This Task Assignment (TA) DC002F is a state and local contract indefinite delivery vehicle issued by the State of Florida Department of Environmental Protection (FDEP) to Geosyntec Consultants Inc. for soil vapor extraction (SVE) system operation and maintenance (O&M) services at the Colonial Drycleaners/Touch of Class Drycleaners facility located at 4552 Lake Worth Road, Greenacres, Palm Beach County, Florida. The contract is authorized under underlying contract number HW683 with a completion date of February 26, 2027. The FDEP project manager is Sarah Aduwa (850-245-8973), and the contractor's project manager is Nicholas Barnes (813-379-4388).

The TA authorizes 12 months of SVE system O&M activities including system restart, groundwater sampling, monthly maintenance, quarterly influent air sampling, and semi-annual and annual reporting. The total contract value is $65,267.78, comprising a fixed unit rate of $61,067.78 and cost reimbursement of $4,200.00 for utilities not to exceed that amount. Payments are structured by deliverable across seven subtasks: Subtask 2 (System Restart and Groundwater Monitoring Field Deliverable) for $13,440.61 due August 27, 2025; Subtask 3 (Months 2-3 O&M) for $8,775.90 due November 25, 2025; Subtask 4 (Months 4-6 O&M and Semi-Annual Report) for $12,123.76 due February 26, 2026; Subtask 5 (Months 7-9 O&M) for $8,775.90 due May 28, 2026; Subtasks 1 & 6 (Project Management and Annual Report) for $17,711.61 due September 17, 2026; and Subtask 7 (Utilities) for $4,440.00 due September 17, 2026. The original cost estimate was $68,170.99, which was successfully negotiated down to $65,267.78, resulting in cost savings of $2,903.21 with a reduction from 330 to 311 total labor hours.

View the file

Other files

File Type Posted
CN-370000-HW683-BF02A.pdf.crdownload CRDOWNLOAD file
CN-370000-HW683-BF02ACO1.pdf PDF
CN-370000-HW683-BF02B.pdf PDF
CN-370000-HW683-BF04CCO2.pdf PDF
CN-370000-HW683-BIL01B.pdf PDF
CN-370000-HW683-BIL01C.pdf PDF
CN-370000-HW683-BIL03A.pdf PDF
CN-370000-HW683-CSS01.pdf PDF
CN-370000-HW683-CSS02B.pdf PDF
CN-370000-HW683-DC002B.pdf PDF
CN-370000-HW683-DC002C.pdf PDF
CN-370000-HW683-DC003D.pdf PDF
CN-370000-HW683-DC003F.pdf PDF
CN-370000-HW683-DC005A.pdf PDF
CN-370000-HW683-DC005B.pdf PDF
CN-370000-HW683-DC005C.pdf PDF
CN-370000-HW683-DC008C.pdf PDF
CN-370000-HW683-DC009D.pdf PDF
CN-370000-HW683-DC010B.pdf PDF
CN-370000-HW683-DC014B.pdf PDF
CN-370000-HW683-DC015A.pdf PDF
CN-370000-HW683-DC017B.pdf PDF
CN-370000-HW683-DC017D.pdf PDF
CN-370000-HW683-DC018A.pdf PDF
CN-370000-HW683-DC019E.pdf PDF
CN-370000-HW683-DC01ACO2.pdf PDF
CN-370000-HW683-DC01B.pdf PDF
CN-370000-HW683-DC020D.pdf PDF
CN-370000-HW683-DC025A.pdf PDF
CN-370000-HW683-DC025C.pdf PDF
CN-370000-HW683-DC028B.pdf PDF
CN-370000-HW683-DC028C.pdf PDF
CN-370000-HW683-DC029C.pdf PDF
CN-370000-HW683-DC029F.pdf PDF
CN-370000-HW683-DC029G.pdf PDF
CN-370000-HW683-DC02ECO2.pdf PDF
CN-370000-HW683-DC030A.pdf PDF
CN-370000-HW683-DC030B.pdf PDF
CN-370000-HW683-DC031A.pdf PDF
CN-370000-HW683-DC032B.pdf PDF
CN-370000-HW683-DC034A.pdf PDF
CN-370000-HW683-DC036C.pdf PDF
CN-370000-HW683-DC037A.pdf PDF
CN-370000-HW683-DC042B.pdf PDF
CN-370000-HW683-DC043B.pdf PDF
CN-370000-HW683-DC044C.pdf PDF
CN-370000-HW683-DC048A.pdf PDF
CN-370000-HW683-DC04A.pdf PDF
CN-370000-HW683-DC04ACO1.pdf PDF
CN-370000-HW683-DC05BCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev.

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

HW683

DC002F Completion February 26, 2027

This Task Assignment authorizes Geosyntec to conduct 12 months of SVE System O&M at Colonial Drycleaners in accordance with the June 24, 2025 Scope of Work, Cost Estimate, and Bid Documentation.

Sarah Aduwa 850-245-8973 Contractor Geosyntec Consultants Inc. Contractor

Contractor Nicholas Barnes Contractor 813-379-4388

ERIC_5222

4552 Lake Worth Road, Greenacres, Palm Beach County

Colonial Drycleaners/Touch of Class Drycleaners

Contractor Contractor

✔ $ 61,067.78 ✔ $ 4,200.00

$ 65,267.78

Scope of Work

Geosyntec Consultants Inc.

