Task Assignment Summary

This Task Assignment (TA) is issued by the State of Florida Department of Environmental Protection (FDEP) to Geosyntec Consultants for annual groundwater monitoring services at the Lipham Cleaners site located at 2492 W State Road 434, Longwood, Seminole County, Florida. The TA operates under Contract Number HW683, with TA Number DC007A, effective February 14, 2022, and completion date of August 30, 2022. The Department Project Manager is Evan Miller, and the Contractor's Project Manager is Todd Kafka. This document authorizes work according to Geosyntec's scope of work, cost estimate, and schedule received on February 11, 2022.

The contract scope includes three primary subtasks: Project Management, Annual Groundwater Monitoring, and Groundwater Monitoring Report preparation. Under Subtask 2, Geosyntec will measure water depth in 30 site-wide monitoring wells and collect groundwater samples from three monitoring wells (MW021, MW025, and MW026) using conventional low-flow purging methods with field parameter analysis. Samples will be submitted for volatile organic hydrocarbon (VOH) analysis by EPA Method 8260. Investigation Derived Waste (IDW) characterization will include VOH and RCRA Metals analysis, with Clark Environmental selected as the IDW disposal subcontractor. The Groundwater Monitoring Report will include field/laboratory data tables, groundwater flow direction figures, analytical results, Mann-Kendal stability analyses, and ADaPT/GIS updates. The total Task Assignment Value is $8,332.56 (fixed unit rate), based on 62 labor hours. The invoice schedule requires submittal of the Groundwater Monitoring Report, ADaPT/GIS update, and IDW Manifest by May 30, 2022, with full payment due upon receipt and approval. The TA was signed by Todd Kafka (Geosyntec Contract Manager) and William E. Burns, Jr. (FDEP Secretary or Designee) on February 14, 2022.

View the file

Other files

File Type Posted
CN-370000-HW683-BF02A.pdf.crdownload CRDOWNLOAD file
CN-370000-HW683-BF02ACO1.pdf PDF
CN-370000-HW683-BF02B.pdf PDF
CN-370000-HW683-BF04CCO2.pdf PDF
CN-370000-HW683-BIL01B.pdf PDF
CN-370000-HW683-BIL01C.pdf PDF
CN-370000-HW683-BIL03A.pdf PDF
CN-370000-HW683-CSS01.pdf PDF
CN-370000-HW683-CSS02B.pdf PDF
CN-370000-HW683-DC002B.pdf PDF
CN-370000-HW683-DC002C.pdf PDF
CN-370000-HW683-DC003D.pdf PDF
CN-370000-HW683-DC003F.pdf PDF
CN-370000-HW683-DC005A.pdf PDF
CN-370000-HW683-DC005B.pdf PDF
CN-370000-HW683-DC005C.pdf PDF
CN-370000-HW683-DC008C.pdf PDF
CN-370000-HW683-DC009D.pdf PDF
CN-370000-HW683-DC010B.pdf PDF
CN-370000-HW683-DC014B.pdf PDF
CN-370000-HW683-DC015A.pdf PDF
CN-370000-HW683-DC017B.pdf PDF
CN-370000-HW683-DC017D.pdf PDF
CN-370000-HW683-DC018A.pdf PDF
CN-370000-HW683-DC019E.pdf PDF
CN-370000-HW683-DC01ACO2.pdf PDF
CN-370000-HW683-DC01B.pdf PDF
CN-370000-HW683-DC020D.pdf PDF
CN-370000-HW683-DC025A.pdf PDF
CN-370000-HW683-DC025C.pdf PDF
CN-370000-HW683-DC028B.pdf PDF
CN-370000-HW683-DC028C.pdf PDF
CN-370000-HW683-DC029C.pdf PDF
CN-370000-HW683-DC029F.pdf PDF
CN-370000-HW683-DC029G.pdf PDF
CN-370000-HW683-DC02ECO2.pdf PDF
CN-370000-HW683-DC030A.pdf PDF
CN-370000-HW683-DC030B.pdf PDF
CN-370000-HW683-DC031A.pdf PDF
CN-370000-HW683-DC032B.pdf PDF
CN-370000-HW683-DC034A.pdf PDF
CN-370000-HW683-DC036C.pdf PDF
CN-370000-HW683-DC037A.pdf PDF
CN-370000-HW683-DC042B.pdf PDF
CN-370000-HW683-DC043B.pdf PDF
CN-370000-HW683-DC044C.pdf PDF
CN-370000-HW683-DC048A.pdf PDF
CN-370000-HW683-DC04A.pdf PDF
CN-370000-HW683-DC04ACO1.pdf PDF
CN-370000-HW683-DC05BCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW683

