This document is a Task Assignment (TA) under Contract Number HW683 between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants. The TA, numbered DC031C, was executed on November 21, 2024, and authorizes work at the Pelican Dry Cleaners facility located at 2141 Drew Street, Clearwater, Pinellas County, Florida (ERIC Project Number 5292). The Department's project manager is Sarah Aduwa, and Geosyntec's project manager is Nick Barnes. The work is scheduled for completion by February 17, 2025.
Geosyntec will conduct well abandonment activities including observation of the abandonment of four groundwater monitoring wells, five MAGS wells, and one vacuum monitoring point performed by a subcontracted driller (Environmental Drilling Service). The scope encompasses well abandonment permit applications to the Southwest Florida Water Management District (SWFWMD), field observation of grouting activities, removal of concrete pads and well vaults, and ground surface restoration. Geosyntec will also prepare a comprehensive Well Abandonment Report with documentation and photographic logs. The total TA value is $6,517.62 on a fixed unit rate basis, comprising 24 labor hours allocated across three subtasks: project management (2 hours), well abandonment activities and field observation (14 hours), and report preparation (8 hours). The deliverable is the completed Well Abandonment Report due January 15, 2025, with full invoice of $6,517.62 due upon submission. Subcontractor drilling costs of $2,468.00 are included within the total TA value. No option periods, renewals, or set-asides are identified in this task assignment.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW683
DC031C Completion February 17, 2025
This Task Assignment authorizes Geosyntec to conduct Well Abandonment activities at Pelican Dry Cleaners in accordance with Geosyntec scope of work, cost estimate and schedule received on November 14, 2024.
Sarah Aduwa 850-245-8973 Contractor Geosyntec Contractor
Contractor Nick Barnes Contractor 813-557-1165
ERIC 5292
2141 Drew Street Clearwater, Pinellas County, Florida
Pelican Dry Cleaners
Contractor Contractor
✔ $ 6,517.62
$ 6,517.62
Scope of Work
Geosyntec Contractor Todd Kafka
Contract Manager
Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.
Date: 2024.11.21 11:44:55 -05'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2024.11.21 10:31:59 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1, 2, 3 - Well Abandonment Report 01/15/2025
Subtasks 1, 2, 3 - Well Abandonment Report $ 6,517.62
$ 6,517.62
HW683
DC031C
Printed on recycled paper.
FFLORIDAA DEPARTMENTT OF
EEnvironmentall Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ronn DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawnn Hamilton Secretary
To: HW683 Contract Negotiation File Pelican Dry Cleaners Clearwater, Pinellas County, Florida
ERIC_5292
From: Sarah Aduwa, Project Manager Date: November 15, 2024 Subject: Negotiation Summary
HW683_DC031C
This Task Assignment authorizes Geosyntec to conduct Well Abandonment activities at Pelican Dry Cleaners in accordance with Geosyntec scope of work, cost estimate and schedule received on November 14, 2024. The total cost is $6,517.62.
Nick Barnes is the project manager, her hours are directly computed.
Subtask 2, 3 – Monitoring Well Abandonment and Reporting Geosyntec personnel will mobilize to the Site to observe the abandonment of four groundwater monitoring wells, five MAGS wells, and one vacuum monitoring point (VMP). Well Abandonment permit applications for the monitoring wells will be completed and submitted to the Southwest Florida Water Management District (SWFWMD) by a State licensed water well driller.
As part of well abandonment activities, Geosyntec will observe the recommended subcontracted driller(Environmental Drilling Service) conduct well abandonment activities in accordance with SWFWMD guidelines. The driller will tremie grout the wells in place from the bottom of the well, within the well screen interval, until grout displaces and infills the annular space up to land surface. The driller will remove the concrete pads and the well vaults. The ground surface will then be patched with neat cement grout flush to surrounding grade if the well was located in concrete or asphalt patch if the well was located in asphalt. Concrete, asphalt, and other debris (e.g. well vault, flush-mount manhole cover) generated during well abandonment will be disposed of by the subcontractor driller offsite in general trash. Photographs of abandoned well locations will be collected in the field.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task assigner. The final cost is $6,517.62 with 24 labor hours.
