Summary of Task Assignment and Scope of Work
This Task Assignment (TA) DC049A is a contract between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants for site assessment activities at the Payless Dry Cleaners facility located at 6718 Hanley Road, Tampa, Hillsborough County, Florida (ERIC 4744). The document establishes a fixed unit rate payment structure with an effective completion date of April 25, 2025, and incorporates by reference a detailed scope of work, cost estimate, and schedule received June 5, 2024.
The total task assignment value is $94,950.69, to be paid on a fixed unit rate basis. Work comprises five subtasks: Subtask 1 involves project management; Subtask 2 includes multi-media sampling (soil, DPT groundwater, and soil vapor) and interior monitoring well installation with a field deliverable due October 30, 2024, invoiced at $55,989.30; Subtask 3 covers exterior monitoring well installation, surveying, and groundwater sampling with deliverables due December 30, 2024, invoiced at $21,731.46; Subtask 4 addresses IDW management and manifest submittal due January 27, 2025, invoiced at $2,032.88; and Subtask 5 involves preparation of a Site Assessment Report complying with Chapter 62-780.600, Florida Administrative Code, due February 27, 2025, invoiced at $15,197.05. The work encompasses 349 total labor hours and utilizes multiple subcontractors including Environmental Drilling Service, Inc., SurvTech Solutions, Site Lines LLC, and Erwin Remediation for specialized services including drilling, surveying, utility locating, and waste disposal.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
HW683
DC049A April 25, 2025
This Task Assignment authorizes Geosyntec to conduct Site Assessment activities at
Payless Dry Cleaners site in accordance with Geosyntec scope of work, cost estimate and schedule received on June 5, 2024.
Sarah Aduwa 850-245-8973 Geosyntec
Nick Barnes 813-557-1165
ERIC 4744
6718 Hanley Road Tampa, Hillsborough County, Florida 33614
Payless Dry Cleaners
$ 94,950.69
$ 94,950.69
Scope of Work
Geosyntec
Todd Kafka
Contract Manager
Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.
Date: 2024.06.25 08:51:46 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.06.24 12:24:35 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
To: HW683 Contract Negotiation File Payless Dry Cleaners Tampa, Hillsborough County, Florida
ERIC_4744
From: Sarah Aduwa, Project Manager Date: June 18, 2024 Subject: Negotiation Summary
HW683_DC049E
This Task Assignment authorizes Geosyntec to conduct Site Assessment activities at Payless Dry Cleaners site in accordance with Geosyntec scope of work, cost estimate and schedule received on June 5, 2024.
Subtask 2 to 4- This includes costs for utility locating, lithology boring, soil sampling, MAGS well installation and testing, DPT groundwater sampling, interior monitoring well installation, field GPS and interior mapping and IDW sampling.
Subtask 5- Following completion of field activities, Geosyntec will proceed with the preparation and submittal of a Site Assessment Report (SAR) documenting assessment activities and summarizing analytical results. This subtask includes costs to generate a SAR that summarizes the analytical results of the assessment activities outlined above and complies with the requirements of Chapter 62-780.600, FAC.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost is $94,950.69 with 349 labor hours.
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Payless Dry Cleaners SUBTASK: Multi-Media Sampling and Interior MW Install
DATE: 6/4/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 4
Project Professional N. Barnes
Project Professional M. Hensley 8
Sr. Staff Professional M. Mohr
Senior Professional S. Wang 10
Sr. Staff Professional A. Ogunkoya
TOTAL LABOR 192
VEHICLE TYPE RATE UNIT USEAGE
Van Ogunkoya $120.00 Day 2 $240.00 Van Ogunkoya $480.00 Week 1 $480.00 Truck Mohr $480.00 Week 1 $480.00 Truck Mohr $120.00 Day 1 $120.00 Truck Barnes $120.00 Day 1 $120.00
Subtotal $1,440.00
TOTAL VEHICLE $1,440.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Drilling (Conventional)
EDS $11,022.00 $11,022.00
$0.00 $0.00 Subtotal $11,022.00
Other SiteLines $800.00 $800.00 Hillsborough County Sheriff's Office $1,706.00 $1,706.00
Subtotal $2,506.00
TOTAL SUB $13,528.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOCs - Soil 8 borings x ~3 samples/boring $110.00 24 0 $2,640.00 VOCs - GW 8 borings x 5 samples/boring $110.00 40 0 $4,400.00 SPLP Prep SPLP (50% of total samples) $55.00 12 0 $660.00 VOCs - SPLP SPLP (50% of total samples) $110.00 12 0 $1,320.00 Percent Moisture 24 soil samples $13.00 24 0 $312.00
TO-15 - GAS 5 MAGS $200.00 5 0 $1,000.00
$0.00 $0.00
Subtotal $10,332.00 Shipping
Large Cooler (25 to 50 lbs) $150.00 6 $900.00 Subtotal $900.00
TOTAL LAB $11,232.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Drilling Related Soil Vapor Sampling Kit $290.00 Day 2 $580.00 Soil Assessment Kit $700.00 Week 1 $700.00 MW Installation Kit $325.00 Day 1 $325.00
Subtotal $1,605.00 Analytical Related
$33.00 Day 5 $165.00 Encore Samplers (SPLP splits) $16.00 Each 24 $384.00
Subtotal $549.00 Expendables
$40.00 Day 7 $280.00 Subtotal $280.00
Other GPS $175.00 Day 1 $175.00 Vacuum Gauges $19.00 Day 2 $38.00 Differential Pressure Gauge $18.00 Day 2 $36.00 Regenerative Blower $180.00 Day 2 $360.00 Air Flow Meter $33.00 Day 2 $66.00 Portable Generator $250.00 Day 2 $500.00
Subtotal $1,175.00
TOTAL EQUIPMENT $3,609.00
Air Sampling Summa Canister (5 canisters)
Evaluating and interpreting field data (2 hr). Prepare for and conduct teleconference with FDEP to discuss soil, MAGS, and DPT groundwater results (2 hr)
Preparation of soil, MAGS, and DPT groundwater results figures
Site Assessment: Field preparation (1 hr). Mobe/demobe (1 hr/day x 5 day = 4 hr). Calibration of instruments (0.5 hr/day x 4 days = 2 hr). Fieldwork: soil, DPT sampling, MAGS well installation, interior MW installation (9 hr x 4 days = 36 hrs). Interior as-built sketch (2 hr). Field GPS of exterior sample locations (4 hr). Prepare field forms documentation (2 hr). MAGS Event:
Mob/demob (2 hr/day x 2 day = 4 hr). MAGS equipment setup (0.5 hr/well x 5 wells = 2.5 hrs).
