This document package consists of Task Assignment (TA) DC011B executed under Contract HW683 between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants, Inc. The task assignment was issued on January 26, 2023, with a completion date of April 30, 2023, for groundwater monitoring services at the former Scott's Custom Cleaners facility located at 2454 McMullen Booth Road, Suite 205, Clearwater, Florida (Project Number ERIC_5307). Brittany Plyler serves as the FDEP Project Manager, while Fabio Fortes represents Geosyntec as the contractor's project manager.
The task assignment authorizes Geosyntec to conduct annual groundwater monitoring comprising three subtasks: (1) project management calculated at 13 percent of direct labor costs; (2) collection of nine groundwater samples from specified monitoring wells (MW002, MW-7, MW-8, MW-9, MW-11, MW-13, MW-14, MW-17, and MW-19) for laboratory analysis of volatile organic halocarbons using EPA Method 8260B; and (3) preparation of a signed and sealed groundwater monitoring report including field forms, data tables, and updated figures. The total task assignment value is $10,273.14, calculated on a fixed unit rate basis. This amount includes 70 labor hours, vehicle rental ($240), laboratory analytical costs ($657), sample shipping ($150), field equipment ($760), investigation-derived waste disposal ($110), and a completion fee. The single invoice milestone requires submittal and FDEP approval of the groundwater monitoring report and investigation-derived waste manifest by March 24, 2023, for payment of the full contract amount.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW683
DC011B Completion April 30, 2023
This Task Assignment authorizes Geosyntec to conduct annual groundwater monitoring at former Scott's Custom Cleaners located in Clearwater, FL in accordance with the Geosyntec scope of work, cost estimate, and schedule received on January 19, 2023.
Brittany Plyler 850-245-8851 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Geosyntec
Geosyntec
Fabio Fortes 703-606-8538
ERIC_5307
2454 McMullen Booth Road, Suite 205, Clearwater, FL 33759
Scott's Custom Cleaners
✔ $ 10,273.14
$ 10,273.14
Scope of Work
Todd Kafka
Contract Manager
Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.
Date: 2023.01.26 15:30:27 -05'00'
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.01.26 12:30:52 -05'00'
N/A
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 1, 2,and 3 - Submittal of Groundwater Monitoring Report and IDW Manifest; PM 03/24/2023
Subtask 1, 2, and 3 - Submittal and FDEP approval of the Groundwater Monitoring Report and IDW Manifest; PM $ 10,273.14
$ 10,273.14
HW683
DC011B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
To:
From:
Date:
HW683 Contract Negotiation File Scott’s Custom Cleaners Clearwater, Florida 33759
ERIC_5307
Brittany Plyler, Project Manager January 23, 2023
Subject: Negotiation Summary
HW683_DC011B
This Task Assignment authorizes Geosyntec to perform annual groundwater monitoring at the former Scott’s Custom Cleaners, Inc. facility located in Clearwater, Florida in accordance with the January 19, 2023, Scope of Work, and Cost Estimate.
Subtask 1- Geosyntec confirmed on January 11, 2023, that subtask 1 consists of the calculated project management labor, based upon 13% of the direct labor costs in this proposal, and includes fringe, overhead, other direct costs (ODCs) and completion fees.
Subtask 2- Geosyntec will collect a total of 9 groundwater samples from MW002, MW-7, MW- 8, MW-9, MW-11, MW-13, MW-14, MW-17, and MW-19. Groundwater samples will be submitted under chain of custody protocol for laboratory analysis of volatile organic halocarbons (VOHs) by Environmental Protection Agency Method 8260B.
Subtask 3- Geosyntec will submit a Groundwater Monitoring Report that will be signed and sealed by a licensed Florida engineer or geologist and include field forms and updated tables and figures.
Geosyntec confirmed site access on January 25, 2023.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $10,273.14 with 70 labor hours.
Printed on recycled paper.