Contractor

Joseph Applegate Digitally signed by Joseph Applegate Date: 2025.06.27 10:46:58 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2025.06.27 09:41:56 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

BWC TAFORM

HW683

DC002F

Subtask 3 - O&M (Months 2 & 3)

Subtask 4 - O&M (Months 4, 5, & 6) & Reporting

Subtask 5 - O&M (Months 7, 8, & 9)

Subtasks 1 & 6 - Project Management; Reporting

Subtask 7 - Utilities (Months 1-12)

Subtask 2 - SVE System Restart and Groundwater Sampling 09/26/2025

01/16/2026

03/27/2026

06/26/2026

11/27/2026

11/27/2026

Subtask 2 - Submittal and FDEP approval of the system restart and groundwater sampling field deliverable

Subtask 3 - Submittal and FDEP approval of the O&M field reports for months 2 & 3

Subtask 4 - Submittal and FDEP approval of the Semi-Annual O&M Report

Subtask 5 - Submittal and FDEP approval of the O&M field reports for months 7, 8, & 9

Subtasks 1 & 6 - Submittal and FDEP approval of the Annual O&M Report

Subtask 7 - Submittal and FDEP approval of paid utility invoices for months 1-12 Utilities (Cost Plus Fixed Fee) not to exceed $4,200.00 Handling Fee: $240.00

$ 13,440.61

$ 65,267.78

$ 8,775.90

$ 12,123.76

$ 8,775.90

$ 17,711.61

$ 4,440.00

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Alexis A. Lambert Secretary

Memorandum

TO:

FROM:

Negotiation File Colonial Drycleaners/Touch of Class Drycleaners Greenacres, Palm Beach County

ERIC_5222

Patrick McG , Project Manager

SUBJECT: Negotiation Summary Task Assignment DC002F (HW683)

DATE: June , 2025

This Task Assignment authorizes Geosyntec Consultants, Inc. (Geosyntec) to conduct 12 months of

Operation and Maintenance (O&M) at the Colonial Touch of Class Cleaners site.

Prior to SVE system restart, select monitoring wells will be sampled to evaluate the current groundwater conditions. O&M will consist of monthly system maintenance, quarterly influent sampling, and semi-annual/annual reporting. Utility costs for the 12 months are not to exceed $4,200.00 and will be invoiced for as cost reimbursement.

The total cost for this project

$6 with 3 total labor hours

All work is to be completed in accordance with the June , 2025, Scope of Work, Cost

Estimate, and Bid Documentation.

Geosyntec may invoice according to the included schedule.

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

G eo sy nt ec C on su lta nt s

D at e:

6/

/2

Ta sk

P en di ng

S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

M on th s

-1

O

M

S ite

S ub Ta sk

S ys te m

R es ta rt an d

G W

S am pl in g S ub Ta sk

U til iti es

(1

M on th s)

A ct iv ity

/P ha se

S ub

Ta sk

M on th s 1-

O

M

S ub

Ta sk

P ro je ct

M an ag er

N

. B ar ne

Ta sk

M on th s

4-

O

M a nd R ep or tin g

S ub

Ta sk

S ub

Ta sk

M on th s 7-

O

M

S ub

Ta sk

T To ta ls

La bo r

R at e C at eg or y

$6 1.

PP

ro je ct M an ag er

N . B ar ne s

.1

$1

.7

Pr in ci pa l T.

K af ka

$5

8.

Se ni or P ro fe ss io na l

M . H en sl ey

$6

1.

Pr oj ec t P ro fe ss io na l

N . B ar ne s

$3

8.

Se ni or S ta ff

Pr of es si on al

R . T em pl e

$2 8.

Ad m in is tra tiv e

As si st an t R

. R es in ge r

To ta l H ou rs

D ire ct L ab or

$1

4, 8.

$1 ,7

.9

$2

,7

.8

$2 ,1

.1

$2

,9

.3

$2 ,1

.1

$3

,2

.2

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh ea d

2.

$2

5, 3.

$2 ,9

.0

$4

,7

.4

$3 ,7

.1

$5

,0

.8

$3 ,7

.1

$5

,6

.0

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or

$4

0, 2.

$4 ,6

.9

$7

,4

.2

$5 ,8

.3

$7

,9

.2

$5 ,8

.3

$8

,9

.3

$0 .0

$0

.0

$0 .0

$0

.0

C ol on ia l T ou ch o f C la ss C le an er s

O pe ra tio n an d M ai nt en an ce (O

M

Co st E st im at e

Pa ge o f

Co st E st im e

FD

EP

C O

ST

E

ST

IM

A

TE

C on tra ct or

G eo sy nt ec C on su lta nt e:

6/

/2

Ta sk

P en di ng

Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

M on th s

-1

O

M

S ite

S ub Ta sk

S ys te m

R es ta rt an d

G W

S am pl in g S ub Ta sk

U til iti es

(1

M on th s)

A ct iv ity

/P ha se

S ub

Ta sk

M on th s 1-

O

M

S ub

Ta sk

P ro je ct

M an ag er

N

. B ar ne

Ta sk

M on th s

4-

O

M a nd R ep or tin g

S ub

Ta sk

S ub

Ta sk

M on th s 7-

O

M

S ub

Ta sk

T To ta ls

C ol on ia l T ou ch o f C la ss C le an er s

O pe ra tio n an d M ai nt en an ce (O

M

TTr av el V eh ic le R en ta l $1

,9

.0

$4

.0

$3

.0

$3

.0

$3

.0

$3

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ile ag e

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

A ir Fa re $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

P er d ie m

H ot el

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l T ra ve l

$$2 ,0

.0

$6

.0

$3

.0

$3

.0

$3

.0

$3

.0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

(E qu ip m en t P ro cu re m en t)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m en t) ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$7

.0

$0 .0

$0

.0

$6

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

U til iti es $4

,2

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$4

,2

.0

$0 .0

$0

.0

$0 .0 te le m et ry

(P R

M

$1 ,3

.0

$1

,3

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$6 ,3

.0

$1

,3

.0

$0 .0

$6

.0

$0

.0

$1

.0

$4 ,2

.0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $4

.0

$1

.0

$0

.0

$6 5.

$0

.0

$1 2.