DC007A Completion August 30, 2022

This Task Assignment authorizes GEO to conduct annual groundwater monitoring in accordance with the GEO scope of work, cost estimate, and schedule received on 11 February 2022.

Evan Miller 850-245-8928 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Geosyntec

Geosyntec

Todd Kafka 813-379-4396

ERIC_5500

2492 W State Road 434, Longwood, Seminole County

Lipham Cleaners

✔ $ 8,332.56

$ 8,332.56

Scope of Work

Todd Kafka

Contract Manager

2-14-22

Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.

Date: 2022.02.14 10:05:56 -05'00'

William E. Burns, Jr.

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.02.14 09:40:43 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 1-3: Submittal of Groundwater Monitoring Report, ADaPT/GIS update, and IDW Manifest; Project Management

05/30/2022

Subtask 1-3: Receipt and approval of Groundwater Monitoring Report, ADaPT/GIS update, and IDW Manifest; Project Management

$ 8,332.56

$ 8,332.56

HW683

DC007A

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

To: HW683 Contract Negotiation File Lipham Cleaners 2492 W State Road 434, Longwood, Seminole County

ERIC_5500

From: Evan Miller, Project Manager Date: February 11, 2022 Subject: Negotiation Summary

HW683 DC007A

This Task Assignment authorizes Geosyntec

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2 – Annual Groundwater Monitoring Subtask 2 includes costs associated with annual groundwater monitoring activities. Geosyntec personnel will gauge the depth to water in Site-wide monitoring wells (total of 30 wells) to evaluate groundwater flow direction and will collect groundwater samples from three monitoring wells (MW021, MW025, and MW026). Groundwater samples will be collected using conventional low flow purging methods and will include collection of field parameters using a water quality meter during groundwater sampling activities.

Subtask 3 – Groundwater Monitoring Report Geosyntec will prepare a report documenting the results of the annual groundwater monitoring event. The report will contain, at a minimum, tables summarizing field/laboratory groundwater data, figures showing groundwater flow direction(s) and analytical results, and a summary of conclusions and recommendations

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $8,332.56 with 62 labor hours.

Geosyntec may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 2/7/2022

Task #: DC010L SubTask 1 Project Management SubTask 6

Site: Lipham Cleaners SubTask 2 Annual Groundwater Monitoring SubTask 7

Activity/Phase: Groundwater Monitoring SubTask 3 Groundwater Monitoring Report SubTask 8

Project Manager: J. Bartlett SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$45.67 Project Manager J. Bartlett 6 5.9 $68.75 Principal T. Kafka 1 0 1 0 0 0 0 0 0 0 $45.67 Project Professional J. Bartlett 9 5 4 0 0 0 0 0 0 0 $46.15 Project Professional M. Hensley 2 0 2 0 0 0 0 0 0 0 $32.21 Senior Staff Professiona A. Langteau 24 0 24 0 0 0 0 0 0 0 $36.54 Staff Professional R. Joslyn 18 18 0 0 0 0 0 0 0 0 $37.26 Administrative Assistant P. Gallagher 2 0 2 0 0 0 0 0 0 0

Total Hours 62 6 23 33 0 0 0 0 0 0 0

Direct Labor $2,347.42 $270.06 $886.07 $1,191.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $4,053.99 $466.39 $1,530.24 $2,057.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,401.41 $736.45 $2,416.31 $3,248.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost Estimate Page 1 of 2 Cost Estimate

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 2/7/2022

Task #: DC010L SubTask 1 Project Management SubTask 6

Site: Lipham Cleaners SubTask 2 Annual Groundwater Monitoring SubTask 7

Activity/Phase: Groundwater Monitoring SubTask 3 Groundwater Monitoring Report SubTask 8

Project Manager: J. Bartlett SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $140.00 $140.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $140.00 $140.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $14.00 $14.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $154.00 $154.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $477.00 $477.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $587.00 $587.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $290.00 $290.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $430.00 $430.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $7,692.41 $736.45 $3,707.31 $3,248.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $640.15 $73.65 $241.63 $324.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $8,332.56 $810.10 $3,948.94 $3,573.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost Estimate Page 2 of 2 Cost Estimate

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Lipham Cleaners SUBTASK: Annual Groundwater Monitoring

DATE: 2/7/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Professional J. Bartlett 5

Staff Professional R. Joslyn 18

TOTAL LABOR 23

VEHICLE TYPE RATE UNIT USEAGE

Car $80.00 Day 0 $0.00 Truck $120.00 Day 1 $120.00 Van $120.00 Day 0 $0.00

Subtotal $120.00

Mileage $0.59 Mile 0 $0.00 Subtotal $0.00

Air Fare $0.00 Round Trip 0 $0.00 Subtotal $0.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

IDW

Clark Environmental $140.00 $140.00

$0.00 $0.00 Subtotal $140.00

TOTAL SUB $140.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs 3 MWs + IDW $73.00 4 1 $365.00 RCRA-8 IDW (1)-8 metals $14.00 8 0 $112.00

Subtotal $477.00 Fast Turnaround Charges Percent

24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00

Subtotal $0.00 Shipping

Large Cooler (25 to 50 lbs) $150.00 0 $0.00 Small Cooler (0 to 25 lbs) $110.00 1 $110.00

Subtotal $110.00

TOTAL LAB $587.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Analytical Related

Groundwater Sampling Kit $290.00 Day 1 $290.00 Water Level Meter $25.00 Day 0 $0.00 YSI 556 MPS $105.00 Day 0 $0.00

Subtotal $290.00 IDW Related

Drum $100.00 Drum 1 $100.00 Subtotal $100.00

Expendables $40.00 Day 1 $40.00

Subtotal $40.00

TOTAL EQUIPMENT $430.00

Field preparation with field staff and comm plan for site owners (Lipham Cleaners and Publix) (1-hr); EHS planning (1-hr); remote support during groundwater sampling event (1-hr); evaluating and interpreting field data (1-hr); IDW management (1-hr).

Field preparation and equipment calibration (2-hr); mob/demob (3-hr); collect depth to groundwater measurements from site-wide (27) monitoring wells (10 min per well @27 wells = 5 hrs); MW sampling (1.5 hrs per well @ 3 MWs = 5 hrs); sample management (1-hr); post-field wrap up (1-hr); IDW management (1-hr)

2/11/2022 Page 1 of 2 Subtask 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Lipham Cleaners SUBTASK: Groundwater Monitoring Report

DATE: 2/7/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 1

Project Professional J. Bartlett 4

Project Professional M. Hensley 2

Senior Staff Professional A. Langteau 24

Administrative Assistant P. Gallagher 2

TOTAL LABOR 33

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

TOTAL SUB $0.00

LABORATORY COSTS

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Report assembly and submittal (2-hr)

Preparing report recommendations and PG sign/seal Groundwater Monitoring Report (1-hr)

Preparation of Groundwater Monitoring Report (4-hrs)

Figure Preparation for Report (2-hr)

Prepare Report text, tables, and draft figures (16-hr); Mann-Kendal (2-hr); ADaPT & GIS update (3 GW data points; 1 GW dup; 30 WLs @ 8 min/pt = 5 hrs); run GIS tables through data checker program, and submit to FDEP (1 hr)

2/11/2022 Page 2 of 2 Subtask 3

12802 Tampa Oaks Blvd., #151 Tampa, Florida 33637

PH 813.558.0990

www.geosyntec.com

Lipham Cleaners_Annual GW Sampling_SOW_2022-02

11 February 2022

Mr. Evan Miller Florida Department of Environmental Protection Waste Cleanup Program 2600 Blair Stone Road Tallahassee, FL 32399-2400

Subject: Scope of Work and Level of Effort 2022 Annual Groundwater Monitoring Lipham Cleaners 2492 W State Road 434, Longwood, Seminole County, Florida

ERIC_5500

Dear Mr. Miller:

Geosyntec Consultants, Inc. (Geosyntec) has prepared the attached proposed Scope of Work and Cost Estimate Form/Level of Effort (CEF/LOE) for annual groundwater monitoring at Lipham Cleaners (Site) located in Longwood, Orange County, Florida. A detailed explanation of the proposed scope of work is provided below.

Subtask 1 – Project Management

This subtask covers the general management of the project as specified in Contract No. HW683.

Subtask 2 – Annual Groundwater Monitoring

Subtask 2 includes costs associated with annual groundwater monitoring activities. Geosyntec personnel will gauge the depth to water in Site-wide monitoring wells (total of 30 wells) to evaluate groundwater flow direction and will collect groundwater samples from three monitoring wells (MW021, MW025, and MW026; Figure 1). This event was originally proposed to be conducted using passive diffusion bags (PDBs); however, further evaluation of the proposed monitoring well diameters indicated that this would not be a feasible option (smallest allowable diameter well is 1-inch; however, a proposed well is 0.75-inch diameter). Therefore, groundwater samples will be collected using conventional low flow purging methods and will include collection of field parameters (consisting of pH, specific conductance, temperature, dissolved oxygen [DO], and oxidation-reduction potential [ORP]) using a water quality meter during groundwater sampling activities. One duplicate groundwater sample will be collected for quality assurance purposes.

Groundwater samples will be submitted to a fixed-based laboratory for volatile organic hydrocarbon (VOH) analysis by Environmental Protection Agency (EPA) Method 8260.

Groundwater sampling activities are proposed to occur in April 2022.

Investigation Derived Waste (IDW) will consist of purge and decontamination water generated during sampling activities and will be placed in one 55-gallon drum for manifested off-site disposal. Necessary IDW characterization samples will be collected from the drum upon completion of the sampling event in order to develop a new waste profile and will include analysis of VOHs (8260B) and 8 RCRA Metals (6010C/7470A). Clark Environmental is the selected subcontractor for IDW transport and disposal. Subcontractor bids and evaluation form are included in Attachment A.

Subtask 3 – Groundwater Monitoring Report

Geosyntec will prepare a report documenting the results of the annual groundwater monitoring event. The report will contain, at a minimum, tables summarizing field/laboratory groundwater data, figures showing groundwater flow direction(s) and analytical results, and a summary of conclusions and recommendations. Additionally, effort will be included to further evaluate analytical results for plume stability using Mann-Kendal analyses. The report will be signed and sealed by a Florida-licensed professional engineer or geologist in responsible charge of the work.

Effort included in this subtask includes the effort to update necessary ADaPT and GIS data tables consisting of groundwater elevation measurements and groundwater sampling laboratory results.

Invoice and Deliverable Schedule

Subtask Deliverable Deliverable Due

Date Invoice Amount

1 - 3 Submittal of Groundwater Monitoring Report, ADaPT/GIS update, and IDW

Manifest 30 May 2022 $8,332.56

We appreciate the opportunity to work with the Florida Department of Environmental Protection on this project. Feel free to contact the undersigned if you have questions or require additional information.

Sincerely, Geosyntec Consultants, Inc.

Joseph K. Bartlett III, P.E. Todd Kafka, P.G.

Project Engineer Senior Principal

Figure 1 – Site Map Attachments A – Subcontractor Bids and Evaluation Form

FIGURE

West State Road 434

W e k iv a S p rin g s R o a d

M a n o r A v e

M o b il e

A v e

W e k iva

S p rin g s L a n e

V a g a b o n d A v e

M o n tg o m e ry

R o a d

MW003

MW002

Southern Community

Bank

Winn Dixie Plaza

The Springs Residential Community

MW005

MW008*

MW017

MW023

MW022

MW027

MW016

MW020

MW011

MW012

MW026

MW013

MW014

MW009

MW021

MW018

MW019

MW028

MW029

MW030

MW024

MW010

MW025

MW015

MW006

MW007

MW008

MW001

MW004

MW033

MW032MW031

P a th

(T it u s v ill e -0

\D

A T

A

T

G

IS

\F

R

\M

X D s \2

\S it e

M a p

M A

R

.m x d

A p ri l

L a s t

E d it e d b y

A L a n g te a u

Notes:

1. ft BLS indicates feet below land surface.

