This file is an Attachment 18 with site pictures related to a federal contract opportunity for repairing Wells 3 and 5 at Shaw Air Force Base with SCADA automation. The images document various equipment, electrical systems, motors, and infrastructure at multiple well locations, including detailed views of control cabinets, motor specifications, soft starters, disconnects, and network configurations. The pictures provide visual documentation of existing equipment and installation requirements for the contract, which involves process equipment installation, controls systems integration, and remote SCADA access using Allen Bradley equipment and managed switches.
The site pictures specifically showcase technical details for Wells 3 and 5, including main well motors, VOC tower soft starters, electrical cabinets, PLC systems, network connections, and specific equipment like analyzers and fiber optic networks. Each image is annotated with technical descriptions outlining specific requirements or actions needed, such as demolishing existing equipment, relocating components, maintaining certain disconnects, and installing new monitoring and control systems. The images serve as a comprehensive visual reference for potential contractors to understand the scope and current state of the wells' infrastructure.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 18 - Site pictures
AT 18 -1
Rev 01 04 18 2025
Rev 02 07 22 2025
Work site locations
Base Coin Fiber exist at all locations.
AT 18 -2
Current COIN Comm connection in PLC cabinet Every well
Per SOW this is the requested COIN Comm connection in PLC cabinet
Base Coin Fiber network Demark point
COIN Fiber connection
BlackBox convertor
Enthernet to Automation
Logic controller
Automation Logic controller BacNet to
RTA
convertor
RTA
convertor
Enthernet to Allen bradley switch
PLC/HMI
Base Coin Fiber network Demark point
COIN Fiber connection
New managed switch
PLC/HMI
AT 18 -3
Current COIN network – COMMS exist between all wells and the base tower. Base COIN fiber network is managed by the 20th COMM squadron
Base
COIN
Fiber network
Well 1
Well 3
Well 4
Well 5Well 6
Base Tower
ECMS
shop
AT 18 -4
Well 3 – Current stripper level sensor system.
Stripper Tower tank level sensor. Contractor to delete the three sensor and provide a single ultra sonic or radar level sensor. The contractor remove and install a new clear 4’’ PVC pipe.
The sensor shall be mounted to the top of the pipe. The pipe shall be marked with the High High Level, High level, Low Level, Low Low Level. The contractor shall provide the ability on the HMI to reset the rescale the sensor by running the water level up to the high level and hitting high high level set button and running the water level down to the low low level and
AT 18 -5
hitting the low low level set button. The system will need to be heat traced. The system will also need to reuse or install a new pressure gauge at the bottom.
Well 3 - Main Well motor
AT 18 -6
Well 3 -
Electrical cabinet and VFD to be returned to 20th CES.
AT 18 -7
Well 3 – Cabinet to be demoed along with attached conduit. Fiber to remain to be move new location next to the PLC electical cabinet.
AT 18 -8
Well 3 – Cabinet to be demoed along with attached conduit and wires. All conduits and wires shall be removed back to the electrical panel.
AT 18 -9
Potential EMCS Allen Bradley PC work station location Work station will be located in Water shop office
AT 18 -10
Well 3 -
Old Analyzers and all plumbing to be demolished
AT 18 -11
B251 Water Shop Potential display location.
AT 18 -12
Well 3 – Current transformer in the electrical room. Contractor needs to verify the supply voltage to the new main motor VFD.
AT 18 -13
Well -3 Contractor to install small drop-down wall mounted table. For the water shop to take samples.
AT 18 -14
Example of the graphics where the display shows the tower level, and which motors are running in green. Would prefer a gray background.
Example of the gray background. The contractor shall provide a display like this for each well and tower.
AT 18 -15
Wall Mounted desk example. Needs to be steel construction, and min dimensions are 24.5’’x17.5’’. and it needs to be lockable.
AT 18 -16
Well 3 New Fiber wall location.
AT 18 -17
Well 4 – Main motor VFD
AT 18 -18
Well 4 – Effluent pump motor VFD
AT 18 -19
Well 5 Eye wash station
AT 18 -20
Well 5 – Pictures
AT 18 -21
Well 5 –Pictures
AT 18 -22
Well 5 –Pictures
AT 18 -23
Well 5 – Pictures
AT 18 -24
Well 5 – Example of All Wells Automated Logic controller
The Automated Logic controller will be disconnected at each location, and it will be removed and turned over to the 20th Civil Engineer Squadron.
AT 18 -25
Well 5 – Old analyzers to be demoed
AT 18 -26
Well 5 – PLC cabinet
AT 18 -27
Well 5 PLC Cabinet
AT 18 -28
Well 5 – Main motor disconnect shall remain
AT 18 -29
Well 5 Disconnect shall remain – Also an example of how any exterior electrical enclosure shall be mounted.
AT 18 -30
Well 5 Disconnect shall remain – Also an example of how any exterior electrical enclosure shall be mounted.
AT 18 -31
Well 5 VOC tower soft starter
AT 18 -32
Well 5 – effluent motor to the VOC tower
AT 18 -33
Well 5 VOC tower soft starter
AT 18 -34
Well 5 - Main well motor