound
04 20 00 SD-02 Shop Drawings
3.4.1.1 GDetail Drawings
SD-03 Product Data
2.3.1.1 GCementitious Materials
SD-07 Certificates
2.1.2.2Concrete Masonry Units (CMU)
2.3.1.1Cementitious Materials
2.3.2.2Admixtures for Grout
2.5.2Anchors, Ties, and Bar
Positioners
2.5.3Joint Reinforcement
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SD-03 Product Data
2.4.1Welding Electrodes and Rods
2.3.1.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.3.2Tension Control Bolts
SD-06 Test Reports
2.3Bolts, Nuts, and Washers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 27 PAGES
05 12 00 3.6.2.1Direct Tension Indicator Washer
Inspection Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.3AISC Structural Steel Fabricator
Quality Certification
1.4.3.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.6.1.1Certified Welding Inspector
3.4Welding Procedure Specifications
(WPS)
05 50 13 SD-02 Shop Drawings
2.3 GFloor Gratings
2.5 GDog House Covers
06 10 00 SD-03 Product Data
2.3.2.1Plywood
SD-07 Certificates
1.8.1Certificates of Grade
1.7Preservative Treatment
06 20 00 SD-03 Product Data
2.2 GSoffits
2.3 GFascias and Trim
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 27 PAGES
06 20 00 1.4.1.1 GCertificates of Grade
2.1.4 SIndoor Air Quality for MDF and
Particleboard
06 41 16.00 10 SD-02 Shop Drawings
2.9Shop Drawings
SD-04 Samples
2.3Plastic Laminates
2.6Cabinet Hardware
06 61 16 SD-02 Shop Drawings
2.3.4 GCounter Tops
SD-03 Product Data
2.1.1 GSolid Polymer
2.1.1 GQuartz Agglomerate Material
SD-04 Samples
2.1 GMaterial
SD-06 Test Reports
2.1.1Test Report Results
SD-07 Certificates
1.4.1Qualifications
2.1.1 SIndoor Air Quality for solid
surface fabrication products
07 21 16 SD-03 Product Data
2.1 GBlanket Insulation
2.1.1 SRecycled Content for Insulation
Materials
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 27 PAGES
07 21 16 2.1.3 SIndoor Air Quality for Insulation
Materials
07 24 00 SD-02 Shop Drawings
1.4.5 GShop Drawings
SD-03 Product Data
2.2Water-Resistant Barrier Coating
2.5Thermal Insulation
2.3Adhesive
2.4Mechanical Fasteners
2.11Accessories
2.6Base Coat
2.7Portland Cement
2.8Reinforcing Fabric
2.9Finish Coat
2.12Joint Sealant
2.10Sealant Primer
2.13Bond Breaker
2.14Backer Rod
1.4.4Insulation Board
1.7Warranty
SD-04 Samples
1.2.3.7 GSample Boards
SD-06 Test Reports
1.2.3.1Abrasion Resistance
1.2.3.2Accelerated Weathering
1.2.2.3Impact Resistance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 27 PAGES
07 24 00 1.2.3.3Mildew Resistance
1.2.3.4Salt Spray Resistance
1.2.3.6Absorption-Freeze-Thaw
1.2.1.1Water Penetration
1.2.3.5Water Resistance
1.2.2.1Surface Burning Characteristics
1.2.2.2Radiant Heat
3.1Substrate
1.2.1.2Wind Load Test
SD-07 Certificates
1.4.1Qualifications of EIFS
Manufacturer
1.4.2Qualification of EIFS Installer
1.4.3Qualification of Sealant Applicator
3.5.1 GInspection Checklist
SD-08 Manufacturer’s Instructions
3.3Manufacturer's Instructions
07 31 13 SD-03 Product Data
2.1.1Shingles
SD-04 Samples
2.1.1 GShingles
2.1.1 GColor Charts
SD-08 Manufacturer’s Instructions
3.3Application
SD-11 Closeout Submittals
1.5.1Manufacturer's Warranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 27 PAGES
07 31 13 1.5.2Contractor's Warranty
07 60 00 SD-02 Shop Drawings
3.1.11 GGutters
3.1.12 GDownspouts
3.1.14 GFlashing at Roof Penetrations
and Equipment Supports