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 1/10/2023
Task #: SubTask 1 Project Management SubTask 6
Site: Scott's Custom Cleaners SubTask 2 Annual Groundwater Sampling SubTask 7
Activity/Phase: SubTask 3 Groundwater Monitoring Report SubTask 8
Project Manager: Fabio Fortes SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$40.38 Project Manager F. Fortes 8 7.9 $76.92 Principal T. Kafka 2 0 2 0 0 0 0 0 0 0 $40.38 Professional F. Fortes 27 11 16 0 0 0 0 0 0 0 $46.15 Project Professional M. Hensley 3 0 3 0 0 0 0 0 0 0 $36.06 Sr. Staff Professional K. Pierce 29 27 2 0 0 0 0 0 0 0 $33.65 Administrative Assistant S. Darling 1 0 1 0 0 0 0 0 0 0
Total Hours 70 8 38 24 0 0 0 0 0 0 0
Direct Labor $2,781.99 $320.05 $1,417.80 $1,044.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $4,804.50 $552.73 $2,448.54 $1,803.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $7,586.49 $872.78 $3,866.34 $2,847.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $11.00 $11.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $121.00 $121.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $657.00 $657.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $150.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $807.00 $807.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $580.00 $580.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $760.00 $760.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $9,514.49 $872.78 $5,794.34 $2,847.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $758.65 $87.28 $386.63 $284.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $10,273.14 $960.06 $6,180.97 $3,132.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Groundwater Sampling
Cost Estimate Page 1 of 3 Cost Estimate
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Scott's Custom Cleaners SUBTASK: Annual Groundwater Sampling
DATE: 01/10/23
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Professional
F. Fortes 11
Sr Staff Professional K. Pierce
TOTAL LABOR 38
VEHICLE TYPE RATE UNIT USAGE
Truck K Pierce $120.00 Day 2 $240.00 Subtotal $240.00
TOTAL VEHICLE $240.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
IDW
Erwin Non-hazardous GW IDW 1 $110.00 $110.00
Subtotal $110.00
TOTAL SUB $110.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs $73.00 9 0 $657.00
Subtotal $657.00 Shipping VOHs Large Cooler (25 to 50 lbs) $150.00 1 $150.00
Subtotal $150.00
TOTAL LAB $807.00
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Analytical Related
Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Subtotal $580.00
IDW Related Drum $100.00 Drum 1 $100.00
Subtotal $100.00 Expendables
$40.00 Day 2 $80.00 Subtotal $80.00
TOTAL EQUIPMENT $760.00
rd trip mobe and site visit to locate MWs inside/outside restaurant (4 hrs), RPO and tenant notifications (1 hr), Evaluate field data (2 hrs), Characterization and waste profile for transportation and disposal of IDW drum (2 hrs)
Field preparation (1 hrs), Mobilization/Demobilization (1.5 hr/day * 2 days = 3 hrs), Calibrate sampling equipment (0.5 hr/day x 2 day = 1 hr), Collect 16 depth to water measurements (3 hrs), Low-flow groundwater sampling (1.5 hr/well x 9 wells = 14 hrs).