$2

.0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$6 ,7

.0

$1

,4

.0

$0 .0

$7

.5

$0

.0

$1

.5

$4 ,4

.0

$0

.0

$0 .0

$0

.0

La bo ra to ry

A na ly tic al C os ts

$2 ,4

.0

$1

,4

.0

$2

.0

$2

.0

$2

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fa st

T ur na ro un d

C ha rg es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S am pl e

S hi pp in g $1

,0

.0

$3

.0

$1

.0

$2

.0

$1

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$3 ,4

.0

$1

,7

.0

$3

.0

$5

.0

$3

.0

$5

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d E xp en se

P er so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $5

.0

$1

.0

$1

.0

$1

.0

$0

.0

$2

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ril lin g re la te d)

$1

.0

$0 .0

$0

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

A na ly tic al re la te

d) $1

,1

.0

$6

.0

$1

.0

$1

.0

$1

.0

$1

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W re la te d)

$2

.0

$1

.0

$0 .0

$1

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$6

,0

.0

$4

.0

$1 ,4

.0

$1

,4

.0

$1 ,4

.0

$1

,4

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$8 ,0

.0

$1

,3

.0

$1 ,6

.0

$1

,7

.0

$1 ,6

.0

$1

,7

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub to ta l $6

1, 8.

$4 ,6

.9

$1

2, 7.

$8 ,1

.3

$1

1, 5.

$8 ,1

.3

$1

1, 7.

$4 ,4

.0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$4 ,0

.2

$4

.3

$7

.3

$5

.5

$7

.0

$5

.5

$8

.5

$0

.0

$0 .0

$0

.0

$0 .0

To ta l E st im at ed C os t

$6 5, 7.

$5

,1

.2

$1 3, 0.

$8

,7

.9

$1 2, 3.

$8

,7

.9

$1 2, 9.

$4

,4

.0

$0 .0

$0

.0

$0 .0

C os t f ro m P rio r C

E F:

M an ua l E nt ry

C os t f ro m D el ta

C E

F;

M an ua l E nt ry C os t (

P rio r + D el ta

$0

.0

A ut o- C al cu la te d R ou nd in g

E rr or

$6 5, 7.

A ut o-

C al cu la te d

Fi na l T ot al C os t:

$6 5, 7.

A ut o-

C al cu la te d

Co st E st im at e

Pa ge o f

Co st E st im e

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Colonial Touch of Class Cleaners SUBTASK: System Restart and GW Sampling

DATE: 6/24/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 2

Senior Professional M. Hensley 3

Project Professional N. Barnes 24

Senior Staff Professional R. Temple

TOTAL LABOR 52

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Day 4 $480.00 Subtotal $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

N. Barnes Per Diem $36.00 Day 1 $36.00 N. Barnes Hotel $140.00 Day 1 $140.00

TOTAL PER DIEM $176.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Utilities PRM Filtration Telemetry Service Telemetry Costs (annual) $1,350.00 $1,350.00

$0.00 $0.00 Subtotal $1,350.00

TOTAL SUB $1,350.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 Influent, VEW003, VEW004 $200.00 3 0 $600.00 VOHs MW Samples $73.00 7 0 $511.00 TCLP VOCs GAC $210.00 1 0 $210.00 TCLP RCRA 8 Meta GAC $135.00 1 0 $135.00 Shipping

Large Cooler (25 to 50 lbs) $150.00 2 $300.00 Subtotal $300.00

TOTAL LAB $1,756.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Analytical Related

Groundwater Sampling Kit $290.00 Day 2 $580.00 Air Sampling Canister (Summa) $33.00 Each 3 $99.00

Subtotal $679.00 IDW Related

Drum (GW Sampling Purge Water) $100.00 Drum 1 $100.00

Subtotal $100.00 Expendables

$40.00 Day 3 $120.00 Subtotal $120.00

Other O&M Kit $360.00 day 1 $360.00 O&M Supplies $75.00 day 1 $75.00 Air Velocity Meter $33.00 day 1 $33.00

$0.00 Subtotal $468.00

TOTAL EQUIPMENT $1,367.00

System restart data and groundwater sampling data interpretation and path forward recommendations.

Generate groundwater elevation contour map, groundwater quality figure, generate ROI figure (3 hrs)

Field preparation (1 hr), Mobe/Demobe (2 hr/day x 2 days = 4 hrs), Equipment calibration (0.5 hr/day x 2 days = 1 hr), Groundwater sample collection (7 wells x 1.5 hrs/well = 10.5 hrs), SVE system restart troubleshooting/O&M assistance (4 hrs), Field notes (0.5 hrs), IDW & Sample Management (2 hrs)

Property/tenant owner notification for system restart and GW sampling events (1 hr).

Mobilization/demobilization for system restart (8 hrs). System restart and O&M event with technical support, system troubleshooting, and ROI test (10 hrs). PE O&M data interpretation and detemine flow rates and operating conditions based on field data to evaluate system optimization (1 hr).Prepare system restart and groundwater sampling field deliverable for FDEP (4 hr).

6/25/2025 Page 3 of 8 Subtask 2

SUBTASK: Months 1- 3 O&M

DATE: 6/24/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 2

Senior Professional M. Hensley 2

Project Professional

N. Barnes

Senior Staff Professional

R. Temple 37

TOTAL LABOR 48

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Day 3 $360.00 Subtotal $360.00

TOTAL VEHICLE $360.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 Influent $200.00 1 0 $200.00

Subtotal $200.00 Shipping

Large Cooler (25 to 50 lbs) $150.00 $0.00 Small Cooler (0 to 25 lbs) $110.00 1 $110.00

Subtotal $110.00

TOTAL LAB $310.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Analytical Related

Water Level Meter $25.00 Day 3 $75.00 Air Sampling Canister (Summa) $33.00 Day/Each 1 $33.00

Subtotal $108.00 IDW Related

Drum $100.00 Drum 0 $0.00 Subtotal $0.00

Expendables $40.00 Day 3 $120.00

Subtotal $120.00

Other O&M Kit $360.00 day 3 $1,080.00 O&M Supplies $75.00 day 3 $225.00 Air Velocity Meter $33.00 day 3 $99.00

Subtotal $1,404.00

TOTAL EQUIPMENT $1,632.00

Data interpretation and path forward recommendations

ROI/Potentiometric Figures preparation

Property owner notification for each O&M event (1 hr). O&M event technical support and system troubleshooting (1 hr/event x 3 events = 3 hr). PE O&M data interpretation and detemine flow rates and operating conditions based on field data to evaluate system optimization (1 hr/event x 3 events = 3 hr).

