This is a Task Assignment (TA) document entered into between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants, Inc., for site assessment activities at the Greater Tampa Cleaners facility located at 8408 North Armenia Avenue, Tampa, Florida (FDEP Site ID ERIC_4774). The task assignment is authorized under Contract Number HW683 and was executed on June 29, 2023, with a completion date of April 30, 2024. The document includes a detailed Scope of Work, Cost Estimation Form (CEF), and Level of Effort (LOE) outlining the environmental assessment work to be performed at the former dry cleaning facility.

The contract authorizes Geosyntec to conduct comprehensive site assessment activities including direct-push technology (DPT) groundwater sampling, monitoring well installation, soil and modified active gas sampling (MAGS), monitoring well sampling and surveying, and preparation of a Site Assessment Report. The total task assignment value is $102,578.21, payable on a fixed unit rate basis with invoicing tied to deliverable completion. Work is structured across seven subtasks with specific deliverable milestones: DPT investigation and monitoring well installation ($41,169.21, due October 31, 2023); soil sampling and MAGS ($34,288.63, due November 30, 2023); monitoring well sampling and surveying ($9,244.49, due November 30, 2023); preliminary data review teleconference ($1,171.78, due December 22, 2023); and site assessment report completion ($16,704.10, due January 31, 2024). The work encompasses 424 total labor hours and includes subcontractor services for drilling, utility location, surveying, and investigation-derived waste (IDW) disposal, with waste characterization and transportation costs included in the overall contract value.

View the file

Other files

File Type Posted
CN-370000-CN802-T9.pdf PDF
CN-370000-HW683-BF01BCO1.pdf PDF
CN-370000-HW683-BF04C.pdf PDF
CN-370000-HW683-BF04CCO1.pdf PDF
CN-370000-HW683-BIL02A.pdf PDF
CN-370000-HW683-DC001E.pdf PDF
CN-370000-HW683-DC001F.pdf PDF
CN-370000-HW683-DC002D.pdf PDF
CN-370000-HW683-DC002E.pdf PDF
CN-370000-HW683-DC003B.pdf PDF
CN-370000-HW683-DC003C.pdf PDF
CN-370000-HW683-DC003E.pdf PDF
CN-370000-HW683-DC010D.pdf PDF
CN-370000-HW683-DC012A.pdf PDF
CN-370000-HW683-DC012C.pdf PDF
CN-370000-HW683-DC013B.pdf PDF
CN-370000-HW683-DC020A.pdf PDF
CN-370000-HW683-DC020C.pdf PDF
CN-370000-HW683-DC021A.pdf PDF
CN-370000-HW683-DC023A.pdf PDF
CN-370000-HW683-DC024B.pdf PDF
CN-370000-HW683-DC024C.pdf PDF
CN-370000-HW683-DC026A.pdf PDF
CN-370000-HW683-DC027A.pdf PDF
CN-370000-HW683-DC027B.pdf PDF
CN-370000-HW683-DC028A.pdf PDF
CN-370000-HW683-DC02DCO1.pdf PDF
CN-370000-HW683-DC02FCO1.pdf PDF
CN-370000-HW683-DC030C.pdf PDF
CN-370000-HW683-DC031B.pdf PDF
CN-370000-HW683-DC034C.pdf PDF
CN-370000-HW683-DC036A.pdf PDF
CN-370000-HW683-DC037D.pdf PDF
CN-370000-HW683-DC039C.pdf PDF
CN-370000-HW683-DC03CCO2.pdf PDF
CN-370000-HW683-DC03ECO1.pdf PDF
CN-370000-HW683-DC040C.pdf PDF
CN-370000-HW683-DC041D.pdf PDF
CN-370000-HW683-DC043C.pdf PDF
CN-370000-HW683-DC044A.pdf PDF
CN-370000-HW683-DC046A.pdf PDF
CN-370000-HW683-DC047A.pdf PDF
CN-370000-HW683-DC049A.pdf PDF
CN-370000-HW683-DC052A.pdf PDF
CN-370000-HW683-DC053B.pdf PDF
CN-370000-HW683-DC054A.pdf PDF
CN-370000-HW683-DC05BCO3.pdf PDF
CN-370000-HW683-DC06ACO1.pdf PDF
CN-370000-HW683-DC07BCo1.pdf PDF
CN-370000-HW683-DC08BCO2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW683

DC026B Completion April 30, 2024

This Task Assignment authorizes Geosyntec to conduct Site Assessment Activities at Greater Tampa Cleaners in accordance with the Geosyntec scope of work, cost estimate, and schedule received on June 26, 2023.

Brittany Plyler 850-245-8851 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Geosyntec

Geosyntec

Olivia Cain 727-330-9961

ERIC_4774

8408 North Armenia Avenue Tampa, Florida 33604

Greater Tampa Cleaners

✔ $ 102,578.21

$ 102,578.21

Scope of Work

Todd Kafka

Contract Manager

Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.

Date: 2023.06.29 11:30:28 -04'00'

Teresa Booeshaghi

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2023.06.29 10:03:08 -04'00'

6/29/2023

N/A

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2: DPT Groundwater Sampling and Monitoring Well Installation Field Deliverable 10/31/2023

Subtask 3: Soil Sampling and MAGS Field Deliverable 11/30/2023

Subtask 4: Monitoring Well Sampling and Surveying Field Deliverable 11/30/2023

Subtask 5: Preliminary Data Review Meeting Minutes 12/22/2023

Subtask 1,6,7: Site Assessment Report with Final IDW Manifests; PM 01/31/2024

Subtask 2: Submittal and FDEP approval of the DPT Groundwater Sampling and Monitoring Well Installation Field Deliverable $ 41,169.21

Subtask 3: Submittal and FDEP approval of the Soil Sampling and MAGS Field Deliverable $ 34,288.63

Subtask 4: Submittal and FDEP approval of the Monitoring Well Sampling and Surveying Field Deliverable $ 9,244.49

Subtask 5: Submittal and FDEP approval of the Preliminary Data Review Meeting Minutes $ 1,171.78

Subtask 1,6,7: Submittal and FDEP approval of the Site Assessment Report with Final IDW Manifests; PM $ 16,704.10

$ 102,578.21

HW683

DC026B

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

To: HW683 Contract Negotiation File Greater Tampa Cleaners Hillsborough County, Florida

ERIC_4774

From: Brittany Plyler, Project Manager Date: June 26, 2023 Subject: Negotiation Summary

HW683_DC026B

This Task Assignment authorizes Geosyntec to conduct Site Assessment Activities at Greater Tampa Cleaners in accordance with the Geosyntec scope of work, cost estimate, and schedule received on June 26, 2023.