MAGS testing w/ step test (2 hr/well x 5 wells = 10 hr).MAGS equipment breakdown (1 hr).
Analytical data import and data management (4 hr); prepare soil vapor, DPT GW, and soil data tables (6 hr)
Utility Locating: Mark borings, oversee utility locate, and survey utilities including mobe (8 hr).
Site Assessment: Mobe/demobe (1 hr/day x 4 days = 4 hr). Fieldwork: soil, DPT sampling, MAGS well installation, interior MW installation (9 hr x 4 days = 36 hrs). MAGS Event: Field preparation, including purchasing MAGS supplies and picking up blower (4 hr). Mobe/demobe (2 hr/day x 2 days = 4 hr). MAGS equipment setup (0.5 hr/well x 5 wells = 2.5 hrs). MAGS testing with step test (2 hr/well x 5 wells = 10 hr). MAGS equipment breakdown (1 hr) IDW management (1 hr). Sample management (1 hr). Compile field notes (1 hr)
Property owner and tenant notifications (1 hr). Healthy & Safety Plan and task hazard analysis preparation (3 hr). Mobe/demobe (1 hr/day x 1 day = 1 hr).Site visit for work kickoff and tenant interior work discussion (6 hrs). Evaluating and interpreting field data (1 hr/day x 4 days = 4 hr).
Prepare draft MAGS, DPT groundwater, soil figures (3 hr). MAGS data tables and data evaluation (4 hr). Prepare field deliverable package (3 hr). Prepare for and conduct teleconference with FDEP to discuss soil, MAGS, and DPT groundwater results (2 hr). Prepare
6/18/2024 Page 3 of 6 Subtask 2
SUBTASK: MW Install, GW Sampling, and Surveying
DATE: 6/4/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 1
Project Professional N. Barnes 8
Project Professional M. Hensley 4
Senior Professional S. Wang 5
Staff Professional A. Ogunkoya
TOTAL LABOR 67
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Day 4 $480.00 Subtotal $480.00
TOTAL VEHICLE $480.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
EDS $6,950.00 $6,950.00
$0.00 $0.00
Subtotal $6,950.00 Surveying SurvTech $2,360.00 $2,360.00
Subtotal $2,360.00
Other Hillsborough County Sheriff's Office $196.50 $196.50
$0.00 $0.00 Subtotal $196.50
TOTAL SUB $9,506.50
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOCs $110.00 6 0 $660.00 TCLP VOCs (Soil) - IDW $210.00 1 0 $210.00 TCLP VOCs (Aqueous) - IDW $205.00 1 0 $205.00
Subtotal $1,075.00 Shipping
Small Cooler (0 to 25 lbs) $110.00 1 $110.00 Subtotal $110.00
TOTAL LAB $1,185.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Drilling Related Monitoring Well Installation Kit $325.00 Day 2 $650.00
Subtotal $650.00 Analytical Related
Groundwater Sampling Kit $290.00 Day 1 $290.00 Subtotal $290.00
Expendables $40.00 Day 4 $160.00
Subtotal $160.00
TOTAL EQUIPMENT $1,100.00
Evaluating and interpreting field data
Property owner and tenant notification (1 hr). Evaluating and interpreting field data (3 hr).
Prepare field deliverable package (3 hr). Monitoring well results draft figure generation (1 hr).
Prepare monitoring well results figure and GW elevation contour map
Analytical data import and data management (3 hr); prepare MW results/parameter tables (2 hr)
MW Install: Field preparation (1 hr). Mobe/demobe (1 hr/day x 2 day = 2 hr). Oversight of monitoring well installations (10 hr/day x 2 day = 20 hr). IDW management (1 hr). Prepare field package (2 hr). GW Sampling: Mobe/demobe (2 hr/day x 1 day = 2 hr). Instrument calibration (0.5 hr/day x 1 day = 1 hr). Sampling 6 monitoring wells @ 1.5hrs each (9 hr). IDW management (1 hr). Sample management (1 hr). Compile field notes (1 hr). MW Survey:
Mobe/demobe (2 hr/day x 1 day = 2 hr). Oversee monitoring well survey (4 hr).
6/18/2024 Page 4 of 6 Subtask 3
SUBTASK: IDW Management
DATE: 6/4/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Professional
N. Barnes 2
Senior Staff Professional
A. Ogunkoya 2
TOTAL LABOR 4
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Day 1 $120.00
Subtotal $120.00
TOTAL VEHICLE $120.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
IDW
Erwin Remediation (6 water drums) $750.00 $750.00
Erwin Remediation (4 soil drums) $440.00 $440.00
Subtotal $1,190.00
TOTAL SUB $1,190.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
$40.00 Day 1 $40.00
Subtotal $40.00
TOTAL EQUIPMENT $40.00
Characterization and waste profile for transportation and disposal of IDW drums (2 hr);
IDW dum pickup oversight with mobilization (2 hrs)
6/18/2024 Page 5 of 6 Subtask 4
SUBTASK: Site Assessment Report
DATE: 6/4/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
T. Kafka 2
Project Professional
M. Hensley 5
Project Professional
N. Barnes 45
Administrative Assistant
R. Resinger 2
TOTAL LABOR 54
Report formatting and PDF compilation
Develop recommendations and path forward
SAR figure preparation (cross sections and MW results)
SAR preparation
6/18/2024 Page 6 of 6 Subtask 5
12802 Tampa Oaks Blvd. Suite 151 Tampa, Florida 33637
PH 813.558.0990
FAX 813.558.9726
www.geosyntec.com
5 June 2024
Ms. Sarah Aduwa Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4520 Tallahassee, Florida 32399-2400
Subject: Scope of Work and Level of Effort – Site Assessment Payless Dry Cleaners
6718 Hanley Road Tampa, Hillsborough County, Florida 33614
FDEP Site ID No. ERIC_4744
Dear Ms. Aduwa, Geosyntec Consultants, Inc. (Geosyntec) has prepared this Scope of Work and Level of Effort (LOE) for site assessment activities at the Payless Dry Cleaners site (Site) located in Tampa, Florida (ERIC_4744) based on the Site Assessment Work Plan (SAWP) submitted to FDEP on 22 May 2024. A description of task breakdown for Site assessment field activities and report preparation is provided below.
