This is a Submittal Register for the Repair of Military Working Dog Kennels Facility at Langley Air Force Base (Contract No. MUHJ 24-4024), dated 2 September 2025. The comprehensive 27-page document details the required submittals across multiple construction specification sections, including product data, shop drawings, samples, test reports, certificates, and closeout documents for various project components.

Key specification sections covered include concrete (03 30 00), masonry (04 20 00), metals (05 12 00), wood (06 10 00, 06 20 00), thermal and moisture protection (07 21 16, 07 24 00), doors and windows (08 11 13, 08 14 00), finishes (09 22 00, 09 29 00, 09 30 10), electrical (26 08 00, 26 12 19), HVAC (23 05 93, 23 07 00), and site work (31 00 00, 32 12 13). The register provides detailed tracking for contractor submittals, including government review and approval processes, with most items requiring review and approval before proceeding with work. Submissions are classified with specific codes indicating the type of review required, and each entry includes references to specific specification paragraphs.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 27 PAGES

MUHJ 24-4024

01 11 00 SD-03 Product Data

GMaterial Safety Data Sheet

(MSDS) for each item State and

EPA Region 3

GNotifications

GRecycling Report Trip Tickets

GAffirmative Procurement Report

GExemption Form, Annex B to

LAFB Affirmative Procurement

Plan 32-7080

GAll Employee Names and Social

Security Numbers Work Clearance

Requests (Air Force Form 103)

GQuality Control (QC) Report

GInitial and Interim DD Forms 1354

Acceptance and Transfer of Real

Property Facilities

SD-11 Closeout Submittals

GSurvey Report Metadata

GThree copies of Computer-Aided

Drafting and Design (CADD) digital final as-built drawings on CD's

GOne As-Built (Redline) Drawings

GTelecommunications As-Built

Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

REPAIR MILITARY WORKING DOG KENNELS FACILITY 1030 LANGLEY AFB, VA

2 September 2025

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 27 PAGES

01 11 00 GOne Telecommunications

As-Built CD-ROM in Microsoft

Visio format

GWarranty of Construction

Equipment

GWarranty Certificate

GEquipment Warranty/Guarantee

Record

GDD Form 1354 Acceptance and

Transfer of Real Property Facilities

01 33 00 SD-01 Preconstruction Submittals

1.7 GSubmittal Register

01 45 35 SD-01 Preconstruction Submittals

3.1.1 GProject Manual

SD-06 Test Reports

3.1.2Special Inspection Daily Reports

3.1.3Special Inspection Daily Reports

3.1.1Special Inspection Biweekly

Reports

3.1.2Special Inspection Biweekly

Reports

SD-07 Certificates

2.1AISC Certified Steel Fabricator

2.1Certificate of Compliance

1.5 GSpecial Inspector

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 27 PAGES

01 45 35 3.1.3 GComprehensive Final Report

01 57 13.00 22 SD-01 Preconstruction Submittals

1.4Construction Sequence Schedule

SD-03 Product Data

2.1Silt Fence

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1Competent Person

1.5.1.2Training Certification

1.5.2.3Occupational and Environmental

Assessment Data Report

1.5.2.4Medical Examinations

1.5.2.8Lead, Cadmium, Chromium

Waste Management Plan

1.5.3Occupant Protection Plan

1.5.2.2 GLead, Cadmium, Chromium

Compliance Plan

3.5.2.1Written Evidence of TSD

Approval

SD-03 Product Data

1.6.1Respirators

1.6.4Vacuum Filters

2.1Materials and Equipment

2.1.1Expendable Supplies

SD-06 Test Reports

1.5.2.3Occupational and Environmental

Assessment Data Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 27 PAGES

REPAIR MILITARY WORKING DOG KENNELS FACILITY 1030

02 83 00 1.5.2.3Sampling Results

SD-07 Certificates

1.5.1.3Testing Laboratory

3.5.1.1Clearance Certification

SD-11 Closeout Submittals

3.5.2.1Hazardous Waste Manifest

02 85 00 SD-01 Preconstruction Submittals

1.2.26Ventilation System Mold

Remediator Qualifications

1.4.1.1 GPreliminary Visual Assessment

Report

1.4.1.2 GMicrobial Remediation Plan

1.4.1.3Respiratory Protection Program

1.4.1.4Worker Records

1.4.1.5Certified Industrial Hygienist

(CIH)/Industrial Hygienist (IH)

