This Task Assignment (TA) is entered into between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants, Inc. (Contractor) pursuant to Contract Number HW683. The Task Assignment Number is DC050B, with a completion date of March 2, 2026. The FDEP Project Manager is Sarah Aduwa (850-245-8973), and the Contractor's Project Manager is Austin Kelly (904-450-4288). The project location is Koastal Kleaners, situated at 14286 Beach Boulevard, Unit 28, Jacksonville Beach, Duval County, Florida 32250, with project number ERIC 4520.

Geosyntec will conduct annual groundwater monitoring at the Koastal Kleaners site in accordance with Geosyntec's scope of work, cost estimate, and schedule received on September 29, 2025. The work consists of four subtasks: Subtask 1 (Project Management), Subtask 2 (Groundwater Monitoring—collection of six groundwater samples from monitoring wells MW001 through MW006, depth to water measurements, and analysis for volatile organic halocarbons via EPA Method 8260B), Subtask 3 (preparation of an Annual Groundwater Monitoring Report), and Subtask 4 (PFAS groundwater screening activities from three monitoring wells—MW001, MW005, and MW003). The total TA value is $9,794.46 on a fixed unit rate basis, with 57 labor hours allocated. Payment is structured by deliverable: Subtask 2 field notes and IDW manifest due November 14, 2025 ($3,733.07); Subtasks 1 and 3 Groundwater Monitoring Report due December 19, 2025 ($4,383.38); and Subtask 4 email with table, figure, field forms, and certified lab report due November 14, 2025 ($1,678.01). The agreement requires compliance with the underlying Contract HW683 and the Scope of Work attachment.

View the file

Other files

File Type Posted
CN-370000-HW683-BF01A.pdf PDF
CN-370000-HW683-BF01B.pdf PDF
CN-370000-HW683-BF02A.pdf PDF
CN-370000-HW683-BF02ACO2.pdf PDF
CN-370000-HW683-BF04A.pdf PDF
CN-370000-HW683-BF04BCO1.pdf PDF
CN-370000-HW683-BF2BCO1.pdf PDF
CN-370000-HW683-BIL01A.pdf PDF
CN-370000-HW683-CSS02.pdf PDF
CN-370000-HW683-CSS02A.pdf PDF
CN-370000-HW683-DC002F.pdf PDF
CN-370000-HW683-DC004B.pdf PDF
CN-370000-HW683-DC004E.pdf PDF
CN-370000-HW683-DC005D.pdf PDF
CN-370000-HW683-DC005E.pdf PDF
CN-370000-HW683-DC007A.pdf PDF
CN-370000-HW683-DC007B.pdf PDF
CN-370000-HW683-DC008A.pdf PDF
CN-370000-HW683-DC008B.pdf PDF
CN-370000-HW683-DC008D.pdf PDF
CN-370000-HW683-DC009A.pdf PDF
CN-370000-HW683-DC009B.pdf PDF
CN-370000-HW683-DC009G.pdf PDF
CN-370000-HW683-DC010C.pdf PDF
CN-370000-HW683-DC011B.pdf PDF
CN-370000-HW683-DC011C.pdf PDF
CN-370000-HW683-DC011D.pdf PDF
CN-370000-HW683-DC012B.pdf PDF
CN-370000-HW683-DC016B.pdf PDF
CN-370000-HW683-DC017A.pdf PDF
CN-370000-HW683-DC018B.pdf PDF
CN-370000-HW683-DC019A.pdf PDF
CN-370000-HW683-DC019B.pdf PDF
CN-370000-HW683-DC019C.pdf PDF
CN-370000-HW683-DC019D.pdf PDF
CN-370000-HW683-DC01ACO1.pdf PDF
CN-370000-HW683-DC025B.pdf PDF
CN-370000-HW683-DC026B.pdf PDF
CN-370000-HW683-DC029A.pdf PDF
CN-370000-HW683-DC029E.pdf PDF
CN-370000-HW683-DC02ACO1.pdf PDF
CN-370000-HW683-DC02E.pdf PDF
CN-370000-HW683-DC031C.pdf PDF
CN-370000-HW683-DC032A.pdf PDF
CN-370000-HW683-DC032C.pdf PDF
CN-370000-HW683-DC035A.pdf PDF
CN-370000-HW683-DC036B.pdf PDF
CN-370000-HW683-DC037B.pdf PDF
CN-370000-HW683-DC038A.pdf PDF
CN-370000-HW683-DC039A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW683

