This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Geosyntec Consultants, Inc. under Contract Number HW683. The task assignment is identified as TA BF04A and pertains to environmental assessment work at the Former Ruck's Park Brownfield Site located at 13760-13780 NE 5th Avenue, North Miami, Miami-Dade County, Florida. The project site is designated as Site ID ERIC_17896 and is under a Brownfield Site Rehabilitation Agreement with the City of North Miami and Miami-Dade County Division of Environmental Resources Management. The services are being funded through federal funds from the State and Tribal Response Program (SRP) cooperative agreement administered by FDEP on behalf of the U.S. Environmental Protection Agency.

The scope of work consists of two subtasks: Project Management ($909.60) and preparation of a Quality Assurance Project Plan (QAPP) and Health and Safety Plan (HASP) ($6,996.80) for contamination delineation at the site, with a total task assignment value of $7,906.40. The deliverable is due February 7, 2025. Geosyntec will prepare these documents in accordance with the cost proposal and level of effort submitted on November 25, 2024, and the QAPP will detail necessary quality assurance and quality control procedures and sampling protocols, while the site-specific HASP will identify task-specific hazards, hazard controls, and safety requirements for field-related activities. The department project manager is Megan Johnson (850.245.8994), and the contractor's project manager is Shekhar Melkote, P.G. (570.575.2631).

View the file

Other files

File Type Posted
CN-370000-HW683-BF01A.pdf PDF
CN-370000-HW683-BF01B.pdf PDF
CN-370000-HW683-BF02A.pdf PDF
CN-370000-HW683-BF02ACO2.pdf PDF
CN-370000-HW683-BF04BCO1.pdf PDF
CN-370000-HW683-BF2BCO1.pdf PDF
CN-370000-HW683-BIL01A.pdf PDF
CN-370000-HW683-CSS02.pdf PDF
CN-370000-HW683-CSS02A.pdf PDF
CN-370000-HW683-DC002F.pdf PDF
CN-370000-HW683-DC004B.pdf PDF
CN-370000-HW683-DC004E.pdf PDF
CN-370000-HW683-DC005D.pdf PDF
CN-370000-HW683-DC005E.pdf PDF
CN-370000-HW683-DC007A.pdf PDF
CN-370000-HW683-DC007B.pdf PDF
CN-370000-HW683-DC008A.pdf PDF
CN-370000-HW683-DC008B.pdf PDF
CN-370000-HW683-DC008D.pdf PDF
CN-370000-HW683-DC009A.pdf PDF
CN-370000-HW683-DC009B.pdf PDF
CN-370000-HW683-DC009G.pdf PDF
CN-370000-HW683-DC010C.pdf PDF
CN-370000-HW683-DC011B.pdf PDF
CN-370000-HW683-DC011C.pdf PDF
CN-370000-HW683-DC011D.pdf PDF
CN-370000-HW683-DC012B.pdf PDF
CN-370000-HW683-DC016B.pdf PDF
CN-370000-HW683-DC017A.pdf PDF
CN-370000-HW683-DC018B.pdf PDF
CN-370000-HW683-DC019A.pdf PDF
CN-370000-HW683-DC019B.pdf PDF
CN-370000-HW683-DC019C.pdf PDF
CN-370000-HW683-DC019D.pdf PDF
CN-370000-HW683-DC01ACO1.pdf PDF
CN-370000-HW683-DC025B.pdf PDF
CN-370000-HW683-DC026B.pdf PDF
CN-370000-HW683-DC029A.pdf PDF
CN-370000-HW683-DC029E.pdf PDF
CN-370000-HW683-DC02ACO1.pdf PDF
CN-370000-HW683-DC02E.pdf PDF
CN-370000-HW683-DC031C.pdf PDF
CN-370000-HW683-DC032A.pdf PDF
CN-370000-HW683-DC032C.pdf PDF
CN-370000-HW683-DC035A.pdf PDF
CN-370000-HW683-DC036B.pdf PDF
CN-370000-HW683-DC037B.pdf PDF
CN-370000-HW683-DC038A.pdf PDF
CN-370000-HW683-DC039A.pdf PDF
CN-370000-HW683-DC039B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW683

BF04A March 14, 2025

Geosyntec will prepare a QAPP and HASP in accordance with the cost proposal and

Level of Effort (LOE) submitted to the Department on November 25, 2024.

Megan Johnson 850.245.8994 Geosyntec Consultants

Shekhar Melkote, P.G. 570.575.2631

ERIC_17896

13760-13780 NE 5th Avenue, North Miami, Miami-Dade County

Former Ruck's Park

$ 7,906.40

$ 7,906.40

Scope of Work

Geosyntec Consultants

Joseph Applegate, P.G.