Monthly O&M Events with mobilization (8 hr/event x 3 events = 24 hr). Update O&M progress report tables (2 hr/event = 6 h) and vapor sample shipping (1 hr); Prepare field O&M reports to FDEP (2 hr/event x 3 events = 6 hr).

6/25/2025 Page 4 of 8 Subtask 3

SUBTASK: Months 4-6 O&M and Reporting

DATE: 6/24/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 2

Senior Professional M. Hensley 3

Project Professional N. Barnes

Senior Staff Professional R. Temple

Administrative Assistant R. Resinger 1

TOTAL LABOR 63

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Day 3 $360.00 Subtotal $360.00

TOTAL VEHICLE $360.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

IDW

Erwin Remediation PFAS Profiling Fee (new disposal facility) $350.00 $350.00 Erwin Remedation Drum Disposal (PFAS-Impacted - $195/drum $195.00 $195.00 Erwin Remedation Vapor Phase GAC Disposal $110.00 $110.00

Subtotal $655.00

TOTAL SUB $655.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 Influent $200.00 1 0 $200.00 VOHs IDW $73.00 1 0 $73.00

Subtotal $273.00 Shipping

Large Cooler (25 to 50 lbs) $150.00 1 $150.00 Small Cooler (0 to 25 lbs) $110.00 1 $110.00

Subtotal $260.00

TOTAL LAB $533.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Analytical Related

Groundwater Sampling Kit $290.00 Day 0 $0.00 Water Level Meter $25.00 Day 3 $75.00 Air Sampling Canister (Summa) $33.00 Day/Each 1 $33.00

Subtotal $108.00 IDW Related

Drum (MS Contents) $100.00 Drum 1 $100.00 Subtotal $100.00

Expendables $40.00 Day 3 $120.00

Subtotal $120.00

Other O&M Kit $360.00 day 3 $1,080.00 O&M Supplies $75.00 day 3 $225.00 Air Velocity Meter $33.00 day 3 $99.00 Air Flow Meter $33.00 day $0.00

Subtotal $1,404.00

TOTAL EQUIPMENT $1,732.00

Format and complile report. PDF preparation/creation.

Semi-Annual O&M Report and path forward recommendations

Figure preparation for Semi-annual O&M Report (ROI, GW Elevation, GW Analytical)

Property owner notification for each O&M event ( 1 hr). O&M event technical support and system troubleshooting (1 hr/event x 3 events = 3 hr). PE O&M data interpretation and detemine flow rates and operating conditions based on field data to evaluate system optimization (1 hr/event x 3 events = 3 hr).Prepare Semi-Annual O&M Report and PE Certification (8 hr) Monthly O&M Events with mobilization (8 hr/event x 3 events = 24 hr). Update O&M progress report tables (2 hrs); .Prepare Semi-Annual O&M Report (16 hr)

6/25/2025 Page 5 of 8 Subtask 4

SUBTASK: Months 7-9 O&M

DATE: 6/24/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 2

Senior Professional M. Hensley 2

Project Professional N. Barnes 7

Senior Staff Professional

R. Temple 37

TOTAL LABOR 48

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Day 3 $360.00 Van Day $0.00

Subtotal $360.00

TOTAL VEHICLE $360.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 Influent $200.00 1 0 $200.00 VOHs Site monitoring wells $73.00 0 $0.00

Subtotal $200.00 Shipping

Large Cooler (25 to 50 lbs) $150.00 $0.00 Small Cooler (0 to 25 lbs) $110.00 1 $110.00

Subtotal $110.00

TOTAL LAB $310.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Analytical Related

Groundwater Sampling Kit $290.00 Day $0.00 Water Level Meter $25.00 Day 3 $75.00 Air Sampling Canister (Summa) $33.00 Day/Each 1 $33.00

Subtotal $108.00 Expendables

$40.00 Day 3 $120.00 Subtotal $120.00

Other O&M Kit $360.00 day 3 $1,080.00 O&M Supplies $75.00 day 3 $225.00 Air Velocity Meter $33.00 day 3 $99.00

Subtotal $1,404.00

TOTAL EQUIPMENT $1,632.00

Data interpretation and developing recommendations

ROI/Potentiometric Figures preparation

Property owner notification for each O&M event (1 hr). O&M event technical support and and system troubleshooting (1 hr/event x 3 events = 3 hr). PE O&M data interpretation and detemine flow rates and operating conditions based on field data to evaluate system optimization (1 hr/event x 3 events = 3 hr).

Monthly O&M Events with mobilization (8 hr/event x 3 events = 24 hr). O&M progress report tables (2 hr/event) and vapor sampling shipping (1 hr). Prepare field O&M reports to FDEP (2 hr/event x 3 events = 6 hr).

6/25/2025 Page 6 of 8 Subtask 5

SUBTASK: Months 10-12 O&M

DATE: 6/24/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 2

Senior Professional M. Hensley 3

Project Professional N. Barnes 15

Senior Staff Professional R. Temple 51

Administrative Assistant R. Resinger 1

TOTAL LABOR 72

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Day 3 $360.00 Subtotal $360.00

TOTAL VEHICLE $360.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

IDW

Erwin Remediation IDW liquid (moisture separator) $125.00 $125.00

$0.00 $0.00 Subtotal $125.00

TOTAL SUB $125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 Influent $200.00 1 0 $200.00 VOHs IDW sample $73.00 1 0 $73.00

Subtotal $273.00 Shipping

Large Cooler (25 to 50 lbs) $150.00 1 $150.00 Small Cooler (0 to 25 lbs) $110.00 1 $110.00

Subtotal $260.00

TOTAL LAB $533.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Analytical Related

Groundwater Sampling Kit $290.00 Day $0.00 Water Level Meter $25.00 Day 3 $75.00 Air Sampling Canister (Summa) $33.00 Day/Each 1 $33.00

Subtotal $108.00 IDW Related

Drum (purge water) $100.00 Drum $0.00 Subtotal $0.00

Expendables $40.00 Day 5 $200.00

Subtotal $200.00

Other O&M Kit $360.00 day 3 $1,080.00 O&M Supplies $75.00 day 3 $225.00 Air Velocity Meter $33.00 day 3 $99.00

Subtotal $1,404.00

TOTAL EQUIPMENT $1,712.00

Format and complile report. PDF preparation/creation.

