CN-370000-HW683-DC032C.pdf
PDF 3 MB Posted
- Contract number
- HW683
- Issued by
- Florida
About this file
This Task Assignment (TA DC032C) is a state contract between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants for environmental monitoring services at the Former Coles Drycleaning site located at 791 3rd Street North, Jacksonville Beach, Florida (ERIC_4608). The contract is issued under the master agreement HW683 and is effective through May 29, 2026. Sarah Aduwa serves as the FDEP Project Manager, while Blaine Dawson is the contractor's Project Manager.
The Task Assignment authorizes Geosyntec to conduct annual groundwater and soil gas monitoring and per- and polyfluoroalkyl substances (PFAS) sampling activities in accordance with the contractor's scope of work and cost estimate submitted on February 26, 2026. The work is structured in four subtasks: project management (10 hours), groundwater monitoring (42 hours), groundwater monitoring report preparation (29 hours), and PFAS sampling and reporting (19 hours), totaling 100 labor hours. The total contract value is $19,881.92, paid on a fixed unit rate basis. Deliverables include submittal of groundwater sampling field notes and IDW manifest by March 31, 2026 ($10,884.91), and submittal of the Groundwater Monitoring Report by April 30, 2026 ($8,997.01). The contract incorporates a Scope of Work attachment that details the monitoring of 13 monitoring wells for volatile organic halocarbons and dissolved gases, soil gas screening at three locations, and PFAS analysis across 13 wells to evaluate groundwater contamination at the former dry-cleaning facility.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW683
DC032C Completion May 29, 2026
This Task Assignment authorizes Geosyntec to conduct Annual Groundwater/soil gas monitoring and PFAS sampling activities at Former Cole Drycleaner site in accordance with Geosyntec’s scope of work, cost estimate and schedule received on February 26, 2026.
Sarah Aduwa 850-245-8973 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Geosyntec
Geosyntec
Blaine Dawson 904-450-4271
ERIC 4608
791 3rd Street North, Jacksonville Beach, Florida
Former Coles Drycleaning
✔ $ 19,881.92
$ 19,881.92
Scope of Work
Todd Kafka
Contract Manager
Joseph Applegate Digitally signed by Joseph Applegate Date: 2026.03.16 13:50:02 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2026.03.10 12:07:54 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2 - Submittal of groundwater sampling field notes and IDW manifest 03/31/2026
Subtask 1,3,4 - Submittal of Groundwater Monitoring Report 04/30/2026
Subtask 2 - Submittal and FDEP approval of groundwater sampling field notes and IDW manifest $ 10,884.91
Subtask 1,3,4 - Submittal and FDEP approval of Groundwater Monitoring Report $ 8,997.01
$ 19,881.92
HW683
DC032C
To: HW683 Contract Negotiation File Former Coles Drycleaner Jacksonville Beach, Florida
ERIC_4608
From: Sarah Aduwa, Project Manager Date: March 3, 2026 Subject: Negotiation Summary
HW683_DC032C
This Task Assignment authorizes Geosyntec to conduct Annual Groundwater/soil gas monitoring and PFAs sampling activities at Former Cole Drycleaner site in accordance with Geosyntec’s scope of work, cost estimate and schedule received on February 26, 2026.
Blaine Dawson is the Project Manager.
Subtask 2 and 3 Monitoring wells MW014, MW015, MW021-MW029, MW031, and MW034 will be sampled and analyzed for volatile organic halocarbons with monitoring wells MW014, MW015, and MW021-MW029 also being analyzed for dissolved gases.
Soil gas monitoring will also be conducted to assess potential methane and hydrogen sulfide generation beneath the former dry-cleaning building. Air samples will be collected from SGP-1, SGP-2, and SV-1 (soil vent fan) and screened for methane, oxygen, and hydrogen sulfide using a multi-RAE.
Geosyntec will prepare an Annual Groundwater Monitoring Report documenting the results of the depth to groundwater measurements and groundwater analytical results.
Subtask 4 Geosyntec will conduct PFAS groundwater monitoring activities concurrently.
Exceedances of the provisional groundwater cleanup target levels were observed at monitoring wells MW001, MW028, MW029, and MW034, with the summation of PFOA and PFOS exceeding 300 nanograms per liter (ng/L) at monitoring wells MW001 (348 ng/L) and MW028 (392 (ng/L).
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost is $19,881.92 with 100 labor hours.