SUBCONTRACTOR EVALUATION
Geosyntec obtained three bids from licensed and qualified utility locating, drilling, and IDW transportation and disposal firms; a cost comparison is provided in Attachment A. Geosyntec recommends the following subcontractors based on lowest cost among the qualified bidders:
Underground utility locating – SiteLines LLC
Soil sampling, MAGS installation, DPT groundwater sampling, and MW installation – Environmental Drilling Service, Inc. (EDS)
IDW transportation and disposal – Erwin Remediation
SurvTech Solutions is recommended for surveying the six (6) proposed monitoring wells. Copies of the bids from each subcontractor are included in Attachment A.
For ease of reference, Table 1 and Figures from the SAWP are attached as a summary of the field activities and samples to be collected.
Ms. Sarah Aduwa 5 June 2024
Subtask 1 – Project Management
Nick Barnes (Tampa) will be the Geosyntec Project Manager. His labor hours are directly computed.
Subtask 2 – Multi-Media Sampling (Soil, DPT groundwater, soil vapor) and Interior Monitoring Well Installation
Geosyntec personnel will mobilize to the Site to observe the first phase of site assessment activities, which includes a private underground utility survey, lithology boring, soil sampling, MAGS well installation and sampling, direct push technology (DPT) groundwater sampling, and interior monitoring well installation.
Health and Safety: Subtask 2 includes labor for field preparation and preparation of a Site Health and Safety Plan and associated task hazard analyses.
Based on the jewelry store operations of the current tenant of the former drycleaning facility space, and the need for ingress and egress through the rear door of the business, the tenant has requested the presence of an off-duty Hillsborough County Sheriff’s Officer for security while the interior installation activities occur. Geosyntec assumes that the officer will be present for two days during interior soil borings and MAG well installations occur and another two days while MAGS implementation occurs, and costs have been included for this security. The business includes several safes within the rear area of the suite. These safes have sophisticated alarm systems with motion sensors in place.
Utility locating: Geosyntec will observe utility locating at the Site performed by SiteLines.
Identified utilities will be mapped by Geosyntec staff using a Global Position System (GPS) unit following the private underground utility survey.
Lithology boring: One soil boring (at the DPT008 location) will be advanced using a DPT drill rig to a depth of approximately 50-feet below land surface (ft BLS) or refusal, whichever is encountered first, to characterize the Site-specific lithology. This data will be used to assist in the selection of vadose zone soil and DPT groundwater sampling intervals.
Soil Sampling: Soil sampling will be performed at up to eight (8) locations (SB001 through SB003, and MAGS001 through MAGS005) as presented on Figure 3 and 4 in the SAWP. A concrete core drill will be used to access soil under the building slab (concrete) and driveway/parking lot (concrete or asphalt). Based on an assumed depth-to-water (DTW) of 4 ft BLS, soil samples will be collected at depth intervals of 0-0.5 ft BLS, 0.5-2 ft BLS, and 2-4 ft BLS, or water table) from each of the 8 proposed soil sample locations. Accordingly, up to a total of 24 samples are proposed. The soil samples will be screened with a photoionization detector
(PID) organic vapor analyzer and will be analyzed for the presence of VOCs via EPA Method 8260 by a National Environmental Laboratory Accreditation Program (NELAP) accredited, fixed-base laboratory. Soil samples. Supplemental soil samples will be collected from each location and depth interval (via Encore samplers) for analysis of VOCs by the synthetic precipitation leaching procedure (SPLP) should initial VOC concentrations exceed the leachability-based soil cleanup target levels (SCTLs) per Chapter 62-777, Florida Administrative Code (FAC). For budgetary purposes, it is assumed that approximately half of the proposed soil samples (12) will be analyzed by SPLP for VOCs. Exterior soil samples will be surveyed with a GPS and interior sampling locations will be transcribed using as-builts based on Site features.
MAGS well installation: Five (5), 2-inch (in.) diameter Schedule 40 polyvinyl chloride (PVC) MAGS wells (MAGS001 through MAGS005) will be installed by hand auger to a depth of up to approximately 3 ft BLS (or 1-ft above the static water level). Each MAGS well will be installed with 1-ft of riser and 0.01-in. slotted well screen extending from 1 ft BLS up to 3 ft BLS. A 20/30 grade environmental sand filter pack will be placed from the bottom of the boring to the top of the well screen. The remaining annular space will be grouted to just below the top of casing.
MAGS well testing: Each MAGS well will be tested for a period calculated to remove one, 10 to 15-ft radius of soil vapor volume using a blower. The test duration is expected to be approximately 1 hour. The vacuum and flow rates used at each MAGS well will be based on the results of a step test performed at one interior location. The step test will include a minimum of three steps at increasing vacuums to evaluate optimum airflow rates. Vacuum will be monitored at adjacent MAGS wells at approximate 15-minute intervals, as practical, during MAGS testing. After the completion of the study, the MAGS wells will be left in place, capped, and covered with a flush-mount manhole so that they may be converted into soil vapor extraction wells and resampled as necessary in the future.