Annual O&M Report and path forward recommendations

Figures preparation for Annual O&M Report (ROI, GW elevation)

Property owner notification for each O&M event ( 1 hr). O&M event technical support and and system troubleshooting (1 hr/event x 3 events = 3 hr). PE O&M data interpretation and detemine flow rates and operating conditions based on field data to evaluate system optimization (1 hr/event x 3 events = 3 hr).. Prepare Annual Remedial Action Status Report and PE certification (8 hrs)

Monthly O&M Events with mobilization (8 hr/event x 3 events = 24 hr). O&M progress report tables (2 hr/event) and vapor sampling shipping (1 hr). Prepare Annual O&M Report (20 hr)

6/25/2025 Page 7 of 8 Subtask 6

SUBTASK: Utilities (12 Months)

DATE: 6/24/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST QUANTITY

Utilities FPL Energy Estimate (12 Months ) $350/month $350.00 12 $4,200.00 Processing Fee $20/month $20.00 12 $240.00

Subtotal $4,440.00

TOTAL SUB $4,440.00

LABORATORY COSTS

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

6/25/2025 Page 8 of 8 Subtask 7

12802 Tampa Oaks Blvd.

Suite 151

Tampa, Florida 33637

PH 813.558.0990

www.geosyntec.com

Colonial TOC Cleaners (ERIC_5222) HW683 SOW_ O&M_rev062425

June 24, 2025

Ms. Sarah Aduwa Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road Tallahassee, FL 32399-2400

Subject: Scope of Work and CEF/LOE

Soil Vapor Extraction System O&M (1 Year) Colonial Touch of Class Cleaners 4552 Lake Worth Road Greenacres, Palm Beach County, Florida 33463 FDEP Facility ID NO. ERIC_5222

Dear Ms. Aduwa:

Geosyntec Consultants, Inc. (Geosyntec) has prepared this proposed Scope of Work (SOW) and Level of Effort (LOE) for groundwater monitoring, soil vapor extraction (SVE) system restart, and 12 months of operation and maintenance (O&M) at the Colonial Touch of Class Cleaners Site located in Greenacres, Florida (ERIC_5222).

The O&M activities following system restart are subdivided into subtasks by quarter. The major scope elements are outlined below and will pertain to multiple subtasks in some cases. Each subtask will be outlined separately thereafter. A cost estimating form (CEF) and LOE is provided as Attachment A.

SVE System Restart

The SVE system has been off since June 2024 to enable supplemental source area assessment including additional MAGs testing to support preparation of a Remedial Alternatives Evaluation (RAE). During the April 29, 2025 site review meeting with FDEP, it was decided that the system should be restarted to evaluate additional mass removal and assess other optimizations prior to re-advancing the Site towards a RAE. During the restart, FDEP requested vacuum data be collected to evaluate if there are any dead zones in the vapor recovery radius of influence and that vapor samples be collected from the combined influent, system effluent, and select vapor extraction wells (VEWs).

Groundwater Sampling Select site monitoring wells shall be sampled to evaluate current groundwater quality, coincident with SVE system restart. The proposed monitoring wells for sampling include MW001, MW002, MW003, MW005, MW006, MW008, and MW009. A figure showing the locations of these wells and prior analytical results is provided as Attachment B. Prior to collecting groundwater samples, depth-to-water measurements will be collected from the well network. Groundwater samples will be analyzed by a fixed-based, certified laboratory for volatile organic halogens (VOHs) using EPA Method 8260. The analytical results will be tabulated and provided in a field deliverable, with an evaluation of the results provided in a Semi-Annual O&M Report.

Monthly SVE System O&M Tasks Geosyntec will conduct monthly O&M visits to the Site following SVE restart. Geosyntec personnel will perform the following tasks during each monthly O&M visit.

Recording vacuum, pressure, and temperature readings at the SVE blower;

Recording air flow rates at the blower and vapor extraction wells (VEWs);

Documenting active and passive VEW operation and adjustment of active and passive

VEWs, as necessary;

Recording vacuum readings at VEW01 through VEW04 and select monitoring wells;

Draining fluids accumulated in the moisture separator and disposing of fluids in a 55-gallon drum as investigation derived waste (IDW);

Collecting groundwater level measurements in select monitoring wells;

Inspecting and cleaning (as needed) the equipment compound;

Inspecting water entrainment and adjustment of VEW wellhead vacuums (if necessary) to minimize water entrainment; and Performing periodic equipment maintenance activities.

Vacuum measurements will be collected at each of the system vacuum gauges during each O&M visit and select VEWs, MAGS wells, and MW wells. The vacuum monitoring data will be used to assess the actual vacuum ROI at the Site. The system will be adjusted to optimize the mass recovery rates through active and passive operations of VEWs. The monthly system O&M activities will be documented in a site-specific O&M log.

Soil Vapor Sampling Upon SVE system restart, Geosyntec will collect samples from the influent, VEW003, and VEW004. Thereafter, influent samples will be collected on a quarterly basis. Air samples will be collected in a Summa cannister and analyzed by a fixed-based, certified laboratory by United

States Environmental Protection Agency (EPA) Method TO-15. Additional soil vapor samples from the VEWs may be collected on an as needed basis, following discussion with FDEP.

IDW Generation IDW assumed to be generated includes purge water collected during groundwater sampling event, moisture captured in the SVE system moisture separator, and the previously utilized granular activated carbon (GAC). Subcontractor bids for IDW transport and disposal are included in Attachment C.

SVE System O&M Status Reporting Monthly Email Summaries and Semi-Annual Reports (i.e., following Month 6 and Month 12) will be prepared to document O&M activities. The O&M reports will include the following:

O&M activities performed during the reporting period;

Calculated mass of VOHs removed by the SVE system during the reporting period, and cumulative total removed since startup;

SVE system hours of operation during the reporting period;

Information regarding the depth-to-groundwater (in summary table form with one set of representative data depicted graphically);

Information regarding any repairs and/or modifications made to the SVE system;

Vacuum radius of influence data (in summary table form with one set of representative data depicted graphically and

Results of laboratory analyses of air samples (System Restart, Months 3, 6, 9, and 12) and groundwater monitoring well samples in tabular and graphical form;

Recommendations pertaining to the continued operation and/or optimization of the SVE system (including cycling VEWs as active or passive).