Sr. Principal Hydrogeologist

Joseph Applegate Digitally signed by Joseph Applegate Date: 2024.12.05 14:39:04 -05'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2024.12.05 13:09:55 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Alexis A. Lambert Secretary

Memorandum

TO: Geosyntec Consultants, Inc. HW683 Contract File

FROM: Megan Johnson, Contract Manager

DATE: December 5, 2024

SUBJECT: Negotiation Summary – SRP28, Task Assignment (TA) BF04A Former Ruck’s Park - Site ID #: ERIC_17896 QAPP and HASP

This TA is for preparing a Quality Assurance Project Plan (QAPP) and Health and Safety Plan (HASP) for the Former Ruck’s Park Brownfield Site, located at 13760-13780 NE 5th

Avenue, North Miami, Miami-Dade County. The services under this task are being conducted using federal funds from the State & Tribal Response Program (SRP) cooperative agreement that is administered by the Department on behalf of the U.S.

Environmental Protection Agency (EPA).

Subtask 1: Project Management This subtask is a percentage of the overall project and has been negotiated as a contract rate. It includes project management, overhead, general, administrative, and fringe costs.

The agreed upon cost of this subtask is $909.60.

Subtask 2: QAPP and HASP Under this subtask, Geosyntec will prepare a QAPP and HASP for contamination delineation at the project site. The QAPP will describe in comprehensive detail the necessary quality assurance, quality control, sampling procedures, and other technical activities that must be implemented to ensure that the results of the work performed will satisfy the stated performance criteria. The site-specific HASP will include a task-specific health and safety analysis to identify task-specific hazards, hazard controls, and monitoring and safety requirements for field related activities at the site. The agreed upon cost of this subtask is $6,996.80.

Summary The Department’s SRP Contract Manager and Geosyntec’s Contract Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $7,906.40. Documentation of these costs is included in the Cost Proposal/Level of Effort (CP/LOE) Form and CP/LOE narrative provided by Geosyntec on November 25, 2024, and the TA Form for BF04A prepared by the Department. The final deliverable for this TA must be received by the Department no later than February 7, 2025.

2039 Centre Pointe Blvd, Suite 301 Tallahassee, Florida 32308

PH 850-765-9312

www.geosyntec.com

Fmr Rucks Park Brownfield Site QAPP+HASP 1

25 November 2024

Ms. Megan Johnson, Project Manager Mr. Scott L. Sweeney, Environmental Manager Brownfields and CERCLA Site Screening Division of Waste Management Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400

Subject: Cost Proposal for Preparing a Quality Assurance Project Plan and Health and Safety

Plan for the Former Rucks Park Brownfield Site, 13760-13780 NE 5th Avenue, North Miami, Florida 33168.

Brownfield ID #1314003001 DERM Facility ID No. IW5-8624/File-8022

Dear Ms. Johnson and Mr. Sweeney:

Geosyntec Consultants, Inc. (Geosyntec) is pleased to submit this proposal and Cost Estimate/Level of Effort (CEF/LOE) for preparing a Quality Assurance Project Plan (QAPP) and Health and Safety Plan (HASP) for the Former Rucks Park Brownfield Site in North Miami, Florida (the “Site”). The Site is currently under a Brownfield Site Rehabilitation Agreement (BSRA) with the City of North Miami and Miami-Dade County Division of Environmental Resources (DERM). The property was recently transferred to Magellan Housing for redevelopment into affordable housing and green space. As per the BSRA, the new owner shall assume all the obligations of completing the environmental assessment and remedial actions necessary for redevelopment.

BACKGROUND

The Site consists of approximately six acres of land formerly occupied by the Rucks Wastewater Treatment Plant and is bounded to the north by NE 139th Street, to the south by NE 137th Street, to the west by NE 4th Avenue and adjacent residences and to the east by NE 5th Avenue in North Miami, Florida (Figure 1).

As per the BSRA, the Site is divided into specific areas based upon historic land uses:

• Sludge Area

• Street Sweeping Area

• Nursery Area

• Underground Storage Tank (UST) Area

Ms. Johnson and Mr. Sweeney 25 November 2025

Fmr Rucks Park Brownfield Site QAPP+HASP

There are also other offsite areas identified as Miami-Dade County (MDC) Stormwater Pump Station to the west that have been in included in the assessment efforts.

Previous assessments identified pesticides, petroleum and other chemicals of concern [COCs) including Arsenic, Dieldrin, Lead, Benzo(a)pyrene (BaP), and Ammonia that exceed the applicable Soil Cleanup Target Level (SCTL) and/or the Groundwater Cleanup Target Level (GCTL) per Chapter 62-780, F.A.C.

Total and fecal coliforms have also been detected historically in groundwater exceeding the DERM criteria.

COCs have been found offsite, primarily on properties west of the Site, including the MDC Stormwater Pump Station, residential homes, and roadways. Soil and groundwater contamination along the western boundary and offsite to the west requires further delineation and remediation as part of redevelopment.

