This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Geosyntec Consultants, Inc. for continued site assessment activities at Jack Sheehan's Drive-In Cleaners #2 located at 831 Belvedere Road, West Palm Beach, Florida (ERIC_5221). The contract is issued under Master Agreement HW683 with Task Assignment number DC053B, effective through August 31, 2026. The contracting parties include the FDEP as the government entity and Geosyntec as the contractor, with Sarah Aduwa serving as the FDEP Project Manager and Melissa Shook representing Geosyntec.

The scope of work encompasses four subtasks: Project Management (Subtask 1), Monitoring Well Installations, Surveying, and Groundwater Sampling (Subtask 2), Site Assessment Report preparation (Subtask 3), and PFAS Screening activities (Subtask 4). The total contract value is $35,677.73 on a fixed unit rate basis, with 151 labor hours allocated across the subtasks. Invoicing is structured in two phases: $25,005.31 upon submittal and FDEP approval of field deliverables for Subtasks 2 and 4 (due May 30, 2026), and $10,672.42 upon submittal and approval of the Site Assessment Report and IDW manifests (due June 30, 2026). The cost estimate includes labor, overhead, subcontractor services for drilling ($6,545.00), surveying ($2,573.00), utility location ($750.00), MOT planning ($855.60), IDW management ($935.00), laboratory analysis ($365.00), field expenses ($740.00), travel ($832.00), and a completion fee ($1,901.48).

View the file

Other files

File Type Posted
CN-370000-HW683-BF01A.pdf PDF
CN-370000-HW683-BF01B.pdf PDF
CN-370000-HW683-BF02A.pdf PDF
CN-370000-HW683-BF02ACO2.pdf PDF
CN-370000-HW683-BF04A.pdf PDF
CN-370000-HW683-BF04BCO1.pdf PDF
CN-370000-HW683-BF2BCO1.pdf PDF
CN-370000-HW683-BIL01A.pdf PDF
CN-370000-HW683-CSS02.pdf PDF
CN-370000-HW683-CSS02A.pdf PDF
CN-370000-HW683-DC002F.pdf PDF
CN-370000-HW683-DC004B.pdf PDF
CN-370000-HW683-DC004E.pdf PDF
CN-370000-HW683-DC005D.pdf PDF
CN-370000-HW683-DC005E.pdf PDF
CN-370000-HW683-DC007A.pdf PDF
CN-370000-HW683-DC007B.pdf PDF
CN-370000-HW683-DC008A.pdf PDF
CN-370000-HW683-DC008B.pdf PDF
CN-370000-HW683-DC008D.pdf PDF
CN-370000-HW683-DC009A.pdf PDF
CN-370000-HW683-DC009B.pdf PDF
CN-370000-HW683-DC009G.pdf PDF
CN-370000-HW683-DC010C.pdf PDF
CN-370000-HW683-DC011B.pdf PDF
CN-370000-HW683-DC011C.pdf PDF
CN-370000-HW683-DC011D.pdf PDF
CN-370000-HW683-DC012B.pdf PDF
CN-370000-HW683-DC016B.pdf PDF
CN-370000-HW683-DC017A.pdf PDF
CN-370000-HW683-DC018B.pdf PDF
CN-370000-HW683-DC019A.pdf PDF
CN-370000-HW683-DC019B.pdf PDF
CN-370000-HW683-DC019C.pdf PDF
CN-370000-HW683-DC019D.pdf PDF
CN-370000-HW683-DC01ACO1.pdf PDF
CN-370000-HW683-DC025B.pdf PDF
CN-370000-HW683-DC026B.pdf PDF
CN-370000-HW683-DC029A.pdf PDF
CN-370000-HW683-DC029E.pdf PDF
CN-370000-HW683-DC02ACO1.pdf PDF
CN-370000-HW683-DC02E.pdf PDF
CN-370000-HW683-DC031C.pdf PDF
CN-370000-HW683-DC032A.pdf PDF
CN-370000-HW683-DC032C.pdf PDF
CN-370000-HW683-DC035A.pdf PDF
CN-370000-HW683-DC036B.pdf PDF
CN-370000-HW683-DC037B.pdf PDF
CN-370000-HW683-DC038A.pdf PDF
CN-370000-HW683-DC039A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW683

DC053B Completion August 31, 2026

This Task Assignment authorizes Geosyntec to continue Site Assessment activities at Jack Sheehan's Drive-In Cleaners #2 site in accordance with Geosyntec’s scope of work, cost estimate and schedule received on March 25, 2026.