DC050B March 2, 2026

This Task Assignment authorizes Geosyntec to conduct Annual Groundwater

Monitoring at Koastal Kleaners site in accordance Geosyntec’s scope of work, cost estimate and schedule received on September 29, 2025.

Sarah Aduwa 850-245-8973 Geosyntec

Austin Kelly 904-450-4288

ERIC 4520

14286 Beach Boulevard, Unit 28, Jacksonville Beach, Duval County, Florida 32250

Koastal Kleaners

$ 9,794.46

$ 9,794.46

Scope of Work

Geosyntec

Todd Kafka

Contract Manager

Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.

Date: 2025.10.09 09:32:01 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.10.08 16:21:42 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

To: HW683 Contract Negotiation File Koastal Kleaners Jacksonville, Duval County, Florida

ERIC_4520

From: Sarah Aduwa, Project Manager Date: September 30, 2025 Subject: Negotiation Summary

HW683_DC050B

This Task Assignment authorizes Geosyntec to conduct Annual Groundwater Monitoring at Koastal Kleaners site in accordance Geosyntec’s scope of work, cost estimate and schedule received on September 29, 2025.

Austin Kelly is the Project Manager.

Subtask 2 - Geosyntec will collect six (6) groundwater samples from the current monitoring well network per the recommendations in the March 2025 SAR. Depth to water measurements will be collected within a 24-hour period from the monitoring well network. Each of the six monitoring wells (MW001 through MW006) will be conventionally sampled using a peristaltic pump. The six groundwater samples will be analyzed by a fixed-based lab for volatile organic halocarbons (VOHs) by Environmental Protection Agency (EPA) Method 8260B.

Subtask 3 – Geosyntec will prepare an Annual Groundwater Monitoring Report documenting the results of the depth to groundwater measurements and chlorinated solvent concentrations. The report will contain tables summarizing field/laboratory groundwater data, one figure showing groundwater flow direction(s), one groundwater results figure, and a summary of the groundwater monitoring event.

Subtask 4 - Geosyntec will conduct PFAS groundwater screening activities concurrently with those described in Subtask 2, groundwater samples will be collected from the following three monitoring wells – MW001 (interior well), MW005 (downgradient well), and MW003 (farthest downgradient well).

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost is $9,794.46 with 57 labor hours.

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Koastal Kleaners SUBTASK: Groundwater Monitoring

DATE: 9/29/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Professional A. Kelly

Sr. Staff Professional D. McGill

TOTAL LABOR 19

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 Day 1 $120.00 Subtotal $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

$36.00 Day $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

IDW

WRI $125.00 $125.00

Subtotal $125.00

TOTAL SUB $125.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs $73.00 6 0 $438.00 Subtotal $438.00

Shipping Large Cooler (25 to 50 lbs) $150.00 1 $150.00

Subtotal $150.00

TOTAL LAB $588.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Analytical Related Groundwater Sampling Kit $290.00 Day 1 $290.00

Subtotal $290.00 IDW Related

Drum $100.00 Drum 1 $100.00 Subtotal $100.00

Expendables $40.00 Day 1 $40.00

Subtotal $40.00

TOTAL EQUIPMENT $430.00

Property owner and tenant notifications (1 hr). Evaluating and interpreting field data (1 hr).

Prepare field package (1 hr). Review and signature of waste profile and manifest (1 hr)

Field preparation (1 hr). pre and post-sampling equipment calibration (1 hr); Measure water levels in 6 site wells (1 hr). Sample 6 wells @ 1.5 hr/well = 9 hrs. Sample management (1 hr).