IDW management (1 hr). Sample management (2 hrs), Field documents package (2 hrs)
1/23/2023 Page 2 of 3 Subtask 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Scott's Custom Cleaners SUBTASK: Groundwater Monitoring Report
DATE: 01/10/23
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 2
Professional F. Fortes 16
Project Professional M. Hensley 3
Sr Staff Professional K. Pierce 2
Administrative Assistant S. Darling 1
TOTAL LABOR 24
Report assembly and PDF compilation (1 hr)
Data evaluation and prepare GWM report recommendations
Preparation of Groundwater Monitoring Report
Groundwater contour figures and groundwater results figures
Prepare GW results table
1/23/2023 Page 3 of 3 Subtask 3
12802 Tampa Oaks Blvd, Suite 151 Tampa, Florida 33637
PH 813.558.0990
FAX 813.558.9726
www.geosyntec.com
FR3305B/Scotts Custom Cleaners (ERIC_5307)_SOW_GW Sampling
19 January 2023
Ms. Brittany Plyler Florida Department of Environmental Protection Waste Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
Subject: Annual Groundwater Monitoring SOW/LOE Scott’s Custom Cleaners, Inc. (ERIC_5307) 2454 McMullen Booth Road, Suite 205 Clearwater, Florida
Dear Ms. Plyler, Geosyntec Consultants, Inc. (Geosyntec) has prepared the following scope of work (SOW) and proposed level of effort (LOE) to perform annual groundwater monitoring at the former Scott’s Custom Cleaners, Inc. facility (herein, the “Site”) located in Clearwater, Florida. Geosyntec prepared this SOW to update groundwater analytical results since the existing data is over 270 days old (groundwater samples were last collected in November 2021). A copy of the CEF and LOE is provided as Attachment A.
A description of task breakdown for groundwater sampling activities and report preparation is provided below.
Subtask 1 – Project Management
Fabio Fortes will be the Geosyntec Project Manager. His labor hours are directly computed.
Subtask 2 – Annual Groundwater Monitoring
Geosyntec will collect groundwater samples from 9 accessible groundwater monitoring wells.
Prior to groundwater sampling, Geosyntec will gauge and record the depth-to-water (DTW) from 16 surficial aquifer monitoring wells within a 24-hour period, including from 6 wells that are not anticipated to be sampled during this event. Additional effort is included for the PM to visit the site on the first day to locate the monitoring wells, many of which are hidden/obscured within heavy overgrowth along a ravine leading to a retention pond and creek. Geosyntec will collect a total of 9 groundwater samples from MW002, MW-7, MW-8, MW-9, MW-11, MW-13, MW-14, MW-17, and MW-19. Geosyntec assumes that a peristaltic pump will be used to collect
Scott’s Custom Cleaners
FR3305E/Scotts Custom Cleaners (ERIC_5307)_SOW_GW Sampling groundwater samples from the superficial monitoring wells, consistent with previous sampling events. Field activities will be conducted in accordance with the FDEP Standard Operating Procedures.
Surficial aquifer monitoring wells MW-1, MW-10, MW-12, MW-16, MW-18, MW-20, and MW- 21 and Upper Floridan aquifer monitoring wells (DMW-1 through DMW-2) will not be sampled during this event because of the absence of exceedances of Groundwater Cleanup Target Levels (GCTL) during the last three annual groundwater sampling events (see Figures 1 and 2).
Groundwater samples will be submitted under chain of custody protocol for laboratory analysis of volatile organic halocarbons (VOHs) by Environmental Protection Agency Method 8260B. Table 1 summarizes the annual groundwater monitoring plan for 2022.
Investigation Derived Waste (IDW) Management
Based on previous sampling events, it is estimated that purge water generated during sampling activities will be containerized in one, 55-gallon drum. Geosyntec also assumes the existing waste characterization analytical results can be used for disposal investigation-derived waste (IDW). Bid costs prepared by the waste disposal companies are summarized in the following table and included in Attachment B. Based on the bids, Geosyntec recommends selecting Erwin to haul and dispose of IDW generated during monitoring activities.
Non-Hazardous Water (Per 55-gal. drum) Clark Environmental $50 + $60 + $30 = $140 Erwin Remediation $110
Universal Environmental Solutions $125
Subtask 3 – Groundwater Monitoring Report
Geosyntec will submit a Groundwater Monitoring Report that will be signed and sealed by a licensed Florida engineer or geologist and include field forms and updated tables and figures. The field forms will consist of groundwater sampling, calibration, and DTW logs generated on-Site during the sampling activities. The tables will include (i) DTW measurements, (ii) groundwater analytical results for VOHs, and (iii) geochemical field parameters. The figures will include (i) Site map, (ii) groundwater elevation contours in the surficial aquifer, and (iii) groundwater analytical results in the surficial aquifer.
