Atch 4-Rev 01 Site Pictures CLIN 0001-18 May 25.pdf

PDF 6 MB Posted

Attached to
Repair Well 3 and Well 5 with SCADA Automation- with AMENDMENT 0005
Solicitation number
FA480325B0011
Issued by

About this file

The document is an Attachment 01 - Site Pictures file containing detailed visual documentation for a federal contract opportunity to repair Wells 3 and 5 at Shaw Air Force Base with SCADA automation. The images comprehensively document existing infrastructure, including electrical cabinets, motor specifications, soft starters, disconnects, logic controllers, and site layouts across multiple well locations. Key visual details include network connectivity diagrams, equipment nameplates showing electrical specifications, control system configurations, and external equipment mounting examples.

The site pictures provide technical reference materials for contractors bidding on the solicitation FA480325B0011, which requires process equipment installation, controls systems integration, and remote SCADA access. The contract is valued between $500,000 and $1,000,000, with bid submissions due by 20 May 2025 at 2:00 PM EST through SAM.gov. The project involves upgrading well systems to meet Shaw AFB design standards, American National Standards Institute (ANSI), American Waterworks Association (AWWA), National Electrical Code (NEC), and Uniform Plumbing Code (UPC) guidelines.

View the file

Other files

File Type Posted
Amendment FA480325B00110005.pdf PDF
Atch 16-DAFGM_2024-32-01.pdf PDF
Atch 17-FA480325B0011 Wells Site Visit 2 Questions CE.pdf PDF
Atch 1-VLSB 18-0010 Repair Well 3 with SCADA Upgrade SOW 072225.pdf PDF
Amendment FA480325B00110001 SF 30.pdf PDF
Amendment FA480325B00110003.pdf PDF
Atch 18-Site Pictures CLIN 0001 - 07222025.pdf PDF
Atch 5-Pricing Sheet-Well Automation BLANK.xlsx XLSX spreadsheet
Solicitation Amendment FA480325B00110003.pdf PDF
Atch 8-Shaw AFB Design Standards 21 Aug 2018.pdf PDF
Atch 11-CONTRACTOR MEMO (optional_informational).docx DOCX document
Atch 7-WD-SC20250030-3 Jan 25.pdf PDF
Atch 9-Base Access Template (CAO Jul 24).docx DOCX document
Atch 15-Well 4 Chemical Skid Photos and Information.pdf PDF
Solicitation FA480325B0011.pdf PDF
Atch 12-REAL ID Act -Shaw AFB Access Handout.docx DOCX document
Amendment FA480325B00110004.pdf PDF
Solicitation Amendment FA480325B00110001.pdf PDF
Atch 2- Shaw AFB Well Utility Controls Schematic.pdf PDF
Atch 10-Base Access Template (How-To Informational).pdf PDF
Atch 3-HMI Screen Reference.pdf PDF
Atch 6-AF Form 66 Blank 7 March.xlsx XLSX spreadsheet
Amendment FA480325B00110002.pdf PDF
Atch 1-Repair Well 3 with SCADA Upgrade SOW-051825.pdf PDF
Atch 14-SCADA QA answer CAD file Document.pdf PDF
Atch 13-Site Visit Question Answers Document-27 May 25.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 01 - Site pictures

AT 01 -1

Rev 01 04182025

Work site locations

Base Coin Fiber exist at all locations.

AT 01 -2

Current COIN Comm connection in PLC cabinet Every well

Per SOW this is the requested COIN Comm connection in PLC cabinet

Base Coin Fiber network Demark point

COIN Fiber connection

BlackBox convertor

Enthernet to Automation

Logic controller

Automation Logic controller BacNet to

RTA

convertor

RTA

convertor

Enthernet to Allen bradley switch

PLC/HMI

Base Coin Fiber network Demark point

COIN Fiber connection

New managed switch

PLC/HMI

AT 01 -3

Current COIN network – COMMS exist between all wells and the base tower. Base COIN fiber network is managed by the 20th COMM squadron

Base

COIN

Fiber network

Well 1

Well 3

Well 4

Well 5Well 6

Base Tower

ECMS

shop

AT 01 -4

Well 3 – Current stripper level sensor system.

Stripper Tower tank level sensor. Contractor to delete the three sensor and provide a single ultra sonic or radar level sensor. The contractor remove and install a new clear 4’’ PVC pipe.

The sensor shall be mounted to the top of the pipe. The pipe shall be marked with the High High Level, High level, Low Level, Low Low Level. The contractor shall provide the ability on the HMI to reset the rescale the sensor by running the water level up to the high level and hitting high high level set button and running the water level down to the low low level and

AT 01 -5

hitting the low low level set button. The system will need to be heat traced. The system will also need to reuse or install a new pressure gauge at the bottom.

Well 3 - Main Well motor

AT 01 -6

Well 3 -

Electrical cabinet and VFD to be returned to 20th CES.

AT 01 -7

Well 3 – Cabinet to be demoed along with attached conduit. Fiber to remain to be move new location next to the PLC electical cabinet.

AT 01 -8

Well 3 – Cabinet to be demoed along with attached conduit and wires. All conduits and wires shall be removed back to the electrical panel.

AT 01 -9

Potential EMCS Allen Bradley PC work station location Work station will be located in Water shop o ice

AT 01 -10

Well 3 -

Old Analyzers and all plumbing to be demolished

AT 01 -11

B251 Water Shop Potential display location.

AT 01 -12

Well 3 – Current transformer in the electrical room. Contractor needs to verify the supply voltage to the new main motor VFD.

AT 01 -13

Well -3 Contractor to install small drop-down wall mounted table. For the water shop to take samples.

AT 01 -14

Example of the graphics where the display shows the tower level, and which motors are running in green. Would prefer a gray background.

Example of the gray background. The contractor shall provide a display like this for each well and tower.

AT 01 -15

Wall Mounted desk example. Needs to be steel construction, and min dimensions are 24.5’’x17.5’’. and it needs to be lockable.

AT 01 -16

Well 3 New Fiber wall location.

AT 01 -17

Well 4 – Main motor VFD

AT 01 -18

Well 4 – E luent pump motor VFD

AT 01 -19

Well 5 Eye wash station

AT 01 -20

Well 5 – Pictures

AT 01 -21

Well 5 –Pictures

AT 01 -22

Well 5 –Pictures

AT 01 -23

Well 5 – Pictures

AT 01 -24

Well 5 – Example of All Wells Automated Logic controller

AT 01 -25

Well 5 – Old analyzers to be demoed

AT 01 -26

Well 5 – PLC cabinet

AT 01 -27

Well 5 PLC Cabinet

AT 01 -28

Well 5 – Main motor disconnect shall remain

AT 01 -29

Well 5 Disconnect shall remain – Also an example of how any exterior electrical enclosure shall be mounted.

AT 01 -30

Well 5 Disconnect shall remain – Also an example of how any exterior electrical enclosure shall be mounted.

AT 01 -31

Well 5 VOC tower soft starter

AT 01 -32

Well 5 – e luent motor to the VOC tower

AT 01 -33

Well 5 VOC tower soft starter

AT 01 -34

Well 5 - Main well motor

File details come from the government source that posted it. Updated .