During testing, soil vapor will be monitored with an organic vapor analyzer equipped with a photoionization detector (PID). Soil vapor samples will be collected at the end of each MAGS test using a batch-certified “clean” Summa canister provided by the analytical laboratory. The soil vapor samples (5) will be sent to a fixed-based laboratory for analysis of VOCs by the TO-15 method.
DPT groundwater sampling: Geosyntec personnel will observe the collection of DPT groundwater samples at up to 8 locations (DPT001 through DPT008), as shown on Figure 3 of the SAWP.
Groundwater samples will be collected at 4-ft intervals approximately every 10 feet (i.e., 5 to 9 ft BLS, 15 to 19 ft BLS, 25 to 29 ft BLS, 35 to 39 ft BLS, 45 to 49 ft BLS) below the water table, resulting in up to 5 samples from 8 locations (40 total samples). Sampling intervals may be adjusted based on observed depth to water and Site lithology. Groundwater samples submitted to a NELAP-approved fixed-based laboratory will be analyzed for the presence of VOCs by EPA Method 8260 (full list). No field duplicates will be collected.
Interior monitoring well installation: One monitoring well (MW001) will be installed inside the former facility as close as possible to the former drycleaning machine location (now covered by a safe with sophisticated alarm system). MW001 will be installed with a decontaminated hand auger in order to attempt to attain the target depth of approximately 13 ft BLS. MW001 will be constructed of 1-inch diameter prepacked PVC well screen between 3 and 13 ft BLS or otherwise as dictated by field conditions.
Field GPS and Interior Mapping: Exterior sampling locations (e.g., DPT groundwater, soil samples, select MAGS wells) will be surveyed with a field GPS by Geosyntec personnel. Interior sampling locations will be transcribed using as-builts based on Site features.
IDW Sampling: The IDW will be sampled prior to profiling. One composite liquid and one composite soil sample will be collected and analyzed for VOCs using the Toxic Characteristic Leaching Procedure.
Field Deliverable and Draft Summary Figure: Geosyntec has included costs to manage the data generated during this subtask and to develop the following to facilitate discussion with FDEP:
One figure and table to summarize VOC laboratory analytical results from the DPT groundwater samples;
One figure and table to summarize VOC laboratory analytical results from soil samples;
and
One figure and table to summarize VOC laboratory analytical results from MAGS samples.
These data will be provided to FDEP for evaluation to select the locations of proposed monitoring wells to be installed in Subtask 3; data gaps will be addressed during Subtask 3, if practical. If fixed-based laboratory analytical results of soil and DPT groundwater samples indicate that additional sampling will be required to complete delineation, Geosyntec will propose additional sampling locations and corresponding depths. The data will be managed in a database.
Subtask 2 activities will be performed by 2 Geosyntec staff members assuming 1 day for utility locating and marking the locations of the borings (1 Geosyntec staff), 4 days for drilling oversight, 2 days for MAGS well sampling and testing, and close-out tasks at the Site (~7 total field days).
Geosyntec has assumed 9-hours on-Site per day.
Subtask 3 – Exterior Monitoring Well Installations, Surveying, and Groundwater Sampling
Monitoring well installations: Once the final monitoring well strategy has been established with FDEP, Geosyntec will re-mobilize to the Site to install and sample the monitoring well network.
Geosyntec personnel will observe the installation of up to five (5) additional exterior monitoring wells to evaluate groundwater quality; the tentative locations are presented on Figure 3 of the SAWP, and the final locations will be determined following evaluation of the data collected during Subtask 2. We have assumed the utility survey conducted in Subtask 2 will be sufficient for siting the proposed monitoring well locations; however, should there be uncertainty in utility locations relative to drilling locations, Geosyntec will submit a WCD or TACO to FDEP for focused utility locating at the drilling locations.
Water-table monitoring wells MW002 through MW005 will be installed surrounding the facility.
The shallow wells will be constructed of 1-in. diameter Schedule 40 PVC pipe with 10 ft of 0.010-
in. pre-packed well screen, filter pack consisting of 20/30 silica sand, and at least a 0.5-ft thick, fine sand (30/65 silica sand) seal. The remaining annular space will be grouted to land surface with Portland Cement Type I/II and monitoring wells will be completed at the surface with a flush-mount 8-in. manhole and a locking monitoring well cap. The proposed deep monitoring well MW006 will be installed with 2-in. diameter Schedule 40 PVC pipe with 5 ft of 0.010-in.
prepacked screen.
The monitoring wells will be developed until the discharge is relatively sediment-free and sampled no sooner than 24 hours after development.
Monitoring Well Survey: This subtask includes costs for a Florida professional land surveyor to survey the six (6) newly installed monitoring wells. Cost has been included for Geosyntec to oversee the survey.
Groundwater sampling: Geosyntec personnel will collect groundwater samples from the six (6) Site monitoring wells. Depth-to-water measurements (DTW) will be collected from the monitoring wells to evaluate groundwater flow direction. The monitoring wells will be sampled using a peristaltic pump in general accordance with FDEP Standard Operating Procedures (SOPs), assuming the DTW and drawdown do not exceed the suction limit of the peristaltic pump. The samples will be stored on ice and shipped to a NELAP approved, fixed-based analytical laboratory under chain of custody for analysis under standard turnaround times. The groundwater samples will be analyzed for VOCs by EPA Method 8260 (full list); the suite may be reduced to VOHs pending the results from DPT groundwater samples.
Subtask 3 activities will be performed by 1 Geosyntec staff member assuming 2 days for drilling oversight, 1 day for surveying oversight, and 1 day for well sampling, IDW sampling, and close out tasks at the Site. Geosyntec has assumed 10-hours per day for 4 field days. Costs for an off-duty Hillsborough County Sheriff’s Officer are included in this Subtask for up to 4 hours during surveying of the interior well and interior monitoring well sampling.