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
G eo sy nt ec C on su lta nt s
D at e:
/3
1/
Ta sk
P en di ng
S ub Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
P el ic an D ry C le an er
Ta sk
W el l A ba nd on m en t A ct iv iti es S ub Ta sk
A ct iv ity
/P ha se
W el l A ba nd om en ts
Ta sk
W el l A ba nd on m en t R ep or t P re pa ra tio n S ub Ta sk
P ro je ct
M an ag er
N
. B ar ne
Ta sk
S ub
Ta sk
S ub
Ta sk
S ub Ta sk
TTo ta ls
La bo r
R at e C at eg or y
$5 9.
P P ro je ct M an ag
N . B ar ne s
2.
$9 7.
Pr in ci pa l
T.
K af ka
$5 9.
Pr oj ec t P ro fe ss io na l N
. B ar ne s
$5 4.
Pr oj ec t P ro fe ss io na l M
. H en sl ey
$3 4.
Se ni or
S ta ff Pr of es si on al A
. O gu nk oy a
Se ni or
S ta ff Pr of es si on al
To ta l H ou rs
D ire ct L ab or
$1
,2
.0
$1
.7
$5
.8
$5
.4
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
2.
$2
,0
.8
$2
.6
$9
.5
$8
.6
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fr in ge
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l L ab or
$3 ,2
.9
$3
.3
$1
,5
.4
$1 ,3
.1
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Co st
E st im at e Pa ge o f
Co st E st im e
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
G eo sy nt ec C on su lta nt e:
/3
1/
Ta sk
P en di ng
Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
P el ic an D ry C le an
Ta sk
W el l A ba nd on m en t A ct iv iti es S ub Ta sk
A ct iv ity
/P ha se
W el l A ba nd om ts
Ta sk
W el l A ba nd on m en t R ep or t P re pa ra tio n S ub Ta sk
P ro je ct
M an ag er
N
. B ar ne
Ta sk
S ub
Ta sk
S ub
Ta sk
S ub Ta sk
TTo ta ls
TTr av el
V eh ic le
R en ta l
$1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$ $1
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m t)
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(S er vi ce s P ro cu re m t) ril lin g (C on ve nt io na l)
$2 ,4
.0
$2
,4
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
(N on
-c on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til iti es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $2
,4
.0
$2 ,4
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
H an dl in g
Fe e
$2
.8
$2
.8
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$2 ,7
.8
$2
,7
.8
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra to ry
A na ly tic al C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fi el d
E xp en se
P so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$4 0.
$4
0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$2 5.
$2
5.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
ID
W re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( O th er
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l F ie ld
E xp en se s $6
5.
$6 5.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l $6
,1
.7
$3
.3
$4 ,4
.2
$1
,3
.1
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
C om pl et io n Fe e $3
.8
$3
7.
$1
.9
$1
.1
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l E st im at ed C os t
$6 ,5
.6
$4
.2
$4
,5
.1
$1 ,5
.2
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C os t f ro m P rio r C
E F:
M an ua l E nt ry
C os t f ro m D el ta
C E
F;
M an ua l E nt ry C os t (
P rio r + D el ta
$0
.0
A ut o- C al cu la te d R ou nd in g
E rr or
$6 ,5
.6
A ut o-
C al cu la te d
Fi na l T ot al C os t:
$6 ,5
.6
A ut o-
C al cu la te d
Co st
E st im at e Pa ge o f
Co st E st im e
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Pelican Dry Cleaners SUBTASK: Well Abandonment Activities
DATE: ########
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Professional N. Barnes 3
Senior Staff Professional A. Ogunkoya 11
TOTAL LABOR 14
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 day 1 $120.00 $0.00
Subtotal $120.00
TOTAL VEHICLE $120.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Drilling (Conventional) Environmental Drilling Service $2,468.00 $2,468.00
$0.00 $0.00 Subtotal $2,468.00 Subtotal $0.00
TOTAL SUB $2,468.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Drilling Related
Water Level Indicator $25.00 Day 1 $25.00 Subtotal $25.00
Expendables $40.00 Day 1 $40.00
Subtotal $40.00
TOTAL EQUIPMENT $65.00
Prepare Field Package and RPO/tenant notifications (2 hr), Task Hazard Analysis (1 hr)
Field preparation and field kickoff meeting (1 hr). Round trip mobilization (1 hr). Oversee well abandonment activites (8 hours), Compile field notes and photographic documentation (1 hr).