Scott’s Custom Cleaners
FR3305E/Scotts Custom Cleaners (ERIC_5307)_SOW_GW Sampling
Invoice and Deliverable Schedule
Please note the following schedule is contingent on FDEP review and approval of this SOW/LOE within two weeks of submittal. We have tentatively scheduled groundwater sampling for the week of 01/23/2023.
Subtask Deliverable Deliverable Date Invoice Amount
1, 2, and 3 Submittal of Groundwater Monitoring Report and IDW Manifest 3/24/2023 $10,273.14
Total $10,273.14 The above schedule is based on sampling being conducted in January 2023.
CLOSURE
As always, it is a pleasure to work with the FDEP. If you require any additional information or have any questions, please contact Fabio Fortes at 703-606-8538.
Sincerely, Fabio Fortes, P.E.
Professional Engineer
Todd K. Kafka, P.G.
Senior Principal Hydrogeologist
Figures Attachment A – CEF/LOE Attachment B – IDW Transport and Disposal Quotes
TABLES
TABLE 1
Annual Groundwater Monitoring Plan 2023
Scott’s Custom Cleaners, Inc.
2454 McMullen Booth Road, Suite 205
Clearwater, Florida
Diameter Well Screen
Interval Analysis
(inches) (ft BLS) VOHs - 8260B
MW-1 2 2 - 12* X
MW-7 2 18.5 - 28.5* X X
MW-8 2 2 - 12* X X
MW-9 2 2 - 12* X X
MW-10 2 2 - 12* X
MW-11 2 2 - 12* X X
MW-12 2 5 - 15* X
MW-13 0.75 14-19 X X
MW-14 0.75 3 - 13 X X
MW-16 0.75 4 - 9 X
MW-17 0.75 15 - 20 X X
MW-18 0.75 3 - 13 X
MW-19 0.75 15 - 20 X X
MW-20 2 15 - 20 X
MW-21 2 15 - 20 X
MW002 1 3 - 13 X X
DMW-1 2 50 - 60
DMW-2 2 65 - 70
DMW-3 2 65 - 75
Notes:
1. ft BLS indicates feet below land surface.
2. DTW indicates depth-to-water
3. VOH indicates volatile organic halocarbons
Surficial Aquifer Monitoring Wells
4. * indicates well previously installed by others (no data available on screened interval); screened interval shown is estimated based on approximate measured depth and assumed screen length of 10 feet.
Upper Floridan Aquifer Monitoring Wells
Well ID Measure
DTW
Page 1 of 1 Geosyntec Consultants, Inc.
FIGURES
S u it e
Suite 205
S u it e
MW-7 (18.5-28.5*) MW-16 (4-9)
MW-18 (3-13)
MW-14 (3-13)
MW002 (3-13)
MW-21 (15-20)
MW-20 (15-20)
MW-19 (15-20)
MW-17 (15-20)
MW-13 (14-19)
MW-6 (NA)MW-9 (2-12*)
MW-8 (2-12*)
MW-11 (2-12*)
MW-10 (2-12*)