Field Deliverable and Draft Summary Figure: Geosyntec has included costs to generate one figure and table that summarize VOC laboratory analytical results from groundwater monitoring well samples. The field deliverable will include the final surveyor report, monitoring well installation field forms, and groundwater sampling forms.
Subtask 4 – IDW Management
Geosyntec will review the generation of a waste characterization profile as well as the preparation of IDW manifests. Geosyntec will coordinate disposal arrangements for up to 10 drums of assumed non-hazardous IDW anticipated to be generated. Upon profiling and scheduling, Geosyntec will oversee observe the pickup of the IDW drums for disposal due to the sensitivity of the tenant’s business operations and to reduce disruption.
For this cost estimate, we have assumed the IDW will not be impacted by PFAS (screening to be performed under separate task assignment) and Geosyntec will submit a WCD or TACO to FDEP for any change of scope.
Subtask 5 – Site Assessment Report
Following completion of field activities, Geosyntec will proceed with the preparation and submittal of a Site Assessment Report (SAR) documenting assessment activities and summarizing analytical results. This subtask includes costs to generate a SAR that summarizes the analytical results of the assessment activities outlined above and complies with the requirements of Chapter 62-780.600, FAC. The costing included in the CEF/LOE includes the following figures:
USGS Site Topographic Map Potable Well Survey Site Layout Site Utility Map Lithologic Cross Section (1 transect) Summary of Soil Analytical Results Summary of DPT Groundwater Sampling Analytical Results Summary of Groundwater Elevations Summary of Monitoring Well Analytical Results
Deliverable and Invoicing Schedule:
Subtask Deliverable Deliverable Due Date*
Invoice Amount
Field deliverable for utility locate, soil sampling, MAGS, and DPT groundwater sampling with summary figures and tables
10/30/24 $55, Field deliverable for monitoring well installation and groundwater sampling and final surveyor report
12/30/24 $21,731.46
4 Submittal of IDW Manifests 1/27/25 $2, 1, 5 Submittal of Site Assessment Report 2/27/25 $1
Total $9
*Assumes TA is approved by 30 June 2024.
Geosyntec appreciates the opportunity to provide this proposal and cost estimate to you and the FDEP. Please contact us if you have any questions or require additional information.
Sincerely, Nicholas S. Barnes, P.E. Todd K. Kafka, P.G.
Project Engineer Sr. Principal Hydrogeologist
Attachments
A – Subcontractor Cost Evaluation and Quotes
SB001 (0.5') Soil 0-0.5 HA VOC L-SCTLs
SB001 (2') Soil 0.5-2 HA VOC L-SCTLs
SB001 (4') Soil 2-4* HA VOC L-SCTLs
SB002(0.5') Soil 0-0.5 HA VOC L-SCTLs
SB002 (2') Soil 0.5-2 HA VOC L-SCTLs
SB002 (4') Soil 2-4* HA VOC L-SCTLs
SB003 (0.5') Soil 0-0.5 HA VOC L-SCTLs
SB003 (2') Soil 0.5-2 HA VOC L-SCTLs
SB003 (4') Soil 2-4* HA VOC L-SCTLs
MAGS001 (0.5') Soil 0-0.5 HA VOC L-SCTLs
MAGS001 (2') Soil 0.5-2 HA VOC L-SCTLs
MAGS001 (4') Soil 2-4* HA VOC L-SCTLs
MAGS002(0.5') Soil 0-0.5 HA VOC L-SCTLs
MAGS002 (2') Soil 0.5-2 HA VOC L-SCTLs
MAGS002 (4') Soil 2-4* HA VOC L-SCTLs
MAGS003 (0.5') Soil 0-0.5 HA VOC L-SCTLs
MAGS003 (2') Soil 0.5-2 HA VOC L-SCTLs
MAGS003 (4') Soil 2-4* HA VOC L-SCTLs
MAGS004 (0.5') Soil 0-0.5 HA VOC L-SCTLs
MAGS004 (2') Soil 0.5-2 HA VOC L-SCTLs
MAGS004 (4') Soil 2-4* HA VOC L-SCTLs
MAGS005 (0.5') Soil 0-0.5 HA VOC L-SCTLs
MAGS005 (2') Soil 0.5-2 HA VOC L-SCTLs
MAGS005 (4') Soil 2-4* HA VOC L-SCTLs
MAGS001 MAGS001 Soil Vapor 1-3* Peristaltic Pump Northeast of former cleaning machine near site screening sample and spotting board location
VOC TO-15
MAGS002 MAGS002 Soil Vapor 1-3* Peristaltic Pump North of former drycleaning machine location in interior area at rear of former drycleaner
VOC TO-15
MAGS003 MAGS003 Soil Vapor 1-3* Peristaltic Pump Outside rear door of former drycleaner VOC TO-15
MAGS004 MAGS004 Soil Vapor 1-3* Peristaltic Pump South of former drycleaning machine and chemical storage area
VOC TO-15
MAGS005 MAGS005 Soil Vapor 1-3* Peristaltic Pump Within former boiler room and waste storage area VOC TO-15
DPT001 (5-9') Groundwater 5-9 DPT / Grab VOC GCTLs
DPT001 (15-19') Groundwater 15-19 DPT / Grab VOC GCTLs
DPT001 (25-29') Groundwater 25-29 DPT / Grab VOC GCTLs
DPT001 (35-39') Groundwater 35-39 DPT / Grab VOC GCTLs
DPT001 (45-49') Groundwater 45-49 DPT / Grab VOC GCTLs
DPT002 (5-9') Groundwater 5-9 DPT / Grab VOC GCTLs
DPT002 (15-19') Groundwater 15-19 DPT / Grab VOC GCTLs
DPT002 (25-29') Groundwater 25-29 DPT / Grab VOC GCTLs
DPT002 (35-39') Groundwater 35-39 DPT / Grab VOC GCTLs
DPT002 (45-49') Groundwater 45-49 DPT / Grab VOC GCTLs
DPT003 (5-9') Groundwater 5-9 DPT / Grab VOC GCTLs
DPT003 (15-19') Groundwater 15-19 DPT / Grab VOC GCTLs
DPT003 (25-29') Groundwater 25-29 DPT / Grab VOC GCTLs
DPT003 (35-39') Groundwater 35-39 DPT / Grab VOC GCTLs
DPT003 (45-49') Groundwater 45-49 DPT / Grab VOC GCTLs