Geosyntec confirmed on June 26, 2023, that Subtask 1 consists of the calculated project management labor, based upon 13% of the direct labor costs in this proposal, and includes fringe, overhead, other direct costs (ODCs) and completion fees.

Subtask 2: This subtask includes cost to conduct a private utility locate, DPT groundwater sampling, DPT soil sampling, and 7 monitoring wells installation during a single mobilization.

Geosyntec will mobilize to the Site to oversee the advancement of two (2) lithologic soil borings (LSB001to the north and LSB002 to the south). These samples will be analyzed for VOCs.

Geosyntec will also collect groundwater samples using DPT at around12 locations (DPT001 through DPT012). Samples will be analyzed for VOCs.

Subtask 3: This subtask includes costs to conduct hand auger soil sampling and MAGS. Six MAGS wells (MAGS001 through MAGS006) will be installed, and five vapor monitoring points (VMPs; VMP001 through VMP005) will be installed. All wells will be sampled and analyze by VOCs.

Geosyntec personnel will observe coring activities within the Site building by PDS. PDS will core the concrete at locations SB001 through SB003, MAGS001 through MAGS006, and VMP001. Soil samples will be collected at 10 locations (SB001 through SB003, MAGS001 through MAGS006, and VMP001). These sample will be analyzed for VOCs.

Subtask 4: Subtask 4 includes costs for Geosyntec personnel to mobilize to the Site to conduct groundwater sampling activities of Site monitoring wells. The groundwater samples will be analyzed for VOCs.

Printed on recycled paper.

MEMORANDUM

Greater Tampa Cleaners June 26, 2023 Page Two

This subtask includes costs for a Florida professional land surveyor to survey the one existing and seven newly installed monitoring wells.

Subtask 5: This subtask includes time to prepare for and conduct a teleconference with FDEP to discuss the Subtask 2, Subtask 3, and Subtask 4 results.

Subtask 6: This subtask includes costs associated with the transportation and disposal of IDW generated as part of Site assessment activities. Geosyntec will coordinate disposal arrangements for up to 23 drums of non-hazardous IDW.

Subtask 7: This subtask includes cost for preparation and submittal of a Site Assessment Report (SAR) documenting assessment activities that complies with the requirements of Chapter

62-780.600, FAC.

The FDEP Project Manager confirmed site access on June 26, 2023.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost is $102,578.21 with 424 labor hours.

FDEP COST ESTIMATE

Contractor: Geosyntec Consultants

Date: 6/26/2023

Task #: Pending SubTask 1 Project Management SubTask 6 Investigation Derived Waste Management

Site: SubTask 2 DPT GW Investigation and MW Install SubTask 7 Site Assessment Report

Activity/Phase: Site Assessment SubTask 3 Soil and Modified Active Gas Sampling SubTask 8

Project Manager: O. Cain SubTask 4 Monitoring Well Sampling and Surveying SubTask 9

SubTask 5 Preliminary Data Review Teleconference SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category

$43.51 Project Manager O. Cain 44 43.7 $86.54 Principal T. Kafka 8 1 2 1 2 0 2 0 0 0

$64.90 Senior Professional S. Wang 17 5 7 5 0 0 0 0 0 0

$48.56 Project Professional M. Hensley 23 3 10 4 0 0 6 0 0 0

$43.51 Professional O. Cain 89 23 13 5 5 3 40 0 0 0

$39.98 Professional M. Lemes 76 8 68 0 0 0 0 0 0 0

$28.85 Staff Professional O. Hollingsworth 154 70 62 19 0 3 0 0 0 0

$28.85 Staff Professional R. Wallace 11 0 0 11 0 0 0 0 0 0

$27.88 Administrative Assistant A. Acosta 2 0 0 0 0 0 2 0 0 0

Total Hours 424 44 110 162 45 7 6 50 0 0 0

Direct Labor $16,542.50 $1,903.12 $3,896.79 $6,185.95 $1,688.33 $390.63 $217.08 $2,260.60 $0.00 $0.00 $0.00

Overhead 172.70% $28,568.92 $3,286.69 $6,729.76 $10,683.14 $2,915.75 $674.62 $374.90 $3,904.06 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $45,111.42 $5,189.81 $10,626.55 $16,869.09 $4,604.08 $1,065.25 $591.98 $6,164.66 $0.00 $0.00 $0.00

Travel

Vehicle Rental $2,340.00 $840.00 $1,200.00 $240.00 $0.00 $60.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $2,340.00 $840.00 $1,200.00 $240.00 $0.00 $60.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

$757.29 $0.00 $757.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$174.19 $0.00 $174.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $931.48 $0.00 $931.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $93.15 $0.00 $93.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $1,024.63 $0.00 $1,024.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Former Greater Tampa Cleaners

Cost Estimate Page 1 of 8 Cost Estimate

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 6/26/2023

Task #: Pending SubTask 1 Project Management SubTask 6 Investigation Derived Waste Management

Site: SubTask 2 DPT GW Investigation and MW Install SubTask 7 Site Assessment Report

Activity/Phase: Site Assessment SubTask 3 Soil and Modified Active Gas Sampling SubTask 8

Project Manager: O. Cain SubTask 4 Monitoring Well Sampling and Surveying SubTask 9

SubTask 5 Preliminary Data Review Teleconference SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Former Greater Tampa Cleaners

Subcontractor (Services Procurement)

Drilling (Conventional) $20,670.00 $19,170.00 $1,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $2,360.00 $0.00 $0.00 $2,360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $2,530.00 $0.00 $0.00 $0.00 $0.00 $2,530.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

GeoTek $750.00 $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $26,310.00 $19,920.00 $1,500.00 $2,360.00 $0.00 $2,530.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $2,631.00 $1,992.00 $150.00 $236.00 $0.00 $253.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $28,941.00 $21,912.00 $1,650.00 $2,596.00 $0.00 $2,783.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $12,304.00 $4,560.00 $6,480.00 $584.00 $0.00 $680.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $12,304.00 $4,560.00 $6,480.00 $584.00 $0.00 $680.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $600.00 $240.00 $240.00 $80.00 $0.00 $40.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $3,950.00 $1,625.00 $2,325.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $1,646.00 $128.00 $938.00 $580.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $300.00 $0.00 $200.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $1,850.00 $175.00 $1,675.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $8,346.00 $2,168.00 $5,378.00 $760.00 $0.00 $40.00 $0.00 $0.00 $0.00 $0.00

Subtotal $98,067.05 $5,189.81 $40,106.55 $32,601.72 $8,784.08 $1,065.25 $4,154.98 $6,164.66 $0.00 $0.00 $0.00

Completion Fee $4,511.16 $518.98 $1,062.66 $1,686.91 $460.41 $106.53 $59.20 $616.47 $0.00 $0.00 $0.00

Total Estimated Cost $102,578.21 $5,708.79 $41,169.21 $34,288.63 $9,244.49 $1,171.78 $4,214.18 $6,781.13 $0.00 $0.00 $0.00

Cost from Prior CEF: $0.00 Manual Entry Invoice 1 (ST2) $41,169.21 Cost from Delta CEF; $0.00 Manual Entry Invoice 2 (ST3) $34,288.63

Cost (Prior + Delta): $0.00 Auto-Calculated Invoice 3 (ST4) $9,244.49 Rounding Error: $102,578.21 Auto-Calculated Invoice 4 (ST 5) $1,171.78

Final Total Cost: $102,578.21 Auto-Calculated Invoice 5 (ST 1,6,7) $16,704.10 Check/Total $102,578.21

Cost Estimate Page 2 of 8 Cost Estimate

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Former Greater Tampa Cleaners SUBTASK: DPT GW Investigation and MW Install

DATE: 6/26/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 1

Senior Professional S. Wang 5

Project Professional M. Hensley 3

Professional O. Cain 23

Professional M. Lemes 8

Staff Professional O. Hollingsworth 70

TOTAL LABOR 110

VEHICLE TYPE RATE UNIT USEAGE

Truck Hollingsworth $480.00 Week 1 $480.00 Truck Hollingsworth $120.00 Day 1 $120.00 Van Lemes (1), Cain (1) $120.00 Day 2 $240.00

Subtotal $840.00

TOTAL VEHICLE $840.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Drilling (Conventional) Preferred Drilling Solutions DPT sampling and well install $19,170.00 $19,170.00

Subtotal $19,170.00

Other GeoTek Utility Locate $750.00 $750.00

Subtotal $750.00

TOTAL SUB $19,920.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs - Water 12 borings x 4 samples/boring $73.00 48 0 $3,504.00 VOHs - Soil 2 borings x 4 samples/boring $73.00 8 0 $584.00 SPLP Exctraction 50% of total soil samples $45.00 4 0 $180.00 VOHs - Water SPLP $73.00 4 0 $292.00

Subtotal $4,560.00

TOTAL LAB $4,560.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Drilling Related Monitoring Well Installation Kit $1,300.00 Week 1 $1,300.00 Monitoring Well Installation Kit $325.00 Day 1 $325.00

Subtotal $1,625.00 Analytical Related

Encore Sampler $16.00 Each 8 $128.00 Subtotal $128.00

Expendables $40.00 Day 6 $240.00

Subtotal $240.00

Other GPS $175.00 Day 1 $175.00

Subtotal $175.00

TOTAL EQUIPMENT $2,168.00

Evaluating and interpreting field data

Analytical data import and data management (3 hr). Prepare DPT results table (2 hr).

Prepare DPT groundwater results figure

Prepare Health and Safety Plan (4 hr). Property owner and tenant notification (1 hr). Day 1 field kickoff/oversight including mobilization (8 hr). Evaluating and interpreting field data (1 hr/day x 6 days = 6 hr). Prepare field deliverable package (3 hr). DPT groundwater figure generation (1

Mark borings, oversee utility locate, and suvey utilities including mobilization

Field preparation (1 hr). Mob/demob from Tampa (0.5 hr/day x 6 days = 3 hr). Calibration of instruments (0.5 hr/day x 6 days = 3 hr). Oversight of DPT lithology, DPT groundwater sampling, and monitoring well installation (10 hr/day x 6 days = 60 hr). IDW management (1 hr). Sample management (1 hr). Compile field notes (1 hr).

6/26/2023 Page 3 of 8 Subtask 2

SUBTASK: Soil and Modified Active Gas Sampling

DATE: 6/26/2023

LABOR CATEGORY

STAFF-TITLE HOURS

Principal T. Kafka 2

Senior Professional S. Wang 7

Project Professional M. Hensley 10

Professional O. Cain 13

Professional M. Lemes 68

Staff Professional O. Hollingsworth 62

TOTAL LABOR 162

VEHICLE TYPE RATE UNIT USEAGE

Truck Hollingsworth $480.00 Week 1 $480.00 Truck Hollingsworth $120.00 Day 1 $120.00 Van Lemes $480.00 Week 1 $480.00 Van Lemes $120.00 Day 1 $120.00

Subtotal $1,200.00

TOTAL VEHICLE $1,200.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Equipment Procurement Atlantic Drilling Supply MAGS materials $757.29 $757.29 Home Depot MAGS materials $174.19 $174.19

Subtotal $931.48

Drilling (Conventional) Prefered Drilling Concrete coring $1,500.00 $1,500.00

Subtotal $1,500.00

TOTAL SUB $2,431.48

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs - Soil 10 borings x 4 samples/boring $73.00 40 0 $2,920.00 SPLP Extraction 50% of total soil samples $45.00 20 0 $900.00 VOHs - Water SPLP $73.00 20 0 $1,460.00 TO-15 - Soil Gas MAGS $200.00 6 0 $1,200.00

Subtotal $6,480.00

TOTAL LAB $6,480.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Drilling Related Soil Vapor Sampling Kit $1,160.00 Week 1 $1,160.00 Soil Assessment Kit $700.00 Week 1 $700.00 Soil Vapor Sampling Kit $290.00 Day 1 $290.00 Soil Assessment Kit $175.00 Day 1 $175.00

Subtotal $2,325.00 Analytical Related

Water Level Meter $100.00 Week 1 $100.00 Encore Sampler $16.00 Each 40 $640.00 Air Sampling Summa Canister $33.00 Each 6 $198.00

Subtotal $938.00 IDW Related

Drum $100.00 Drum 2 $200.00 Subtotal $200.00

Expendables $40.00 Day 6 $240.00

Subtotal $240.00

Other GPS $175.00 Day 1 $175.00 Vacuum Gauges $19.00 Day 3 $57.00 Differential Pressure Gauge $18.00 Day 3 $54.00 Regenerative Blower $180.00 Day 3 $540.00 Air Flow Meter $33.00 Day 3 $99.00 Portable Generator 15-25 kW $250.00 Day 3 $750.00

Subtotal $1,675.00

TOTAL EQUIPMENT $5,378.00

*PROVIDE TIME REQUIRED FOR EACH PERSON

WORK DESCRIPTION

Evaluating and interpreting field data

Analytical data import and data management (3 hr). Prepare soil vapor and soil analytical tables (4 hr).

Preparation of soil and MAGS results figures (5 figures)

Property owner and tenant notifications (1 hr). Evaluating and interpreting field data (1 hr/day x 5 days = 5 hr). MAGS and soil figure generation (2 hr). MAGS data evaluation (2 hr).

Prepare field deliverable package (3 hr).

Preparation of purchasing MAGS supplies and picking up blower (4 hr).

Mob/demob from Tampa (0.5 hr/day x 6 days = 3 hr). Calibration of instruments (0.5 hr/day x 6 days = 3 hr). Soil coring and sampling (1.5 hr/location x 10 locations = 15 hr). MAGS well installation (2 hr/well x 6 wells = 12 hr). VMP well installation (2 hr/well x 5 wells = 10 hr).

MAGS equipment setup (0.5 hr/well x 6 wells = 3 hrs). MAGS testing with step test (2 hr/well x 6 wells = 12 hr). Interior as-built generation (2 hr). GPS exterior locations (3 hr). Sample management (1 hr)

Field preparation (1 hr). Mob/demob from Tampa (0.5 hr/day x 6 days = 3 hr). Calibration of instruments (0.5 hr/day x 6 days = 3 hr). Soil sampling (1.5 hr/location x 10 locations = 15 hr);

MAGS well installation (2 hr/well x 6 wells = 12 hr). VMP well installation (2 hr/well x 5 wells = 10 hr). MAGS equipment setup (0.5 hr/well x 6 wells = 3 hrs). MAGS testing with step test (2 hr/well x 6 wells = 12 hr). Interior as-built sketch (2 hr). IDW management (1 hr).

6/26/2023 Page 4 of 8 Subtask 3

SUBTASK: Monitoring Well Sampling and Surveying

DATE: 6/26/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 1

Senior Professional S. Wang 5

Project Professional M. Hensley 4

Professional O. Cain 5

Staff Professional O. Hollingsworth 19

Staff Professional R. Wallace 11

TOTAL LABOR 45

VEHICLE TYPE RATE UNIT USEAGE

Truck Hollingsworth $120.00 Day 1 $120.00 Van Wallace $120.00 Day 1 $120.00

Subtotal $240.00

TOTAL VEHICLE $240.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Surveying SurvTech MW survey $2,360.00 $2,360.00

Subtotal $2,360.00

TOTAL SUB $2,360.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs $73.00 8 0 $584.00 Subtotal $584.00

TOTAL LAB $584.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Analytical Related Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00

Subtotal $580.00 IDW Related

Drum $100.00 Drum 1 $100.00 Subtotal $100.00

Expendables $40.00 Day 2 $80.00

Subtotal $80.00

TOTAL EQUIPMENT $760.00

Field preparation (1 hr). Mob/demob from Tampa (0.5 hr). Instrument calibration (1 hr).

Sample monitoring wells (1.5 hr/well x 4 wells = 8 hr).

Evaluating and interpreting field data

Analytical data import and data management (3 hr). Prepare MW results and parameter tables (2 hr).

Prepare monitoring well results figure (2 hr). Prepare groundwater elevation contour map (2 hr).

Property owner and tenant notifications (1 hr). Evaluating and interpreting field data (1 hr).

Prepare field package (2 hr). Monitoring well results figure generation (1 hr).

Field preparation (1 hr). Mob/demob from Tampa (0.5 hr). Instrument calibration (1 hr).

Sample monitoring wells (1.5 hr/well x 4 wells = 8 hr). IDW management (1 hr). Sample management (1 hr). Compile field notes (1 hr).

Mob/demob from Tampa (0.5 hr). Oversee monitoring well survey (4 hr).

6/26/2023 Page 5 of 8 Subtask 4

SUBTASK: Preliminary Data Review Teleconference

DATE: 6/26/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

T. Kafka 2

Professional

O. Cain 5

TOTAL LABOR 7

Prepare for and conduct teleconference with FDEP to discuss soil, MAGS, and groundwater results

Prepare for and conduct teleconference with FDEP to discuss soil, MAGS, and groundwater results (4 hr). Prepare email summary of meeting minutes (1 hr).

6/26/2023 Page 6 of 8 Subtask 5

SUBTASK: Investigation Derived Waste Management

DATE: 6/26/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Professional

O. Cain 3

Staff Professional

O. Hollingsworth 3

TOTAL LABOR 6

VEHICLE TYPE RATE UNIT USEAGE

Van $120.00 Day 0.5 $60.00

Subtotal $60.00

TOTAL VEHICLE $60.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

IDW

Erwin Remediation $110/drum (non-PFAS) - 20 ST2, 2 ST3, 1 ST4 $2,530.00 $2,530.00

Subtotal $2,530.00

TOTAL SUB $2,530.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TCLP VOCs (Soil) $210.00 1 0 $210.00

TCLP Metals (Soil) $135.00 1 0 $135.00

TCLP VOCs (Aqueous) $205.00 1 0 $205.00

TCLP Metals (Aqueous) $130.00 1 0 $130.00

Subtotal $680.00

TOTAL LAB $680.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

$40.00 Day 1 $40.00

Subtotal $40.00

TOTAL EQUIPMENT $40.00

Characterization and waste profile for transport and disposal of drums (2 hr). Sign IDW manifest (1 hr).

IDW sampling with mobilization

6/26/2023 Page 7 of 8 Subtask 6

SUBTASK: Site Assessment Report

DATE: 6/26/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

T. Kafka 2

Project Professional

M. Hensley 6

Professional

O. Cain 40

Administrative Assistant

A. Acosta 2

TOTAL LABOR 50

Report formatting and PDF compilation

Develop recommendations and path forward

SAR figure preparation, including a well survey and cross section

SAR preparation

6/26/2023 Page 8 of 8 Subtask 7

19321 U.S. Highway 19 North Building C, Suite 200

Clearwater, Florida 33764

PH 813-792-4820

www.geosyntec.com

Former Greater Tampa Cleaners (ERIC_4774)_HW683 SOW_LOE_2023-06

Ms. Brittany Plyer Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400

Subject: Scope of Work and CEF/LOE – Site Assessment

Greater Tampa Cleaners 8408 North Armenia Avenue Tampa, Florida 33604 FDEP Site ID No. ERIC_4774

Dear Ms. Plyer:

Geosyntec Consultants, Inc. (Geosyntec) has prepared this Scope of Work, Cost Estimating Form (CEF), and Level of Effort (LOE) for Site assessment activities at the Former Greater Tampa Cleaners (“Site”) located in Tampa, Florida (ERIC_4774). Geosyntec prepared this LOE based on Geosyntec’s March 14, 2023 Site Assessment Work Plan (SAWP), approved by the Florida Department of Environmental Protection (FDEP) based on comments provided in June 2023. A task description breakdown for Site assessment field activities and report preparation is provided below. A CEF/LOE is provided as Attachment A.

Geosyntec obtained three bids from licensed and qualified contractors for utility locating, drilling, and investigation derived waste (IDW) transportation and disposal. A cost comparison is provided in Attachment B. Geosyntec recommends the following subcontractors based on lowest cost among the qualified bidders:

• Underground utility locating – GeoTek Services, LLC

• Drilling for direct-push technology (DPT) groundwater sampling and monitoring well installation – Preferred Drilling Solutions (PDS)

• Concrete coring – PDS

• IDW transportation and disposal – Erwin Remediation, Inc.

Geosyntec recommends that SurvTech Solutions, Inc. provides professional surveying services of the eight (8) monitoring wells (one existing and seven proposed for installation). Geosyntec will http://www.geosyntec.com/ subcontract PDS to core the locations proposed for soil sampling and modified active gas sampling (MAGS). Copies of the bids from each subcontractor are included in Attachment B.

The figures and Table 1 from the SAWP have been revised to reflect FDEP’s comments and are included in Attachment C.

Subtask 1 – Project Management

Costs associated with this subtask are directly computed.

Subtask 2 – DPT Investigation and Monitoring Well Installation

This subtask includes costs to conduct a private utility locate, DPT groundwater sampling, DPT soil sampling, and monitoring well installation during a single mobilization. These activities are summarized below.

Private Utility Locate

Geosyntec personnel will mobilize to the Site to oversee a private underground utility survey.

Identified utilities inside and around the Site building will be mapped by Geosyntec staff using a Global Position System (GPS) unit following the private underground utility survey. As a cost savings, Geosyntec assumes that the locator will also scan each location proposed under Subtask 3 for underground utilities while on-Site.

Lithologic Soil Borings and DPT Groundwater Sampling

Geosyntec will mobilize to the Site to oversee the advancement of two (2) lithologic soil borings (LSB001 and LSB002) using a DPT drill rig to a depth of approximately 50 feet (ft) below land surface (BLS; or refusal, whichever comes first) to characterize the Site-specific lithology.

Geosyntec proposes to advance LSB001 north of the Site building in the back parking lot near the location of the former boiler (Figure 4). LSB002 is proposed south of the Site building and the former drycleaning machine (Figure 4). These data will be used to assist in the evaluation of DPT groundwater sampling intervals and better identify the depth to limestone at the Site.

A hand auger will be used to collect lab analytical samples at LSB001 and LSB002 from the following intervals: 0 to 0.5, 0.5 to 2, 2 to 4, and 4 to 6 ft BLS (or the water table if encountered shallower than 6 ft BLS). The depth of each soil boring may be adjusted based on the observed depth to water encountered during soil boring completion. The soil samples will be analyzed using United States Environmental Protection Agency (EPA) Method 8260 (full list) for volatile organic compounds (VOCs) by a state of Florida certified, National Environmental Laboratory

Accreditation Program (NELAP) approved fixed-based laboratory. At each soil sample location, a 25-gram, Encore sample will be collected to evaluate soil leachability. The Encore samples will be placed on hold with the analytical laboratory. If leachability criteria for constituents are exceeded in soil sample(s), and concentrations are below the Residential Soil Cleanup Target Level (SCTL), Geosyntec will inform FDEP and request approval to instruct the analytical laboratory to analyze the corresponding Encore sample using the Synthetic Precipitation Leaching Procedure (SPLP). For budgetary purposes, it is assumed that approximately half of the proposed soil samples (4) will be analyzed by SPLP for VOCs.

Geosyntec will also collect groundwater samples using DPT at 12 locations (DPT001 through DPT012) as shown on Figure 5 of the SAWP included in Attachment C. Groundwater samples will be collected at 4-ft intervals approximately every 10 ft (i.e., 6 to 10, 16 to 20, 26 to 30 ft, and 36 to 40 ft BLS) to an estimated 40 ft BLS or refusal, whichever comes first. Sampling depths may be adjusted based on the results from LSB001 and LSB002. Groundwater samples will be submitted to a NELAP-approved fixed-based laboratory and analyzed for VOCs by EPA Method 8260 (full list).

Geosyntec has included costs to generate one figure and table that summarize VOC laboratory analytical results from the DPT groundwater samples. If fixed-based laboratory analytical results of DPT groundwater samples indicate that additional groundwater sampling will be required for delineation of groundwater impacts, Geosyntec will propose additional sampling locations and corresponding depths and/or monitoring wells.

Monitoring Well Installation

Seven (7) monitoring wells (MW002 through MW008) will be installed at the approximate locations shown on Figure 5 and Figure 6 of the SAWP included in Attachment C. Monitoring well MW002 will be installed using a hand auger and constructed of 2-ft of 1-inch diameter Schedule 40 polyvinyl chloride (PVC) riser and 5-ft of 1-inch diameter Schedule 40 PVC pre-packed well screen. This monitoring well will be screened from approximately 3 to 8 ft BLS.

Monitoring wells MW003 through MW008 will be installed using the hollow stem augur drilling method and constructed of 2-inch diameter Schedule 40 PVC with 0.010-inch slotted well screen.

Well screen intervals for water-table monitoring wells MW003 through MW006 and MW008 will be based on the lithologic data observed during the LSB001 boring installation and measured depth to water in existing monitoring well MW-1. However, it is assumed that the water-table monitoring wells will be screened similarly to MW-1 (i.e., from 3 to 13 ft BLS). Monitoring well MW007 will be screened from 25 to 35 ft BLS.

The new water-table monitoring wells will be installed with a filter pack consisting of 20/30 silica sand placed around the well screen to approximately 0.5-ft above the top of the screen, followed by at least a 1-ft thick, bentonite seal. The remaining annular space will be grouted to land surface with Portland Cement Type I/II and monitoring wells will be completed at the surface with a flush-mount 8-inch diameter manhole and a locking monitoring well cap. The monitoring wells will be developed until the discharge is relatively sediment-free. The top-of-casing elevation and horizontal coordinates of each monitoring well will be measured by a Florida-licensed professional surveyor at part of Subtask 4.

Geosyntec assumes source water for decontamination that is pre-screened for per- and polyfluoroalkyl substances (PFAS) will not be required to complete this work.

The top-of-casing elevation and horizontal coordinates of each monitoring well will be measured by a Florida-licensed professional surveyor as part of Subtask 4.

Field Deliverable and Draft Summary Figure

Geosyntec has included costs to generate one figure and table that summarize VOC laboratory analytical results from DPT groundwater samples. These data will be provided to FDEP for evaluation. Data gaps will be addressed during Subtask 5, if warranted.

Subtask 3 – Soil Sampling and Modified Active Gas Sampling

This subtask includes costs to conduct hand auger soil sampling and MAGS. These activities are summarized below and are anticipated to be performed during a single mobilization.

Concrete Coring

Geosyntec personnel will observe coring activities within the Site building by PDS. PDS will core the concrete at locations SB001 through SB003, MAGS001 through MAGS006, and VMP001.

Soil Sampling

Soil samples will be collected at 10 locations (SB001 through SB003, MAGS001 through MAGS006, and VMP001) shown on Figure 4 included in Attachment C to identify the location of potential source area(s). A hand auger will be used to collect samples from the following intervals: 0 to 0.5, 0.5 to 2, 2 to 4, and 4 to 6 ft BLS (or the water table if encountered shallower than 6 ft BLS). The depth of each soil boring may be adjusted based on the observed depth to water encountered during soil boring completion.

The soil samples will be analyzed using EPA Method 8260 (full list) for VOCs by a state of Florida certified, NELAP-accredited fixed-based laboratory. At each soil sample location, a 25-gram, Encore sample will be collected to evaluate soil leachability. The Encore samples will be placed on hold with the analytical laboratory. If leachability criteria for constituents are exceeded in soil sample(s), and concentrations are below the Residential SCTL, Geosyntec will inform FDEP and request approval to instruct the analytical laboratory to analyze the corresponding Encore sample using the SPLP. For budgetary purposes, it is assumed that approximately half of the proposed soil samples (20) will be analyzed by SPLP for VOCs.

Geosyntec assumes source water for decontamination that is pre-screened for PFAS will not be required to complete this work.

Exterior soil samples will be surveyed with a GPS. Interior sampling locations will be transcribed using as-builts based on Site features.

MAGS Well Installation

Six (6), 2-inch diameter Schedule 40 PVC MAGS wells (MAGS001 through MAGS006) will be installed at the approximate locations shown on Figure 4 included in Attachment C by hand auger to a depth of approximately 5 ft BLS (i.e., 1-ft above the anticipated depth to groundwater). Each MAGS well will be installed with approximately 1-ft of 1-inch diameter Schedule 40 PVC riser and 4-ft of 2-inch diameter Schedule 40 PVC screen slotted at 0.01-inches extending from approximately 1 to 5 ft BLS. A 20/30 silica sand filter pack will be placed from the bottom of the boring to the top of the well screen. The remaining annular space will be grouted to just below the top of casing. A temporary grout patch will be placed on top of a PVC cap that will be placed on each well to match existing grade and protect the well following installation and testing. Exterior MAGS locations will be surveyed with a GPS. Interior sampling locations will be transcribed using as-builts based on Site features.

Five (5), 1-inch diameter Schedule 40 PVC vapor monitoring points (VMPs; VMP001 through VMP005) will be installed at the approximate locations shown on Figure 4 included in Attachment C using a hand auger to a depth of approximately 5 ft BLS (or 1-ft above the anticipated depth to groundwater). Each VMP will be installed with approximately 1-ft of 1-inch diameter Schedule 40 PVC riser and 4-ft of 1-inch diameter Schedule 40 PVC screen slotted at 0.010-inches extending from approximately 1 to 5 ft BLS. A 20/30 grade silica sand filter pack will be placed from the bottom of the boring to the top of the VMP screen. The remaining annular space will be grouted to just below the top of casing. A temporary grout patch will be placed on top of a PVC cap that will be placed on each well to match existing grade and protect the VMP following installation and testing. VMP locations will be transcribed using as-builts based on Site features.

Quotes for MAGS supplies are included in Attachment D.

MAGS Testing

Each MAGS well will be tested for a period calculated to remove one, 10 to 15-ft radius of soil vapor volume using a blower. The test duration is expected to range between 0.5 and 1 hour. The vacuum and flow rates used at each MAGS well will be based on the results of a step test at one interior location. The step test will include a minimum of three steps at increasing vacuums to evaluate optimum air flow rates. Vacuum will be monitored at adjacent MAGS wells, VMPs, and monitoring wells (see Subtask 2) at approximate 15-minute intervals, as practical, during MAGS testing.

During testing, soil vapor will be monitored with an organic vapor analyzer equipped with a photoionization detector (PID) utilizing a 10.6 electronic volt lamp. Soil vapor samples (6 total) will be collected at the end of each MAGS test using a batch-certified “clean” Summa canister provided by the analytical laboratory. The soil vapor samples will be sent to a fixed-based, NELAP-approved laboratory for analysis of VOCs by the TO-15 method.

Field Deliverable and Draft Summary Figures

Geosyntec has included costs to generate one table and four figures that summarize VOC laboratory analytical results from soil samples and one figure and table that summarize VOC laboratory analytical results from MAGS samples. These data will be provided to FDEP for evaluation. Data gaps will be addressed during Subtask 5, if warranted.

Subtask 4 – Monitoring Well Sampling and Surveying

This subtask includes costs to collect groundwater samples from the one (1) existing and seven (7) newly installed monitoring wells and oversee a professional survey. These activities are summarized below.

