This is a Task Assignment (TA) under Contract Number HW683 between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants, Inc., effective August 30, 2024, with a completion date of August 30, 2024. The task assignment is identified as DC018B and authorizes work at the Former First Class Cleaners site located at 591 East Semoran Boulevard, Casselberry, Seminole County, Florida (ERIC Project #5489). The Department Project Manager is Sarah Aduwa (850-245-8973), and the contractor's Project Manager is Melissa Shook (321-914-9394).
The task assignment authorizes Geosyntec to conduct groundwater sampling activities at the Former First Class Cleaners site in accordance with the contractor's scope of work, cost estimate, and schedule received on April 4, 2024. The work is structured as four subtasks: (1) Project Management based on 13% of direct labor costs; (2) Site Access Agreements for six properties or property groups requiring new or updated agreements; (3) Annual Groundwater Monitoring involving depth-to-groundwater measurements from up to 34 monitoring wells, collection of 16 groundwater samples (12 via low-flow methods and 4 via passive diffusion bags), and deployment of four passive diffusion bag samplers; and (4) preparation of an Annual Groundwater Monitoring Report including text, eight figures, and tables, signed and sealed by a Florida-licensed professional geologist. The total task assignment value is $22,550.37 on a fixed unit rate basis, comprising 139 labor hours. Invoicing is scheduled in two installments: $15,959.20 upon submittal of field deliverables and site access agreements by May 31, 2024, and $6,591.17 upon submittal of the Annual Groundwater Monitoring Report by June 30, 2024. Investigation-derived waste transportation and disposal costs of $220.00 are included and were selected from three vendor quotes based on lowest cost.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
HW683
DC018B August 30, 2024
This Task Assignment authorizes Geosyntec to conduct groundwater sampling activities at
Former First Class Cleaners site in accordance with Geosyntec scope of work, cost estimate and schedule received on April 4, 2024
Sarah Aduwa 850-245-8973 Geosyntec
Melissa Shook 321-914-9394
ERIC 5489
591 East Semoran Boulevard Casselberry, Seminole County, Florida
Former First Class Cleaners
$ 22,550.37
$ 22,550.37
Scope of Work
Geosyntec
Todd Kafka
Contract Manager
Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.
Date: 2024.04.12 17:38:03 -04'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2024.04.11 10:03:03 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
To: HW683 Contract Negotiation File Former First Class Cleaners Casselberry, Seminole County, Florida
ERIC_5489
From: Sarah Aduwa, Project Manager Date: April 9, 2024 Subject: Negotiation Summary
HW683_DC018B
This Task Assignment authorizes Geosyntec to conduct groundwater sampling activities at Former First Class Cleaners site in accordance with Geosyntec scope of work, cost estimate and schedule received on April 4, 2024
Subtask 1: Project Management An automatic calculation of project management labor based upon 13% of direct labor cost in this proposal and includes fringe, overhead, other directs costs (ODC) and completions fees.
Subtask 2: Site Access Agreements Various source-property access and non-source access agreements will be pursued for the sites within which the monitoring wells are located. Some properties still have an existing valid site access agreement while others require site access agreements before they can be accessed for sample collection. Geosyntec will send new or updated site access agreements for the six properties or property groups requiring new or updated access agreements.
Subtask 3: Annual Groundwater Monitoring Geosyntec proposes to collect depth-to-groundwater measurements from each accessible monitoring well (up to 34 total wells) within a 24-hour period, collect 16 groundwater samples (12 via low-flow methods and 4 via passive diffusion bags [PDBs]), and deploy four PDBs Purge water generated during groundwater sampling activities will be placed in two 55-gallon drums.
Subtasks 4: Annual Groundwater Monitoring Report This subtask includes labor costs associated with the preparation of a summary report, including text, 8 figures, and tables. The report will document the results of the VOH groundwater sampling. The report will be signed/sealed by a licensed professional geologist in the State of Florida.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost is $22,550.37 with 139 labor hours.