The QAPP will detail the soil and groundwater sampling required to define the extent of contamination and outline the specific procedures, standards, and quality control measures for the site assessment, while the HASP will address worker and public safety during the investigation.

The associated scope of work consists of the following tasks:

Subtask 1 – Project Management

This subtask includes effort for overall Project Management.

Subtask 2 – QAPP and HASP

Under this subtask, Geosyntec will prepare a QAPP and HASP for contamination delineation at the Site.

The QAPP will describe in comprehensive detail the necessary quality assurance (QA), quality control (QC), sampling procedures and other technical activities that must be implemented to ensure that the results of the work performed will satisfy the stated performance criteria. The site-specific HASP will include a task-specific health and safety analysis to identify task-specific hazards, hazard controls, and monitoring and safety requirements for field related activities at the Site.

DERM recently (4 November 2024; attached) provided comments on the Site Assessment Report Addendum (SARA; Geosyntec 20241), which will guide the development of the QAPP. The CEF/LOE allocates time and budget for preparing an updated sampling map, encompassing additional soil borings, monitoring wells, and soil and groundwater sampling to complete the contamination delineation. While off-site access agreements may be required, we anticipate addressing this in the subsequent phase, which involves field work and reporting. Additionally, we've scheduled a meeting with Florida Department of Environmental Protection (FDEP), DERM, and Goldstein Environmental Law Firm (GELF) to discuss

1 Geosyntec. 2024. Site Assessment Report Addendum, Former Rucks Park Brownfield Site, 13760 – 13780 NE 5th Avenue, North Miami, Florida, DERM Facility ID IW5-8624/File-8022/Brownfield ID #131403001). 11 October.

Ms. Johnson and Mr. Sweeney 25 November 2025

Fmr Rucks Park Brownfield Site QAPP+HASP this next phase. Our objective is to finalize the site assessment during this phase and promptly transition to remediation, enabling the site's redevelopment as soon as feasible.

Cost Estimate and Schedule:

The cost estimate and level of effort for preparing the QAPP and HASP is presented in attached CEF/LOE forms. The invoicing and deliverable schedule is presented below. The schedule assumes that the project Task Assignment would be issued by 16 December 2024.

Subtask Deliverable Deliverable Due Date Invoice Amount 1+ 2 QAPP and HASP 7 February 2025 $7,90

Total: $7,90

We appreciate the opportunity to conduct this project for the FDEP. Please contact Joe Applegate at

850.556.8419 or Shekhar Melkote at 570.575.2631 if you have any questions.

Sincerely, Joseph L. Applegate, P.G. (FL) Shekhar Melkote, P.G. (FL) Sr. Principal Hydrogeologist Senior Consultant

Attachment(s): CEF/LOE Form Figure 1: Site Layout DERM Review Letter (4 November 2024)

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 11/25/2024

Task #: HW683 SubTask 1 Project Management SubTask 6

Site: SubTask 2 QAPP & HASP SubTask 7

Activity/Phase: QAPP and HASP SubTask 3 SubTask 8

Project Manager: Shekhar Melkote SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Labor Rate Category $72.18 Project Manager S. Melkote 4 4.2 $84.13 Principal J. Applegate 6 6 0 0 0 0 0 0 0 0 $72.18 Senior Consultant S. Melkote 20 20 0 0 0 0 0 0 0 0 $32.00 Staff Professional V. Covington 3 3 0 0 0 0 0 0 0 0 $54.57 Project Professional M. Hensley 4 4 0 0 0 0 0 0 0 0 $34.92 Administrative Assistant T. Hampton 2 2 0 0 0 0 0 0 0 0

Total Hours 39 4 35 0 0 0 0 0 0 0 0

Direct Labor $2,635.73 $303.23 $2,332.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $4,551.91 $523.68 $4,028.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $7,187.64 $826.91 $6,360.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $7,187.64 $826.91 $6,360.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Completion Fee $718.76 $82.69 $636.07 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost 7,906.40$ 909.60$ 6,996.80$ -$ -$ -$ -$ -$ -$ -$ -$

Former Rucks Park Brownfield Site, North Miami, Florida

Cost Estimate Page 1 of 2 Cost Estimate

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Former Rucks Park Brownfield Site, North Miami, Florida

SUBTASK: QAPP & HASP

DATE: 11/25/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal J. Applegate 6

Senior Consultant S. Melkote 20

Staff Professional V. Covington 3

Project Professional

M. Hensley 4

Administrative Assistant T. Hampton 2

TOTAL LABOR 35

Prepare Health and Safety Plan

Editing and Figure Preparation QAPP (3 hrs); HASP (1 hr)

QAPP/HASP Formatting (2 hr)

Technical Review and Oversight of QAPP (5 hrs) and HASP (1hr). Meeting(s).

Prepare Quality Assurance Project Plan (QAPP) (20 hrs). Meeting(s).

12/5/2024 Page 2 of 2 Subtask 2