3.1.10 GDrip Edges
3.1.13 GEave Flashing
SD-04 Samples
1.4.2 GFinish Samples
07 92 00 SD-03 Product Data
2.1 GSealants
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.3 GFrames
2.3 GFrames
SD-03 Product Data
2.1 GDoors
2.1 SRecycled Content for Steel Door
Product
2.3 GFrames
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 27 PAGES
08 11 13 2.3 SRecycled Content for Steel Frame
Product
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
2.1 GDoors
SD-04 Samples
2.1Doors
2.3.4.2 GDoor Finish Colors
SD-06 Test Reports
2.4Cycle-Slam
2.4Hinge Loading Resistance
SD-07 Certificates
2.1.1 SCertified Sustainably Harvested
Flush Wood Doors
SD-11 Closeout Submittals
1.5Warranty
08 71 00 SD-02 Shop Drawings
1.4 GHardware Schedule
2.3.4 GKeying System
SD-03 Product Data
2.3 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-11 Closeout Submittals
1.5.1Key Bitting
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 27 PAGES
08 81 00 SD-03 Product Data
2.2Insulating Glass
2.4Blackout Glazing Film
SD-08 Manufacturer’s Instructions
2.3Setting and Sealing Materials
08 91 00 SD-03 Product Data
2.2Door Louvers
09 22 00 SD-03 Product Data
2.1Metal Support Systems
2.1 SRecycled Content for Metal
Support Systems
09 29 00 SD-03 Product Data
2.1.2Water-Resistant Gypsum Backing
Board
2.1.1Gypsum Board
2.1.1 SRecycled Content for Gypsum
Board
2.1.1 SRecycled Content for Paper
Facing and Gypsum Cores
2.1.3 SVOC Content of Joint Compound
SD-07 Certificates
2.1 GAsbestos Free Materials
09 30 10 SD-03 Product Data
2.1 GTile
2.3 GMortar and Grout
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 27 PAGES
09 30 10 2.1 GTile
2.3.2 GGrout
09 65 00 SD-03 Product Data
2.8 GResilient Flooring and
Accessories
2.2Wall Base;
2.4Adhesives;
SD-04 Samples
2.8Resilient Flooring and
Accessories
SD-06 Test Reports
3.3Moisture, Alkalinity and Bond
Tests
SD-07 Certificates
2.1 SIndoor Air Quality for Luxury Vinyl
Tile
2.2 SIndoor Air Quality for Wall Base
2.4 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.2Surface Preparation
3.1Installation
SD-10 Operation and Maintenance
Data
2.8Resilient Flooring and
Accessories
09 67 23.13 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 27 PAGES
09 67 23.13 1.2.2Manufacturer's Catalog Data
SD-04 Samples
1.5.2Hardboard Mounted Epoxy
Flooring
SD-07 Certificates
1.5.1Listing of Product Installations
1.5Referenced Standards
Certificates
SD-11 Closeout Submittals
1.6Warranty
09 90 00 SD-03 Product Data
2.1 GCoatings
2.1Product Data Sheets
SD-04 Samples
2.2 GColor
SD-07 Certificates
1.5.5.2 GQualification Testing
SD-08 Manufacturer’s Instructions
3.2.1Application Instructions
2.1Mixing
1.7.1Manufacturer's Safety Data
Sheets
09 96 59 SD-03 Product Data
2.1.4High-Build Glaze Coatings
SD-04 Samples
2.1.4 GHigh-Build Glaze Coatings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
REPAIR MILITARY WORKING DOG KENNELS FACILITY 1030 LANGLEY AFB, VAREPAIR MILITARY WORKING DOG KENNELS FACILITY 1030 LANGLEY AFB, VAREPAIR MILITARY WORKING DOG KENNELS FACILITY 1030 LANGLEY AFB, VA
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 27 PAGES
09 96 59 SD-06 Test Reports
2.1.1Filler Material
2.1.2Primers
2.1.3Top Coating
SD-07 Certificates
1.5Qualifications of Installer
SD-08 Manufacturer’s Instructions
2.1Wall Coating System
10 22 13 SD-02 Shop Drawings
1.4Wire Mesh Partitions