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 2/26/2026
Task #: SubTask 1 Project Management SubTask 6
Site: Former Coles Drycleanin SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 GMR SubTask 8
Project Manager: Sarah Aduwa SubTask 4 PFAS Sampling and Reporting SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$57.47 Project Manager B. Dawson 10 9.5 $105.00 Principal T. Kafka 2 0 1 1 0 0 0 0 0 0
$57.47 Senior Professional B. Dawson 24 4 18 2 0 0 0 0 0 0 $46.16 Professional C. Saville 8 0 5 3 0 0 0 0 0 0 $39.95 Senior Staff Professiona N. Cotter 55 38 4 13 0 0 0 0 0 0 $45.32 Administrative Assistant P. Gallagher 1 0 1 0 0 0 0 0 0 0
Total Hours 100 10 42 29 19 0 0 0 0 0 0
Direct Labor $4,747.28 $546.15 $1,747.98 $1,575.38 $877.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $8,198.55 $943.20 $3,018.76 $2,720.68 $1,515.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $12,945.83 $1,489.35 $4,766.74 $4,296.06 $2,393.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost Estimate Page 1 of 5 Cost Estimate
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 2/26/2026
Task #: SubTask 1 Project Management SubTask 6
Site: Former Coles Drycleanin SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 GMR SubTask 8
Project Manager: Sarah Aduwa SubTask 4 PFAS Sampling and Reporting SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $545.00 $545.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $545.00 $545.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $54.50 $54.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $599.50 $599.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $3,002.00 $3,002.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $300.00 $300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,302.00 $3,302.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,160.00 $1,160.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,380.00 $1,380.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $18,587.33 $1,489.35 $10,408.24 $4,296.06 $2,393.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,294.59 $148.94 $476.67 $429.61 $239.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $19,881.92 $1,638.29 $10,884.91 $4,725.67 $2,633.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost from Prior CEF: Manual Entry Cost from Delta CEF; Manual Entry
Cost (Prior + Delta): $0.00 Auto-Calculated Rounding Error: $19,881.92 Auto-Calculated
Final Total Cost: $19,881.92 Auto-Calculated
Cost Estimate Page 2 of 5 Cost Estimate
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Former Coles Drycleaning SUBTASK: Groundwater Monitoring
DATE: 2/26/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Professional B. Dawson 4
Senior Staff Professional N. Cotter
TOTAL LABOR 42
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Day 3 $360.00 Subtotal $360.00
TOTAL VEHICLE $360.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
IDW
Erwin 1 liquid $545.00 $545.00
Subtotal $545.00
TOTAL SUB $545.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs 13 wells + 1 IDW $73.00 14 0 $1,022.00 MEE 11 wells $180.00 11 0 $1,980.00
Subtotal $3,002.00 Shipping
Large Cooler (25 to 50 lbs) $150.00 2 $300.00 Subtotal $300.00
TOTAL LAB $3,302.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Analytical Related
Groundwater Sampling Kit $290.00 Day 3 $870.00 Soil Vapor Sampling Kit $290.00 Day 1 $290.00
Subtotal $1,160.00 IDW Related
Drum $100.00 Drum 1 $100.00 Subtotal $100.00
Expendables $40.00 Day 3 $120.00
Subtotal $120.00
TOTAL EQUIPMENT $1,380.00
Property owner notification (1 hr); Evaluating and interpreting field data (1 hr); Prepare field package (1 hr); Prepare and sign IDW manifest (1 hr)
Field preparation (1 hr); Mobe 3 days @ 2 hr/day (6 hrs); Collect DTW measurements (3 hrs);
Calibration of equipment (0.5 hr/day x 3 days = 2 hrs); Sampling 13 monitoring wells @ 1.5 hr/well (20 hrs); Perform soil gas screening (2 hrs); Sample management/shipping (2 hrs);
IDW management (1 hr); Prepare field notes (1 hr).
3/3/2026 Page 3 of 5 Subtask 2
SUBTASK: GMR
DATE: 2/26/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 1
Senior Professional B. Dawson 18
Professional C. Saville 5
Senior Staff Professional N. Cotter 4
Administrative Assistant P. Gallagher 1
TOTAL LABOR 29
Compiling and assembling PDF of final report
Develop recommendations and path forward
Preparation of Groundwater Monitoring Report (PG cert)
GIS figures preparation
Prepare tables, draft contour figures, assemble appendices
3/3/2026 Page 4 of 5 Subtask 3
SUBTASK: PFAS Sampling and Reporting
DATE: 2/26/2026
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 1
Senior Professional B. Dawson 2
Professional C. Saville 3
Senior Staff Professional N. Cotter
TOTAL LABOR 19
Data evaluation and path forward recommendation for PFAS assessment
Prepare PFAS evaluation in GMR
PFAS groundwater results figures
Sample 13 wells for PFAS including additional decon procedures (13 wells @ 0.5 hr/well = 7 hrs). IDW management (1 hr). Sample management for FDEP lab (2 hr); Prepare GW results tables (3 hr).