IDW Management (1 hr). Prepare field package (1 hr).

9/30/2025 Page 3 of 4 Subtask 2

SUBTASK: Groundwater Monitoring Report

DATE: 9/29/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

T. Kafka 1

Project Professional

A. Kelly 12

Professional C. Saville 4

Senior Staff Professional D. McGill 4

Administrative Assistant

P. Gallagher 1

TOTAL LABOR 22

Compiling and assembling PDF of final report

Develop recommendations and path forward

Preparation of Groundwater Monitoring Report

Groundwater contours and groundwater results figures

Prepare tables, draft contour figures, assemble appendices

9/30/2025 Page 4 of 4 Subtask 3

SUBTASK: PFAS Sampling and Reporting

DATE: 9/29/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal

T. Kafka 1

Senior Professional

S. Wang 2

Project Professional

A. Kelly 2

Professional

C. Saville 2

Senior Staff Professional D. McGill 3

TOTAL LABOR 10

Data evaluation and path forward recommendation

Analytical data import and data management (1 hr); prepare results table (1 hr)

Prepare PFAS summary deliverable

PFAS groundwater results figure

Sample 3 wells for PFAS including additional decon procedures (3 wells @ 0.5 hr/well = 1.5 hrs). IDW management (0.5 hr). Sample management for FDEP lab (1 hr).

10/8/2025 Page 1 of 1 Subtask 4

1200 Riverplace Boulevard, Suite 710 Jacksonville, Florida 32207

PH 904.858.1818

FAX 904.396.1143

www.geosyntec.com

29 September 2025

Ms. Sarah Aduwa Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road Tallahassee, Florida 32399-2400

Subject: Scope of Work and Level of Effort Annual Monitoring

Koastal Kleaners 14286 Beach Boulevard, Unit 28

Jacksonville Beach, Duval County, Florida 32250 FDEP Site ID No. ERIC_4520

Dear Ms. Aduwa, Geosyntec Consultants, Inc. has prepared this Scope of Work (SOW) and Level of Effort (LOE) for annual groundwater monitoring activities at Koastal Kleaners (ERIC_4520, the Site) located in Jacksonville Beach. A copy of the CEF and LOE is provided as Attachment A. Annual volatile organic halocarbon (VOH) monitoring proposed in this SOW is consistent with the recommendations provided in the March 2025 Site Assessment Report (SAR). Additional groundwater monitoring for per- and polyfluoroalkyl substances (PFAS) has also been proposed in this SOW in accordance with the September 2024 guidance provide by the Florida Department of Environmental Protection.

On 6 June 2025, Geosyntec confirmed the Site Access Agreement (SAA) was executed with 286 Beach RMR LLC, on 24 May 2023, as the real property owner of the Koastal Kleaners Site (ERIC_4520) located at the above address. The Duval County Property Appraiser database indicates the property owner since 1 June 2015 is �286 Beach RMR LLC,� and that the property has not changed ownership since then.

Subtask 1 � Project Management

Austin Kelly, Project Geologist, will be the project manager (PM), and his PM hours are directly computed.

Ms. Sarah Aduwa 29 September 2025

Subtask 2 � Groundwater Monitoring

Geosyntec will collect six (6) groundwater samples from the current monitoring well network per the recommendations in the March 2025 SAR; however, surface water sampling recommended in the SAR (to support potential delineation of groundwater to the south) will not be pursued until an additional round of groundwater data is generated and evaluated. Depth to water measurements will be collected within a 24-hour period from the monitoring well network. Each of the six monitoring wells (MW001 through MW006) will be conventionally sampled using a peristaltic pump. The six groundwater samples will be analyzed by a fixed-based lab for volatile organic halocarbons (VOHs) by Environmental Protection Agency (EPA) Method 8260B.

Purge water generated during sampling activities will be placed in a 55-gallon drum and manifested for off-Site disposal. Investigation derived waste (IDW) will be staged in the rear of the facility near the active dumpster. Historical analytical results (VOHs) indicate IDW has been non-hazardous; however, to verify applicability with the current waste profile, Geosyntec proposes the collection of a liquid IDW sample for analysis of PFAS. Geosyntec has assumed disposal of the IDW drum as non-hazardous and non-PFAS impacted; however, if concentrations in the waste profiling sample indicate exceedance of hazardous limits, a change order will be submitted for the additional disposal costs. Bid costs prepared by the waste disposal companies are included in Attachment A.

Subtask 3 - Groundwater Monitoring Report

Geosyntec will prepare an Annual Groundwater Monitoring Report documenting the results of the depth to groundwater measurements and chlorinated solvent concentrations. The report will contain tables summarizing field/laboratory groundwater data, one figure showing groundwater flow direction(s), one groundwater results figure, and a summary of the groundwater monitoring event. The report will be signed and sealed by a Florida-licensed professional geologist. A final signed waste manifest for IDW transport and disposal will also be included in the Groundwater Monitoring Report.

Subtask 4 � PFAS Sampling and Reporting

Geosyntec will conduct PFAS groundwater screening activities concurrently with those described in Subtask 2. These sampling activities are proposed to evaluate for the presence of PFAS in Site groundwater. There are no upgradient monitoring wells at this time and four of the five monitoring wells had GCTL exceedances of at least 1 VOH during the site assessment. Therefore, groundwater samples will be collected from the following three monitoring wells � MW001 (interior well), MW005 (downgradient well), and MW003 (farthest downgradient well).

PFAS samples will be collected using low-flow purging via a peristaltic pump in accordance with draft SOPs for PFAS sampling developed by FDEP and the SOPs for PFAS sampling prepared by Geosyntec for use at FDEP�s Site Investigation Section firefighting training facilities. PFAS free water will used to decontaminate the water level meter between sampling wells.

Geosyntec understands that the FDEP laboratory will analyze the three (3) groundwater samples for PFAS constituents, and the FDEP will ship the sampling kits to Geosyntec. Geosyntec anticipates shipping the samples to the FDEP laboratory upon completion of sampling.

Geosyntec will prepare an email deliverable with attachments including one figure with groundwater analytical results for PFAS (showing PFOA, PFOS, and PFOA + PFOS concentrations for each well sampled and no isoconcentration lines), certified analytical laboratory report, and field forms including equipment calibration logs, groundwater sampling forms, and an IDW drum log. The email deliverable will be submitted to the FDEP within two working days of receipt of the final certified analytical laboratory report from the FDEP laboratory. Geosyntec assumes the final analytical laboratory report will be emailed by the FDEP laboratory to Austin Kelly (austin.kelly@geosyntec.com) after the report is finalized. The email deliverable will be submitted to Sarah Aduwa, and additional FDEP staff will be copied including Mubeen Darji, Benjamin Grubbs, Jen Farrell, and Breck Dalton.

Deliverable and Invoicing Schedule:

Subtask Deliverable Deliverable Due Date

Invoice Amount

Submittal of groundwater sampling field notes and IDW manifest 14 November

$3,733.07

1, 3 Submittal of Groundwater Monitoring Report 19 December

$4,383.38

Submittal of email with 1 table, 1 figure, field forms, and certified lab report 14 November

$1,678.01

Total $9,794.46

As always, it is a pleasure to work with the FDEP. If you require any additional information or have any questions, please contact Austin Kelly at 904.450.4288.

Sincerely, Austin Kelly, P.G.

Project Geologist

Todd K. Kafka, P.G.

Sr. Principal Hydrogeologist

Attachment A � Subcontractor Quotes

1200 Riverplace Boulevard, Suite 710 Jacksonville, Florida 32207

PH 904.858.1818

FAX 904.396.1143

www.geosyntec.com

ATTACHMENT A

SUBCONTRACTOR QUOTES

1 Drum $260.00 1 Drum $125 1 Drum $225 1 Transportation $450 1 Energy/Insurance Fee (20%) $135

Notes The selected subcontractor is highlighted in yellow.