Utilities Monthly electrical utility bills have been estimated at $350 per month.

Subtask 1 – Project Management

Subtask 2 – SVE System Restart and Groundwater Monitoring

This subtask includes restart of the SVE system and an annual groundwater monitoring event, as discussed during the 29 April 2025 annual site review meeting. Seven groundwater samples will be collected from the monitoring wells outlined above, and three vapor samples (influent, VEW03, and VEW04) will be sampled, as described above. Nick Barnes will assume responsibilities as the FL Professional Engineer and Project Manager; Nick will mobilize to the Site to conduct the SVE restart activities with a local field staff member who will be onsite to conduct groundwater sampling. The cost for the annual telemetry service fee from the equipment manufacturer, PRM Filtration, is included in this Subtask.

Subtask 3 – Quarter 1 (Month 1 to Month 3) O&M

This subtask includes costs for three months of O&M, including influent air sampling during Month 3 event.

Subtask 4 – Quarter 2 (Month 4 to 6) O&M and Reporting

This subtask includes costs for three months of O&M, including air sampling during Month 6, and the submittal of a Semi-Annual O&M Report that will include evaluation of the groundwater monitoring data generated during Subtask 1.

Subtask 5 – Quarter 3 (Month 7 to 9) O&M

This subtask includes costs for three months of O&M, including air sampling during Month 9, with monthly email summaries to FDEP.

Subtask 6 – Quarter 4 (Month 10 to 12) O&M and Reporting

This subtask includes costs for three months of O&M, including air sampling. This subtask also includes the submittal of an Annual O&M Report with final IDW manifests.

Subtask 7 – Utilities

This subtask includes estimated costs associated with electrical utility fees for 12 months of system operation.

Invoice and Deliverable Schedule

The proposed invoice and deliverable schedule is as follows, assuming TA approval by July 1, 2025, and Month 1 is August 2025:

Colonial TOC Cleaners (ERIC_5222) HW683 SOW_ O&M_rev062425

Subtask Deliverable Deliverable Due Date Invoice Amount

2 System Restart and Groundwater Monitoring Field Deliverable August 27, 2025 $13,440.61

3 Month 2 and 3 O&M Summary Email November 25, 2025 $8,775.90

4 Month 4, 5, and 6 O&M Summary Email and Semi-Annual O&M Report February 26, 2026 $12,123.76

5 Month 7, 8, and 9 O&M Summary Email May 28, 2026 $8,775.90

6, 1 Month 10, 11, and 12 Summary Email and Annual O&M Report September 17, 2026 $17,711.61

7 Utility Invoices and Handling Fees (Months 1 – 12) September 17, 2026 $4,440.00

Total: $65,267.78 The above schedule assumes that system re-start occurs by August 2025.

CLOSURE

We appreciate the opportunity to assist FDEP with this project. Please review and contact us if you have any questions or require additional information.

Sincerely, Nicholas S. Barnes, P.E. (FL) Todd K. Kafka, P.G. (FL)

Project Engineer Senior Principal Hydrogeologist

Attachments: Attachment A – CEF-LOE Attachment B – Figure Attachment C – Subcontractor Quotes

ATTACHMENT A

Cost Estimate Form and Level of Effort

ATTACHMENT B

Figure

MW007

MW005

MW003

MW006

MW004

MW001

MW002

2.7

MW009

MW008

Summary of Monitoring Well CVOC Results

Colonial/ Touch of Class Cleaners Site 4552 Lake Worth Road, Lake Worth, FL

FDEP ID # ERIC_5222

Figure

Boca Raton, FL November 2023

15 0 157.5 Feet

Notes:

1. Screen intervals are presented in feet below land surface (ft bls).

2. Results are presented in micrograms per liter (μg/L).

3. Detections are shown in bold text.

4. U indicates not detected above laboratory method detection limit (MDL).

5. I indicates estimated value between MDL and reporting limit.

6. J3 indicates estimated value. Spike recovery or RPD outside of criteria

7. DUP indicates a sample duplicate.

8. NT indicates not tested.

9. Yellow highlighted values indicate an exceedance of the Groundwater Cleanup Target Level (GCTL) per Chapter 62-777 Florida Administrative

Code (FAC).

10. Orange highlighted values indicate an exceedance of the Natural Attenuation Default Criteria (NADC) per Chapter 62-777 FAC.

11. Blue highlighted values indicate not detected, however, the reporting limit exceeds the GCTL.

12. Purple highlighted values indicate not detected, however, the reporting limit exceeds the NADC.

13. Aerial Source: Nearmap, HERE; captured 1 May 2023.

Legend

Shallow Monitoring Well Location

Deep Monitoring Well Location

PCE GCTL Isopleth, g/L

PCE NADC Isopleth, g/L

TCE GCTL Isopleth, g/L

Approximate Location of Potable Water Line

Approximate Location of Sanitary Sewer Line

Former Colonial Touch of Class Cleaners

Date PCE TCE cDCE tDCE 1,1-DCE VC CM 1/16/2019 0.50 U 0.61 U 0.32 U 0.39 U 0.26 U 0.26 U 0.32 U 11/10/2020 0.50 U 0.61 U 0.32 U 0.39 U 0.26 U 0.26 U 0.76 U

12/14/2021 0.29 U J3 0.61 U 0.32 U 0.39 U NT 0.26 U NT

12/15/2022 0.50 U 0.50 U 0.50 U 0.50 U 0.50 U 0.50 U 1.0 U

MW005 (10-20)

Date PCE TCE cDCE tDCE 1,1-DCE VC CM 1/16/2019 0.50 U 0.61 U 0.32 U 0.39 U 0.26 U 0.26 U 0.32 U 11/10/2020 0.50 U 0.61 U 0.32 U 0.39 U 0.26 U 0.26 U 0.76 U