Sarah Aduwa 850-245-8973 Contractor Geosyntec Contractor

Contractor Melissa Shook Contractor 321-451-5480

ERIC 5221

831 Belvedere Road West Palm Beach, Florida 33405

Jack Sheehan's Drive-In Cleaners #2

Contractor Contractor

✔ $ 35,677.73

$ 35,677.73

Scope of Work

Geosyntec Contractor Todd Kafka

Contract Manager

Todd K. Kafka, PG (FL) Digitally signed by Todd K. Kafka, PG (FL) Date: 2026.04.14 10:22:55 -04'00'

Digitally signed by Jennifer Farrell Date: 2026.03.30 10:41:33 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2,4 - Field Deliverable Subtask 2 and Field Deliverable for Subtask 4 05/30/2026

Subtask 1,3 - Submittal of Site Assessment Report and IDW Manifests 06/30/2026

Subtask 2,4 - Submittal and FDEP approval of Field Deliverable Subtask 2 and Subtask 4 $ 25,005.31

Subtask 1,3 - Submittal and FDEP approval of Site Assessment Report and IDW Manifests $ 10,672.42

$ 35,677.73

HW683

DC053B

To: HW683 Contract Negotiation File Jack Sheehan Drive-In Cleaners #2 West Palm Beach, Florida

ERIC_5221

From: Sarah Aduwa, Project Manager Date: March 25, 2026 Subject: Negotiation Summary

HW683_DC053B

This Task Assignment authorizes Geosyntec to continue Site Assessment activities at Jack Sheehan's Drive-In Cleaners #2 site in accordance with Geosyntec’s scope of work, cost estimate and schedule received on March 25, 2026.

Melissa Shook is the Project Manager.

Subtask 2 - 3 This includes costs for underground utility locating, monitoring well installation, groundwater sampling and survey. Following completion of field activities, Geosyntec will proceed with the preparation and submittal of a Site Assessment Report (SAR) documenting assessment activities and summarizing analytical results. This subtask includes costs to generate a SAR that summarizes the analytical results of the assessment activities outlined above and complies with the requirements of Chapter 62-780.600, FAC.

Subtask 4 (PFAS) Geosyntec will conduct PFAS screening activities concurrently with those described in Subtask 2. Each well sampled as part of Subtask 2 (MW001, MW002, MW003, MW004, and MW005) is proposed to be sampled for PFAS to evaluate PFAS impacts.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task assignment. The final cost is $35,677.73 with 151 labor hours.

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

G eo sy nt ec C on su lta nt s

D at e:

3/

/2

Ta sk

D C

3B

-P en di ng

S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

Ja ck S he eh an

Ta sk

M

W In st al la tio ns , S ur ve yi ng

, S am pl in g S ub Ta sk

A ct iv ity

/P ha se

S ite

A ss es sm en t

Ta sk

S ite

A ss es sm en t R ep or t S ub Ta sk

P ro je ct

M an ag er

M el is sa S ho ok

Ta sk

P

FA

S S cr ee ni ng

S ub

Ta sk

S ub

Ta sk

S ub Ta sk

TTo ta ls

La bo r

R at e C at eg or y

$4 8.

P P ro je ct M an ag er

M . S ho ok

.6 $1

.0

Pr in ci pa l

T.

K af ka

$7 0.

Se ni or

P ro fe ss io na l S

. W an g

$4

6.

Pr of es si on al

C . S av ill e

$4

8.

Pr of es si on al

M . S ho ok

$4 1.

Se ni or

S ta ff Pr of es si on a G

. M om m er s

$3

3.

St af f P ro fe ss io na l A

. B ou ld in

$4 5.

Ad m in is tra tiv e

As si st an t P

. G al la gh er

To ta l H ou rs

D ire ct L ab or

$6

,9

.7

$8

.1

$2 ,7

.5

$2

,7

.6

$6

.4

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh ea d

2.

$1

2, 2.

$1 ,3

.3

$4

,6

.6

$4 ,7

.0

$1

,2

.9

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or

$1

9, 4.

$2 ,1

.5

$7

,4

.2

$7 ,5

.6

$1

,8

.3

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

FI

NA

L Pa ge o f

FI

NA

L

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

G eo sy nt ec C on su lta nt at e:

3/

/2

Ta sk

D C

3B

-P en di ng

Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

Ja ck S he eh an

Ta sk

M

W In st al la tio ns , S ur ve yi ng

, S am pl in g S ub Ta sk

A ct iv ity

/P ha se

S ite

A ss es sm t

Ta sk

S ite

A ss es sm en t R ep or t S ub Ta sk

P ro je ct

M an ag er

M el is sa S ho ok

Ta sk

P

FA

S S cr ee ni ng

S ub

Ta sk

S ub

Ta sk

S ub Ta sk

TTo ta ls

Tr av el

V eh ic le

R en ta l

$4

.0

$4

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el

$3

.0

$3

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$8

.0

$8

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (E qu ip m en t P ro cu re m t)

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P ro cu re m en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(S er vi ce s P ro cu re m t) ril lin g (C on ve nt io na l)

$6 ,5

.0

$6

,5

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ril lin g

(N on

-c on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ur ve yi ng $2

,5

.0

$2 ,5

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

ID

W $9

.0

$9

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

U til iti es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$7

.0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$8

.6

$8

.6

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $1

1, 8.

