Atch 6-AF Form 66 Blank 7 March.xlsx
XLSX spreadsheet 27 KB Posted
- Solicitation number
- FA480325B0011
About this file
The attached file is an Air Force Form 66 (AF Form 66) materials submittal schedule for a project related to well repair and SCADA automation at Shaw Air Force Base. The form outlines a detailed timeline for required project submittals, including:
The solicitation requires installation of process equipment, controls systems, and remote SCADA access for Wells 3 and 5, with a project value between $500,000 and $1,000,000. Key dates include a mandatory site visit on 18 April 2025, questions due by 23 April 2025, and bid submissions due on 20 May 2025 at 2:00 PM EST. The project will be completed using Allen Bradley remote access and newly managed switches, excluding the existing Automated Logix WebCTRL system. Bid submissions are only accepted electronically through SAM.gov or via email to the Contracting Officer (Mr. Darrel Ford) and Contract Specialist (SrA Felix Prose). The submittal schedule on the form tracks critical documentation like construction schedules, equipment submittals, O&M manuals, and various drawing stages from 35% to as-built drawings.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NCOC-A
| PROJECT NUMBER : | PROJECT TITLE: | SOLICITATION/CONTRACT NO.: | |
| SCHEDULE OF MATERIAL SUBMITTALS | |||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR |
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | OTHER | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | |||||||||||||||||||
| 1 | Construction Schedule | x | Within 1 week of NTP | |||||||||||||||||
| 2 | Equipment submittals | x | ||||||||||||||||||
| 3 | O&M Manuals | x | ||||||||||||||||||
| 4 | 35% Drawings | x | ||||||||||||||||||
| 5 | 65% Drawings | x | ||||||||||||||||||
| 6 | 95% Drawings | x | ||||||||||||||||||
| 7 | As-Built Drawings | x | ||||||||||||||||||
| 8 | HMI Graphics | x | x | |||||||||||||||||
| 9 | ||||||||||||||||||||
| 10 | ||||||||||||||||||||
| 11 | ||||||||||||||||||||
| 12 | ||||||||||||||||||||
| 13 | ||||||||||||||||||||
| 14 | ||||||||||||||||||||
| 15 | ||||||||||||||||||||
| 16 | ||||||||||||||||||||
| 17 | ||||||||||||||||||||
| 18 | ||||||||||||||||||||
| 19 |
Solicitation No. F38604-99-1480 Attachment 6
AF FORM 66
(Computer Generated) PAGE &P of &N