DPT004 (5-9') Groundwater 5-9 DPT / Grab VOC GCTLs
DPT004 (15-19') Groundwater 15-19 DPT / Grab VOC GCTLs
DPT004 (25-29') Groundwater 25-29 DPT / Grab VOC GCTLs
DPT004 (35-39') Groundwater 35-39 DPT / Grab VOC GCTLs
DPT004 (45-49') Groundwater 45-49 DPT / Grab VOC GCTLs
DPT005 (5-9') Groundwater 5-9 DPT / Grab VOC GCTLs
DPT005 (15-19') Groundwater 15-19 DPT / Grab VOC GCTLs
DPT005 (25-29') Groundwater 25-29 DPT / Grab VOC GCTLs
DPT005 (35-39') Groundwater 35-39 DPT / Grab VOC GCTLs
DPT005 (45-49') Groundwater 45-49 DPT / Grab VOC GCTLs
DPT006 (5-9') Groundwater 5-9 DPT / Grab VOC GCTLs
DPT006 (15-19') Groundwater 15-19 DPT / Grab VOC GCTLs
DPT006 (25-29') Groundwater 25-29 DPT / Grab VOC GCTLs
DPT006 (35-39') Groundwater 35-39 DPT / Grab VOC GCTLs
DPT006 (45-49') Groundwater 45-49 DPT / Grab VOC GCTLs
DPT007 (5-9') Groundwater 5-9 DPT / Grab VOC GCTLs
DPT007 (15-19') Groundwater 15-19 DPT / Grab VOC GCTLs
DPT007 (25-29') Groundwater 25-29 DPT / Grab VOC GCTLs
DPT007 (35-39') Groundwater 35-39 DPT / Grab VOC GCTLs
DPT007 (45-49') Groundwater 45-49 DPT / Grab VOC GCTLs
DPT008 (5-9') Groundwater 5-9 DPT / Grab VOC GCTLs
DPT008 (15-19') Groundwater 15-19 DPT / Grab VOC GCTLs
DPT008 (25-29') Groundwater 25-29 DPT / Grab VOC GCTLs
DPT008 (35-39') Groundwater 35-39 DPT / Grab VOC GCTLs
DPT008 (45-49') Groundwater 45-49 DPT / Grab VOC GCTLs
MW001 MW001 Groundwater 3-13 Peristaltic Pump Interior well VOC GCTLs, PFAS
Provisional GCTLs
MW002 MW002 Groundwater 3-13 Peristaltic Pump Outside former rear door of drycleaner suite VOC GCTLs, PFAS
Provisional GCTLs
MW003 MW003 Groundwater 3-13 Peristaltic Pump Southwest of former drycleaner suite VOC GCTLs, PFAS
Provisional GCTLs
MW004 MW004 Groundwater 3-13 Peristaltic Pump Outside former front door of drycleaner suite VOC GCTLs, PFAS
Provisional GCTLs
MW005 MW005 Groundwater 3-13 Peristaltic Pump Southeast of former drycleaner suite VOC GCTLs
MW006 MW005 Groundwater 30-35 Peristaltic Pump Outside former rear door of drycleaner suite VOC GCTLs
Composite IDW-1 Soil Waste Characterization NA
Composite IDW-2 Water Waste Characterization NA
1. ft BLS indicates feet below land surface. 8. DPT indicates direct-push technology.
2. SB indicates soil boring 9. GCTL indicates groundwater cleanup target levels.
3. LSB indicates lithology soil boring 10. MW indicates monitoring well.
4. MAGS indicates modified active gas sampling. 11. IDW indicates investigation derived waste.
5. HA indicates hand auger. 12. NA indicates not applicable.
6. VOCs indicates volatile organic carbons. 13. ND indicates not determinated.
7. L-SCTLs indicates leachability based soil cleanup target levels.
MAGS004
South of former drycleaning machine and chemical storage area
MAGS005 Within former boiler room and waste storage area
MAGS001
Northeast of former cleaning machine near site screening sample and spotting board location
MAGS002
North of former drycleaning machine location in interior area at rear of former drycleaner
MAGS003 Outside rear door of former drycleaner
DPT008 Near rear door of former drycleaner
Southwest of former drycleaner in rear alley
DPT007 Southwest of former drycleaner in rear alley
East of former drycleaner in front of shopping center building
Southeast of former drycleaner in front of shopping center building
South of former drycleaner near dumpster area
DPT001
DPT002
DPT003
DPT004
DPT005
DPT006
14. * Geosyntec will review the depth of groundwater and lithology data from the preliminary assessment tasks and revise the depths of subsequent soil sampling, MAGS, DPT groundwater samples, and MW installation. For the purpose of this table, the water table has been assumed to be 4 ft bls
Drilling, decon, purge water
Soil Cuttings
Northwest of former drycleaner in rear alley
Northeast of former drycleaner in front of shopping center building
Rear portion of former cleaning facility interiorSB001
Rear of former drycleanerSB002
SB003 Front of former drycleaner facility
ATTACHMENT A
SUBCONTRACTOR COST
EVALUATION AND QUOTES
Drilling Mobilization 1 Environmental Drilling Service
Action Environmental
Preferred Drilling Solutions
Mobilization $1,000 $1,000 $650 Daily Rate $1,850 $2,250 $2,100 Night Work Rate - - - 1/2 Day Rate - - $1,600 Completions (each) $100 $125 $150 Drum Cost $70 $75 $125 Drums 5 3 12 Per Diem (per night) $250 - - Days 4 5 5
Total $11,022 $15,753 $16,490
Drilling Mobilization 2 Environmental Drilling Service
Action Environmental
Preferred Drilling Solutions
Mobilization $1,000 $700 $650 Daily Rate $1,850 $1,900 $2,100 1/2 Day Rate $1,250 - - Per Diem (per night) $250 - - Drums 5 5 6 Days 1.5 - 2 2 2
Total $6,950 $7,265 $7,875
Utility Locating Site Lines LLC GeoView ProCheck GPRS Total $800 $900 $900 $1,050
IDW Erwin Hulls Hepaco Soil $110 $250 $210 Liquid $125 $250 $141.75 Transportation - $50 $50 Driver and Flatbed - - $145.92/hr
Surveying (Professional Service) SurvTech $2,360
Subcontractor Evaluations
3007 N. 50th St. Tampa, Florida 813-909-0040/0042 fax
May 30, 2024
Nick Barnes, P.E.