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : First Class Cleaners SUBTASK: Site Access Agreements
DATE: 2/23/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Staff Professional
M. Shook 18
TOTAL LABOR 18
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
TOTAL SUB $0.00
LABORATORY COSTS
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Update 6 Site access agreements (3 hrs per address = 18 hrs)
4/9/2024 Page 3 of 5 Subtask 2
SUBTASK: Annual Groundwater Monitoring
DATE: 2/23/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Professional M. Hensley 2
Senior Staff Professional
M. Shook 10
Senior Staff Professional L. Haverlin 32
Senior Staff Professional A. Lamore 28
TOTAL LABOR 72
VEHICLE TYPE RATE UNIT USEAGE
Truck #1 $120.00 Day 3 $360.00 Truck #2 $120.00 Day 3 $360.00
Subtotal $720.00
TOTAL VEHICLE $720.00
PER DIEM STAFF RATE UNIT USEAGE
A. Lamore Hotel $93.00 Day 3 $279.00 A. Lamore Food $36.00 Day 3 $108.00
TOTAL PER DIEM $387.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
IDW
Erwin Remediation Pickup, transport, dispose IDW $220.00 $220.00
Subtotal $220.00
TOTAL SUB $220.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs 16 samples $73.00 16 0 $1,168.00 Subtotal $1,168.00
Shipping Large Cooler (25 to 50 lbs) $150.00 1 $150.00
Subtotal $150.00
TOTAL LAB $1,318.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Analytical Related Groundwater Sampling Kit $290.00 Day 6 $1,740.00
Subtotal $1,740.00 IDW Related
Drum $100.00 Drum 2 $200.00 Subtotal $200.00
Expendables Expendables $40.00 Day 3 $120.00
Subtotal $120.00
Other GPS $175.00 Day 3 $525.00 Metal Detector $40.00 Day 3 $120.00 4 Passive Diffusion Bag (PDB) Samplers Large diameter (RW005) $40.00 Each 1 $40.00 Small diameter (MW034, MW035, MW03 $36.00 Each 3 $108.00
Subtotal $793.00
TOTAL EQUIPMENT $2,853.00
Preparation of Geospatial data for use on GPS (2 hr)
Field event notifications to owners, tenant, and five additional property owners (4 hrs); daily field data evaluation (1 hr x 3 days); IDW profile confirmation (1 hr); IDW manifest coordination (1
hr) IDW pickup arrangement (1 hr)
Field preparation (1 hrs); Mobilization (2 hrs rd trip/day = 6 hrs); depth to water measurements 15 wells (5 hrs); equipment calibration (1 hr x 3 days = 3 hrs); groundwater sampling and deploying 4 PDBs (2.5 hr); groundwater sampling 6 widely-spaced wells (1.75 x 6 = 10.5 hrs );
sample management/shipping (2 hrs); IDW management (1 hr)
Field preparation (1 hrs); Mobilization (5 hrs rd trip); depth to water measurements 15 wells (5 hrs); equipment calibration (1 hr x 3 days = 3 hrs); groundwater sampling 6 widely-spaced wells (1.75 x 6 = 11 hrs); sample management (1 hr); IDW management (1 hr)
4/9/2024 Page 4 of 5 Subtask 3
SUBTASK: Annual Groundwater Monitoring Report
DATE: 2/23/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
T. Kafka 2
Senior Professional
M. Hensley 8
Senior Staff Professional
M. Shook 23
TOTAL LABOR 33
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
TOTAL SUB $0.00
LABORATORY COSTS
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Recommendation and path forward (1 hr); PG sign and seal (1 hr)
Eight GIS figures
Report text (16 hrs), data evaluation and interpretation (2 hrs), data table update (2 hrs), draft contour figures (2 hrs). Compile and assemble PDF (1 hr)
4/9/2024 Page 5 of 5 Subtask 4
6770 S. Washington Ave, Suite 3 Titusville, FL 32780
PH 321.747.1909
www.geosyntec.com
First Class_2024 Annual GWM_SOW
April 4, 2024
Ms. Sarah Aduwa Florida Department of Environmental Protection Waste Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
Subject: Statement of Work – Annual Groundwater Monitoring Former First Class Cleaners 591 East Semoran Boulevard Casselberry, Seminole County, Florida
ERIC_5489
Dear Sarah:
Geosyntec Consultants, Inc. (Geosyntec) has prepared this statement of work (SOW) and attached level of effort (LOE) cost estimate for the Florida Department of Environmental Protection (FDEP) to conduct semi-annual groundwater monitoring at the former First Class Dry Cleaner Site (FDEP Facility ID ERIC_5489). The Site is located at 591 East Semoran Boulevard, Casselberry, Seminole County, Florida. Proposed sampling activities are in accordance with the recommendations provided to FDEP from the Semi-Annual Groundwater Monitoring Report 2023. Groundwater samples were last collected at the Site in February 2023.