2. 2015 World Imagery Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community.

³

Site Map

Lipham Cleaners 2492 West State Road 434

Longwood, Florida FDEP Facility ID No. 599800783 (ERIC_5500)

Figure

Titusville, FL April 2021

120 0 12060

Feet

Lipham Cleaners

Legend

Monitoring Well Locations Screened in the Lower Surficial Aquifer (27-40 ft BLS)

Monitoring Well Locations Screened in the Upper Floridan Aquifer (65-125 ft BLS)

MW008* Monitoring Well Installed during the site assessment activites for Society Cleaners (FDEP Facility ID No. 599501298)

Monitoring Well Locations Screened in the Upper Surficial Aquifer (5-20 ft BLS)

Destroyed Monitoring Well Locations&<

Publix

SITE

ATTACHMENT A

1/7/22, 11:18 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19200 1/2

Quote Number: 19200

QUOTE

QUOTED TO: Todd Kafka

QUOTE DATE: 1/7/2022

COMPANY NAME: Geosyntec - 2022 QUOTED BY: Craig Burns

PHONE NUMBER:

Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR

THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.

**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns

863.327.6289 - cburns@clarkenv.com

This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.

Name (print) Title

ALangteau Rectangle

ALangteau Rectangle

ALangteau Text Box Total: $140

1/7/22, 11:18 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19200 2/2

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com

BID PROPOSAL FORM 2022

FDEP Drycleaner and Hazardous Waste Sites

Investigation Derived Waste (IDW) Transportation and Disposal

Contractor Company Name: HEPACO, LLC

Contact: Linda Basinger, 813-240-8020, lbasinger@hepaco.com

Region T&D of 1 Non-Hazardous IDW Drum (solid or liquid), Process Code STAB01

T&D of 1 Hazardous IDW Drum (solid or liquid), Process Code STAB02

Northwest $ 191.27 $ 367.36

Northeast $ 191.27 $ 367.36

Central $ 170.00 $ 346.10

Southwest $ 170.00 $ 346.10

Southeast* $ 170.00 $ 346.10

Assumptions and Clarifications:

• Unless otherwise specified within this proposal all terms and conditions will be governed by the most recent Master Services

Agreement between GEOSYNTEC and HEPACO, LLC. In the event that a current agreement is not in place all terms and conditions will be governed by HEPACO’s standard service agreement.

• Price is contingent upon profile approval and process code approval into HEPACO’s preferred disposal facilities.

• A minimum stop fee of $500.00 will apply to all shipments.

• The above rates are for less than truck load quantities (LTL). In the event that a higher volume of disposal is needed at any particular facility HEPACO will provide a case by case pricing scenario to help reduce overall cost.

• Above rates include a standard energy and insurance fee. In the event that market changes dramatically HEPACO reserves the right to increase or decrease these fees based on the appropriate energy index. In the event that this is required HEPACO will provide a

30 day written notice of the change.

* Excludes Monroe County (Case by case basis determined by volume of IDW)

• Bid costs above should be inclusive of transportation fees, fuel fees, environmental recovery fees, etc.

• No standby time should be included in the above bid costs.

• Assume that the drums are accessible.

• It is assumed that VOH totals results will be provided for profiling. If other analytical results are required, please indicated here:

Branch Locations Serving Florida:

Tampa

Gary Weiss, Project Manager

5371 Hartford St, Tampa gweiss@hepaco.com

813.550.7229 Mbl

Jacksonville

Andy Moats, Project Manager

1830 Clarkson St, Jacksonville amoats@hepaco.com

706.829.0145 Mbl

Panhandle

Chad Cobb, Project Manager

3490 Hurricane Bay Dr, Theodore AL ccobb@hepaco.com

251.293.9598 mailto:gweiss@hepaco.com mailto:amoats@hepaco.com mailto:ccobb@hepaco.com TKafka Highlight

CEF.pdf
Cost Estimate
LOEs.pdf
Subtask 2
Subtask 3

File details come from the government source that posted it. Updated .