Qualifications

1.4.1.6Microbial Remediation Supervisor

Qualifications

SD-03 Product Data

1.2.11Disinfectants or Biocide

Sanitizing Solutions

1.2.14Fungicidal Agents, (EPA)

1.2.21Personal Protective Equipment

(PPE)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 27 PAGES

02 85 00 1.2.24Pressure Differential Measuring

Instrument

2.2Safety Data Sheets (SDS) for All

Materials

3.1.4Dehumidifiers

3.1.5Air Filtration Units

SD-06 Test Reports

1.4.3IH Daily Reports

SD-11 Closeout Submittals

1.4.4 GSubmittals at Completion of

Remediation Work

03 30 00 SD-01 Preconstruction Submittals

1.6.6 GQuality Control Program

1.6.7 GQuality Control Personnel

Certifications

1.6.7Quality Control Organizational

Chart

1.6.9 GLaboratory Accreditation

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-03 Product Data

2.4.4Joint Filler

2.3.1Cementitious Materials

2.4.5Vapor Retarder

2.4.1Concrete Curing Materials

2.6Reinforcement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 27 PAGES

03 30 00 2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.3.4Admixtures

2.2.2Biodegradable Form Release

Agent

2.4.2Nonshrink Grout

SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

1.6.4.3Aggregates

3.12.3.3 GCompressive Strength Tests

3.12.3.5Unit Weight of Structural

Concrete

3.12.3.4Air Content

3.12.3.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.8Welder Qualifications

1.6.3.1Safety Data Sheets

1.6.7.2Field Testing Technician and

Testing Agency

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 27 PAGES

03 30 00 SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.1Curing Compound

04 20 00 SD-02 Shop Drawings

3.4.1.1 GDetail Drawings

SD-03 Product Data

2.3.1.1 GCementitious Materials

SD-07 Certificates

2.1.2.2Concrete Masonry Units (CMU)

2.3.1.1Cementitious Materials

2.3.2.2Admixtures for Grout

2.5.2Anchors, Ties, and Bar

Positioners

2.5.3Joint Reinforcement

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection

SD-02 Shop Drawings

1.4.2 GFabrication Drawings

SD-03 Product Data

2.4.1Welding Electrodes and Rods

2.3.1.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.3.2Tension Control Bolts

SD-06 Test Reports

2.3Bolts, Nuts, and Washers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 27 PAGES

05 12 00 3.6.2.1Direct Tension Indicator Washer

Inspection Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.3AISC Structural Steel Fabricator

Quality Certification

1.4.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.6.1.1Certified Welding Inspector

3.4Welding Procedure Specifications

(WPS)

