This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Geosyntec Consultants for work on the Concord Cleaners #045 environmental remediation project located at 1940-77 North Monroe Street in Tallahassee, Leon County. The task assignment is issued under underlying Contract Number HW683 and is identified as TA Number DC008A. The FDEP Project Manager is Evan Miller, and Geosyntec's Project Manager is Todd Kafka. The assignment was signed on February 17, 2022, with a completion date of June 30, 2022.
Geosyntec will conduct file and data review, preparation of summary soil data figures and tables, and preparation of a letter report. The scope includes two primary subtasks: Subtask 1 involves project management with 21 labor hours, and Subtask 2 involves file, historical data, and new analytical data review with 122 labor hours totaling 143 hours. The work includes reviewing historical Site Assessment Reports, Interim Source Removal Reports, and Remedial Action Plans from the project's inception in May 2000; analyzing newly collected soil data to evaluate remaining soil above soil cleanup target levels; preparing three soil summary interval maps, two cross-section maps, and three depth-of-excavation maps; and meeting with FDEP to discuss removal strategies and an Interim Source Removal Plan framework. The total Task Assignment value is $20,980.45 on a fixed unit rate basis. The single deliverable—a letter report with historical and newly collected data plus project management—is due March 31, 2022, with invoicing occurring upon delivery.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW683
DC008A Completion June 30, 2022
This Task Assignment authorizes Geosyntec to conduct file and data review, preparation of summary soil data figures and tables, and preparation of a letter report in accordance with the Geosyntec scope of work, cost estimate, and schedule received on 16 February 2022.
Evan Miller 850-245-8928 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Geosyntec
Geosyntec
Todd Kafka 813-379-4396
ERIC_4870
1940-77 North Monroe Street Tallahassee, Leon County
Concord Cleaners #045
✔ $ 20,980.45
$ 20,980.45
Scope of Work
Todd Kafka
Contract Manager
2-17-22
Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.
Date: 2022.02.17 12:16:12 -05'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.02.17 11:40:59 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 1,2- Letter Report Historical and Newly collected data, Project Management 03/31/2022
Subtask 1,2- Letter Report Historical and Newly collected data, Project Management $ 20,980.45
$ 20,980.45
HW683
DC008A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
To:
From:
Date:
HW683 Contract Negotiation File Concord Cleaners #045 Tallahassee, Leon County
ERIC_4870
Evan Miller, Project Manager February 17, 2022
Subject: Negotiation Summary
HW683 DC008A
This Task Assignment authorizes Geosyntec to conduct file and data review, preparation of summary soil data figures and tables, and preparation of a letter report for the Concord Cleaners #045
Subtask 1 - Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2 - File, Historical Data, and New Analytical Data Review In consultation with FDEP, Geosyntec proposes to conduct the following tasks:
1) Reviewing general Site data from previous SARs, ISRs, RAPs, and other historical data, and providing a chronology of activities that have occurred since the project began in May 2000.
2) Reviewing newly collected and analyzed soil data that was collected by Earth Systems in January 2022 in context with historical data to evaluate the extent of soil remaining above SCTLs. We have included time/budget to prepare an updated summary soil maps including 3 soil summary (tag) interval maps, 2 cross section, and depth of excavation maps (3) of soil analytical results and distribution of the flowable fill. Final deliverable will be a letter report with updated tables and figures and a recommended path forward.
3) Meeting with FDEP to discuss the most expeditious and cost-effective approach for moving forward with additional excavation targeting residual soils with SCTL exceedances and to discuss the framework of an Interim Source Removal Plan (ISRP) for the next phase of work.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $20,980.45 with 143 labor hours.
Geosyntec may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
Printed on recycled paper.
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 2/17/2022
Task #: SubTask 1 Project Management SubTask 6
Site: Concord Cleaners #045 SubTask 2 File, Historical & New Analytical Data Review-letter report SubTask 7
Activity/Phase: File/Data Review SubTask 3 SubTask 8
Project Manager: Applegate SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$38.70 Project Manager S. Sanchez 21 20.8 $84.13 Principal J. Applegate 18 18 0 0 0 0 0 0 0 0 $72.60 Principal K. Warner 6 6 0 0 0 0 0 0 0 0 $46.15 Project Professional M. Hensley 60 60 0 0 0 0 0 0 0 0 $38.70 Senior Staff Professiona S. Sanchez 38 38 0 0 0 0 0 0 0 0
Total Hours 143 21 122 0 0 0 0 0 0 0 0
Direct Labor $6,994.18 $804.64 $6,189.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $12,078.95 $1,389.61 $10,689.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $19,073.13 $2,194.25 $16,878.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost Estimate Page 1 of 2 Cost Estimate
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 2/17/2022
Task #: SubTask 1 Project Management SubTask 6
Site: Concord Cleaners #045 SubTask 2 File, Historical & New Analytical Data Review-letter report SubTask 7
Activity/Phase: File/Data Review SubTask 3 SubTask 8
Project Manager: Applegate SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $19,073.13 $2,194.25 $16,878.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,907.32 $219.43 $1,687.89 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $20,980.45 $2,413.68 $18,566.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost Estimate Page 2 of 2 Cost Estimate
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Concord Cleaners #045 SUBTASK: File, Historical & New Analytical Data Review-letter report
DATE: 2/17/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal J. Applegate 18
Principal K. Warner 6
Project Professional
M. Hensley 60
Senior Staff Professional
S. Sanchez 38
TOTAL LABOR 122
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
TOTAL SUB $0.00
LABORATORY COSTS
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Strategy calls with FDEP (4 mtgs, 1 hr each with followup notes 8 hrs), multi-party path fwd discussions (2), letter report preparation (8 hrs)
File Review (2 hrs), New analytical data evaluation (2 hrs), Strategy call with FDEP (2 hrs)
GIS Soil Analytical Summary Figures by depth (3 figures drafting_18 hrs) Cross Section (2 figures drafting, 10 hrs) preparation and soil tables update (16 hrs), revisions of figures and tables (16)
File Review (12 hrs), chronology and file review summary preparation (6), VOH data tabulation and drafting Soil Analytical summary figure assistance (4), prepare letter report and revisions (16)
2/17/2022 Page 1 of 1 Subtask 2
GEO Project Concord Cleaners #045 File and Data Review
12039 Centre Point Blvd, Suite 103 Tallahassee, Florida 32308
PH 850.556-8419
www.geosyntec.com
17 February 2022
Via Email: Evan.E.Miller@FloridaDEP.gov
Mr. Evan Miller Environmental Specialist II Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject: SCOPE OF WORK and LOE Concord Cleaners #045 1940-77 North Monroe Street Tallahassee, Leon, Florida
FDEP ERIC ID_4870
Dear Mr. Miller, Please find attached Geosyntec’s Scope of Work and proposed Level of Effort (LOE) for file and data review, preparation of summary soil data figures and tables, and preparation of a letter report for the Concord Cleaners #045 (Site) located in Tallahassee, Florida. A summary of the costs associated with the attached LOE is provided below.