$1 1, 8.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

$1 ,1

.8

$1

,1

.8

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$1 2, 4.

$1

2, 4.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra to ry

A na ly tic al C os ts

$3

.0

$3

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $3

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fi el d

E xp en se

P er so na l P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E xp en da bl es

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

A na ly tic al re la te

d) $5

.0

$5

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $7

.0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub to ta l $3

3, 6.

$2 ,1

.5

$2

2, 7.

$7 ,5

.6

$1

,8

.3

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$1 ,9

.4

$2

.7

$7

.6

$7

.4

$1

.6

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l E st im at ed C os t

$3 5, 7.

$2

,4

.2

$2 2, 9.

$8

,2

.1

$2 ,0

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

C os t f ro m P rio r C

E F:

M an ua l E nt ry

C os t f ro m D el ta

C E

F;

M an ua l E nt ry C os t (

P rio r + D el ta

$0

.0

A ut o- C al cu la te d R ou nd in g

E rr or

$3 5, 7.

A ut o-

C al cu la te d

Fi na l T ot al C os t:

$3 5, 7.

A ut o-

C al cu la te d

FI

NA

L Pa ge o f

FI

NA

L

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Jack Sheehan #2 SUBTASK 2: MW Installations, Surveying, Sampling

DATE: 3/23/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 1

Senior Professional S. Wang 5

Professional M. Shook

Staff Professional G. Mommers 27

Staff Professional

A. Bouldin 22

TOTAL LABOR 63

VEHICLE TYPE RATE UNIT USEAGE

Truck G. Mommers $120.00 Day 2 $240.00 Truck A. Boudlin $120.00 Day 2 $240.00

Subtotal $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

G. Mommers Food $36.00 Day 1 $36.00 G. Mommers Lodging $140.00 Day 1 $140.00 A. Bouldin Food $36.00 Day 1 $36.00 A. Bouldin Lodging $140.00 Day 1 $140.00

TOTAL PER DIEM $352.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Drilling (Conventional)

EDS $6,545.00 $6,545.00

Subtotal $6,545.00 Surveying Kugelmann Survey of 5 MWs. $2,573.00 $2,573.00

Subtotal $2,573.00

IDW

Erwin Remediation Removal of three PFAS IDW drums $935.00 $935.00

Subtotal $935.00 Other GeoTek Services, LLC Utility Locate $750.00 $750.00 MOT Plans.com Inc. MOT Plan and setup $855.60 $855.60

Subtotal $1,605.60

TOTAL SUB $11,658.60

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOCs - GW Water 5 MWs $73.00 5 0 $365.00

Subtotal $365.00

TOTAL LAB $365.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Analytical Related

$290.00 Day 2 $580.00 Subtotal $580.00

Expendables $40.00 Day 4 $160.00

Subtotal $160.00

TOTAL EQUIPMENT $740.00

Data evaluation and interpretation

Analytical data import and data management (3 hr); generate MW results/parameter tables (2 hr)

Update Site Access Agreement (2 hr); Property owner and tenant notification (1 hr); Evaluating and interpreting field data (2 hr); Prepare field deliverable package (3 hr).

Shallow Groundwater Sampling Kit

Installation of 5 MWs (including drums).

MW Sampling: mobe/demobe (4 hr); monitoring well survey oversight (5 hrs); Collect DTW measurements (1 hrs); Calibration of equipment (0.5 hr/day x 1 days = 0.5 hrs); Sampling 5 monitoring wells @ 1.5 hr/well (7.5 hrs); Sample management/shipping (2 hrs); IDW management (1 hr); Prepare field notes (1 hr).

MW Installation: Field prep (1 hr); mobe/demobe (4 hr); monitoring well installation oversight (10 hr x 2 days = 20 hrs); Compile field notes (2 hr).

3/25/2026 Page 3 of 5 Subtask 2

SUBTASK 3: Site Assessment Report

DATE: 3/23/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 2

Professional C. Saville 6

Professional M. Shook 47

TOTAL LABOR 55

Develop recommendations and path forward; PG certification

SAR final figure preparation (including geologic cross section)

SAR preparation

3/25/2026 Page 4 of 5 Subtask 3

SUBTASK 4: PFAS Screening

DATE: 3/23/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 1

Professional M. Shook 4

Professional C. Saville 2

Senior Staff Professional A. Bouldin

TOTAL LABOR 16

Data evaluation and path forward recommendation for PFAS assessment

PFAS groundwater results figures

Sample 5 wells for PFAS including additional decon procedures (5 wells @ 0.5 hr/well = 2.5 hrs). IDW management (1 hr). Sample management for FDEP lab (2 hr); Prepare GW results tables (3 hr).

Prepare PFAS Field Deliverable.