SD-03 Product Data
1.4Wire Mesh Partitions
SD-04 Samples
2.1 GSamples
10 51 13 SD-02 Shop Drawings
2.1 GLockers
3.1Installation
SD-03 Product Data
2.1Lockers
SD-04 Samples
1.5.1 GColor chips
22 00 00 SD-03 Product Data
2.4Fixtures
2.4.1Kitchen Sinks
2.7 GWater Heaters
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
REPAIR MILITARY WORKING DOG KENNELS FACILITY 1030 LANGLEY AFB, VAREPAIR MILITARY WORKING DOG KENNELS FACILITY 1030 LANGLEY AFB, VA
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 27 PAGES
22 00 00 1.3Materials and Equipment
2.1.1Bolts
23 05 93 SD-02 Shop Drawings
1.3.2 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
2.3.1 SRecycled content for insulation
materials
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
SD-04 Samples
2.2.1.3 GThermal Insulation
SD-07 Certificates
2.2.1 SIndoor air quality for adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 27 PAGES
23 07 00 SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
23 30 00 SD-03 Product Data
2.8.1.1Metallic Flexible Duct
2.8.2Duct Access Doors
2.8.3Fire Dampers
2.8.4 GManual Balancing Dampers
2.8.6.1Diffusers
2.8.6.2Registers and Grilles
SD-06 Test Reports
3.10 GPerformance Tests
3.8 GDamper Acceptance Test
SD-07 Certificates
1.4.3Ozone Depleting Substances
Technician Certification
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation
Instructions
3.12.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.12.1 GOperation and Maintenance
Manuals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 27 PAGES
23 30 00 2.8.3 GFire Dampers
23 74 33 SD-02 Shop Drawings
2.7Controls
3.1 GInstallation Drawings
SD-03 Product Data
Part 1 GEquipment and Performance
Data
3.2.1 GAir-Conditioning Systems
2.5.2 GCompressor
2.4 GCoils
2.3 GFans
2.7 GControls
2.2.1 GUnit Cabinet
2.2.2 GCasing
2.6 GAir Filters
2.5.4.1 GAir-Cooled Condenser
SD-06 Test Reports
3.3 GRefrigerant Tests, Charging, and
Start-Up
3.2.2 GSystem Performance Tests
SD-07 Certificates
1.4List of Product Installations
1.9 GManufacturer's Warranty
SD-08 Manufacturer’s Instructions
3.1Manufacturer's Installation
Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 27 PAGES
23 74 33 3.4.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.4.1Operation and Maintenance
Manuals, Data Package 2
26 08 00 SD-06 Test Reports
3.1 GAcceptance Tests and
Inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance Test and Inspections
Procedure
26 12 19 SD-02 Shop Drawings
1.5.1 GPad-mounted Transformer
Drawings
SD-03 Product Data
2.2 GPad-mounted Transformers
SD-06 Test Reports
3.6.1 GAcceptance Checks and Tests
SD-07 Certificates
2.2.2.1 GTransformer Efficiencies
SD-09 Manufacturer’s Field
Reports
2.7.1 GTransformer Test Schedule
2.7.2 GDesign Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 27 PAGES
26 12 19 2.7.3 GRoutine and Other Tests
SD-10 Operation and Maintenance
Data
1.6.1 GTransformer(s)
26 20 00 SD-02 Shop Drawings
2.10 GPanelboards
SD-03 Product Data
2.9Receptacles
2.10.1Circuit Breakers
2.8Switches
SD-06 Test Reports
3.5.2600-volt Wiring Test
3.5.3Ground-fault Receptacle Test
26 51 00 SD-02 Shop Drawings
1.5.1Luminaire Drawings
SD-03 Product Data
2.2Luminaires
2.3Light Sources
2.4LED Drivers
1.6.1Luminaire Warranty
1.6.2Lighting Controls Warranty
2.5.1.1Switches
2.5.1.2Wall Box Dimmers
2.5.1.3Occupancy/Vacancy Sensors
2.5.1.4Photosensors