Monitoring Well Sampling

Subtask 4 includes costs for Geosyntec personnel to mobilize to the Site to conduct groundwater sampling activities of Site monitoring wells. Prior to sampling, depth to water measurements will be collected to evaluate groundwater flow direction. The monitoring wells will be sampled using a peristaltic pump in general accordance with FDEP Standard Operating Procedures (SOPs). The samples will be stored on ice and shipped to a NELAP-approved, fixed-based analytical laboratory under chain of custody for analysis under standard turnaround times. The groundwater samples will be analyzed for VOCs by EPA Method 8260 (full list).

Screening for PFAS has been authorized by FDEP for up to five (5) monitoring wells under a separate task assignment (HW028A). Therefore, the cost for PFAS analysis is not included in this proposal.

Monitoring Well Survey

This subtask includes costs for a Florida professional land surveyor to survey the horizontal coordinates, top of casing elevations, and ground surface elevations of the one (1) existing and seven (7) newly installed monitoring wells. Cost has been included for Geosyntec to oversee the survey.

Field Deliverable and Draft Summary Figure

Geosyntec has included costs to generate one figure and table that summarize VOC laboratory analytical results from groundwater monitoring well samples. These data will be provided to FDEP for evaluation. Data gaps will be addressed during Subtask 5, if warranted.

Subtask 5 – Preliminary Data Review Teleconference

This subtask includes time to prepare for and conduct a teleconference with FDEP to discuss the Subtask 2, Subtask 3, and Subtask 4 results. If warranted and agreed upon during the teleconference, additional assessment activities may be proposed to complete Site assessment under Chapter 62-780, FAC. Presumptive remedies, if warranted, will also be discussed during this teleconference.

Subtask 6 – IDW Management

This subtask includes costs associated with the transportation and disposal of IDW generated as part of Site assessment activities. The soil and liquid IDW will be containerized in new 55-gallon drums and staged on-Site at a location designated by Geosyntec. It is estimated that the following number of drums will be generated as part of each subtask.

Number of Drums Subtask 2 – DPT Soil and Groundwater Sampling, and Monitoring Well Installation 20

Subtask 3 – Soil Sampling and MAGS 2 Subtask 4 – Monitoring Well Sampling 1 Total Drums for All Subtasks 23

The IDW will be sampled prior to profiling. One composite liquid and one composite soil sample will be collected ana analyzed for VOCs and metals using the Toxic Characteristic Leaching Procedure. Geosyntec will review the waste characterization profile and IDW manifests prepared by the selected waste hauler. Geosyntec will coordinate disposal arrangements for up to 23 drums of non-hazardous IDW. Analytical costs are included to establish the soil and groundwater profiles required by the selected waste hauler. We have assumed field oversight of the drum pickup is not necessary.

Subtask 7 – Site Assessment Report

Following completion of field activities, Geosyntec will proceed with the preparation and submittal of a Site Assessment Report (SAR) documenting assessment activities and summarizing analytical results. This subtask includes costs to generate a SAR that summarizes the analytical results of the assessment activities outlined above and complies with the requirements of Chapter 62-780.600, FAC. The costing included in the CEF/LOE includes the following figures:

• USGS Site Topographic Map,

• Potable Well Survey,

• Site Layout,

• Site Utility Map,

• Lithologic Cross Section (1 transect),

• Summary of Soil Analytical Results from 0-0.5, 0.5-2, 2-4, and 4-6 ft BLS (4 figures),

• Summary of MAGS Results,

• Summary of DPT Groundwater Sampling Analytical Results,

• Summary of Groundwater Elevations, and

• Summary of Monitoring Well Analytical Results.

Invoice and Deliverable Schedule

Subtask Deliverable Due Date Invoice Amount

DPT Groundwater Sampling and Monitoring Well Installation Field Deliverable

October 19, 2023 $41,169.21

3 Soil Sampling and MAGS Field Deliverable November 9, 2023 $34,288.63

4 Monitoring Well Sampling and Surveying Field Deliverable November 16, 2023 $9,244.49

5 Preliminary Data Review Meeting Minutes December 14, 2023 $1,171.78

1,6,7 Site Assessment Report with Final IDW Manifests January 18, 2024 $16,704.10

Total $102,578.21 The above schedule is based on the assumptions that Geosyntec is tasked for this scope of work by July 27, 2023.

Assumes Subtask 2, Subtask 3, and Subtask 4 activities are conducted in September or October 2023.

CLOSURE

Please review and contact us if you have any questions or require additional information. As always, it is a pleasure to work with the FDEP.

Sincerely, Olivia Cain, P.E. (FL) Todd K. Kafka, P.G. (FL, TN) Engineer Senior Principal Hydrogeologist

Attachments: Attachment A – CEF-LOE Attachment B – Bid Evaluations

Attachment C – Revised SAWP Attachment D – MAGS Materials Quotes

ATTACHMENT B

Bid Evaluations

Utility Locate Bids

Underground Utility Locate

Company GeoTek, LLC GeoView, Inc Site Lines, LLC

Total Quote $750.00 $1,400.00 $800.00

FDEP Site ID No. ERIC_7447

Former Greater Tampa Cleaners, Tampa, Florida

Subcontractor Cost Evaluation

Job Details - Scan up to 34 locations inside and outside the Site building.

GeoTek Services, LLC

15 June 2023

To: Olivia Hollingsworth

Geosyntec Consultants, Inc.

12802 Tampa Oaks Blvd Tampa, Florida 33637

From: GeoTek Services, LLC 4060 Sparrow Hawk Road

Melbourne, Florida 32934

RE: Utility Locating Services – Greater Tampa Cleaners, Tampa, Florida

Ms. Hollingsworth, GeoTek Services is pleased to respond to your request for Utility Locating services at the Greater Tampa Cleaners site located in Tampa, Florida. We will scan a 10’ x 10’ area around 34 proposed bore locations with the goal of locating underground utilities.

We can only scan the easily accessible open areas for utilities. Note that we cannot scan beneath fixed objects such as landscaping, fencing, buildings, or vehicles. We will scan as close as reasonably possible to fixed objects such as brush, curbing, etc. Our deliverable will be marking paint and/or flags indicating the location of potential underground utilities. It is the client’s responsibility to protect and preserve all marks.