3/3/2026 Page 5 of 5 Subtask 4
ERIC_4608 - Former Coles Drycleaning - Limited Annual Monitoring SOW_20266 1
1200 Riverplace Boulevard, Suite 710 Jacksonville, Florida 32207
PH 904.858.1818
FAX 904.396.1143
www.geosyntec.com
26 February 2026
Ms. Sarah Aduwa Florida Department of Environmental Protection Wastes Sites Cleanup Section 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject: Limited Annual Groundwater and Soil Gas Monitoring
Scope of Work and Level of Effort Former Coles Drycleaning
791 3rd Street North, Jacksonville Beach, Florida FDEP Facility ID ERIC_4608
Dear Ms. Aduwa, Geosyntec Consultants, Inc. (Geosyntec) has prepared this statement of work (SOW), Cost Estimate Form (CEF), and Level of Effort (LOE) for conducting limited annual groundwater and soil gas monitoring activities at the Former Coles Drycleaning Site (Site) located in Jacksonville Beach, Florida. A copy of the CEF and LOE is provided as Attachment A. The monitoring activities in this SOW were recommended in the March 2025 Annual Groundwater Monitoring Report and discussed during Geosyntec’s annual site review meeting with FDEP on April 29, 2025.
On 4 February 2026, Geosyntec confirmed that a Site Access Agreement (SAA) was executed with No. 3 Commercial, LLC on 31 October 2022, as the real property owner of the Former Coles Cleaners Site (ERIC_4608) located at the above address. The Duval County property appraiser database indicates the property owner since 5 November 2005 is “No. 3 Commercial, LLC,” and that the property has not changed ownership since then. As a result, Geosyntec believes the current SAA remains in force.
Subtask 1 – Project Management
Blaine Dawson, Senior Geologist, will be the project manager (PM), and his PM hours are directly computed.
Subtask 2 –Groundwater Monitoring
Annual groundwater monitoring is tentatively scheduled for March 2026 and will be completed in accordance with Table 1. Monitoring wells MW014, MW015, MW021-MW029, MW031, and MW034 will be sampled and analyzed for volatile organic halocarbons with monitoring wells
ERIC_4608 - Former Coles Drycleaning - Limited Annual Monitoring SOW_20266
MW014, MW015, and MW021-MW029 also being analyzed for dissolved gases. Groundwater samples will be stored on ice and shipped to the analytical laboratory under chain of custody for analysis under standard turnaround times.
Soil gas monitoring will also be conducted to assess potential methane and hydrogen sulfide generation beneath the former dry-cleaning building. Air samples will be collected from SGP-1, SGP-2, and SV-1 (soil vent fan) and screened for methane, oxygen, and hydrogen sulfide using a multi-RAE.
Investigation derived waste (IDW) purge water generated during sampling activities will be placed in a 55-gallon drum and manifested for off-Site disposal. The IDW will be staged in the rear of the facility. Based on the historical detections of per- and polyfluoroalkyl substances (PFAS) in groundwater, IDW purge water generated during monitoring activities will need to be treated as PFAS impacted waste. Bid costs prepared by the waste disposal companies are included in Attachment A.
Subtask 3 – Groundwater Monitoring Report
Geosyntec will prepare an Annual Groundwater Monitoring Report documenting the results of the depth to groundwater measurements and groundwater analytical results. The report will contain tables summarizing field/laboratory groundwater data, figures showing groundwater flow direction(s), and a summary of the groundwater monitoring event. The report will be signed and sealed by a Florida-licensed professional geologist. A final signed waste manifest for IDW transport and disposal will also be included in the Groundwater Monitoring Report.
Subtask 4 – PFAS Sampling and Reporting
Geosyntec will conduct PFAS groundwater monitoring activities concurrently with those described in Subtask 2. These sampling activities are proposed to evaluate the PFAS groundwater impacts observed during initial PFAS screening activities in November 2022. Exceedances of the provisional groundwater cleanup target levels were observed at monitoring wells MW001, MW028, MW029, and MW034, with the summation of PFOA and PFOS exceeding 300 nanograms per liter (ng/L) at monitoring wells MW001 (348 ng/L) and MW028 (392 (ng/L). Due to the limited nature of the initial screening efforts (five wells sampled), an expanded PFAS sampling plan has been included in Subtask 2 that includes sample collection from each of the 13 monitoring wells sampled as part of Subtask 2 (MW014, MW015, MW021-MW029, MW031, and MW034) to evaluate delineation of the observed groundwater impacts.
PFAS samples will be collected using low-flow purging via a peristaltic pump in accordance with draft SOPs for PFAS sampling developed by FDEP and the SOPs for PFAS sampling prepared by Geosyntec for use at FDEP’s Site Investigation Section firefighting training facilities. PFAS free
ERIC_4608 - Former Coles Drycleaning - Limited Annual Monitoring SOW_20266 water will used to decontaminate the water level meter between sampling wells. Supplemental labor for PFAS field handling and sampling that will be performed in concert with the groundwater sampling in Subtask 2 has been included in the LOE.