05 50 13 SD-02 Shop Drawings

2.3 GFloor Gratings

2.5 GDog House Covers

06 10 00 SD-03 Product Data

2.3.2.1Plywood

SD-07 Certificates

1.8.1Certificates of Grade

1.7Preservative Treatment

06 20 00 SD-03 Product Data

2.2 GSoffits

2.3 GFascias and Trim

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 27 PAGES

06 20 00 1.4.1.1 GCertificates of Grade

2.1.4 SIndoor Air Quality for MDF and

Particleboard

06 41 16.00 10 SD-02 Shop Drawings

2.9Shop Drawings

SD-04 Samples

2.3Plastic Laminates

2.6Cabinet Hardware

06 61 16 SD-02 Shop Drawings

2.3.4 GCounter Tops

SD-03 Product Data

2.1.1 GSolid Polymer

2.1.1 GQuartz Agglomerate Material

SD-04 Samples

2.1 GMaterial

SD-06 Test Reports

2.1.1Test Report Results

SD-07 Certificates

1.4.1Qualifications

2.1.1 SIndoor Air Quality for solid

surface fabrication products

07 21 16 SD-03 Product Data

2.1 GBlanket Insulation

2.1.1 SRecycled Content for Insulation

Materials

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 27 PAGES

07 21 16 2.1.3 SIndoor Air Quality for Insulation

Materials

07 24 00 SD-02 Shop Drawings

1.4.5 GShop Drawings

SD-03 Product Data

2.2Water-Resistant Barrier Coating

2.5Thermal Insulation

2.3Adhesive

2.4Mechanical Fasteners

2.11Accessories

2.6Base Coat

2.7Portland Cement

2.8Reinforcing Fabric

2.9Finish Coat

2.12Joint Sealant

2.10Sealant Primer

2.13Bond Breaker

2.14Backer Rod

1.4.4Insulation Board

1.7Warranty

SD-04 Samples

1.2.3.7 GSample Boards

SD-06 Test Reports

1.2.3.1Abrasion Resistance

1.2.3.2Accelerated Weathering

1.2.2.3Impact Resistance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 27 PAGES

07 24 00 1.2.3.3Mildew Resistance

1.2.3.4Salt Spray Resistance

1.2.3.6Absorption-Freeze-Thaw

1.2.1.1Water Penetration

1.2.3.5Water Resistance

1.2.2.1Surface Burning Characteristics

1.2.2.2Radiant Heat

3.1Substrate

1.2.1.2Wind Load Test

SD-07 Certificates

1.4.1Qualifications of EIFS

Manufacturer

1.4.2Qualification of EIFS Installer

1.4.3Qualification of Sealant Applicator

3.5.1 GInspection Checklist

SD-08 Manufacturer’s Instructions

3.3Manufacturer's Instructions

07 31 13 SD-03 Product Data

2.1.1Shingles

SD-04 Samples

2.1.1 GShingles

2.1.1 GColor Charts

SD-08 Manufacturer’s Instructions

3.3Application

SD-11 Closeout Submittals

1.5.1Manufacturer's Warranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 27 PAGES