3/25/2026 Page 5 of 5 Subtask 4

6770 South Washington Ave Suite 3

Titusville, FL 32780

PH 321-269-5880

www.geosyntec.com

25 March 2026

Ms. Sarah Aduwa Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4500 Tallahassee, Florida 32399-2400

Subject: Site Assessment Scope of Work and Level of Effort – Jack Sheehan’s Drive-In Cleaners #2 831 Belvedere Road West Palm Beach, Florida 33405 FDEP Site ID No. ERIC_5221 HW683 – DC053B (pending)

Dear Ms. Aduwa, Geosyntec Consultants, Inc. (Geosyntec) has prepared this Scope of Work and Level of Effort (LOE), Cost Estimate Form (CEF) and Level of Effort (LOE) for conducting site assessment activities at the Jack Sheehan’s Drive-In Cleaner’s #2 site (Site) located in West Palm Beach, Florida (ERIC_5221). Geosyntec prepared this LOE based on Geosyntec’s 19 May 2025 Documentation of Field Work Completion and correspondence between Geosyntec and the Florida Department of Environmental Protection.

On 10 March 2026, Geosyntec confirmed that a Site Access Agreement (SAA) was executed with AJS Realty LLC on 08 August 2023, as the real property owner of the Jack Sheehan’s Drive-in Cleaners #2 (ERIC_5521) located at the above address. The Palm Beach County property appraiser database indicates the property owner changed ownership on 12 August 2025 to 831 Belvedere Road LLC. As a result, Geosyntec believes that a new Site Access Agreement is required.

A description of task breakdown for Site assessment field activities and report preparation is provided below.

Subtask 1 – Project Management

Melissa Shook, Professional, will be the project manager (PM). Her labor hours are directly computed.

Subtask 2 – Monitoring Well Installations, Surveying and Groundwater Sampling

Ms. Sarah Aduwa 25 March 2026

Exterior monitoring well installations: Geosyntec personnel will mobilize to the Site to observe the installation of up to five exterior monitoring wells (MW001, M002, MW003, MW004, and MW005) screened from 10 to 20 ft BLS. A utility survey will be conducted to verify that monitoring well locations do not conflict with underground utility location. Additionally, due to the location of MW005 (located in the right of way), a temporary traffic plan will be required.

As recommended by FDEP in an email dated 11 August 2025, the monitoring wells will be installed upgradient, cross-gradient, and downgradient of the facility using DPT drilling methods.

The wells will be constructed of Schedule 40 PVC pipe with 10 ft of pre-packed 0.010-in. slotted well screen, filter pack consisting of 20/30 silica sand will be placed to 2-ft above the top of the screen, and at least a 2-ft thick, fine sand (30/65 silica sand) seal will be placed above the filter pack. The remaining annular space will be grouted to land surface with Portland Cement Type I/II and monitoring wells will be completed at the surface with a flush-mount 8-in. manhole and a locking monitoring well cap.

The monitoring wells will be developed until the discharge is relatively sediment-free. Geosyntec will demobilize to allow 24 hours between development and sampling.

Monitoring Well Survey: This subtask includes costs for a Florida professional land surveyor to survey the five newly installed monitoring wells.

Groundwater sampling: Geosyntec personnel will remobilize to the site to measure depth to groundwater and groundwater samples from the five Site monitoring wells (MW001, MW002, MW003, MW004, and MW005). The monitoring wells will be sampled using a peristaltic pump in general accordance with the FDEP Standard Operating Procedures (SOPs). The samples will be stored on ice and shipped to a NELAP-accredited, fixed-based analytical laboratory under chain of custody for analysis under standard turnaround times. The groundwater samples will be analyzed for volatile organic carbons by EPA Method 8260 (full list).

IDW Management: Investigation derived waste (IDW) purge water generated during well installation and sampling activities will be placed in a 55-gallon drum and manifested for off-Site disposal. For this cost estimate, we have assumed the IDW be impacted by PFAS and Geosyntec will submit a WCD or TACO to the FDEP for any change of scope. Bid costs prepared by the waste disposal companies are included in Attachment A. Due to the quantity of drums anticipated and Site logistics, we have assumed field oversight of the drum pickup is necessary.

Field Deliverable and Draft Summary Figure: Geosyntec has included costs to generate three figures (final site map, groundwater results figure, groundwater elevation contour figure). The deliverable will include the final surveyor report, monitoring well installation field forms, and groundwater sampling forms.

Subtask 2 activities will be performed by one Geosyntec staff member assuming two days for drilling oversight and one day for well sampling, and close out tasks at the Site. We have assumed up to 10 hours per field day not including round trip mobilizations.