Geosyntec understands that the FDEP laboratory will analyze the 13 groundwater samples for PFAS constituents, and the FDEP will ship the sampling kits to Geosyntec. Based on the location of the Site, Geosyntec anticipates shipping the samples to the FDEP laboratory. Geosyntec assumes that the FDEP laboratory will provide return shipping labels with the sampling kits.
The PFAS analytical results will be presented within the annual groundwater monitoring report included in Subtask 3.
Invoice and Deliverable Schedule:
Subtask Deliverable Deliverable Date Invoice Amount
2 Submittal of groundwater sampling field notes and IDW manifest 20 March 2026 $10,884.91
1, 3, 4 Submittal of Groundwater Monitoring Report 17 April 2026 $8,997.01
Total $19,881.92
As always, it is a pleasure to work with the FDEP. If you require any additional information or have any questions, please contact Blaine Dawson at 904.450.4271.
Sincerely, Blaine Dawson, P.G.
Senior Geologist
Todd K. Kafka, P.G.
Sr. Principal Hydrogeologist
Attachments
Florida Department of Environmental Protection -- Waste Site Cleanup Section
TABLE 1: PROPOSED MONITORING WELL SAMPLING PLAN
Facility Name: Coles Drycleaning
ERIC_4608
VOHs by EPA method
8260B
Dissolved Gases by
RSK-175
Soil Gas Screening
MW014, MW015, MW021-MW029 X X
MW031 and MW034 X
SGP-1, SGP-2, SV-1 X
Notes:
1. VOH = volatile organic halocarbons.
2. Dissolved gases = methane, ethene, and ethane.
Sampling Event
Analysis
Annual NAM
!H
!H
!H
!H
!H!H
A A
/N o rth rd S tre e t
6th Avenue North th
S tre e t N o rth
MW019 (58-68)
DW-2R (40-45)
MW032 (30-50)
MW030 (30-50)
MW024 (30-35)
MW023 (38-43)
MW022 (30-35)
MW021 (37-42)
MW028 (30-35)
MW027 (30-35)
MW026 (38-43)
MW025 (37-42)
MW034 (30-50)
MW035 (30-50)
MW036 (30-50)
MW037 (30-50)
IW0016 (35-45)
IW022 (35-45)
IW024 (35-45)
IW023 (25-35)
MW031 (90-100)
IW020 (35-45)
IW0017 (35-45)
MW029 (35-40)
MW033 (30-50)
MW013 (15-20)
MW010 (15-20)
MW009 (25-35)
MW017 (65-75)
MW002 (35-45)
MW003 (5.8-9.8)
MW018 (3.5-8.5)
MW015 (3.5-8.5)
MW014 (3.5-8.5)
MW016 (3.5-8.5)
MW005 (24.6-34.6)
MW004 (24.7-34.7)
MW001 (24.8-34.8)
MW008 (24.95-34.95)
Monitoring Well VOH Results
Coles Drycleaning Facility ID: ERIC_4608 791 3rd Street North
Jacksonville Beach, Duval County, Florida
Figure
Path: (Titusville-01\DATA) \\Titusville-01\Data\0GIS\FR2548_Coles\MXDs\202503\MW_lNJ_results_Feb2025.mxd 24 March 2025. Last Edited by: csaville
Jacksonville, FL March 2025
80 0 8040 Feet
³
Notes:
1. VOH indicates volatile organic halogen.
2. ft BLS indicates feet below land surface.
3. Results are presented in micrograms per liter (µg/L).
4. J4 indicates potential high bias due to laboratory matrix spike recovery outside control criteria
5. U indicates compound was analyzed for but not detected.
6. I indicates value is between the method detection limit and the practical quantitation limit.
7. Bold text indicates a detected value.
8. Results in yellow and bold exceed Groundwater Cleanup Target Levels (GCTLs) established in Chapter 62-777, Florida Administrative Code (FAC).
9. Results in orange and bold exceed both the GCTLs and natural attenuation default concentrations (NADCs) established in Chapter 62-777, FAC.
10. Results in blue indicate the laboratory method detection limit was above the
GCTL.
11. Locations are approximate.
12. Parcel boundary obtained from Florida Geographic Data Library website and visual compared to Duval County Property Appraiser's website..
13. 2023 aerial source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA FSA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community.