The purpose of the annual groundwater monitoring is to collect groundwater samples for analysis of volatile organic halocarbons (VOHs) to evaluate groundwater quality at the Site. The attached LOE consists of four subtasks and is summarized below.
Subtask 1 – Project Management
Subtask 2 – Site Access Agreements
1. The Site property, located at 591 SR 436, Casselberry, FL 32707 (Parcel ID 20-21-30- 300-0A1G-0000) is owned by 591 SR 436, LLC. The existing agreement for this property was authorized in July 2021 by Tracy K. King, representative of 591 SR 436, LLC, and is still valid. However, the existing agreement should be updated to the latest FDEP site access agreement language. Therefore, an updated Source-Property Access
April 4, 2024
FR0929#/First Class_2024 Annual GWM_SOW
Agreement will be pursued but will not be required to be in place in order to collect samples.
2. Several properties owned by the City of Casselberry contain monitoring wells requiring sampling and/or water level gauging. These properties are 92 Wilshire Dr. Casselberry FL 32707 (Parcel ID: 21-21-30-501-0200-0040), 720 SR 436 Casselberry FL 32707 (Parcel ID 21-21-30-501-0200-0000), and Easements. The existing agreement for these properties was authorized in July 2001 by Bruce A. Pronovost, , but is no longer valid as the original site access agreement had language voiding it ten years after its signing.
Therefore, an updated Non-Source Access Agreement will be required to be in place in order to collect samples.
3. MW021 and MW003 are located at 815 SR 436 Casselberry, FL 32707 (Parcel ID 20-21-30-5MJ-0000-0010), which is owned by Barracuda Stations LLC as of 2019. No Site access agreements could be located on OCULUS; therefore, an updated Non-Source Access Agreement will be required to be in place in order to collect samples.
4. MW027, MW028, and MW029 are located within the property at 830 Sr 436 Casselberry Fl 32707 (Parcel ID 21-21-30-501-0100-0000), owned by Floorsystems Inc. as of December 1977. No Site access agreements could be located on OCULUS; therefore, an updated Non-Source Access Agreement will be required to be in place in order to collect samples.
5. MW020 is located within the property at 750 SR 436 Casselberry FL 32707 (Parcel ID 21-21-30-501-0200-0020) owned by Om Pati LLC, as of April 1993. There is no existing site access agreement. Therefore, a Non-Source Access Agreement will be required prior to collecting samples.
6. MW030 is located within the property at E 436 SR Casselberry FL 32707 (Parcel ID 21-21-30-501-0100-00A0), owned by Zhi Wen Li as of September 2017.
There is no site access agreement for this property; therefore, a new Non-Source Access Agreement will be required prior to collecting samples.
Geosyntec will attempt to obtain each new or updated site access agreement specified above.
However, due to the large number of agreements needed, it is anticipated that several site access agreements will not be in place to allow for timely sampling. Therefore, Geosyntec will allow no more than two months after the acceptance of this SOW for site access agreements to be in place before initiating Subtask 3. If, at that time, an access agreement is not in place, Geosyntec will not collect a sample or water level from the affected location(s) within that property unless otherwise directed by FDEP.
Subtask 3 – Annual Groundwater Monitoring Geosyntec will mobilize to the Site to collect depth-to-groundwater measurements from each accessible monitoring well (up to 34 total wells) within a 24-hour period, collect 16 groundwater
FR0929#/First Class_2024 Annual GWM_SOW samples (12 via low-flow methods and 4 via passive diffusion bags [PDBs]), and deploy four PDBs for the March 2024 annual groundwater monitoring. Refer to the sampling plan provided in Attachment A.