We will use both Electromagnetic Induction instruments as well as Ground Penetrating Radar (GPR) to detect objects below the surface. Due to the nature of sub-surface detection and the physical laws governing radio wave propagation, some buried objects may not be detectable due to depth, obscuration, or a weak radar signature. GeoTek Services will use industry standard best practices to locate sub-surface objects, however some objects may not be detectable. Geotek Services does not guarantee that all underground objects can be found. GeoTek Services assumes no liability for any damages.

We request access to any as-built site plans of the scan areas prior to rendering services. Our quote for this effort is $750.00. No out-of-pocket expenses are expected for this project. This quote is valid for sixty days.

Best Regards, Martin (Bud) Connor GeoTek Services, LLC

4060 Sparrow Hawk Road ● Melbourne, FL 32934-8525 ● info@GeoTekServices.com ● 321.473.7498

From: Mike Wightman To: Olivia Hollingsworth Subject: RE: Utility Locate - Great Tampa Cleaners Date: Wednesday, June 14, 2023 1:50:27 PM

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."

Thanks Olivia, our quote for the investigation would $1400. This is based on the assumption that the work can be done during normal business hours, M-F and that an AutoCAD site to document the study results is not required.

Appreciate the opportunity and let me know if you need a formal proposal.

Regards, MJW

Mike Wightman, P.G President, GeoView O: 727-209-2334 C: 813-690-6667 mwightman@geoviewinc.com

From: Olivia Hollingsworth <Olivia.Hollingsworth@Geosyntec.com> Sent: Wednesday, June 14, 2023 1:33 PM To: Mike Wightman <mwightman@geoviewinc.com> Subject: Utility Locate - Great Tampa Cleaners

Hello Mike, I hope this finds you well.

I’m reaching out on behalf of Olivia Cain to get a quote for a utility locate at 34 locations in Tampa.

This is for the Greater Tampa Cleaners site located at 8408 North Armenia Avenue. I’ve attached maps showing the proposed locations for reference. This site is part of the Florida Department of Environmental Protection Waste Site Cleanup Section and the work is being competitively bid. The bidder providing the lowest cost meeting project requirements will be selected for the work.

Let me know if you have any questions or need any additional information! We are requesting that bids be submitted no later than 19 June 2023 at 6:00 PM EST.

Have a great week, Olivia Hollingsworth Staff Scientist

Geosyntec Consultants, Inc.

12802 Tampa Oaks Blvd, FL 33637 Mobile: 561.213.8580

GEOSYNTEC | SIREM | SAVRON

SITE LINES LLC

Utility Locating 1143 59th Avenue North (727) 432-9482 St. Petersburg, FL 33703 bhardy@sitelinesllc.com

Olivia B. Cain, P.E.

19321 U.S. Highway 19 North Building C, Suite 200 Clearwater, FL 33764

June 19, 2023

SITE: Greater Tampa Cleaners Site – Tampa, Florida PROPOSAL: 01297p

Dear Ms. Cain:

Thank you for contacting Site Lines LLC regarding the private utility locate at your project site. Attached is our proposal in response to your inquiry.

Please review the proposal to ensure I have accurately captured the project details.

If you agree to the proposal, including the terms and conditions, and the statement of work, please sign, initial and date where indicated. Upon signing, the proposal will serve as the Agreement of the parties as to the above-referenced Project.

If you have any questions, please feel free to contact me. I look forward to working with you.

Site Lines LLC

William L. Hardy II Geophysicist President

Enclosure

SITE LINES LLC PROPOSAL

SITE LOCATION

Greater Tampa Cleaners Site – 8408 North Armenia Avenue, Tampa, FL

PROPOSED SCOPE OF WORK

Site Lines (“Company”) will use Ground Penetrating Radar (GPR) and conventional electromagnetic (EM) pipe and cable locators to determine the location of underground utilities at the site identified by Geosyntec (“Client”). Of specific concern is the utilities within a 10-foot radius of approximately 34 proposed sample locations.

RESULTS OF THE INVESTIGATION

The estimated depth and location of utilities identified during the investigation will be marked on the ground surface using spray paint or other method to be agreed upon by the parties. The American Public Works Association Uniform Color Codes for the marking of underground utilities will be used.

PROJECT FEE

The fee to complete the project as described within this proposal is: Eight Hundred Dollars [$800.00].

Client shall pay Company in full within thirty (30) days of the invoice date, unless the parties have agreed to another payment arrangement in writing. If during the investigation, Company determines that the goals of the project cannot be achieved with the resources available to Company, Company will notify Client as soon as reasonably possible. Under such circumstances, Company will charge Client only for time expended and materials used to date.

CLIENT REQUIREMENTS

Client is responsible for all site access, maintenance of traffic (MOT), site clearing and/or any other logistical considerations necessary to conduct the utility locate.

Client will also provide all pertinent maps of the project site, including those that show the boundaries of the utility locate, pertinent landmarks, and known utilities (if available). Company is not a substitute for Chapter 556, Florida Statutes.

Accordingly, Client is responsible for calling Sunshine State One Call of Florida

(811) before undertaking any invasive activities, whether through Company, any other entity, or on its own.

DESCRIPTION OF COMPANY INVESTIGATION AND LIMITATIONS

A GSSI SIR-4000 GPR system will be used with a 900, 400, or 270 megahertz antenna configuration depending on site conditions and desired targets. The GPR will assist in locating nonmetallic and metallic utilities. Physical surface conditions, subsurface conditions and technical limitations effect the ability of GPR to resolve targeted utilities and/or subsurface structures. Depth and/or diameter of the utility, soil type, moisture/ionic content of the soil, and electrical properties of the soil compared to that of the utility can prevent the GPR from identifying utilities at the site. The diameter of a utility cannot be determined by GPR data. Estimated depths of utilities are directly affected by soil conditions and the material of the utility. A margin of error of +/- 20-25% in depth should be expected when performing invasive activities.

An RD 8000 will be used for the EM survey. Electromagnetic induction which transmits a signal directly into the desired target and passive power detection which locates naturally occurring magnetic fields in energized lines will be identified by detecting and following the signals with a receiver. The EM survey will assist in finding only metallic utilities. The magnetic field and/or induced signal should emanate from the target in a circular geometry. When this occurs, the receiver will receive its peak signal directly above the target. However, when metallic utilities are running near each other, or there is environmental interference from fences, cars or overhead power lines, the signal can become distorted and the peak no longer can be directly over the utility. Care must be taken when doing any invasive work around the utilities.