Date PCE TCE cDCE VC
5/7/2015 1 U 1 U 1 U 1 U
11/17/2022 0.25 U 0.25 U 2,300 45
MW014 (3.5 - 8.5)
Date PCE TCE cDCE VC
5/7/2015 5 1 U 1 U 1 U
8/16/2017 0.36 U 0.29 U 0.20 U 0.20 U
MW003 (5.8 - 9.8)
Date PCE TCE cDCE VC
5/7/2015 1 U 1 U 27 1 U
1/31/2018 0.36 U 0.29 U 27 8.9
6/19/2019 0.36 U 0.29 U 29 11
MW004 (24.7 - 34.7)
Date PCE TCE cDCE VC
5/7/2015 1 U 1 U 2 1 U
MW005 (24.6 - 34.6)
Date PCE TCE cDCE VC
5/7/2015 1 U 1 U 1 U 1 U
1/31/2018 0.36 U 0.29 U 0.24 U 0.20 U
MW013 (15 - 20)
Date PCE TCE cDCE VC
5/7/2015 1 U 1 U 5 4
8/17/2017 0.75 I 0.46 I 2.4 0.20 U
11/17/2022 0.25 U 0.25 U 0.50 U 1.6
MW015 (3.5 - 8.5)
Date PCE TCE cDCE VC
5/7/2015 1 U 1 U 1 U 1 U
MW016 (3.5 - 8.5)
Date PCE TCE cDCE VC
5/7/2015 1 U 1 U 1 1 U
MW018 (3.5 - 8.5)
Date PCE TCE cDCE VC
5/7/2015 1 U 1 U 1 U 1 U
1/31/2018 0.36 U 0.29 U 0.24 U 0.20 U
MW019 (58 - 68)
Date PCE TCE cDCE VC
5/14/2019 1.1 U 0.87 U 150 0.6 U
MW035 (30-50)
Date PCE TCE cDCE VC
2/22/2016 1,100 280 320 85 I
5/15/2019 11,000 1400 900 29
6/19/2019 3,800 840 740 23
IW016 (35 - 45)
Date PCE TCE cDCE VC
2/23/2016 36 U 29 U 320 540
5/15/2019 5.8 1.2 160 160
IW017 (35 - 45)
Date PCE TCE cDCE VC
5/16/2019 4.4 2.4 I 890 520
IW0020 (35-45)
Date PCE TCE cDCE VC
5/16/2019 1.6 I 0.55 I 890 210
IW0022 (35-45)
Date PCE TCE cDCE VC
5/16/2019 0.36 U 0.29 U 13 19
IW0023 (25-35)
Date PCE TCE cDCE VC
5/15/2019 1.1 I 0.29 U 95 140
IW0024 (35-45)
Date PCE TCE cDCE VC
6/22/2016 0.36 U 0.29 U 12 J4 0.20 U
1/31/2018 13 2.3 I 13 0.20 U
DW-2R (40 - 45 )
Legend
Abandoned Compliance Well Location showing screen interval (ft BLS)*
Approximate Parcel Boundary
&< Monitoring Well Location showing screen interval (ft BLS)
!H Injection Well Location showing screen interval (ft BLS)
VOH NADC Isocontour
VOH GCTL Isocontour (Dashed where Inferred)
Date PCE TCE cDCE VC
2/27/2020 3.6 U 2.9 U 2.4 U 360
8/5/2020 3.4 I 1.4 U 150 1,100
3/9/2022 0.25 U 0.25 U 1.6 I 130
11/16/2022 0.25 U 0.25 U 0.50 U 13
7/25/2023 0.25 U 0.25 U 0.50 U 3.4
1/18/2024 2.5 U 2.5 U 5.0 U 2.5 U
2/13/2025 0.25 U 0.25 U 0.50 U 2.0
MW001 (24.8 - 34.8)
Date PCE TCE cDCE VC
2/27/2020 0.36 U 0.29 U 0.24 U 0.20 U
8/5/2020 2.7 0.29 U 0.24 U 71
3/8/2022 0.25 U 0.25 U 0.5 U 150
3/8/2022 (D) 0.25 U 0.25 U 0.5 U 150
11/17/2022 0.25 U 0.25 U 0.50 U 0.25 U
7/25/2023 0.25 U 0.25 U 0.50 U 0.25 U
1/17/2024 0.25 U 0.25 U 0.50 U 0.25 U
2/11/2025 0.25 U 0.25 U 0.50 U 0.25 U
MW021 (37 - 42)
Date PCE TCE cDCE VC
2/27/2020 3.6 U 2.9 U 2.4 U 100
8/5/2020 1.8 U 1.4 U 140 620
3/8/2022 0.25 U 0.25 U 160 190
11/17/2022 0.50 U 0.50 U 1.4 I 43
7/25/2023 0.25 U 0.25 U 0.50 U 38
1/17/2024 0.25 U 0.25 U 0.50 U 200
2/12/2025 0.25 U 0.25 U 7.8 570
MW022 (30 - 35)
Date PCE TCE cDCE VC
2/27/2020 1.1 U 0.87 U 0.72 U 200
8/4/2020 1.8 U 1.4 U 1.2 U 470
3/8/2022 0.25 U 0.25 U 0.52 I 67
11/18/2022 0.25 U 0.25 U 0.50 U 4.2