MW-12 (5-15*)
MW-1 (2-12*)
SW003
SW002
SW001
SW001A
Path: (Titusville-01\DATA) T:\0GIS\FR3305_Scotts_Northwood_Cleaners\MXDs\202111\GW_Results_Surficial_202111.mxd 07 December 2021. Last Edited by: mhensley
0 30
Feet
³ Former Scotts Custom Cleaners
2454 McMullen Booth Road Clearwater, Pinellas County, Florida
FDEP ID# ERIC_5307
Surface Water and Monitoirng Well Groundwater Analytical Results - Surficial Aquifer
Figure
Tampa, FL December 2021
Legend
&> Surface Water Sampling Location
&< Surficial Aquifer Monitoring Well Location (showing screen interval ft BLS)
Unnamed Creek
Approximate Location of Former Scott's Custom Cleaners
Stormwater Retention Pond
3 µg/L PCE Isopleth
300 µg/L PCE Isopleth
3 µg/L TCE Isopleth
300 µg/L TCE Isopleth
1 µg/L VC Isopleth
70 µg/L cDCE Isopleth
Date
8/6/2018 0.50 U 0.61 U 0.32 U 0.26 U
SW001 (0.5)
PCE TCE cDCE VC
Date
4/21/2020 0.50 U 0.61 U 0.32 U 0.26 U
SW001A (0.5)
PCE TCE cDCE VC
Date
8/8/2018 0.50 U 0.61 U 0.32 U 0.26 U
4/21/2020 0.50 U 0.61 U 0.32 U 0.26 U
SW002 (0.5)
PCE TCE cDCE VC Date
4/21/2020 0.50 U 0.61 U 0.32 U 0.26 U
SW003 (0.5)
PCE TCE cDCE VC
Date
8/8/2018 0.50 U 0.61 U 31 2.0
4/21/2020 0.50 U 0.61 U 0.90 I 0.26 U
11/3/2021 0.29 U 0.61 U 8.0 0.36 I
11/3/2021 (DUP) 0.29 U 0.61 U 8.1 0.26 U
PCE TCE cDCE VC
MW-1 (2 - 12*)
Date
8/8/2018 0.50 U 0.61 U 0.32 U 0.26 U
4/21/2020 0.50 U 0.61 U 0.32 U 0.26 U
11/3/2021 0.29 U 0.61 U 0.32 U 0.26 U
MW-8 (2 - 12*)
PCE TCE cDCE VC
Date
8/8/2018 0.50 U 0.61 U 0.32 U 0.26 U
4/21/2020 0.50 U 0.61 U 0.32 U 0.26 U
11/3/2021 0.29 U 0.61 U 39 3.0
MW-9 (2 - 12*)
PCE TCE cDCE VC
Date
10/15/2018 0.50 U 0.61 U 6.6 7.2
4/21/2020 0.50 U 0.61 U 13 11
11/3/2021 0.29 U 0.61 U 4.9 0.26 U
11/3/2021 (DUP) 0.29 U 0.61 U 5.4 0.26 U
MW-11 (2 - 12*)
PCE TCE cDCE VC
Date
8/6/2018 0.50 U 0.61 U 0.32 U 0.26 U
4/21/2020 0.50 U 0.61 U 0.32 U 0.26 U
11/2/2021 0.29 U 0.61 U 0.32 U 0.26 U
MW-12 (5 - 15*)
PCE TCE cDCE VC
Date
10/15/2018 8,500 370 84 13 U
1/21/2019 14,000 820 150 7.4 I
4/20/2020 5,700 490 73 17
11/2/2021 4,800 540 99 5.1 U
MW-13 (14-19)
PCE TCE cDCE VC
Date
10/15/2018 0.50 U 0.61 U 0.32 U 0.26 U
4/21/2020 0.50 U 0.61 U 0.32 U 0.26 U
11/3/2021 0.29 U 0.61 U 0.32 U 0.26 U
MW-16 (4 - 9)