07 31 13 1.5.2Contractor's Warranty

07 60 00 SD-02 Shop Drawings

3.1.11 GGutters

3.1.12 GDownspouts

3.1.14 GFlashing at Roof Penetrations

and Equipment Supports

3.1.10 GDrip Edges

3.1.13 GEave Flashing

SD-04 Samples

1.4.2 GFinish Samples

07 92 00 SD-03 Product Data

2.1 GSealants

SD-07 Certificates

2.1.1 SIndoor Air Quality For Interior

Sealants

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.3 GFrames

2.3 GFrames

SD-03 Product Data

2.1 GDoors

2.1 SRecycled Content for Steel Door

Product

2.3 GFrames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 27 PAGES

08 11 13 2.3 SRecycled Content for Steel Frame

Product

08 14 00 SD-02 Shop Drawings

2.1 GDoors

SD-03 Product Data

2.1 GDoors

SD-04 Samples

2.1Doors

2.3.4.2 GDoor Finish Colors

SD-06 Test Reports

2.4Cycle-Slam

2.4Hinge Loading Resistance

SD-07 Certificates

2.1.1 SCertified Sustainably Harvested

Flush Wood Doors

SD-11 Closeout Submittals

1.5Warranty

08 71 00 SD-02 Shop Drawings

1.4 GHardware Schedule

2.3.4 GKeying System

SD-03 Product Data

2.3 GHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-11 Closeout Submittals

1.5.1Key Bitting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 27 PAGES

08 81 00 SD-03 Product Data

2.2Insulating Glass

2.4Blackout Glazing Film

SD-08 Manufacturer’s Instructions

2.3Setting and Sealing Materials

08 91 00 SD-03 Product Data

2.2Door Louvers

09 22 00 SD-03 Product Data

2.1Metal Support Systems

2.1 SRecycled Content for Metal

Support Systems

09 29 00 SD-03 Product Data

2.1.2Water-Resistant Gypsum Backing

Board

2.1.1Gypsum Board

2.1.1 SRecycled Content for Gypsum

Board

2.1.1 SRecycled Content for Paper

Facing and Gypsum Cores

2.1.3 SVOC Content of Joint Compound

SD-07 Certificates

2.1 GAsbestos Free Materials

09 30 10 SD-03 Product Data

2.1 GTile

2.3 GMortar and Grout

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 27 PAGES

09 30 10 2.1 GTile

2.3.2 GGrout

09 65 00 SD-03 Product Data

2.8 GResilient Flooring and

Accessories

2.2Wall Base;

2.4Adhesives;

SD-04 Samples

2.8Resilient Flooring and

Accessories

SD-06 Test Reports

3.3Moisture, Alkalinity and Bond

Tests

SD-07 Certificates

2.1 SIndoor Air Quality for Luxury Vinyl

Tile

2.2 SIndoor Air Quality for Wall Base

2.4 SIndoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.2Surface Preparation

3.1Installation

SD-10 Operation and Maintenance

Data

2.8Resilient Flooring and

Accessories

09 67 23.13 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 27 PAGES

09 67 23.13 1.2.2Manufacturer's Catalog Data

SD-04 Samples

1.5.2Hardboard Mounted Epoxy

Flooring

SD-07 Certificates

1.5.1Listing of Product Installations

1.5Referenced Standards

Certificates

SD-11 Closeout Submittals

1.6Warranty

09 90 00 SD-03 Product Data

2.1 GCoatings

2.1Product Data Sheets

SD-04 Samples

2.2 GColor

SD-07 Certificates

1.5.5.2 GQualification Testing

SD-08 Manufacturer’s Instructions

3.2.1Application Instructions

2.1Mixing

1.7.1Manufacturer's Safety Data

Sheets

09 96 59 SD-03 Product Data

2.1.4High-Build Glaze Coatings

SD-04 Samples

2.1.4 GHigh-Build Glaze Coatings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

REPAIR MILITARY WORKING DOG KENNELS FACILITY 1030 LANGLEY AFB, VAREPAIR MILITARY WORKING DOG KENNELS FACILITY 1030 LANGLEY AFB, VAREPAIR MILITARY WORKING DOG KENNELS FACILITY 1030 LANGLEY AFB, VA

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 27 PAGES

09 96 59 SD-06 Test Reports

2.1.1Filler Material

2.1.2Primers

2.1.3Top Coating

SD-07 Certificates

1.5Qualifications of Installer

SD-08 Manufacturer’s Instructions

2.1Wall Coating System

10 22 13 SD-02 Shop Drawings

1.4Wire Mesh Partitions

SD-03 Product Data

1.4Wire Mesh Partitions

SD-04 Samples

2.1 GSamples

10 51 13 SD-02 Shop Drawings

2.1 GLockers

3.1Installation

SD-03 Product Data

2.1Lockers

SD-04 Samples

1.5.1 GColor chips

22 00 00 SD-03 Product Data

2.4Fixtures

2.4.1Kitchen Sinks

2.7 GWater Heaters

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

REPAIR MILITARY WORKING DOG KENNELS FACILITY 1030 LANGLEY AFB, VAREPAIR MILITARY WORKING DOG KENNELS FACILITY 1030 LANGLEY AFB, VA