Subtask 3 – Site Assessment Report

Geosyntec will prepare and submit a Site Assessment Report (SAR) documenting assessment activities and summarizing analytical results. This subtask includes costs to generate a SAR that summarizes the analytical results of the assessment activities outlined above and complies with the requirements of Chapter 62-780.600, FAC. Our cost estimate includes the following figures:

USGS Site Topographic Map

Potable Well Survey

Site Layout

Site Utility Map

Lithologic Cross Section (1 transect)

Summary of Soil Analytical Results from 0-0.5, 0.5-2, 2-4, 4-6, and 6-8 ft BLS intervals until the water table (assuming DTW at 8 ft BLS, 5 figures)

Summary of DPT Groundwater Sampling Analytical Results

Summary of Groundwater Elevations

Summary of Monitoring Well Analytical Results

The SAR will include recommendations for remediation, further assessment, or closure based on the data. The SAR will be signed/sealed by a FL professional geologist or engineer.

Subtask 4 – PFAS Screening

Geosyntec will conduct PFAS screening activities concurrently with those described in Subtask 2.

Each well sampled as part of Subtask 2 (MW001, MW002, MW003, MW004, and MW005) is proposed to be sampled for PFAS to evaluate PFAS impacts. PFAS samples will be collected using low-flow purging via a peristaltic pump in accordance with draft SOPs for PFAS sampling developed by FDEP and the SOPs for PFAS sampling prepared by Geosyntec for use at FDEP’s Site Investigation Section firefighting training facilities. PFAS-free water will used to decontaminate the water level meter between sampling wells. Supplemental labor for PFAS field handling and sampling that will be performed in concert with the groundwater sampling in Subtask 2 has been included in the LOE.

Geosyntec understands that the FDEP laboratory will analyze the five groundwater samples for PFAS constituents, and the FDEP will ship the sampling kits to Geosyntec. Geosyntec anticipates shipping the samples to the FDEP laboratory using return shipping labels provided by the laboratory with the sampling kits. The PFAS analytical results will be presented within the annual groundwater monitoring report included in Subtask 3.

Geosyntec will prepare an email deliverable with attachments that include: a figure showing PFAS groundwater results (PFOA, PFOS, and their combined concentrations for each well, without isoconcentration lines), general groundwater flow direction, the certified analytical laboratory report, equipment calibration logs, and groundwater sampling forms. This email will be submitted to the FDEP within two working days after receiving the final certified laboratory report from the FDEP Laboratory. Geosyntec expects the final laboratory report to be emailed to Melissa Shook (melissa.shook@geosyntec.com) by the FDEP Laboratory. The completed email deliverable will be submitted to Sarah Aduwa, James Breck Dalton, Safa Shariat, Jenifer Farrel, Mubeen Darji, and Doris Brown.

Deliverable and Invoicing Schedule:

Subtask Deliverable Deliverable Due Date*

Invoice Amount

2, 4 Field Deliverable Subtask 2 and Field

Deliverable for Subtask 4 5/30/26 $25,005.31

1, 3 Submittal of Site Assessment Report and IDW

Manifests 6/30/26 $10,6 .4

Total $35,6 7.7

* Deliverable due date assumed the TA for this Scope of Work and Level of Effort will be received by 11 April 2026.

6770 South Washington Ave Suite 3

Titusville, FL 32780

PH 321-269-5880

www.geosyntec.com Geosyntec appreciates the opportunity to provide this proposal and cost estimate to you and the FDEP. If you require any additional information of have any questions, please contact Melissa Shook at 321.451.5480.

Sincerely, Melissa Shook Professional

Todd K. Kafka, P.G.

Sr. Principal Hydrogeologist

Attachments:

Figures Attachment A – Subcontractor Cost Evaluation Attachment B – Subcontractor Quotes

FIGURES

Pr op os ed

M W

M W

M W

M W

M W

M W

ATTACHMENT A

SUBCONTRACTOR COST

EVALUATION

1 Daily Rate $2,275 1 Daily Rate $1,800 1 Daily Rate $1,900 1 Half-Day $1,475 1 Half-Day $1,200

10 5' pre-packed screens $110 10 5' pre-packed screens $82 10 5' of 1" riser $35 5 10' of 1" riser $25

5 Well completion $150 5 Well completion $500 5 Caps, plugs, points $20 1 Mobilization $1,025 1 Mobilization $600 10 Bag sand $10 1 Per Diem $575 5 Well completion $150 1 55-Gallon drum (soil) $75 1 Permits $275 4 55-Gallon drum (wate $75 4 55-Gallon Drums $75 1 Mobilization $800 5 Permits $75 1 Permits $275 1 per diem $250

3 55-Gallon Drums $75

Notes The selected subcontractor is highlighted in yellow.

* Quote specifies a 2-day job will be $7,875.00. Based on other qualified bidders, assume the job will be more than one day and the two day rate will apply.

Subcontractor Evaluation: MW Installation

EDS

$8,300 $7,875* $6,545

MW Installation

PDS JAEE*

1 Day $900.00 1 Day $750

Notes The selected subcontractor is highlighted in yellow.

Subcontractor Evaluation: GPR Utility Locate

Precision GPR

$900.00 $750.00 No Bid

GPR Utility Locate GeoView GeoTek

3 Drum $915.20 1 Profile Fee (PFAS) $350 3 Drum $625 1 Transportation $380.00 3 Drum $195 1 Transportation $450

1 Engery/Insurance Fee (20%) $465

Notes The selected subcontractor is highlighted in yellow.