Groundwater levels will be collected on the first day. Each of the 30 monitoring wells are flush-mounted, in high-traffic areas, and/or prone to collecting stormwater inside the manhole.
Geosyntec personnel will bail the manholes, measure and record groundwater levels, and resecure the manholes. Additional time has been included due to the site-specific challenges, including (i) long distances between wells necessitating driving time and traffic navigation and (ii) flush-mounted wells located in vegetated and overgrown areas necessitating the use of a metal detector to locate wells.
Geosyntec will collect 16 groundwater samples from the monitoring well network using a combination of low-flow sampling techniques and existing PDBs.
PDBs deployed in February 2023 are located in MW034, MW035, MW036, and RW005.
PDB samples will be collected from these wells, and new PDBs will be redeployed for sampling in February 2025.
Low-flow sampling techniques will be used to collect groundwater samples from 11 0.75-inch diameter monitoring wells that are too small for PDBs and from one recovery well that contains pumps and cables that block PDB deployment (Table 1). Geosyntec has assumed that these wells can be sampled using a peristaltic pump, consistent with previous sampling events at the site. Additional time has been allotted to allow travel between widely spaced wells, right-of-way access, and heavy traffic. Two field personnel will work separately for maximum effectiveness.
Additionally, low-flow groundwater samples will be collected from RW002 (sampled from approximately 95 ft bls).
The groundwater samples will be submitted for laboratory analysis of VOHs by Environmental Protection Agency (EPA) Method 8260B.
Geosyntec will use a metal detector and a GPS to locate several monitoring wells in overgrown vegetated areas. Geosyntec assumes the sampling event will take 2 people 3 days to complete and will require one truck per person.
Investigation derived waste (IDW) will be collected in two 55-gallon drums, which will be labeled, covered with plastic, and wrapped in orange construction fencing. Geosyntec obtained IDW transportation and disposal (T&D) estimates from Hulls, Erwin Remediation, LLC, and Enviroserve (Attachment B). Each company is a licensed waste hauler in Florida. Erwin
FR0929#/First Class_2024 Annual GWM_SOW
Remediation was selected due to the lowest overall cost. No IDW sample will be collected for waste characterization, as Erwin Remediation has a current waste profile for First Class Cleaners.
Sub-Contractor T&D Cost Selected Erwin Remediation $ 220.00 X Hulls $ 573.00 EnviroServe $ 366.30 Note: T&D Cost includes required IDW sampling costs
Subtask 4 – Annual Groundwater Monitoring Report Geosyntec will prepare a report summarizing sampling activities and results and will provide conclusions and recommendations based on data evaluation. The report will contain text, tables and figures summarizing field/laboratory data.
A total of three tables will be included: (i) well construction/groundwater elevation data,
(ii) groundwater analytical results, and (iii) natural attenuation data.
A total of eight figures will be included: (i) site location, (ii) site features, (iii) groundwater elevation contours (one for each of three depth intervals), and (iv) VOH concentrations (one for each of three depth intervals).
The report will be signed/sealed by a Florida-licensed geologist/engineer.
Deliverable Schedule and Invoicing Note that this schedule reflects a two-week FDEP review of LOE. Geosyntec anticipates the following schedule of deliverables and invoices.
Subtask Deliverable Deliverable
Date Invoice Amount
2 and 3 Submittal of Field Deliverable (field notes, and laboratory report) and Site Access Agreements
May 31, 2024 $15,959.20
1 and 4 Submittal of Annual Groundwater Monitoring
Report June 31, 2024 $6,591.17
TOTAL COST $22,550.37
6770 S. Washington Ave, Suite 3 Titusville, FL 32780
PH 321.747.1909
www.geosyntec.com
First Class_2024 Annual GWM_SOW
Closure
We appreciate this opportunity to work with FDEP on this project. Feel free to contact us if you have any questions or require any additional information.