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 27 PAGES

22 00 00 1.3Materials and Equipment

2.1.1Bolts

23 05 93 SD-02 Shop Drawings

1.3.2 GTAB Schematic Drawings and

Report Forms

SD-03 Product Data

1.3 GEquipment and Performance

Data

SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

2.3.1 SRecycled content for insulation

materials

SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

SD-04 Samples

2.2.1.3 GThermal Insulation

SD-07 Certificates

2.2.1 SIndoor air quality for adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 27 PAGES

23 07 00 SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

23 30 00 SD-03 Product Data

2.8.1.1Metallic Flexible Duct

2.8.2Duct Access Doors

2.8.3Fire Dampers

2.8.4 GManual Balancing Dampers

2.8.6.1Diffusers

2.8.6.2Registers and Grilles

SD-06 Test Reports

3.10 GPerformance Tests

3.8 GDamper Acceptance Test

SD-07 Certificates

1.4.3Ozone Depleting Substances

Technician Certification

SD-08 Manufacturer’s Instructions

3.2Manufacturer's Installation

Instructions

3.12.2Operation and Maintenance

Training

SD-10 Operation and Maintenance

Data

3.12.1 GOperation and Maintenance

Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 27 PAGES

23 30 00 2.8.3 GFire Dampers

23 74 33 SD-02 Shop Drawings

2.7Controls

3.1 GInstallation Drawings

SD-03 Product Data

Part 1 GEquipment and Performance

Data

3.2.1 GAir-Conditioning Systems

2.5.2 GCompressor

2.4 GCoils

2.3 GFans

2.7 GControls

2.2.1 GUnit Cabinet

2.2.2 GCasing

2.6 GAir Filters

2.5.4.1 GAir-Cooled Condenser

SD-06 Test Reports

3.3 GRefrigerant Tests, Charging, and

Start-Up

3.2.2 GSystem Performance Tests

SD-07 Certificates

1.4List of Product Installations

1.9 GManufacturer's Warranty

SD-08 Manufacturer’s Instructions

3.1Manufacturer's Installation

Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 27 PAGES

23 74 33 3.4.2Operation and Maintenance

Training

SD-10 Operation and Maintenance

Data

3.4.1Operation and Maintenance

Manuals, Data Package 2

26 08 00 SD-06 Test Reports

3.1 GAcceptance Tests and

Inspections

SD-07 Certificates

1.4.1 GQualifications

1.4.3 GAcceptance Test and Inspections

Procedure

26 12 19 SD-02 Shop Drawings

1.5.1 GPad-mounted Transformer

Drawings

SD-03 Product Data

2.2 GPad-mounted Transformers

SD-06 Test Reports

3.6.1 GAcceptance Checks and Tests

SD-07 Certificates

2.2.2.1 GTransformer Efficiencies

SD-09 Manufacturer’s Field

Reports

2.7.1 GTransformer Test Schedule

2.7.2 GDesign Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 27 PAGES

26 12 19 2.7.3 GRoutine and Other Tests

SD-10 Operation and Maintenance

Data

1.6.1 GTransformer(s)

26 20 00 SD-02 Shop Drawings

2.10 GPanelboards

SD-03 Product Data

2.9Receptacles

2.10.1Circuit Breakers

2.8Switches

SD-06 Test Reports

3.5.2600-volt Wiring Test

3.5.3Ground-fault Receptacle Test

26 51 00 SD-02 Shop Drawings

1.5.1Luminaire Drawings

SD-03 Product Data

2.2Luminaires

2.3Light Sources

2.4LED Drivers

1.6.1Luminaire Warranty

1.6.2Lighting Controls Warranty

2.5.1.1Switches

2.5.1.2Wall Box Dimmers

2.5.1.3Occupancy/Vacancy Sensors

2.5.1.4Photosensors

2.5.1.3.4Power Packs

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 27 PAGES

26 51 00 2.6.1Exit Signs

2.6.2Emergency Drivers

SD-05 Design Data

1.5.2Luminaire Design Data