Subcontractor Evaluation: IDW

York Environmental

$3,125.60 $935.00 $2,790.00

IDW DISPOSAL

Hulls Erwin Remedation

1 MOT Plan $250.00 1 MOT Plan $250 1 MOT Plan $150 1 Setup and Teardown UNK 40 FDOT Cones $0.48 1 Setup and Teardown UNK

4 Pedestrian LCD $0.85 1 Arrow Board $25 1 Day $58.00 1 Equipment Setup $250.00 1 Equipment Pickup $250.00

Notes The selected subcontractor is highlighted in yellow.

* subcontractor refuse to provide costs for setup, teardown, and sign rental until MOT Plan costs are paid.

Subcontractor Evaluation: MOT Setup and Teardown

Bobs Barricades*

UNK $855.60 UNK

MOT Setup and ACME* MOT Plans.com Inc.

No bid 1 Mobe/Demobe $2,144 No bid 5 Well Survey/well $225.00 1 Office Calcs $204.00

Notes The selected subcontractor is highlighted in yellow.

Subcontractor Evaluation: MW Survey

Epic Survey

$0.00 $3,473.00 $0.00

MW Survey Goodnight Survey Kugelmann Land Surveying

ATTACHMENT B

SUBCONTRACTOR QUOTES

Preferred Drilling Solutions, Inc.

8820 66th St. North, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

DIRECT PUSH TECHNOLOGY QUOTE FORM

Date: 2/24/26 FAC ID#:

Unit Unit Rate Number of Units Extended Price whole day $2,275.00 1 2,275.00$ half day $1,475.00 1 1,475.00$ per foot $25.00 -$ each $110.00 10 1,100.00$ each $50.00 -$ each $35.00 10 350.00$ per well $150.00 5 750.00$ roundtrip $1,025.00 1 1,025.00$ per crew / per night $575.00 1 575.00$ each $75.00 4 300.00$ each $75.00 1 75.00$ per day $150.00 -$ each $75.00 5 375.00$ lump sum $350.00 -$ per day $50.00 -$

TOTAL QUOTE PRICE $8,300.00

Notes: 1. Includes saw cuts, development, standby time, and decon.

Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: RRose Hood , Rose Hood Estimating & Scheduling Manager Date: 2/24/26

Days to Complete Scope of Work: 1.5

Direct Push Daily Rate 1 - on-site day

Equipment Type: Geoprobe 8040DT, 3230DT, 7822DT, 6620DT, 6712DT

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Other (specify)

Steam Cleaner

Decon Pad

GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)

DOT Approved 55-gal Drum (water)

Per Diem Mobilization

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

Permits

DOT Approved 55-gal Drum (soil)

Site Name and Location: Jack Sheehan's Cleaners

Consultant Name: Geosyntec Consultants

PROPOSED SCOPE OF WORK:

(5) 1" x 20' MWs with 10' prepack screen, soil sampling, drum cuttings, pads and 8" bolt-down manholes.

831 Belvedere Rd, Fort Lauderdale, Broward County, FL

Well Completion (includes 8" MH w/ cover, concrete pad, and locking well cap)

Well Riser (includes all materials) ID 1" 5' Length

Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"

Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"

Auger Attachment, 2" Well Install

Direct Push Half-Day Rate 1 - on-site half day

GeoTek Services, LLC

24 February 2026

To: Melissa Shook

Geosyntec Consultants, Inc.

6770 South Washington Avenue, Suite 3 Titusville, Florida 32780

From: GeoTek Services, LLC 4060 Sparrow Hawk Road

Melbourne, Florida 32934

RE: Utility Locating Services – Jack Sheehan #2, WPB, Florida

Ms. Shook, GeoTek Services is pleased to respond to your request for Utility Locating services at Jack Sheehan #2 located in West Palm Beach, Florida. We will scan the area shown in your PDF drawing with the goal of locating underground utilities. We can only scan the easily accessible open areas for utilities. Note that we cannot scan beneath fixed objects such as vehicles, structures, obstructions. We will scan as close as reasonably possible to fixed objects such as curbs, landscaping, or obstructions, etc. Our deliverable will be marking paint or flags indicating the horizontal location of potential underground utilities. It is the client’s responsibility to protect and preserve all marks.

We will use both Electromagnetic Induction instruments as well as Ground Penetrating Radar (GPR) to detect objects below the surface. Due to the nature of sub-surface detection and the physical laws governing radio wave propagation, some buried objects may not be detectable due to depth, obscuration, or a weak radar signature. GeoTek Services will use industry standard best practices to locate sub-surface objects, however some objects may not be detectable. Geotek Services does not guarantee that all underground objects can be found. GeoTek Services assumes no liability for any damages.