BACKGROUND
Based on discussion of the Site with FDEP, it is our understanding the Site has been through multiple phases of assessment and remediation. The City of Tallahassee is redeveloping the property and FDEP is planning to conduct additional remediation of the remaining soil contamination under an accelerated Interim Source Removal (ISR).
In addition, FDEP tasked Earth Systems (current and out-going consultant) to collect additional soil samples under and around the footprint of the former cleaners (recently demolished) to refine the extent of soil exceeding soil cleanup target levels (SCTLs), which have been mainly leachability exceedances. The subsurface beneath the former cleaners was excavated with large diameter augers and backfilled with flowable fill. Depending on what remaining soil above SCTLs exist and the City of Tallahassee’s redevelopment plans, some of the flowable fill may need to be removed during the ISR.
mailto:Evan.E.Miller@FloridaDEP.gov
Mr. Evan Miller
GEO Project Concord Cleaners #045 File and Data Review
Subtask 1 – Project Management
Subtask 2 – File, Historical Data, and New Analytical Data Review
In consultation with FDEP, Geosyntec proposes to conduct the following tasks:
1) Reviewing general Site data from previous SARs, ISRs, RAPs, and other historical data, and providing a chronology of activities that have occurred since the project began in May 2000.
2) Reviewing newly collected and analyzed soil data that was collected by Earth Systems in January 2022 in context with historical data to evaluate the extent of soil remaining above SCTLs. We have included time/budget to prepare an updated summary soil maps including 3 soil summary (tag) interval maps, 2 cross section, and depth of excavation maps (3) of soil analytical results and distribution of the flowable fill. Final deliverable will be a letter report with updated tables and figures and a recommended path forward.
3) Meeting with FDEP to discuss the most expeditious and cost-effective approach for moving forward with additional excavation targeting residual soils with SCTL exceedances and to discuss the framework of an Interim Source Removal Plan (ISRP) for the next phase of work.
The deliverables for Subtask 2 will be a written summary of our file review that will include a chronology of assessment and remedial activities, a qualitative description of remaining soil above SCTLs, soil analytical summary maps showing SCTL exceedances by depth, an estimate of remaining soil volume of exceedances targeted for removal, and Geosyntec’s recommendation for moving forward with preparing an ISRP.
Our proposed team is based in Tallahassee and collaborated with the FDEP in 2021 on the Vogue Cleaners ISR.
We have included 4 meetings/teleconferences (2 hour each including follow-up and preparation) with the FDEP: 1) to discuss the review of historical and newly collected analytical data and: 2) a second meeting to discuss the ISRP approach and schedule, and 2 additional meetings to discuss figures, tables, and path forward. We have also included two meetings with the City of Tallahassee to determine the demolitions and construction schedule for the overall property and the former Concord Cleaners #045 facility.
Mr. Evan Miller
GEO Project Concord Cleaners #045 File and Data Review
Invoice and Deliverable Schedule:
Subtask Deliverable Deliverable Due Date
Invoice Amount
1 and 2 Letter Report Historical and Newly collected data 3/31/22 $20,980.45
Period of Performance 6/30/22
Total: $15.995.61
Please review and call Joe Applegate at 850-556-8419 or Todd Kafka at (813) 379-4396 if you have any questions. As always, it is a pleasure to work with the FDEP.
Sincerely, GEOSYNTEC CONSULTANTS, INC.
Joe Applegate, P.G. (FL #1067) Todd Kafka, P.G. (FL #2338) Sr. Principal Hydrogeologist Sr. Principal Hydrogeologist
Attachment: A – LOE workbook
| Concord 045 CEF.pdf |
| Cost Estimate |
| Concord 045 LOE.pdf |
| Subtask 2 |
| Concord Cleaners #45_Proposal for File Review and Data Evaluation_2_16_2022.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – File, Historical Data, and New Analytical Data Review |
| Concord 045 CEF.pdf |
| Cost Estimate |
| Concord 045 LOE.pdf |
| Subtask 2 |
| Concord Cleaners #45_Proposal for File Review and Data Evaluation_2_16_2022.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – File, Historical Data, and New Analytical Data Review |