PCE TCE cDCE VC
Date
1/21/2019 0.50 U 4.1 15 3.1
4/20/2020 0.50 U 0.61 U 13 3.3
11/2/2021 0.29 U 0.61 U 20 1.3
MW-17 (15 - 20)
PCE TCE cDCE VC
Date
1/21/2019 0.69 I 0.61 U 0.32 U 0.71 I
4/21/2020 0.50 U 0.61 U 0.32 U 0.26 U
11/2/2021 0.29 U 0.61 I 0.53 I 0.79 I
MW-18 (3 - 13)
PCE TCE cDCE VC
Date
4/9/2019 0.50 U 0.61 U 0.32 U 0.26 U
4/21/2020 0.50 U 0.61 U 0.32 U 0.26 U
11/2/2021 0.29 U 0.61 U 0.32 U 0.26 U
MW-21 (15 - 20)
PCE TCE cDCE VC
Date
8/8/2018 0.50 U 0.61 U 0.32 U 0.26 U
4/21/2020 0.50 U 0.61 U 0.32 U 0.26 U
11/3/2021 0.29 U 0.61 U 0.32 U 0.26 U
MW-10 (2 - 12*)
PCE TCE cDCE VC
Date
8/26/2018 0.50 U 0.61 U 8.6 0.73 I
4/20/2020 0.50 U 0.61 U 26 3.1
11/2/2021 0.31 I 0.61 U 56 9.9
MW002 (3 - 13)
PCE TCE cDCE VC
Date
10/15/2018 0.78 I 0.61 U 4.0 1.6
1/21/2019 1.2 I 1.1 I 4.5 2.8
4/20/2020 1.0 I 0.61 U 2.6 1.5
11/2/2021 0.29 U 0.61 U 1.4 1.3
MW-14 (3 - 13)
PCE TCE cDCE VC
Date
4/9/2019 0.50 U 0.61 U 0.32 U 0.26 U
4/21/2020 0.50 U 0.61 U 0.32 U 0.26 U
11/2/2021 0.29 U 0.61 U 0.32 U 0.26 U
MW-20 (15 - 20)
PCE TCE cDCE VC
Date
1/21/2019 0.50 U 6.1 0.32 U 0.26 U
4/21/2020 0.50 U 0.61 U 0.32 U 0.26 U
11/2/2021 0.29 U 0.61 U 0.32 U 0.26 U
MW-19 (15 - 20)
PCE TCE cDCE VC
Notes:
1. ft BLS indicates feet below land surface.
2. Results and screening criteria are presented in micrograms per liter (µg/L).
3. DUP indicates duplicate sample result.
4. NA indicates not available.
5. U indicates the compound was analyzed for but not detected above the laboratory method detection limit listed.
6. I indicates the reported value is between the method detection limit and the practical quantitation limit.
7. Yellow shaded, bold text indicates an exceedance is of the
Florida Department of Environmental Protection (FDEP) Groundwater Cleanup Target Levels (GCTL), per Chapter
62-777 FAC.
8. Orange shaded, bold text indicates an exceedance of the FDEP Natural Attenuation Default Concentration (NADC), per Chapter 62-777 FAC.
9. * indicates well previously installed by others (no data available on screened interval); screened interval shown is estimated based on approximate measured depth and assumed screen length of 10 feet. These monitoring well locations are estimated.
10. Source of 2020 aerial: Florida Department of Transportation Aerial Photo Look Up System website.
Parameter Tetrachloroethene Trichloroethene cis-1,2-Dichloroethene Vinyl Chloride
Abbreviation PCE TCE cDCE VC
GCTL 3 3 70 1
NADC 300 300 700 100
Groundwater Screening Criteria
Parameter Tetrachloroethene Trichloroethene cis-1,2-Dichloroethene Vinyl Chloride
Abbreviation PCE TCE cDCE VC
Criteria 8.85 80.7 NA 2.4
Freshwater Surface Water Screening Criteria
Date
8/8/2018 0.50 U 0.61 U 27 1.8
4/21/2020 0.50 U 0.61 U 26 0.26 U
11/2/2021 0.29 U 0.61 U 0.32 U 0.26 U
MW-7 (18.5 - 28.5*)
PCE TCE cDCE VC
S u it e
4Suite 205
S u it e
DMW-3 (65-75)
DMW-2 (65-70)
DMW-1 (50-60)
Path: (Titusville-01\DATA) T:\0GIS\FR3305_Scotts_Northwood_Cleaners\MXDs\202111\GW_Results_UpperFloridan_202111.mxd 23 November 2021. Last Edited by: MHensley
0 30 Feet
³ Former Scotts Custom Cleaners
2454 McMullen Booth Road Clearwater, Pinellas County, Florida
FDEP ID# ERIC_5307
Monitoring Well Groundwater Analytical Results - Upper Floridan Aquifer
Figure
Tampa, FL December 2021
Legend
&< Upper Floridan Aquifer Monitoring Well Location (showing screen interval ft BLS)
Unnamed Creek
Approximate Location of Former Scott's Custom Cleaners
Stormwater Retention Pond
Date
10/15/2018 0.50 U 0.61 U 0.32 U 0.26 U
4/22/2020 0.50 U 0.61 U 0.32 U 0.26 U
11/3/2021 0.29 U 0.61 U 0.32 U 0.26 U
DMW-1 (50 - 60)
PCE TCE cDCE VC
Date
10/15/2018 0.50 U 0.61 U 0.32 U 0.26 U
4/22/2020 0.50 U 0.61 U 0.32 U 0.26 U
11/3/2021 0.29 U 0.61 U 0.32 U 0.26 U
DMW-2 (65 - 70)
PCE TCE cDCE VC
Date
10/15/2018 0.50 U 0.61 U 0.32 U 0.26 U
4/22/2020 0.50 U 0.61 U 0.32 U 0.26 U
11/3/2021 0.29 U 0.61 U 0.32 U 0.26 U
DMW-3 (65 - 75)
PCE TCE cDCE VC
Parameter Tetrachloroethene Trichloroethene cis-1,2-Dichloroethene Vinyl Chloride
Abbreviation PCE TCE cDCE VC
GCTL 3 3 70 1
NADC 300 300 700 100
Groundwater Screening Criteria
Notes:
1. ft BLS indicates feet below land surface.
2. Results and screening criteria are presented in micrograms per liter (µg/L).
3. U indicates the compound was analyzed for but not detected above the laboratory method detection limit listed.
4. I indicates the reported value is between the method detection limit and the practical quantitation limit.
5. GCTL indicates Florida Department of Environmental Protection
(FDEP) Groundwater Cleanup Target Levels, per Chapter
62-777 FAC.
6. NADC indicates FDEP Natural Attenuation Default Concentration per Chapter 62-777 FAC.
7. Source of 2020 aerial: Florida Department of Transportation Aerial Photo Look Up System website.
ATTACHMENT B
SUBCONTRACTOR BIDS
1/7/22, 11:18 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19200 1/2
Quote Number: 19200
QUOTE
QUOTED TO: Todd Kafka
QUOTE DATE: 1/7/2022
COMPANY NAME: Geosyntec - 2022 QUOTED BY: Craig Burns
PHONE NUMBER:
Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR
THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.
**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns
863.327.6289 - cburns@clarkenv.com
This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
Name (print) Title
Fabio.Fortes Rectangle
1/7/22, 11:18 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19200 2/2
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Todd Kafka - Geosyntec Consultants, Inc.
12802 Tampa Oaks Blvd, Ste 151
Tampa, FL 33637
June 14, 2022
Re: Non-Hazardous Drum Disposal Quote
Mr. Kafka:
The price for the transportation and disposal (T&D) of drums of non-hazardous soil, mud and water is listed below.
Non-Hazardous Chlorinated VOHs, Petroleum and Metals:
Description Rate Unit
T&D - Non-Haz Soil $ 110.00 Per Drum
T&D - Non-Haz Mud/Water $ 110.00 Per Drum
Non-Hazardous PFAS Impacted:
Description Rate Unit
Profile Fee $ 350.00 Per Site
T&D - Non-Haz PFOS/PFAS Impacted Soil $ 120.00 Per Drum
T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 130.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
This quote is valid for 90 days.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
File details come from the government source that posted it. Updated .