2.5.1.3.4Power Packs
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 27 PAGES
26 51 00 2.6.1Exit Signs
2.6.2Emergency Drivers
SD-05 Design Data
1.5.2Luminaire Design Data
SD-06 Test Reports
1.5.3ANSI/IES LM-79 Test Report
1.5.4ANSI/IES LM-80 Test Report
1.5.5ANSI/IES TM-21 Test Report
1.5.6 GANSI/IES TM-30 Test Report
3.2.1.1Occupancy/Vacancy Sensor
Verification Test
3.2.1.1 GPhotosensor Verification Test
SD-07 Certificates
1.5.7LED Driver and Dimming Switch
Compatibility Certificate
31 00 00 SD-01 Preconstruction Submittals
3.1.3 GExcavation and Trenching Plan
3.1.2.2 GDewatering Work Plan
3.4.3 GJacking, Boring, and Tunneling
Plan
3.8 GDisposition of Surplus Materials
1.5.3 GPreconstruction Meeting Minutes
SD-03 Product Data
2.5Geotextiles
SD-04 Samples
2.5Geotextiles
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 27 PAGES
31 00 00 SD-06 Test Reports
3.1.2.2 GDewatering Performance Records
3.9 GMaterial Test Report
31 05 19.13 SD-04 Samples
2.2.1Geotextiles
SD-07 Certificates
2.2.1Geotextiles
2.2.1.3Needle Punched Geotextile
32 01 19.61 SD-03 Product Data
2.1Sealants
3.5.2Manufacturer's
Recommendations
SD-06 Test Reports
2.1Sealants
SD-07 Certificates
3.1Equipment List
SD-08 Manufacturer’s Instructions
2.1Sealants
32 11 23 SD-03 Product Data
1.4 G AEEquipment and Tools
SD-06 Test Reports
2.2.1 G AEInitial Tests
3.13.1 G AEIn-Place Tests
32 12 13 SD-06 Test Reports
3.7Sampling and Testing
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 27 PAGES
32 12 13 2.1 G AETack Coat
32 12 16 SD-03 Product Data
2.4 G AEMix Design
3.9 G AEQuality Control
3.10 G AEMaterial Acceptance
1.1.3 G AEPercent Payment
SD-06 Test Reports
2.2 G AEAggregates
3.9.3.10QC Monitoring
SD-07 Certificates
2.3 G AEAsphalt Cement Binder
3.5Testing Laboratory
32 13 13.06 SD-03 Product Data
2.1.5 G AECuring Materials
2.1.4.2 G AEReinforcement
2.1.8 G AEEpoxy Resin
2.1.8 G AEEpoxy Resin
2.1.4.1 G AEDowel Bars
2.1.9.1 G AEExpansion Joint Filler
SD-05 Design Data
2.2.1 G AEMix Design Report
SD-06 Test Reports
3.10.2 G AEConcrete Slump Tests
2.3.1 G AEConcrete Uniformity
3.10.3 G AECompressive Strength
3.10.4 G AEAir Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 27 PAGES
32 13 13.06 SD-07 Certificates
1.3.4 G AEBatch Tickets
1.3.1 G AENRMCA Certificate Of
Conformance
32 31 13 SD-02 Shop Drawings
2.1 GFence Assembly
2.1 GGate Assembly
2.3.5Gate Hardware and Accessories
Part 3Erection/Installation Drawings
SD-03 Product Data
2.1Fence Assembly
2.1Gate Assembly
2.3.5Gate Hardware and Accessories
33 05 23.16 SD-01 Preconstruction Submittals
1.3Statement of Contractor
Qualifications
1.2Jacking and Boring Plan
1.5.1Jacking and Boring Plan
SD-02 Shop Drawings
3.9Record Drawings
SD-03 Product Data
1.2Manufacturer's Catalog Data
SD-08 Manufacturer’s Instructions
1.2Material Safety Data Sheets
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 27 PAGES
33 05 23.16 3.9Work Complete Logs of
Installation Operations
33 71 02 SD-03 Product Data
2.5 GMedium Voltage Cable
2.6 GMedium Voltage Cable
Terminations
SD-06 Test Reports
2.11.2 GMedium Voltage Cable
Qualification and Production Tests
3.15.1 GField Acceptance Checks and
Tests
2.11.1 GArc-proofing Test
SD-07 Certificates
1.5.1 GCable splicer/terminator
1.5.2 GCable Installer Qualifications
1.5.3 GCertificate of Conformance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS