This Task Assignment (TA) is entered into between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants, Inc., pursuant to underlying Contract Number HW683. The TA, numbered DC005D, authorizes Geosyntec to conduct natural attenuation monitoring (NAM) at the Walker Plaza site (ERIC_4783) located at 603–617 North Maryland Avenue, Plant City, Hillsborough County, Florida. The assignment is effective through the completion date of May 31, 2024, with project management oversight provided by FDEP Project Manager Brittany Plyler and Geosyntec's Project Manager James Mills.
The contract authorizes Geosyntec to perform four subtasks for a total fixed unit rate value of $8,851.41: Subtask 1 comprises project management labor calculated at 13 percent of direct labor costs ($826.30); Subtask 2 includes NAM groundwater sampling activities involving depth-to-groundwater measurements from 19 wells and samples from 6 monitoring wells (MW002, MW006, MW010, MW011, MW013, and MW016) with analysis for volatile organic halocarbons ($4,130.62, due December 29, 2023); Subtask 3 covers the transportation and disposal of investigation-derived waste through Erwin Remediation at a cost of $265.22; and Subtask 4 covers preparation of the Annual NAM Report including data evaluation, Mann-Kendall statistical analysis, and evaluation of non-recorded institutional controls for potential site closure ($4,720.79, due March 29, 2024). The total TA value of $8,851.41 includes 57 labor hours and is invoiced upon completion of deliverables in two phases.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW683
DC005D Completion May 31, 2024
This Task Assignment authorizes Geosyntec to conduct NAM in accordance with the Geosyntec scope of work, cost estimate, and schedule received on October 6, 2023.
Brittany Plyler 850-245-8851 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Geosyntec
Geosyntec
James Mills 813-379-4389
ERIC_4783
603 – 617 North Maryland Avenue Plant City, Hillsborough County, Florida
Walker Plaza
✔ $ 8,851.41
$ 8,851.41
Scope of Work
Todd Kafka
Contract Manager
Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.
Date: 2023.10.16 14:19:38 -04'00'
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.10.16 12:37:51 -04'00'
N/A
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Submittal of groundwater sampling field forms 12/29/2023
Subtask 1, 3, 4: Submittal of Annual NAM Report; PM 03/29/2024
Subtask 2: Submittal of the groundwater sampling field forms $ 4,130.62
Subtask 1, 3, 4: Submittal and FDEP approval of the Annual NAM Report; PM $ 4,720.79
$ 8,851.41
HW683
DC005D
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
To: HW683 Contract Negotiation File Walker Plaza Hillsborough County, Florida
ERIC_4783
From: Brittany Plyler, Project Manager Date: October 9, 2023 Subject: Negotiation Summary
HW683_DC005D
This Task Assignment authorizes Geosyntec to conduct NAM in accordance with the Geosyntec scope of work, cost estimate, and schedule received on October 6, 2023.
Geosyntec confirmed on October 6, 2023, that Subtask 1 consists of the calculated project management labor, based upon 13% of the direct labor costs in this proposal, and includes fringe, overhead, other direct costs (ODCs) and completion fees.
Subtask 2: This subtask includes cost for NAM activities. Geosyntec will collect DPT measurements from 19 wells, and collect groundwater samples from 6 wells (MW002, MW006, MW010, MW11, MW013, and MW016. These samples will be submitted for VOHs.
Subtask 3: This subtask includes IDW Costs. Erwin Remediation is the lowest bidder.
Subtask 4: This subtask includes cost for Geosyntec to prepare the Annual NAM Report summarizing sampling activities and results.
Geosyntec confirmed site access on October 6, 2023.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost is $8,851.41 with 57 labor hours.
Printed on recycled paper.
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 10/5/2023
Task #: DC005D (pending) SubTask 1 Project Management SubTask 6
Site: Walker Plaza SubTask 2 NAM Groundwater Sampling SubTask 7
Activity/Phase: NAM Sampling SubTask 3 IDW Management SubTask 8
Project Manager: James Mills SubTask 4 Annual GWMR SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$48.08 Project Manager J. Mills 6 5.7 $86.54 Principal T. Kafka 2 0 0 2 0 0 0 0 0 0 $51.44 Project Professional M. Hensley 4 0 0 4 0 0 0 0 0 0 $48.08 Project Professional J. Mills 19 4 1 14 0 0 0 0 0 0 $33.05 Senior Staff Professional A. Lamore 4 0 0 4 0 0 0 0 0 0 $31.84 Senior Engineering Tech R. Mathias 21 21 0 0 0 0 0 0 0 0 $25.72 Administrative Assistant R. Resinger 1 0 0 1 0 0 0 0 0 0
Total Hours 57 6 25 1 25 0 0 0 0 0 0
Direct Labor $2,394.38 $275.46 $860.96 $48.08 $1,209.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $4,135.09 $475.72 $1,486.88 $83.03 $2,089.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,529.47 $751.18 $2,347.84 $131.11 $3,299.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 10/5/2023
Task #: DC005D (pending) SubTask 1 Project Management SubTask 6
Site: Walker Plaza SubTask 2 NAM Groundwater Sampling SubTask 7
Activity/Phase: NAM Sampling SubTask 3 IDW Management SubTask 8
Project Manager: James Mills SubTask 4 Annual GWMR SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $110.00 $0.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $110.00 $0.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $11.00 $0.00 $11.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $121.00 $0.00 $121.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $438.00 $438.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $548.00 $548.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $580.00 $580.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $760.00 $760.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $8,198.47 $751.18 $3,895.84 $252.11 $3,299.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $652.94 $75.12 $234.78 $13.11 $329.93 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $8,851.41 $826.30 $4,130.62 $265.22 $3,629.27 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
STs 1,3, 4 $4,720.79
REV: 02/03 CEF ARCADIS Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Walker Plaza SUBTASK: NAM Groundwater Sampling
DATE: 10/5/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Professional J. Mills 4
Senior Engineering Tech R. Mathias
TOTAL LABOR 25
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Day 2 $240.00 Subtotal $240.00
TOTAL VEHICLE $240.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOCs 6 wells $73.00 6 $438.00
Subtotal $438.00 Shipping
Small Cooler (0 to 25 lbs) $110.00 1 $110.00 Subtotal $110.00
TOTAL LAB $548.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Analytical Related
Groundwater Sampling Kit $290.00 Day 2 $580.00 Subtotal $580.00
IDW Related Drum $100.00 Each 1 $100.00
Subtotal $100.00 Expendables
$40.00 Day 2 $80.00 Subtotal $80.00
TOTAL EQUIPMENT $760.00
RPO coordination and logistics to access interior wells (2 hr); Evaluate and interpret field data (1 hr); Prepare field package (1 hr)
Field preparation (1 hr); mobe/demob (2 d @ 2hr/d = 4 hr); collect 15 water levels from MWs not sampled on first day (2 hr); sample 6 monitoring wells (6 @ 1.5 hr/well = 9 hr);
equipment calibration (2 d @ 0.5 hr/d = 1 hr); IDW management (1 hr); sample management (2 hr)
FINAL --7/24/96
SUBTASK: IDW Management
DATE: 10/5/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Professional J. Mills 1
TOTAL LABOR 1
SUBCONTRACTOR COSTS
NAME PURPOSE COST
IDW
Erwin Remediation IDW T&D $110.00 $110.00
Subtotal $110.00
TOTAL SUB $110.00
Review and signature of waste profile and manifest, including pickup coordiation
SUBTASK: Annual GWMR
DATE: 10/5/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 2
Project Professional M. Hensley 4
Project Professional J. Mills 14
Senior Staff Professional A. Lamore 4
Administrative Assistant R. Resinger 1
TOTAL LABOR 25
Report formatting, PDF compilation
Data evaluation/interpretation and PG certification on report (2 hr)
Update 4 report figures
Prepare report text, appendices, and tables (12 hr); Research non-recorded institutional control for groundwater (2 hr)
Prepare report tables, draft contour figures, and Mann-Kendall (4 hr)
12802 Tampa Oaks Blvd, Suite 151 Tampa, Florida 33637
PH 813.558.0990
FAX 813.558.9726
www.geosyntec.com
WALKER PLAZA (ERIC_4783)_SOW_NAM SAMPLING_OCT 23, V2
6 October 2023
Ms. Brittany Plyler Florida Department of Environmental Protection Waste Cleanup Program 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject: Scope of Work and Cost Estimate Form/Level of Effort Natural Attenuation Monitoring - 2023
Walker Plaza 603 – 617 North Maryland Avenue Plant City, Hillsborough County, Florida
FDEP Facility ID ERIC_4783
Dear Ms. Plyler:
Geosyntec Consultants, Inc. (Geosyntec) has prepared this Scope of Work (SOW) and Cost Estimate Form/Level of Effort (Attachment A) for natural attenuation monitoring (NAM) of volatile organic halocarbons (VOHs) at the Walker Plaza site (herein, the “Site”; Facility ID ERIC_4783) located in Plant City, Florida. NAM of VOHs proposed in this SOW is consistent with recommendations provided in the Post Active Remediation Monitoring Report (Report) dated March 2023 and approved by the Florida Department of Environmental Protection (FDEP) on 5 June 2023.
Geosyntec confirmed that Site Access Agreements were executed by Ms. Karen Davis on 27 April 2022 as the property owner of Walker Plaza (ERIC_4783) located at the above address and by David Ligon on 30 October 2018 as the property owner of the parcel adjacent to Walker Plaza located at 1502 East Baker Street, Plant City, FL.
Subtask 1 – Project Management
James Mills, E.I. will serve as Project Manager for the proposed SOW. Costs associated with this subtask are directly computed.
Subtask 2 – NAM Groundwater Sampling
This subtask includes costs associated with NAM activities tentatively scheduled for December 2023. As recommended in the 2023 Report, Geosyntec will collect depth-to-groundwater measurements from 19 accessible monitoring wells at the Site and groundwater samples from six monitoring wells. The monitoring wells include six surficial aquifer wells (MW002, MW006, MW010, MW011, MW013, and MW016). Groundwater samples will be collected in
WALKER PLAZA (ERIC_4783)_SOW_NAM SAMPLING_OCT 23, V23
general accordance with FDEP’s Standard Operating Procedures and will be submitted for laboratory analysis of VOHs by Environmental Protection Agency Method 8260B.
Geosyntec has assumed that this subtask can be completed by one field staff in two field days including round trip travel.
Subtask 3 – IDW Management
This subtask includes costs associated with the transportation and disposal of IDW generated during groundwater sampling activities. Geosyntec will containerize purge water in one 55-gallon steel drum, which will be labelled, covered with plastic, and wrapped in orange construction fencing. The drum will be transported off-Site and disposed of under the existing non-hazardous waste profile by Erwin Remediation, Inc. Quotes for the transportation and disposal of IDW are included as Attachment B. Erwin Remediation, Inc. remains the lowest cost provider.
Subtask 4 – Annual Groundwater Monitoring Report Preparation
This subtask includes effort for Geosyntec to prepare an Annual NAM Report summarizing sampling activities and results, and provide conclusions and recommendations based on data evaluation. The report will contain field forms, the final signed waste manifest for IDW transport and disposal, tables summarizing field and laboratory data, figures showing groundwater flow directions, and a textual summary of the groundwater monitoring event. As part of the report preparation and to evaluate the path forward, Geosyntec will evaluate plume stability and attenuation of the groundwater plume using Mann-Kendall statistical analysis. The report will be signed and sealed by a Florida-licensed geologist and one electronic copy of the final report will be submitted to the FDEP via email.
Additionally, this subtask includes effort for Geosyntec to evaluate the use of a non-recorded institutional control for groundwater with the Southwest Florida Water Management District to pursue conditional closure of the Site via Risk Management Option III. The Annual NAM Report will include the findings from this effort and recommend a path forward for site closure.
WALKER PLAZA (ERIC_4783)_SOW_NAM SAMPLING_OCT 23, V23
Invoice and Deliverable Schedule:
Note that this schedule reflects two weeks FDEP review of the SOW. Geosyntec requests the following schedule of deliverables and invoices:
Subtask Deliverable Deliverable Date Invoice Amount
Submittal of groundwater sampling field forms 15 December 2023 $4,130.62
1, 3, & 4 Submittal of Annual NAM Report 1 March 2023 $4,720.79
TOTAL $8,851.41
As always, it is a pleasure to work with the FDEP. Please contact James Mills at
813.379.4389 if you have any questions or require additional information.