Sincerely, Melissa Shook, EI Senior Staff Professional
Todd K. Kafka, PG (#2338) Principal
Attachments: A – 2024 Sampling Plan B – IDW cost estimates
ATTACHMENT A
Florida Department of Environmental Protection -- Bureau of Waste Cleanup -- Hazardous Waste Cleanup Section
TABLE 1: 2024 ANNUAL GROUNDWATER MONITORING PLAN
Depth to Groundwater Measurements
VOHs by US EPA
Method 8260B Sampling Method
MW001 Upper Surficial 20 to 25 X MW002 Lower Surficial 45 to 50 X MW006 Lower Surficial 47 to 52 X X Low-flow MW007 Intermediate 66 to 71 X X Low-flow MW008 Intermediate 85 to 90 X X Low-flow MW009 Upper Surficial 10 to 15 X X Low-flow MW010 Upper Surficial 20 to 30 X X Low-flow MW011 Lower Surficial 50 to 55 X X Low-flow MW012 Upper Surficial 10 to 15 X X Low-flow MW013 Lower Surficial 50 to 55 X X Low-flow MW014 Intermediate 70 to 75 X X Low-flow MW015 Upper Surficial 20 to 30 X MW016 Intermediate 70 to 75 X MW017 Upper Surficial 10 to 15 X MW018 Upper Surficial 20 to 30 X MW019 Lower Surficial 50 to 55 X MW023 Upper Surficial 10 to 15 X MW024 Upper Surficial 20 to 30 X MW025 Lower Surficial 50 to 55 X MW026 Upper Surficial 20 to 30 X MW027 Upper Surficial 20 to 30 X MW028 Lower Surficial 50 to 55 X X Low-flow MW029 Intermediate 70 to 75 X X Low-flow MW031 Upper Surficial 20 to 30 X MW034 Lower Surficial 40 to 50 X X PDB MW035 Lower Surficial 40 to 50 X X PDB MW036 Lower Surficial 40 to 50 X X PDB MW037 Upper Surficial 5 to 15 X RW002 Intermediate 66 to 96 X X Low-flow RW005 Upper Surficial 5 to 50 X X PDB
Notes:
1. VOH indicates volatile organic halogens.
2. EPA indicates Environmental Protection Agency.
3. PDB indicated passive diffusion bag.
4. ft BLS indicates feet below land surface.
5. ft BTOC indicates feet below top of casing
Facility Name: Former First Class Cleaners Facility ID No. ERIC_5489
Analysis Screen Interval
(ft BLS) Sampling Location Aquifer Zone
Page 1 of 1 Geosyntec Consultants, Inc.
ATTACHMENT B
Sub-Conctractor VOH Liquid (per drum) Profile Lab Cost Milage Fee Stop Fee Energy Total
Erwin Remediation 110.00$ -$ -$ -$ -$ -$ 220.00$
Hulls 200.00$ -$ 73.00$ 100.00$ -$ -$ 573.00$
EnviroServe 110.00$ -$ 73.00$ -$ 50.00$ 23.30$ 366.30$
Assumptions 2 Drums will be generated
Non Hazardous
VOH PFAS VOH Cost PFAS Cost
Erwin Remediation 0 0 73.00$ 315.00$ -$
Hulls 1 0 73.00$ 315.00$ 73.00$
EnviroServe 1 0 73.00$ 315.00$ 73.00$
Sub-Contractor T&D Cost
Lab Analysis
Cost Total Selected
Erwin Remediation 220.00$ -$ 220.00$ X
Hulls 646.00$ 73.00$ 719.00$
EnviroServe 439.30$ 73.00$ 512.30$
Notes:
