Atch 6-AF Form 66 Blank 7 March.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Repair Well 3 and Well 5 with SCADA Automation- with AMENDMENT 0005
Solicitation number
FA480325B0011
Issued by

About this file

The attached file is an Air Force Form 66 (AF Form 66) materials submittal schedule for a project related to well repair and SCADA automation at Shaw Air Force Base. The form outlines a detailed timeline for required project submittals, including:

The solicitation requires installation of process equipment, controls systems, and remote SCADA access for Wells 3 and 5, with a project value between $500,000 and $1,000,000. Key dates include a mandatory site visit on 18 April 2025, questions due by 23 April 2025, and bid submissions due on 20 May 2025 at 2:00 PM EST. The project will be completed using Allen Bradley remote access and newly managed switches, excluding the existing Automated Logix WebCTRL system. Bid submissions are only accepted electronically through SAM.gov or via email to the Contracting Officer (Mr. Darrel Ford) and Contract Specialist (SrA Felix Prose). The submittal schedule on the form tracks critical documentation like construction schedules, equipment submittals, O&M manuals, and various drawing stages from 35% to as-built drawings.

View the file

Other files

File Type Posted
Amendment FA480325B00110003.pdf PDF
Atch 18-Site Pictures CLIN 0001 - 07222025.pdf PDF
Amendment FA480325B00110001 SF 30.pdf PDF
Atch 17-FA480325B0011 Wells Site Visit 2 Questions CE.pdf PDF
Amendment FA480325B00110005.pdf PDF
Atch 1-VLSB 18-0010 Repair Well 3 with SCADA Upgrade SOW 072225.pdf PDF
Atch 16-DAFGM_2024-32-01.pdf PDF
Atch 2- Shaw AFB Well Utility Controls Schematic.pdf PDF
Atch 5-Pricing Sheet-Well Automation BLANK.xlsx XLSX spreadsheet
Solicitation Amendment FA480325B00110001.pdf PDF
Amendment FA480325B00110004.pdf PDF
Atch 3-HMI Screen Reference.pdf PDF
Atch 7-WD-SC20250030-3 Jan 25.pdf PDF
Atch 9-Base Access Template (CAO Jul 24).docx DOCX document
Atch 10-Base Access Template (How-To Informational).pdf PDF
Atch 11-CONTRACTOR MEMO (optional_informational).docx DOCX document
Atch 15-Well 4 Chemical Skid Photos and Information.pdf PDF
Solicitation FA480325B0011.pdf PDF
Atch 8-Shaw AFB Design Standards 21 Aug 2018.pdf PDF
Atch 12-REAL ID Act -Shaw AFB Access Handout.docx DOCX document
Solicitation Amendment FA480325B00110003.pdf PDF
Atch 13-Site Visit Question Answers Document-27 May 25.pdf PDF
Atch 14-SCADA QA answer CAD file Document.pdf PDF
Amendment FA480325B00110002.pdf PDF
Atch 1-Repair Well 3 with SCADA Upgrade SOW-051825.pdf PDF
Atch 4-Rev 01 Site Pictures CLIN 0001-18 May 25.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NCOC-A

PROJECT NUMBER :PROJECT TITLE:SOLICITATION/CONTRACT NO.:
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSOTHERREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
1Construction SchedulexWithin 1 week of NTP
2Equipment submittalsx
3O&M Manualsx
435% Drawingsx
565% Drawingsx
695% Drawingsx
7As-Built Drawingsx
8HMI Graphicsxx
9
10
11
12
13
14
15
16
17
18
19

Solicitation No. F38604-99-1480 Attachment 6

AF FORM 66

(Computer Generated) PAGE &P of &N