We request access to any as-built site plans of the scan areas prior to rendering services. We also request all grassy areas to be mowed prior to scanning. Our fixed price quote for this effort is $750.00. No out-of-pocket expenses are expected for this project. This quote is valid for sixty days.

Best Regards, Martin (Bud) Connor GeoTek Services, LLC

4060 Sparrow Hawk Road Melbourne, FL 32934-8525 info@GeoTekServices.com 321.473.7498

From: Larry Hall To: Blaine Dawson Subject: RE: Updated Generic IDW Quote Date: Friday, August 8, 2025 9:45:00 AM

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."

Yes- if it is sampled for and has any hit it will have to go to a hazardous waste facility.

From: Blaine Dawson <BCDawson@Geosyntec.com> Sent: Friday, August 8, 2025 9:41 AM To: Larry Hall <lhall@hullsenvironmental.com> Subject: Re: Updated Generic IDW Quote

Good morning Larry, Is PFAS waste having to go hazardous now?

Thank you, Blaine

Get Outlook for iOS

From: Larry Hall <lhall@hullsenvironmental.com> Sent: Friday, August 8, 2025 9:09:19 AM To: Blaine Dawson <BCDawson@Geosyntec.com> Subject: RE: Updated Generic IDW Quote

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."

Blaine, See pricing below.

Thanks, Larry Hall

Yes- if it is sampled for and has any hit it will have to go to a hazardous waste facility

From: Blaine Dawson <BCDawson@Geosyntec.com> Sent: Thursday, August 7, 2025 11:04 AM To: Larry Hall <lhall@hullsenvironmental.com> Subject: Updated Generic IDW Quote

Good morning Larry, In light of the update you recently provided about LES, I was hoping you might be able to prepare an updated IDW disposal quote (previous version attached) for use as part of future proposals. Please see the below list of scenarios I need updated waste disposal costs for through the remainder of 2025. We will reach out again at the beginning of 2026 for updated rates.

Scenario 1

FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has not been investigated for at the site. $260.00 per drum solid or liquid less than 50 miles- Add $95 per additional 50 miles

Scenario 2

FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the laboratory's method detection limit but is below the current provisional groundwater cleanup target level of 70 ng/L. $915.20 per drum solid or liquid- Transportation per drum/load up to 10 drums- $380.00

Scenario 3

FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the current provisional groundwater cleanup target level of 70 ng/L. $915.20 per drum solid or liquid- Transportation per drum/load up to 10 drums -$380.00

Scenario 4

FDEP PRP site where VOA concentrations are below hazardous levels for both soils and groundwater. $260.00 per drum solid or liquid less than 50 miles- Add $95 per each additional 50 miles

Please let me know if you have any questions or if you need anything else from me to support your efforts on this. If any of the above scenarios requires additional analytical results beyond those described, please let me know so I can include those in the overall cost evaluation. I really appreciate your help with this!

Thank you, Blaine Dawson, PG (FL,TN) Senior Geologist p g p g $915.20 per drum solid or liquid- Transportation per drum/load up to 10 drums- $380.00

408 Ditmar Street Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562 (850) 292-6511

To: Mr. Nicholas Barnes Geosyntec Consultants, Inc.

12802 Tampa Oaks Boulevard, Suite 151 Tampa, FL 33637

April 15, 2025

Re: Non-Hazardous Drum Disposal of PFOS/PFAS Impacted Materials

Mr. Barnes:

The price for the transportation and disposal (T&D) of 55-gallon drums of non-hazardous soil, mud, and water is listed below:

Impacted with Non-Hazardous Petroleum or Chlorinated Solvents:

Description Rate Unit T&D - Non-Haz Soil $ 110.00 Per Drum T&D - Non-Haz Mud/Water $ 125.00 Per Drum

Impacted with Non-Hazardous PFAS/PFOS:

Description Rate Unit Profile Fee (Charged once per site) $ 350.00 Per Site T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum

Dry cleaning sites will require 8260-VOH lab analysis and PFAS sites will require the full FDEP lab analysis for IDW waste characterization.

This quote is valid for 120 days.

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: Robert@ErwinRemediation.com Office: (850) 466-2358

Profile Fee (Charged once per site) $ 350.00 Per Site T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum

From: Tony Burgess To: Blaine Dawson Subject: Re: IDW Management Quotes Date: Monday, September 22, 2025 2:27:31 PM

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."

Blaine, We went through the scenarios described below.

Please contact me with any additional questions or concerns.

Scenario 1 FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has not been investigated for at the site.

NonHaz - $225.00/55 Liquids/Solids – No PFAS F002 - $625.00/55 Liquids and Solids – No PFAS Scenario 2 FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the laboratory's method detection limit but is below the current provisional groundwater cleanup target level of 70 ng/L.

PFAS only - $625.00/55 Liquids and Solids F002 & PFAS - $7.40/Lb with $625.00/55 Min – Liquids F002 & PFAS - $4.40/Lb with $625.00/55 Min – Solids Scenario 3 FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the current provisional groundwater cleanup target level of 70 ng/L.