11/10/2020 (DUP) 0.50 U 0.61 U 0.32 U 0.39 U 0.26 U 0.26 U 0.76 U

12/14/2021 0.29 U J3 0.61 U 0.32 U 0.39 U NT 0.26 U NT

12/15/2022 0.50 U 0.50 U 0.50 U 0.50 U 0.50 U 0.50 U 1.0 U

MW004 (10-20)

Date PCE TCE cDCE tDCE 1,1-DCE VC CM 1/15/2019 0.50 U 0.61 U 0.65 I 0.39 U 0.26 U 0.26 U 0.32 U 11/10/2020 0.50 U 0.61 U 1.1 0.39 U 0.26 U 0.26 U 0.76 U

12/14/2021 0.29 U J3 0.61 U 1.8 0.39 U NT 0.26 U NT

12/15/2022 0.50 U 0.50 U 1.7 0.50 U 0.50 U 0.50 U 1.0 U

MW006 (45-50)

Date PCE TCE cDCE tDCE 1,1-DCE VC CM 1/16/2019 0.50 U 0.61 U 0.69 I 0.39 U 0.26 U 0.26 U 0.32 U 11/10/2020 0.50 U 0.61 U 0.32 U 0.39 U 0.26 U 0.26 U 0.76 U

12/14/2021 0.29 U J3 0.61 U 0.32 U 0.39 U NT 0.26 U NT

12/15/2022 0.50 U 0.50 U 0.50 U 0.50 U 0.50 U 0.50 U 1.0 U

MW007 (10-20)

Date PCE TCE cDCE tDCE 1,1-DCE VC CM 1/15/2019 0.50 U 0.61 U 2.2 0.39 U 0.26 U 0.26 U 0.32 U 11/10/2020 0.50 U 6.9 290 3.0 0.60 I 0.26 U 0.76 U

6/11/2021 0.29 U 0.61 U 43 0.55 I NT 0.26 U 0.76 U

12/14/2021 0.29 U J3 0.61 U 28 0.40 I NT 0.26 U NT

12/15/2022 0.50 U 0.50 U 0.50 U 0.50 U 0.50 U 0.50 U 1.0 U

MW003 (10-20)

Constituent Abbreviation GCTL NADC Tetrachloroethene PCE 3 300 Trichloroethene TCE 3 300 cis-1,2-dichloroethene cDCE 70 700 trans-1,2-dichloroethene tDCE 100 1,000 1,1-dichloroethene 1,1-DCE 7 70 Vinyl chloride VC 1 100 Chloromethane CM 2.7 270

Screening Criteria

Date PCE TCE cDCE tDCE 1,1-DCE VC CM 1/15/2019 0.50 U 0.61 U 56 0.51 I 0.26 U 0.26 U 0.32 U 11/10/2020 0.50 U 0.61 U 4.2 0.39 U 0.26 U 0.26 U 0.76 U

6/11/2021 0.29 U 0.61 U 7.9 0.39 U NT 0.26 U NT

12/14/2021 0.29 U J3 0.61 U 4.7 0.39 U NT 0.26 U NT

7/6/2022 0.29 U 0.61 U 3.6 0.39 U 0.26 U 0.26 U 0.76 U

12/15/2022 0.50 U 0.50 U 1.7 0.50 U 0.50 U 0.50 U 4.3 6/16/2023 0.76 U 0.89 U 2.1 0.73 U 0.94 U 0.71 U 0.82 U

MW002 (10-20)

Date PCE TCE cDCE tDCE 1,1-DCE VC CM 1/17/2019 500 340 75 2.3 I 0.52 U 0.51 U 0.64 U 11/10/2020 10,000 2,800 420 17 I 6.5 U 6.4 U 19 U

6/11/2021 32,000 6,500 1000 240 I NT 130 U NT

9/22/2021 50,000 5,300 1000 I 780 U NT 510 U NT

12/14/2021 5,200 J3 2,000 J3 720 130 I NT 26 U NT

7/6/2022 17,000 J3 3,500 980 210 I 130 U 130 U 380 U

12/15/2022 33,000 3,900 1000 U 1000 U 1000 U 1000 U 2000 U 6/16/2023 20,000 3,200 1,000 370 U 470 U 360 U 410 U

10/18/2023 5,700 1,400 500 95 24 U 0.71 U NT

MW001 (5-15)

Date PCE TCE cDCE tDCE 1,1-DCE VC CM

10/18/2023 0.76 U 0.89 U 0.62 I 0.73 U 0.94 U 0.71 U NT

MW008 (5-15)

Date PCE TCE cDCE tDCE 1,1-DCE VC CM

10/16/2023 0.76 U 0.89 U 9.3 1.8 0.94 U 0.71 U NT

MW009 (5-15)

ATTACHMENT C

Subcontractor Quotes

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562 (850) 292-6511

To: Mr. Nicholas Barnes Geosyntec Consultants, Inc.

12802 Tampa Oaks Boulevard, Suite 151 Tampa, FL 33637

April 15, 2025

Re: Non-Hazardous Drum Disposal of PFOS/PFAS Impacted Materials

Mr. Barnes:

The price for the transportation and disposal (T&D) of 55-gallon drums of non-hazardous soil, mud, and water is listed below:

Impacted with Non-Hazardous Petroleum or Chlorinated Solvents:

Description Rate Unit T&D - Non-Haz Soil $ 110.00 Per Drum T&D - Non-Haz Mud/Water $ 125.00 Per Drum

Impacted with Non-Hazardous PFAS/PFOS:

Description Rate Unit Profile Fee (Charged once per site) $ 350.00 Per Site T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum

Dry cleaning sites will require 8260-VOH lab analysis and PFAS sites will require the full FDEP lab analysis for IDW waste characterization.

This quote is valid for 120 days.

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: Robert@ErwinRemediation.com Office: (850) 466-2358

: 2025FC0101

: 1/1/2025

Jeff Maylon/ Office Manager

From: Jeff Maylon To: Olivia Cain; Amanda Kimball Subject: RE: Request for Quote (WRI/Moran) - 2025 IDW Pricing for FDEP Sites Date: Tuesday, January 14, 2025 10:46:24 AM Attachments: image005.png image006.png image007.png image008.png image009.png image010.png

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."