7/26/2023 1.9 I 0.30 I 0.73 I 26
1/17/2024 0.25 U 0.25 U 0.50 U 67
2/12/2025 0.25 U 0.25 U 0.61 I 120
MW024 (30 - 35)
Date PCE TCE cDCE VC
2/27/2020 1.1 U 0.87 U 0.72 U 39 J4
8/4/2020 2.1 0.29 U 0.24 U 22
3/8/2022 0.25 U 0.25 U 0.5 U 920
11/18/2022 0.25 U 0.25 U 0.50 U 2.3
7/26/2023 1.4 I 0.25 U 0.50 U 7.9
1/17/2024 0.25 U 0.25 U 0.50 U 12
2/12/2025 0.25 U 0.25 U 0.50 U 16
MW023 (38 - 43)
Date PCE TCE cDCE VC
2/27/2020 3.6 U 2.9 U 22 670
8/4/2020 3.6 U 2.9 U 2.4 U 630
3/9/2022 0.25 U 0.25 U 0.7 I 41
11/17/2022 0.25 U 0.25 U 0.50 U 67
7/26/2023 3.3 2.8 I 0.92 I 45
1/18/2024 0.25 U 0.25 U 0.50 U 13
2/13/2025 0.25 U 0.25 U 0.50 U 3.7
MW002 (35 - 45)
Date PCE TCE cDCE VC
2/27/2020 0.36 U 0.29 U 1.6 8.8
5/27/2020 0.36 U 0.29 U 0.95 I 0.20 U
8/4/2020 2.2 0.29 U 3.6 13 J4
11/17/2022 0.25 U 0.25 U 0.87 I 3.3
1/18/2024 0.25 U 0.25 U 1.0 I 4.1
2/14/2025 0.25 U 0.25 U 1.8 I 5.2
MW017 (65 - 75)
Date PCE TCE cDCE VC
2/27/2020 0.36 U 0.29 U 0.23 U 150
5/27/2020 0.72 U 0.58 U 2.3 490
8/5/2020 1.1 U 0.87 U 0.72 U 300
11/17/2022 0.25 U 0.25 U 0.50 U 20
1/18/2024 0.25 U 0.25 U 0.50 U 47
2/13/2025 0.25 U 0.25 U 0.50 U 85
MW031 (90-100)
Date PCE TCE cDCE VC
8/6/2020 1.9 0.29 U 0.83 I 0.67 I
11/18/2022 0.25 U 0.25 U 0.53 I 0.25 U
1/16/2024 0.25 U 0.25 U 0.65 I 0.25 U
2/11/2025 0.25 U 0.25 U 0.71 I 0.25 U
MW032 (30-50)
Date PCE TCE cDCE VC
8/6/2020 2.1 0.29 U 0.24 U 0.20 U
11/18/2022 0.25 U 0.25 U 0.50 U 0.25 U
1/16/2024 0.25 U 0.25 U 0.50 U 0.25 U
2/10/2025 0.25 U 0.25 U 0.50 U 0.25 U
MW037 (30-50)
Date PCE TCE cDCE VC
8/6/2020 2.2 0.29 U 96 4.7
11/18/2022 0.25 U 0.25 U 11 13
1/16/2024 0.25 U 0.25 U 10 19
2/11/2025 0.25 U 0.25 U 6.1 14
MW010 (15 - 20)
Date PCE TCE cDCE VC
8/6/2020 2.5 0.29 U 0.24 U 0.44 I
11/18/2022 0.25 U 0.25 U 1.2 I 0.25 U
1/16/2024 0.25 U 0.25 U 0.50 U 0.25 U
2/10/2025 0.25 U 0.25 U 0.82 I 0.25 U
MW036 (30-50)
Date PCE TCE cDCE VC
8/6/2020 1.8 U 1.4 U 760 160
11/16/2022 0.25 U 0.25 U 370 100
1/16/2024 1.2 U 1.2 U 560 210
2/13/2025 1.2 U 1.2 U 270 97
MW034 (30-50)
Date PCE TCE cDCE VC
8/5/2020 2.6 0.29 U 1.8 1.1
11/17/2022 0.25 U 0.25 U 0.50 U 0.25 U
1/15/2024 0.25 U 0.25 U 0.50 U 0.25 U
2/11/2025 0.25 U 0.25 U 0.56 I 0.37 I
MW009 (25 - 35)
Date PCE TCE cDCE VC
8/5/2020 2.6 0.29 U 0.84 I 3.1
11/17/2022 0.25 U 0.25 U 0.50 U 0.25 U
1/15/2024 0.25 U 0.25 U 0.50 U 0.25 U
2/11/2025 0.25 U 0.25 U 0.50 U 0.25 U
MW008 (24.95 - 34.95)
Date PCE TCE cDCE VC
2/27/2020 7.2 U 5.8 U 4.8 U 440
8/4/2020 3.6 U 2.9 U 2.4 U 160
3/8/2022 0.25 U 0.25 U 0.57 I 2.9
11/16/2022 0.25 U 0.25 U 5.3 69
7/24/2023 0.25 U 0.25 U 0.50 U 93
1/18/2024 0.25 U 0.25 U 0.50 U 52
2/12/2025 0.25 U 0.25 U 66 170
MW029 (35 - 40)
Date PCE TCE cDCE VC
8/5/2020 2.5 0.29 U 79 50
11/17/2022 0.25 U 0.25 U 34 18
1/16/2024 0.25 U 0.25 U 0.50 U 23
2/13/2025 0.25 U 0.25 U 34 16
MW033 (30-50)