11/15/2024 Page 3 of 4 Subtask 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Pelican Dry Cleaners SUBTASK: Well Abandonment Report Preparation
DATE: ########
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 1
Project Professional M. Hensley 1
Project Professional N. Barnes 6
TOTAL LABOR 8
Well Abandoment Report and PG sign/seal
Prepare figures for Well Abandoment Report
Prepare Well Abandonment Report
11/15/2024 Page 4 of 4 Subtask 3
FR9668/Pelican Dry Cleaners (ERIC_5292) SOW - Well Abandonments
12802 Tampa Oaks Blvd.
Suite 151
Tampa, Florida 33637
PH 813.558.0990
www.geosyntec.com
14 November 2024
Ms. Sarah Aduwa Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject: Scope of Work and Level of Effort for Well Abandonments Pelican Dry Cleaners 2141 Drew Street Clearwater, Pinellas County, Florida FDEP Facility ID No. ERIC_5292
Dear Ms. Aduwa, Please find attached Geosyntec’s Scope of Work and proposed Level of Effort (LOE) for well abandonment activities at the Pelican Dry Cleaners (Site) located in Clearwater, Florida. A summary of the costs associated with the scope of work described below is included with the attached LOE and subcontractor evaluation which compares the associated driller costs from three quotations.
Subtask 1 – Project Management
Nick Barnes will be the Geosyntec Project Manager. His labor hours are directly computed.
Subtask 2 –Monitoring Well Abandonment and Reporting
Geosyntec personnel will mobilize to the Site to observe the abandonment of four groundwater monitoring wells, five MAGS wells, and one vacuum monitoring point (VMP). Well abandonment permit applications for the monitoring wells will be completed and submitted to the Southwest Florida Water Management District (SWFWMD) by a State licensed water well driller.
Geosyntec requested quotes from three drillers to complete well abandonment activities. The quotes are included in this proposal and an evaluation of the received quotes is attached. As part of well abandonment activities, Geosyntec will observe the recommended subcontracted driller (Environmental Drilling Service) conduct well abandonment activities in accordance with SWFWMD guidelines. The driller will tremie grout the wells in place from the bottom of the well, within the well screen interval, until grout displaces and infills the annular space up to land surface.
The driller will remove the concrete pads and the well vaults. The ground surface will then be patched with neat cement grout flush to surrounding grade if the well was located in concrete or
Ms. Sarah Aduwa 14 November 2024
FR9668/Pelican Dry Cleaners (ERIC_5292) SOW - Well Abandonments asphalt patch if the well was located in asphalt. Concrete, asphalt, and other debris (e.g. well vault, flush-mount manhole cover) generated during well abandonment will be disposed of by the subcontractor driller offsite in general trash. Photographs of abandoned well locations will be collected in the field.
Upon completion of all site activities, Geosyntec will prepare a Well Abandonment Report for submittal to the Florida Department of Environmental Protection (FDEP). The report will summarize completed well abandonment activities and include an updated well location figure, well abandonment logs, SWFWMD well abandonment permits, and a photographic log.
Invoice and Deliverable Schedule:
Geosyntec proposes the following revised Invoice and Deliverable schedule. The schedule below assumes two weeks for approval of the Task Assignment (TA) approval by the FDEP:
Subtask Deliverable Deliverable Due Date Invoice Amount
1, 2, & 3 Well Abandonment Report 15 January 2025 $6,517.692
Closing
We appreciate the opportunity to assist with this project. Please let us know if you have any questions upon your review.
Sincerely, Nicholas S. Barnes, P.E. Todd K. Kafka, P.G.