Good morning Olivia, We only accept non-hazardous waste for disposal at our facility. We do offer transportation of PFAS contaminated waste for disposal at the Waste Management Emelle AL facility.

Respectfully, Jeffrey Maylon Office Manager Water Recovery, LLC

Office: 904.475.9320 WRIJax.com

PERFORMANCE | CAPABILITIES | CULTURE

CONFIDENTIAL NOTICE: This document is for the sole purpose of the intended recipient(s) and may contain confidential and/or privileged information. Any unauthorized review, use, disclosure, or distribution is prohibited. If you are not the intended recipient, please contact the sender and destroy all copies of the original document.

Please consider the environment before printing this email

From: Olivia Cain <OCain@Geosyntec.com> Sent: Tuesday, January 14, 2025 10:42 AM To: Amanda Kimball <akimball@wrijax.com> Cc: Jeff Maylon <jmaylon@wrijax.com> Subject: RE: Request for Quote (WRI/Moran) - 2025 IDW Pricing for FDEP Sites

Good morning! I wanted to follow up on my question from last week.

Olivia B. Cain, P.E. (FL) Project Engineer Geosyntec Consultants, Inc.

Clearwater, FL Pronouns: she/her

You don't often get email from ian.shirely@prmfiltration.com. Learn why this is important

From: Ian Shirely To: Nick Barnes Subject: Re: Colonial Dry Cleaner Boca Raton SVE Skid WO 6207 Telemetry Date: Tuesday, May 27, 2025 2:15:55 PM Attachments: image004.png image005.png

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."

Nick, That is the final amount. Not a problem I will be available for any support when you are ready.

On Tue, May 27, 2025 at 2:09 PM Nick Barnes <Nick.Barnes@geosyntec.com> wrote:

Thanks Ian, we aren’t ready yet, but I’ll let you know when we are.

Are there any taxes/fees in addition to the costs below, or is that the final amount?

Thanks, Nick

From: Ian Shirely <ian.shirely@prmfiltration.com> Sent: Tuesday, May 27, 2025 2:04 PM To: Nick Barnes <Nick.Barnes@geosyntec.com> Cc: bruce.baize@prmfiltration.com; Micah Findeisen <micah.findeisen@prmfiltration.com> Subject: Re: Colonial Dry Cleaner Boca Raton SVE Skid WO 6207 Telemetry

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."

Nick, For your needs, I'd recommend the 200MB per month plan. It should be sufficient for basic alarm notifications and system status updates.

Let me know if you'd like me to get that set up for you.

Thanks, Ian Shirely Technical Support Representative Product Recovery Management, Inc.

direct: (984) 317-0077 main: (888) 873-2848 support: Click here for immediate support [https://forms.gle/iq6CvK7x8MJZQdVn9](https://forms.gle/iq6CvK7x8MJZQdVn9) eComm: shop.prmfiltration.com website: [www.prmfiltration.com](https://www.prmfiltration.com) email: ian.shirely@prmfiltration.com

On Tue, May 27, 2025 at 1:48 PM Nick Barnes <Nick.Barnes@geosyntec.com> wrote:

Thanks Ian.

What would you recommend regarding the options below? I won’t need to frequently use the telemetry or make any adjustments remotely, I’ll just want to get notifications if the system goes down/has an alarm condition, etc.

Thanks, Nick

Nicholas S. Barnes, PE (FL)

Project Engineer

You don't often get email from ian.shirely@prmfiltration.com. Learn why this is important

12802 Tampa Oaks Blvd, Suite 151

Tampa, FL 33637

Mobile: 813-557-1165

Direct: 813-379-4388 www.geosyntec.com

From: Ian Shirely <ian.shirely@prmfiltration.com> Sent: Friday, May 23, 2025 11:33 AM To: bruce.baize@prmfiltration.com Cc: Nick Barnes <Nick.Barnes@geosyntec.com>; Micah Findeisen <micah.findeisen@prmfiltration.com> Subject: Re: Colonial Dry Cleaner Boca Raton SVE Skid WO 6207 Telemetry

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."

Nick, I would be happy to get you pricing for plans. All of our plans would be billed out annually. Below is a short list of the most frequently used plans all based on usage:

200MB per month: $1350.00 yr 500MB per month: $1400.00 yr 1GB per month: $1475.00 yr

Please feel free to reach out to me with any questions. I have attached the sheet to walk you through accounts setup and the process to claim your device. Your device's claim code is still 6207.

200MB per month: $1350.00 yr

On Fri, May 23, 2025 at 11:26 AM <bruce.baize@prmfiltration.com> wrote:

Hello Nick, James is no longer with PRM. I have copied Ian, he can help with telemetry.

Bruce Baize National Account Manager Product Recovery Management, Inc.

mobile: (941) 400-6151 main: (888) 873-2848 support: Click here for immediate support address: 200 20th Street Butner, NC 27509 eComm: shop.prmfiltration.com website: www.prmfiltration.com email: bruce.baize@prmfiltration.com

This message (including any attachments) is intended only for the use of the individual or entity to which it is addressed and may contain information that is non-public, proprietary, privileged, confidential, and exempt from disclosure under applicable law or may constitute an attorney work product. If you are not the intended recipient, you are hereby notified that any use, dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, notify us immediately by telephone and (i) destroy this message if a facsimile or (ii) delete this message immediately if this is an electronic communication.

Product Recovery Management, Incorporated is a North Carolina Corporation. Your acceptance and responding communications acknowledge that you are doing business with a North Carolina Corporation. PRM may operate under the Trade Names of Product Recovery Management, Inc., PRM, PRM Filtration, LMS Remediation, Spartox, Falmouth Products, Falco, PRMDetect, MagStrainer, Nema-7.com, PRM Carbon Services, BagFilters.com, Triangle Stainless, or PD-Blowers.com.

Please consider the environment before printing this email.

File details come from the government source that posted it. Updated .