Date PCE TCE cDCE VC
5/14/2019 0.36 U 0.29 U 0.27 I 0.2 U
8/5/2020 1.7 0.29 U 0.24 U 0.89 I
1/16/2024 0.25 U 0.25 U 0.50 U 1.1
2/11/2025 0.25 U 0.25 U 0.50 U 0.25 U
MW030 (30-50)
Date PCE TCE cDCE VC
2/27/2020 7.2 U 5.8 U 4.8 U 980
8/4/2020 7.2 U 5.8 U 4.8 U 440
3/8/2022 0.25 U 0.25 U 0.5 U 2.3
11/17/2022 0.25 U 0.25 U 0.50 U 3.4
7/25/2023 33 4.1 2.6 3.9
1/18/2024 0.25 U 0.25 U 0.50 U 0.75 I
2/14/2025 0.25 U 0.25 U 0.50 U 0.25 U
MW025 (37 - 42)
Date PCE TCE cDCE VC
2/27/2020 36 U 29 U 24 U 9,700
8/4/2020 36 U 29 U 24 U 8,600
3/7/2022 0.25 U 0.25 U 0.5 U 120
11/17/2022 0.25 U 0.25 U 0.83 I 0.67 I
7/25/2023 67 9.6 7.3 11
1/17/2024 0.25 U 0.25 U 0.50 U 0.42 I
2/14/2025 0.25 U 0.25 U 0.50 U 0.25 U
MW026 (38 - 43)
Date PCE TCE cDCE VC
2/27/2020 18 U 14 U 76 6,700
8/4/2020 18 U 14 U 12 U 2,900
3/8/2022 0.5 U 0.5 U 1.0 U 210
11/17/2022 0.50 U 0.50 U 1.0 U 260
7/25/2023 20 2.5 1.3 I 5.5
1/18/2024 0.75 U 0.75 U 1.5 U 28
2/14/2025 0.25 U 0.25 U 0.62 I 58
MW027 (30 - 35)
Date PCE TCE cDCE VC
2/27/2020 240 250 12,000 16,000
8/4/2020 430 440 13,000 23,000
3/7/2022 230 89 1,500 8,200
11/16/2022 1,400 400 2,100 9,100
7/25/2023 2,500 500 3,400 10,000
1/17/2024 860 330 1,400 17,000
2/12/2025 640 200 1,400 8,300
MW028 (30 - 35)
Abandoned Monitoring Well Location showing screen interval (ft BLS)
Blaine Dawson Rectangle
Blaine Dawson Rectangle
Blaine Dawson Rectangle
Blaine Dawson Rectangle
Blaine Dawson Rectangle
Blaine Dawson Rectangle
Blaine Dawson Rectangle
Blaine Dawson Rectangle
Blaine Dawson Rectangle
Blaine Dawson Rectangle
Blaine Dawson Rectangle
Blaine Dawson Rectangle
Blaine Dawson Rectangle
ATTACHMENT B
SUBCONTRACTOR QUOTES
1 Drum $915.20 1 Profile Fee (PFAS) $350 1 Drum $625
1 Transportation $380.00 1 Drum $195 1 Transportation $450
1 Engery/Insurance Fee (20%) $215
Notes
The selected subcontractor is highlighted in yellow.
Subcontractor Evaluation: Former Coles Cleaners, Jacksonville Beach, Florida
York Environmental
$1,295.20 $545.00 $1,290.00
IDW DISPOSAL
Hulls Erwin Remedation
From: Larry Hall To: Blaine Dawson Subject: RE: Updated Generic IDW Quote Date: Friday, August 8, 2025 9:45:00 AM
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."
Yes- if it is sampled for and has any hit it will have to go to a hazardous waste facility.
From: Blaine Dawson <BCDawson@Geosyntec.com> Sent: Friday, August 8, 2025 9:41 AM To: Larry Hall <lhall@hullsenvironmental.com> Subject: Re: Updated Generic IDW Quote
Good morning Larry, Is PFAS waste having to go hazardous now?
Thank you, Blaine
Get Outlook for iOS
From: Larry Hall <lhall@hullsenvironmental.com> Sent: Friday, August 8, 2025 9:09:19 AM To: Blaine Dawson <BCDawson@Geosyntec.com> Subject: RE: Updated Generic IDW Quote
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."
Blaine, See pricing below.