Project Engineer Senior Principal Hydrogeologist
Attachments: Subcontractor Evaluation Table and Subcontractor Quotes Level of Effort
ATTACHMENT A
SUBCONTRACTOR EVALUATION
AND QUOTES
Description Environmental Drilling
Service Preferred Drilling
Solutions Action
Environmental Mobilization $700.00 $550.00 $1,518.00 Materials $768.00 $1,143.00 $715.00 Labor $1,000.00 $1,250.00 $1,872.00 Permit(s) Included $25.00 Included Days 1 1 1 Total $2,468.00 $2,968.00 $4,105.00
Well Abandonments
Preferred Drilling Solutions, Inc.
8820 66th St, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
Date: / /24 FAC ID#: ERIC_5292
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Unit Unit Rate Number of Units Extended Price
Rig Type: Auger/Mud Rotary_____
HSA Drilling & Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Borehole Grouting
4 - inch borehole diameter per foot $0.00 6 - inch borehole diameter per foot $0.00 8 - inch borehole diameter per foot $0.00
1" - 2" Well Installation (includes screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
4" Well Installation (includes screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Double Cased Well $0.00
6" Surface Casing per foot $0.00 per well $0.00
1"- 2" Well Abandonment (includes grouting) per foot $12.00 95.25 $1,143.00 3"- 4" Well Abandonment (includes grouting) per foot $0.00 5"- 6" Well Abandonment (includes grouting) per foot $0.00 2' x 2' Well Pad Removal and Patch each $125.00 10 $1,250.00
Mobilization roundtrip $550.00 1 $550.00
Per Diem per crew / per night $0.00 DOT Approved 55-gal Drum each $0.00 each $25.00 1 $25.00
$0.00
$0.00
$0.00 Standby/Delay/Difficult Access Time per hour $0.00 Additional Development Time per hour $0.00 Additional Decontamination Time per hour $0.00
TOTAL QUOTE PRICE $2,968.00
Project No.:
Signature and Title of Person Submitting Quote: _________________________________ Austin Bonacum, Estimator Date: 6/12/24
Days to Complete Scope of Work: 1
2141 Drew Street, Clearwater, Pinellas County, FL
Well Completion (includes MH w/ cover, concrete pad, locking well cap, DRILLING
MISCELLANEOUS
Permits
Consultant Name: Geosyntec Consultants
Site Name & Location: Pelican Dry Cleaners
PROPOSED SCOPE OF WORK:
Abandon (10) 1" - 2" wells between 6' - 15', total depth: 95.25', remove well pads and manholes, restore grade
(4) locations are indoors, restore grade with concrete
Geosyntec, Pelican Dry Cleaners, Clearwater, FL (abandonment)
October 24, 2024
Nicholas S. Barnes, PE
Project Engineer
Re: Pelican Dry Cleaners Well Abandonment Clearwater
Dear Mr. Barnes:
In accordance with your request, Action Environmental is pleased to provide you with a cost estimatete for the well abandonment at Pelican Dry Cleaners located at 2141 Drew Street in Clearwater, Florida. We understand the scope of work includes the following:
SCOPE OF SERVICES
Action to prepare a Health and Safety Plan prior to mobilization.
Permit all 9 wells and 1 vacuum monitoring point for abandonment through the SWFWMD.
Daily pre-job safety meeting to discuss applicable work hazards.
Abandonment of 4 monitoring wells, 5 MAGS wells, and 1 vacuum monitoring point. All are 1” & 2” inch diameter. All will be abandoned according to all SWFWMD rules and regulations. They will be abandoned by using tremie pipe to fill each well from bottom to top with Portland cement.
All exterior manhole covers and metal rings on the surface will be removed and manholes will be filled with concrete/asphalt. All interior manhole covers will be grouted in place.
Proper disposal of all waste concrete and well materials offsite by Action.
j g
ESTIMATED COSTS
CONDITIONS and Exclusions
Project budgeted at 1 work day, 10 hours onsite if necessary.
All waste will be properly disposed of offsite by Action.
Site access is client’s responsibility, if remobilization is required because of access issues, client will be charged a mobilization and day rate for lost time or additional days.
Work to be completed on a Monday.
Excludes dewatering.
Respectfully Submitted, Action Environmental
Chris Cipollina
Environmental Estimator & Project Manager