PFAS only - $625.00/55 Liquids and Solids F002 & PFAS - $7.40/Lb with $625.00/55 Min – Liquids F002 & PFAS - $4.40/Lb with $625.00/55 Min – Solids Scenario 4 FDEP PRP site where VOA concentrations are below hazardous levels for both soils and groundwater.

NonHaz - $225.00/55 Liquids/Solids – No PFAS F002 - $625.00/55 Liquids and Solids – No PFAS Please add:

Energy/Insurance------------20% (Total Ticket) Transportation----------------$450.00/stop

Tony Burgess

York Environmental Services PO Box 600532 Jacksonville, FL 32260 Phone: (904) 718-0883 p g g PFAS only - $625.00/55 Liquids and Solids

Energy/Insurance------------20% (Total Ticket)gy ( Transportation----------------$450.00/stop

MOTPlans.com Inc.

631 NE 45 Street Oakland Park, Fl. 33334 Ph # 954-560-0450 Fax # 954-759-9186

Job # GeoSyntec 831 Belvedere Road

Lane Closure # units Description U/M Price Total

20 Work Zone Signs ED 0.52$ 10.40$ 40 FDOT Cones ED 0.48$ 19.20$ 4 Pedestrian LCD ED 0.85$ 3.40$ 1 Arrow Board ED 25.00$ 25.00$

Total Daily Rate 58.00$

Initial Setup of Equipment EA 250.00$ Pickup of Equipment EA 250.00$

MOT Drawing LS 250.00$

*Sales tax not included. Flaggers not included. Post mounting of signs if required not included.

From: Bobs Delray <bobsdelray@bobsbarricades.com> Sent: Tuesday, March 3, 2026 12:34 PM To: Melissa.shook@Geosyntec.com Subject: RE: Request for Quote - Site in Fort Lauderdale - Jack Sheehan's 2

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."

Melissa, Good afternoon.

831 Belvedere Rd comes up as location being in WPB.

The cost of the MOT plan is $ 150.00 per page.

ETA of MOT plan is 5-7 business days.

Please advise if ok to proceed the creation of the MOT plan.

Thanks Bobs Barricades Delray Office Karen

From: Bobs Orlando <bobsorlando@bobsbarricades.com> Sent: Tuesday, March 3, 2026 12:27 PM To: Bobs Delray <bobsdelray@bobsbarricades.com> Subject: Fw: Request for Quote - Site in Fort Lauderdale - Jack Sheehan's 2

From: Melissa Shook <Melissa.shook@Geosyntec.com> Sent: Tuesday, March 3, 2026 11:26 AM To: Bobs Orlando <bobsorlando@bobsbarricades.com> Subject: Request for Quote - Site in Fort Lauderdale - Jack Sheehan's 2

Good afternoon, I have a project located at 831 Belvedere Road, Fort Lauderdale, Florida 33405 called Jack Sheehan's #2. We will be performing work in the right-of-way, impacting the sidewalk and will be working right up against the curb.

We will need an MOT plan, as well as signs to close off the sidewalk and at least one lane.

Can you please provide a quote for completing a sealed MOT plan, setup and removal of the MOT? Assume 2 days of work.

Best, You don't often get email from bobsdelray@bobsbarricades.com. Learn why this is important

From: Miami Admin <Miamiadmin@AcmeBarricades.com> Sent: Wednesday, March 4, 2026 5:21 PM To: Melissa Shook Cc: SouthFL Subject: Re: Request for Quote - Site in Fort Lauderdale

Importance: High

Follow Up Flag: Flag for follow up Flag Status: Flagged

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."

Hi, I sent your request to our mot plan designer, It normally takes 3-5 business days to get it done.

Our mot plans cost starts at $250

I attached a CC authorization form, please make sure to return it completely filled out.

Sincerely, Clere Machiavello

4601 Oakes Rd Davie, FL 33314 Office: 954-321-8205 Fax: 954-791-0921

From: Melissa Magee <Mmagee@acmebarricades.com> Sent: Tuesday, March 3, 2026 12:15 PM To: Melissa Shook <Melissa.shook@Geosyntec.com>

You don't often get email from miamiadmin@acmebarricades.com. Learn why this is important

Kugelmann Land Surveying, Inc.

30 North Tropical Trail, Suite B

Merritt Island, FL 32953 Phone (321)459-0930 klsinc@cfl.rr.com

Rate Quote DATE: 3/11/2026 Ph #: 321-451-5480

TO: Melissa Shook, EIT

@ Geosyntec Consultants

FROM: Dave Kugelmann @ KLS

Here is the cost breakdown for 831 Belvedere Road, West Palm Beach, FL 33405

TASK RATE

Mob/Demob $ 2144.00 Survey 5 Well to include horizontal & vertical data @ $45 per well $ 225.00 Office Calculations and Excel Sheet $204.00

TOTAL $2573.00