* indicates costing based on no detections of PFAS.

Subcontractor Evaluation: IDW Management*

York Environmental

$260.00 $125.00 $810.00

IDW DISPOSAL

Hulls Erwin Remedation

From: Blaine Dawson <BCDawson@Geosyntec.com> Sent: Thursday, August 7, 2025 11:04 AM To: Larry Hall <lhall@hullsenvironmental.com> Subject: Updated Generic IDW Quote

Good morning Larry, In light of the update you recently provided about LES, I was hoping you might be able to prepare an updated IDW disposal quote (previous version attached) for use as part of future proposals. Please see the below list of scenarios I need updated waste disposal costs for through the remainder of 2025. We will reach out again at the beginning of 2026 for updated rates.

Scenario 1

FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has not been investigated for at the site. $260.00 per drum solid or liquid less than 50 miles- Add $95 per additional 50 miles

Scenario 2

FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the laboratory's method detection limit but is below the current provisional groundwater cleanup target level of 70 ng/L. $915.20 per drum solid or liquid- Transportation per drum/load up to 10 drums- $380.00

Scenario 3

FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the current provisional groundwater cleanup target level of 70 ng/L. $915.20 per drum solid or liquid- Transportation per drum/load up to 10 drums -$380.00

Scenario 4

FDEP PRP site where VOA concentrations are below hazardous levels for both soils and groundwater. $260.00 per drum solid or liquid less than 50 miles- Add $95 per each additional 50 miles

Please let me know if you have any questions or if you need anything else from me to support your efforts on this. If any of the above scenarios requires additional analytical results beyond those described, please let me know so I can include those in the overall cost evaluation. I really appreciate your help with this!

Thank you, Blaine Dawson, PG (FL,TN) Senior Geologist

FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and $260.00 per drum solid orgroundwater, and PFAS has not been investigated for at the site.

liquid less than 50 miles- Add $95 per additional 50 miles

From: Tony Burgess To: Blaine Dawson Subject: Re: IDW Management Quotes Date: Monday, September 22, 2025 2:27:31 PM

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."

Blaine, We went through the scenarios described below.

Please contact me with any additional questions or concerns.

Scenario 1 FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has not been investigated for at the site.

NonHaz - $225.00/55 Liquids/Solids – No PFAS F002 - $625.00/55 Liquids and Solids – No PFAS Scenario 2 FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the laboratory's method detection limit but is below the current provisional groundwater cleanup target level of 70 ng/L.

PFAS only - $625.00/55 Liquids and Solids F002 & PFAS - $7.40/Lb with $625.00/55 Min – Liquids F002 & PFAS - $4.40/Lb with $625.00/55 Min – Solids Scenario 3 FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the current provisional groundwater cleanup target level of 70 ng/L.

PFAS only - $625.00/55 Liquids and Solids F002 & PFAS - $7.40/Lb with $625.00/55 Min – Liquids F002 & PFAS - $4.40/Lb with $625.00/55 Min – Solids Scenario 4 FDEP PRP site where VOA concentrations are below hazardous levels for both soils and groundwater.

NonHaz - $225.00/55 Liquids/Solids – No PFAS F002 - $625.00/55 Liquids and Solids – No PFAS Please add:

Energy/Insurance------------20% (Total Ticket) Transportation----------------$450.00/stop

York Environmental Services PO Box 600532 Jacksonville, FL 32260 Phone: (904) 718-0883 soils and groundwater, and PFAS has not been investigated for at the site.

NonHaz - $225.00/55 Liquids/Solids – No PFAS

Energy/Insurance------------20% (Total Ticket)Energy/Insurance------------20% (Total Ticket) Transportation----------------$450.00/stop

File details come from the government source that posted it. Updated .