1. Cost in consideration of one non-hazardous drum requiring transportation and disposal.
2. T&D indicates transportation and disposal.
3. UNK indicates unknown due to T&D subcontractor unresponsiveness.
Sub-Conctractor q y of Drums Lab Rates Lab
Analysis Cost
First Class Cleaners Transportation and Disposal Cost Analysis
755 Prairie Industrial Parkway, Mulberry, Florida 33860 Telephone (863) 425-4884
Disposal Pricing Effective January 1, 2024
GEOSYNTEC CONSULTANTS
DRUMS WASTE PROCESSING
Size (gal) Trans Liquid
Light Debris
Sludge or Oil Dry Solids Gels
Lab Packs
Empty Trans
Empty Disp
1 $2 $5 $5 $8 $8 $8 $25 $3 $5 5 $5 $10 $10 $12 $12 $15 $75 $5 $5
10 $10 $20 $20 $20 $20 $30 $75 $5 $5 15-25 $15 $40 $40 $55 $55 $65 $100 $10 $8
55 Below $ 0 $ $80 $80 $105 $175 $10 $15 85 Below $80 $80 $125 $125 $155 $15 $20 yd³ Below $180 $210 $250 $250 $350 $80 251-400 miles - $50/drum ($60/85-gal) Totes- $200 <11 drums/site – Surcharge of $200/site 101-250 miles - $40/drum ($50/85-gal) Totes- $160 < 6 drums/site – Surcharge of $50/site 0-100 miles - $30/drum ($40/85-gal) Totes- $120 < 6 drums/site – Surcharge of $50/site New Empties- $40 + Tax
BULK - Based on Centrifuge Testing (v/v) per SOP WASTE PROCESSING
Liquids <10% Solid
Sludge 10-25% Solid Solids
Sludge >25%
Light Debris
$0.040/lb $0.045/lb $0.040/lb $0.070/lb $0.080/lb
BULK SOILS BR CODE (Recycling)
Tons Standard
< 14 tons $500 minimum 14 - 140 $35.00
141 – 700 $33.00 701 – 1400 $30.00
1401 – 2100 Negotiable > 2100 Negotiable
Clean Fill $3.25/yd3 + tax Excess Debris Surcharge N/A
Hazadous Waste E-Manifest Fee - $40/manifest 10% FSC to all Invoices
So lid s N or th ea st Re gi on
N or th w es tR eg io n
Ce nt ra lR eg io n
So ut hw es tR eg io n*
T& D, D ru m ,5
G al ,N on H az ar do us ,I D W
$2
.0
$6
.0
$2
.0
$2
.0
T& D, D ru m ,5
G al ,H az ar do us ,I
DW
T& D, D ru m ,5
G al ,P
FA
S, ID
W ca se by ca se ;c al lf or qu ot e
$1 ,1
.0
$1 ,2
.0
Li qu id s 3% so lid
s) N or th ea st Re gi on
N or th w es tR eg io n
Ce nt ra lR eg io n
So ut hw es tR eg io n*
T& D, D ru m ,5
G al ,N on H az ar do us ,I D W
$2
.0
$2
.0
$2
.0
$2
.0
T& D, D ru m ,5
G al ,H az ar do us ,I
DW
T& D, D ru m ,5
G al ,P
FA
S, ID
W ca se by ca se ;c al lf or qu ot e
$1 ,2
.0
$1 ,1
.0
$1 ,2
.0
Ad di tio na lF ee s
<3 M ile s
M ile s
>5 M ile s
Tr an sp or ta tio n (f ro m po rt al to p/ u si te
$5
$1
Po lic ie s
Ja ck so nv ill e, FL
La rr y H al l
Co lli ns
Av e, Ja ck so nv ill e, FL
Ta m pa
,F L
M ik e Be va cq ua th
St N ,S t.
Pe te rs bu rg ,F L
W in te rH av en
,F L
Be n Sk id m or e
E Br id ge rs Av e, Au bu rn da le ,F L
Pa na m a Ci ty ,F L
Je ss e H ix so n
In du st ria lD r, Pa na m a Ci ty ,F L
FD
EP
PR
P D ry cl ea ne rT D Ra te s ca se by ca se ;c al lf or qu ot e ca se by ca se ;c al lf or qu ot e
LO
CA
TI
O N S
Ty pi ca lly w as te pr of ile s< ye ar ca n be ut ili ze d.
H ow ev er ,t hi si s N O T al w ay s th e ca se .H ul l's w ill no tif y
AT
C in th e ev en ta ne w er pr of ile is ne ed ed
Al lR eg io ns
File details come from the government source that posted it. Updated .