Thanks, Larry Hall mailto:lhall@hullsenvironmental.com mailto:BCDawson@Geosyntec.com https://nam02.safelinks.protection.outlook.com/?url=https%3A%2F%2Faka.ms%2Fo0ukef&data=05%7C02%7CBCDawson%40Geosyntec.com%7Cbf08abf29ab543615e1408ddd681c1ec%7C7125495671b047f48977c4c17bc205cb%7C0%7C0%7C638902574992960669%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=Xngy9scD00NQQVOMrHyHqwDJJbJqAcH0lWEUfCYkmsY%3D&reserved=0 mailto:lhall@hullsenvironmental.com mailto:BCDawson@Geosyntec.com BCDawson Highlight
From: Blaine Dawson <BCDawson@Geosyntec.com> Sent: Thursday, August 7, 2025 11:04 AM To: Larry Hall <lhall@hullsenvironmental.com> Subject: Updated Generic IDW Quote
Good morning Larry, In light of the update you recently provided about LES, I was hoping you might be able to prepare an updated IDW disposal quote (previous version attached) for use as part of future proposals. Please see the below list of scenarios I need updated waste disposal costs for through the remainder of 2025. We will reach out again at the beginning of 2026 for updated rates.
Scenario 1
FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has not been investigated for at the site. $260.00 per drum solid or liquid less than 50 miles- Add $95 per additional 50 miles
Scenario 2
FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the laboratory's method detection limit but is below the current provisional groundwater cleanup target level of 70 ng/L. $915.20 per drum solid or liquid- Transportation per drum/load up to 10 drums- $380.00
Scenario 3
FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the current provisional groundwater cleanup target level of 70 ng/L. $915.20 per drum solid or liquid- Transportation per drum/load up to 10 drums -$380.00
Scenario 4
FDEP PRP site where VOA concentrations are below hazardous levels for both soils and groundwater. $260.00 per drum solid or liquid less than 50 miles- Add $95 per each additional 50 miles
Please let me know if you have any questions or if you need anything else from me to support your efforts on this. If any of the above scenarios requires additional analytical results beyond those described, please let me know so I can include those in the overall cost evaluation. I really appreciate your help with this!
Thank you, Blaine Dawson, PG (FL,TN) Senior Geologist mailto:BCDawson@Geosyntec.com mailto:lhall@hullsenvironmental.com
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Nicholas Barnes Geosyntec Consultants, Inc.
12802 Tampa Oaks Boulevard, Suite 151 Tampa, FL 33637
April 15, 2025
Re: Non-Hazardous Drum Disposal of PFOS/PFAS Impacted Materials
Mr. Barnes:
The price for the transportation and disposal (T&D) of 55-gallon drums of non-hazardous soil, mud, and water is listed below:
Impacted with Non-Hazardous Petroleum or Chlorinated Solvents:
Description Rate Unit
T&D - Non-Haz Soil $ 110.00 Per Drum
T&D - Non-Haz Mud/Water $ 125.00 Per Drum
Impacted with Non-Hazardous PFAS/PFOS:
Description Rate Unit
Profile Fee (Charged once per site) $ 350.00 Per Site
T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum
T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum
Dry cleaning sites will require 8260-VOH lab analysis and PFAS sites will require the full FDEP lab analysis for IDW waste characterization.
This quote is valid for 120 days.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: Robert@ErwinRemediation.com Office: (850) 466-2358
From: Tony Burgess To: Blaine Dawson Subject: Re: IDW Management Quotes Date: Monday, September 22, 2025 2:27:31 PM
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."
Blaine, We went through the scenarios described below.
Please contact me with any additional questions or concerns.
Scenario 1 FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has not been investigated for at the site.
NonHaz - $225.00/55 Liquids/Solids – No PFAS F002 - $625.00/55 Liquids and Solids – No PFAS Scenario 2 FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the laboratory's method detection limit but is below the current provisional groundwater cleanup target level of 70 ng/L.
PFAS only - $625.00/55 Liquids and Solids F002 & PFAS - $7.40/Lb with $625.00/55 Min – Liquids F002 & PFAS - $4.40/Lb with $625.00/55 Min – Solids Scenario 3 FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the current provisional groundwater cleanup target level of 70 ng/L.
PFAS only - $625.00/55 Liquids and Solids F002 & PFAS - $7.40/Lb with $625.00/55 Min – Liquids F002 & PFAS - $4.40/Lb with $625.00/55 Min – Solids Scenario 4 FDEP PRP site where VOA concentrations are below hazardous levels for both soils and groundwater.
NonHaz - $225.00/55 Liquids/Solids – No PFAS F002 - $625.00/55 Liquids and Solids – No PFAS Please add:
Energy/Insurance------------20% (Total Ticket) Transportation----------------$450.00/stop
Tony Burgess
York Environmental Services PO Box 600532 Jacksonville, FL 32260 Phone: (904) 718-0883 mailto:yorkenv@comcast.net mailto:BCDawson@Geosyntec.com BCDawson Highlight
File details come from the government source that posted it. Updated .