SD-06 Test Reports

1.5.3ANSI/IES LM-79 Test Report

1.5.4ANSI/IES LM-80 Test Report

1.5.5ANSI/IES TM-21 Test Report

1.5.6 GANSI/IES TM-30 Test Report

3.2.1.1Occupancy/Vacancy Sensor

Verification Test

3.2.1.1 GPhotosensor Verification Test

SD-07 Certificates

1.5.7LED Driver and Dimming Switch

Compatibility Certificate

31 00 00 SD-01 Preconstruction Submittals

3.1.3 GExcavation and Trenching Plan

3.1.2.2 GDewatering Work Plan

3.4.3 GJacking, Boring, and Tunneling

Plan

3.8 GDisposition of Surplus Materials

1.5.3 GPreconstruction Meeting Minutes

SD-03 Product Data

2.5Geotextiles

SD-04 Samples

2.5Geotextiles

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 27 PAGES

31 00 00 SD-06 Test Reports

3.1.2.2 GDewatering Performance Records

3.9 GMaterial Test Report

31 05 19.13 SD-04 Samples

2.2.1Geotextiles

SD-07 Certificates

2.2.1Geotextiles

2.2.1.3Needle Punched Geotextile

32 01 19.61 SD-03 Product Data

2.1Sealants

3.5.2Manufacturer's

Recommendations

SD-06 Test Reports

2.1Sealants

SD-07 Certificates

3.1Equipment List

SD-08 Manufacturer’s Instructions

2.1Sealants

32 11 23 SD-03 Product Data

1.4 G AEEquipment and Tools

SD-06 Test Reports

2.2.1 G AEInitial Tests

3.13.1 G AEIn-Place Tests

32 12 13 SD-06 Test Reports

3.7Sampling and Testing

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 27 PAGES

32 12 13 2.1 G AETack Coat

32 12 16 SD-03 Product Data

2.4 G AEMix Design

3.9 G AEQuality Control

3.10 G AEMaterial Acceptance

1.1.3 G AEPercent Payment

SD-06 Test Reports

2.2 G AEAggregates

3.9.3.10QC Monitoring

SD-07 Certificates

2.3 G AEAsphalt Cement Binder

3.5Testing Laboratory

32 13 13.06 SD-03 Product Data

2.1.5 G AECuring Materials

2.1.4.2 G AEReinforcement

2.1.8 G AEEpoxy Resin

2.1.8 G AEEpoxy Resin

2.1.4.1 G AEDowel Bars

2.1.9.1 G AEExpansion Joint Filler

SD-05 Design Data

2.2.1 G AEMix Design Report

SD-06 Test Reports

3.10.2 G AEConcrete Slump Tests

2.3.1 G AEConcrete Uniformity

3.10.3 G AECompressive Strength

3.10.4 G AEAir Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 27 PAGES

32 13 13.06 SD-07 Certificates

1.3.4 G AEBatch Tickets

1.3.1 G AENRMCA Certificate Of

Conformance

32 31 13 SD-02 Shop Drawings

2.1 GFence Assembly

2.1 GGate Assembly

2.3.5Gate Hardware and Accessories

Part 3Erection/Installation Drawings

SD-03 Product Data

2.1Fence Assembly

2.1Gate Assembly

2.3.5Gate Hardware and Accessories

33 05 23.16 SD-01 Preconstruction Submittals

1.3Statement of Contractor

Qualifications

1.2Jacking and Boring Plan

1.5.1Jacking and Boring Plan

SD-02 Shop Drawings

3.9Record Drawings

SD-03 Product Data

1.2Manufacturer's Catalog Data

SD-08 Manufacturer’s Instructions

1.2Material Safety Data Sheets

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 27 PAGES

33 05 23.16 3.9Work Complete Logs of

Installation Operations

33 71 02 SD-03 Product Data

2.5 GMedium Voltage Cable

2.6 GMedium Voltage Cable

Terminations

SD-06 Test Reports

2.11.2 GMedium Voltage Cable

Qualification and Production Tests

3.15.1 GField Acceptance Checks and

Tests

2.11.1 GArc-proofing Test

SD-07 Certificates

1.5.1 GCable splicer/terminator

1.5.2 GCable Installer Qualifications

1.5.3 GCertificate of Conformance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

File details come from the government source that posted it. Updated .