Sincerely, James C. Mills, E.I.
Project Professional
Todd K. Kafka, P.G.
Senior Principal Hydrogeologist
Attachments
ATTACHMENT B
IDW QUOTES
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Ms. Olivia Cain Geosyntec Consultants, Inc.
19321 US Highway 19 North Building C, Suite 200 Clearwater, FL 33764
April 6, 2023
Re: Non-Hazardous Drum Disposal of PFOS/PFAS Impacted Materials
Ms. Cain:
The price for the transportation and disposal (T&D) of 55-gallon drums of non-hazardous soil, mud, and water is listed below:
Impacted with Non-Hazardous Petroleum or Chlorinated Solvents:
Description Rate Unit
T&D - Non-Haz Soil $ 110.00 Per Drum
T&D - Non-Haz Mud/Water $ 110.00 Per Drum
Impacted with Non-Hazardous PFAS/PFOS:
Description Rate Unit
Profile Fee (Charged once per site) $ 350.00 Per Site
T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum
T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum
Dry cleaning sites will require 8260-VOH lab analysis and PFAS sites will require the full FDEP lab analysis for IDW waste characterization.
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: robert@erwinremediation.com
JMills Rectangle
JMills Text Box Total = $110
02/13/2023 02:24 PM PAGE 1 OF 7
Scope of Work
NonHaz disposal Drums:
$60/per drum liquids
$80/per drum solids
Transportation Drums:
From Mulberry shop (755 Prairie Industrial Parkway, Mulberry, FL 33860)
0-100 miles - $30/per drum, < 6 drums per pick up - $50/stop fee
101-250 miles - $40/per drum, < 6 drums per pick up - $50/stop fee
251-400 miles - $50/per drum, < 11 drums per pick up - $50/stop fee (May incur per diem ''hotel'' for driver - please call)
New Replacement drums / empites - $40/plus sales tax
*10% FSC will apply to the final invoice*
755 PRARIE INDUSTRIAL PKWY,
MULBERRY, FLORIDA, 33860
QUOTE #: 0033693
DATE: 02/13/2023 PROJECT PROPOSAL
CLIENT
GEOSYNTEC
PROJECT DESCRIPTION
NON HAZ DRUM DISPOSAL - STATE OF FLORIDA
TBD
THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE
CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.
FEE STRUCTURE
JMills Rectangle
JMills Rectangle
JMills Text Box Total = $60 + $30 + $50 = $140
QUOTE
Customer GEOSYNTEC CONSULTANTS
Project Street Address Various Locations
Project State FL
Project City Various Cities
Project Zip Various Zips
Quote Number Q212587TPA
Quote Date Feb 27, 2023 02:36:18 PM
Hull's Rep Jamie Michael
SCOPE OF WORK
Waste T&D for non-hazardous drum pickup and disposal within the State of Florida. Assumptions are as follows:
Laboratory analysis will be provided for each location
Customer agrees to execute third-party authorization for Hull's to act as agent for waste transportation & disposal
Fuel costs are included in rates Off-spec waste will be returned to original location at the expense of customer
Rates include manfiests Transportation billed according to actual round trip elapsed time; portal to site to TSDF to portal
Item description Quantity Unit Rate Amount
Disposal - 55 Gal Drum, Soil or Water, Non-Hazardous, IDW 1.00 Drum $ 175.00 $ 175.00
Disposal - 55 Gal Drum, Soil or Water, Non-Hazardous, IDW, >Qty 5 1.00 Drum $ 150.00 $ 150.00
Transportation, Stake Body (or Equivalent), Driver/ Field Technician (Billed for Actual Time)
1.00 Hour $ 100.00 $ 100.00
TOTAL $ 425.00
Unit Pricing Disclaimer
Unit price quotations are designed to provide an estimated cost when complexity, duration and resource needs for a particular scope of work are difficult to determine due to factors like training requirements, location, weather conditions, materials, supplies, market fluctuations, unforeseen circumstances, and other characteristics. As such, Hull’s Environmental Services and client acknowledge that this is a unit price contract , that such unit prices vary from project to project and can ultimately alter the final cost of a project.
UNIT PRICING
JMills Rectangle
JMills Text Box Total = $175 + $200 = $375