Atch 4-Rev 01 Site Pictures CLIN 0001-18 May 25.pdf
PDF 6 MB Posted
- Solicitation number
- FA480325B0011
About this file
The document is an Attachment 01 - Site Pictures file containing detailed visual documentation for a federal contract opportunity to repair Wells 3 and 5 at Shaw Air Force Base with SCADA automation. The images comprehensively document existing infrastructure, including electrical cabinets, motor specifications, soft starters, disconnects, logic controllers, and site layouts across multiple well locations. Key visual details include network connectivity diagrams, equipment nameplates showing electrical specifications, control system configurations, and external equipment mounting examples.
The site pictures provide technical reference materials for contractors bidding on the solicitation FA480325B0011, which requires process equipment installation, controls systems integration, and remote SCADA access. The contract is valued between $500,000 and $1,000,000, with bid submissions due by 20 May 2025 at 2:00 PM EST through SAM.gov. The project involves upgrading well systems to meet Shaw AFB design standards, American National Standards Institute (ANSI), American Waterworks Association (AWWA), National Electrical Code (NEC), and Uniform Plumbing Code (UPC) guidelines.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 01 - Site pictures
AT 01 -1
Rev 01 04182025
Work site locations
Base Coin Fiber exist at all locations.
AT 01 -2
Current COIN Comm connection in PLC cabinet Every well
Per SOW this is the requested COIN Comm connection in PLC cabinet
Base Coin Fiber network Demark point
COIN Fiber connection
BlackBox convertor
Enthernet to Automation
Logic controller
Automation Logic controller BacNet to
RTA
convertor
RTA
convertor
Enthernet to Allen bradley switch
PLC/HMI
Base Coin Fiber network Demark point
COIN Fiber connection
New managed switch
PLC/HMI
AT 01 -3
Current COIN network – COMMS exist between all wells and the base tower. Base COIN fiber network is managed by the 20th COMM squadron
Base
COIN
Fiber network
Well 1
Well 3
Well 4
Well 5Well 6
Base Tower
ECMS
shop
AT 01 -4
Well 3 – Current stripper level sensor system.
Stripper Tower tank level sensor. Contractor to delete the three sensor and provide a single ultra sonic or radar level sensor. The contractor remove and install a new clear 4’’ PVC pipe.
The sensor shall be mounted to the top of the pipe. The pipe shall be marked with the High High Level, High level, Low Level, Low Low Level. The contractor shall provide the ability on the HMI to reset the rescale the sensor by running the water level up to the high level and hitting high high level set button and running the water level down to the low low level and
AT 01 -5
hitting the low low level set button. The system will need to be heat traced. The system will also need to reuse or install a new pressure gauge at the bottom.
Well 3 - Main Well motor
AT 01 -6
Well 3 -
Electrical cabinet and VFD to be returned to 20th CES.
AT 01 -7
Well 3 – Cabinet to be demoed along with attached conduit. Fiber to remain to be move new location next to the PLC electical cabinet.
AT 01 -8
Well 3 – Cabinet to be demoed along with attached conduit and wires. All conduits and wires shall be removed back to the electrical panel.
AT 01 -9
Potential EMCS Allen Bradley PC work station location Work station will be located in Water shop o ice
AT 01 -10
Well 3 -
Old Analyzers and all plumbing to be demolished
AT 01 -11
B251 Water Shop Potential display location.
AT 01 -12
Well 3 – Current transformer in the electrical room. Contractor needs to verify the supply voltage to the new main motor VFD.
AT 01 -13
Well -3 Contractor to install small drop-down wall mounted table. For the water shop to take samples.
AT 01 -14
Example of the graphics where the display shows the tower level, and which motors are running in green. Would prefer a gray background.
Example of the gray background. The contractor shall provide a display like this for each well and tower.
AT 01 -15
Wall Mounted desk example. Needs to be steel construction, and min dimensions are 24.5’’x17.5’’. and it needs to be lockable.
AT 01 -16
Well 3 New Fiber wall location.
AT 01 -17
Well 4 – Main motor VFD
AT 01 -18
Well 4 – E luent pump motor VFD
AT 01 -19
Well 5 Eye wash station
AT 01 -20
Well 5 – Pictures
AT 01 -21
Well 5 –Pictures
AT 01 -22
Well 5 –Pictures
AT 01 -23
Well 5 – Pictures
AT 01 -24
Well 5 – Example of All Wells Automated Logic controller
AT 01 -25
Well 5 – Old analyzers to be demoed
AT 01 -26
Well 5 – PLC cabinet
AT 01 -27
Well 5 PLC Cabinet
AT 01 -28
Well 5 – Main motor disconnect shall remain
AT 01 -29
Well 5 Disconnect shall remain – Also an example of how any exterior electrical enclosure shall be mounted.
AT 01 -30
Well 5 Disconnect shall remain – Also an example of how any exterior electrical enclosure shall be mounted.
AT 01 -31
Well 5 VOC tower soft starter
AT 01 -32
Well 5 – e luent motor to the VOC tower
AT 01 -33
Well 5 VOC tower soft starter
AT 01 -34
Well 5 - Main well motor