Project Engineer
Geosyntec Consultants, Inc.
12802 Tampa Oaks Blvd, Suite 151 Tampa, Florida 33637 D. 813.379.4388 | M. 813.5571165 Nick.barnes@Geosyntec.com
Re: Mobilization One Payless Dry Cleaner Tampa
Dear Mr. Barnes:
In accordance with your request, Action Environmental is pleased to provide you with a cost estimate for the first mobilization scope of work at the Payless Dry Cleaners located at 6728 Hanley Road in Tampa, Florida. We understand the scope of work includes the following:
SCOPE OF SERVICES
Public Utility Location called in at least three business days prior to beginning work.
Daily pre-job safety meetings to discuss the applicable job hazards.
Permits required will be obtained through the SWFWMD by a licensed water well contractor..
Clear all boreholes by hand to 5 feet with hand augers or posthole diggers.
One continuous DPT soil sample to 50 feet using macrocore samplers. Borehole will be abandoned with Portland cement using tremie pipe and patched if necessary.
Eight groundwater boreholes to up to 50 feet, each borehole with up to 5 groundwater intervals.
Groundwater samples will be obtained using DPT and groundwater sampling point and pumping directly through the rods using a peristaltic pump. Boreholes will be abandoned using Portland cement and tremie pipe and patched if necessary.
Three shallow soil borings using hand augers. One in the interior of the building utilizing a core drill, and two on the exterior to an estimated depth of 4 feet using hand augers to obtain the soil samples.
Boreholes will be abandoned with Portland cement and patched if necessary.
Installation of five MAGS wells, four on the interior of the building and one on the exterior. The MAGS wells will be 2 inch diameter installed to 3 feet, screened from 3-1 feet. The locations on the interior of the building will be cored using a 5 inch core. All the Mags wells will be finished with a 4- 5 inch diameter manhole.
Installation of one shallow monitoring well on the interior of the building by hand auger. The borehole will be cored with a core machine, and the monitor well will be installed up 13 feet depending on depth to groundwater. The well will have 10 feet of .010 slotted prepacked screen.
Staging of the IDW and Groundwater IDW drums in designated locations. Cleaning of drilling/work areas to Geosyntec’s specifications.
ESTIMATED COSTS
Payless Dry Cleaner Hanley Road Tampa – Mobilization One Scope – Estimated Costs
Task Quantity Units Rate Extended
Mob/Demob, Vehicles, Fuel and Permitting 1 LS $1000.00 $1000.00
Drilling Crew 5 Days $2250.00 $11,250.00 MAGS Well Materials (screens, casing, caps, sand and grout) 5 EA $138.00 $690.00
Monitor Well Materials 1 EA $335.00 $335.00
MAGS and Shallow Monitor Well Completions 6 EA $125.00 $750.00
Core Drill and Generator 1 LS $650.00 $650.00 Soil Sampling and Groundwater Sampling Materials (expendable points, tubing, grout for abandonment, etc.) 1 LS $928.00 $928.00
Drums 3 EA $75.00 $150.00
TOTAL $15,753.00
LS= Lump Sum, EA= Each
Project Estimated at 5 Work Days
CONDITIONS and EXCLUSIONS
Project budgeted as five work days, 8 hours onsite if necessary per day. This is an estimate and actual days to complete the job will be included on the final invoice.
Groundwater samples will be to a depth that is over the maximum depth of a peristaltic pump and depending on the site’s lithology may cause delays or inability to obtain samples at deeper depths that are apart of the scope.
Lithological and groundwater boreholes will be abandoned using tremie pipe. This bid does not include pumping from the bottom of the borehole. Tremie pipe will be lowered as deep as possible (dependent on where the boreholes collapse, and grout will be gravity poured into boreholes to abandon. If pumping is required additional cost for time and materials will be required.
Drums must be staged on hard surface such as asphalt or concrete.
Drums are an estimate, actual number of drums used will be included on the final invoice.
Concrete on the interior MUST BE 12 inches or less. If concrete floor is thicker and outside subcontractor will be required to core all interior boreholes at an additional cost.
Respectfully Submitted, Action EnvironmentalX Jonathan Abbott Drilling Division Manager
Jonathan Abbott, Drilling Division Manager
Preferred Drilling Solutions, Inc.
8820 66th St. North, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
DIRECT PUSH TECHNOLOGY QUOTE FORM
Date: 5/30/24 FAC ID#:
Unit Unit Rate Number of Units
Extended Price whole day $2,100.00 5 10,500.00$ half day $1,600.00 -$ per foot $25.00 20 500.00$ each $115.00 2 230.00$ each $50.00 -$ each $35.00 1 35.00$ per well $150.00 6 900.00$ roundtrip $650.00 1 650.00$ per crew / per night $575.00 -$ each $125.00 12 1,500.00$ per day $150.00 5 750.00$ each $75.00 1 75.00$ lump sum $350.00 1 350.00$ per day $100.00 5 500.00$ per day $100.00 5 500.00$
TOTAL QUOTE PRICE $16,490.00
Notes: 1. Includes saw cuts, development, standby time, and decon.
Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: ___________________________________Austin Bonacum, Estimator Date: 5/30/24
Decon pad, decon all down hole tooling with steam cleaner
PDS to supply concrete core drill w/ 6" bit
6718 Hanley Road, Tampa, Hillsborough County, FL
Well Completion (includes MH w/ cover, concrete, and locking well cap)
Well Riser (includes all materials) ID 1"
Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"
Pre-Packed Well Screen (includes all materials) ID 1" 5' Length
2" Well Install (includes all materials)
Direct Push Half-Day Rate 1 - on-site half day
(5) 2" x to 4' MAGs wells with up to 2' .010 screen, installed via hand auger, drum cuttings, pad and 5" manhole
Drum cuttings, development water, and decon fluids in NEW drums
(1) 1" x up to 13' MW with 10' .010 prepacked screen, installed via hand auger to 14' or as deep as possible, drum cuttings, pad and 5" manhole
Site Name and Location: Payless Dry Cleaners
Consultant Name: Geosyntec Consultants
PROPOSED SCOPE OF WORK:
(1) DPT boring to 50' (or refusal), drum cuttings, grout and restore grade
(3) Hand auger borings to 4', drum cuttings, grout and restore grade
Event 1
(8) DPT borings to 50' (or refusal), grab groundwater sampling at up to (5) intervals per boring, drum soil & water, grout and restore grade
Days to Complete Scope of Work: 5
Direct Push Daily Rate 1 - on-site day
Equipment Type: Geoprobe 8040DT, Geoprobe 3230DT, 7822DT
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Steam Cleaner
Decon Pad
Concrete Core Drill with 6" core bit
NEW - DOT Approved 55-gal Drum
Per Diem
Mobilization
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)
Permits
2 3,700.00
$6,950.00
Preferred Drilling Solutions, Inc.
8820 66th St. North, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
DIRECT PUSH TECHNOLOGY QUOTE FORM
Date: 5/30/24 FAC ID#:
Unit Unit Rate Number of Units
Extended Price whole day $2,150.00 2 4,300.00$ half day $1,750.00 -$ per foot $25.00 -$ each $115.00 -$ each $50.00 9 450.00$ each $35.00 10 350.00$ per well $150.00 5 750.00$ roundtrip $650.00 1 650.00$ per crew / per night $575.00 -$ each $125.00 6 750.00$ per day $150.00 -$ each $75.00 1 75.00$ lump sum $350.00 1 350.00$ per day $100.00 2 200.00$ per day $100.00 -$
TOTAL QUOTE PRICE $7,875.00
Notes: 1. Includes saw cuts, development, standby time, and decon.
Project No.:
Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782
Signature and Title of Person Submitting Quote: ___________________________________Austin Bonacum, Estimator Date: 5/30/24
Decon pad, decon all down hole tooling with steam cleaner
Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"
Pre-Packed Well Screen (includes all materials) ID 1" 5' Length
2" Well Install (includes all materials)
Direct Push Half-Day Rate 1 - on-site half day
Site Name and Location: Payless Dry Cleaners
Consultant Name: Geosyntec Consultants
PROPOSED SCOPE OF WORK:
(4) 1" x 13' MW's with 10' .010 screen, installed via DPT with 3.25" rods, drum cuttings, pad and 8" manhole
Drum cuttings, development water, and decon fluids
Event 2
(1) 1" x 35' MW with 5' .010 screen, installed via DPT with 3.25" rods, drum cuttings, pad and 8" manhole
6718 Hanley Road, Tampa, Hillsborough County, FL
Days to Complete Scope of Work: 2
Direct Push Daily Rate 1 - on-site day
Equipment Type: Geoprobe 8040DT, Geoprobe 3230DT
Steam Cleaner
Decon Pad
Concrete Core Drill with 6" core bit
NEW - DOT Approved 55-gal Drum
Per Diem
Mobilization
DIRECT PUSH TECHNOLOGY
MISCELLANEOUS
GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)
Permits
Well Completion (includes MH w/ cover, concrete, and locking well cap)
Well Riser (includes all materials) ID 1"
May 31, 2024
Nick Barnes, P.E.
Project Engineer
Geosyntec Consultants, Inc.
12802 Tampa Oaks Blvd, Suite 151 Tampa, Florida 33637 D. 813.379.4388 | M. 813.5571165 Nick.barnes@Geosyntec.com
Re: Mobilization Two Payless Dry Cleaner Tampa
Dear Mr. Barnes:
In accordance with your request, Action Environmental is pleased to provide you with a cost estimate for the second mobilization scope of work at the Payless Dry Cleaners located at 6728 Hanley Road in Tampa, Florida. We understand the scope of work includes the following:
SCOPE OF SERVICES
Public Utility Location called in at least three business days prior to beginning work.
Daily pre-job safety meetings to discuss the applicable job hazards.
Permits required will be obtained through the SWFWMD by a licensed water well contractor.
Clear all boreholes by hand to 5 feet with hand augers or posthole diggers.
Installation of four shallow monitoring wells using DPT. Each monitoring well will be 1 inch diameter with 10 feet of .010 slotted prepacked screen installed to 13 feet. The wells will be finished with 2x2 concrete pads and 8 inch bolt down manholes. All four wells will be developed using a peristaltic pump. All soils and development water will be drummed.
Installation of one deep monitoring well using 4.25 inch hollow stem augers. The deep well will be 2 inch diameter with 5 feet of .010 slotted screen installed to 35 feet. A 20/30 silica sand pack will be used to 2 feet above the screen, with at least 1 foot of 30/65 sealing sand pack layer, and grouted to 3 inches below land surface. The well will be completed with a 2x2 concrete pad and 8 inch bolt down manhole. The well will be developed with a submersible pump. All drill cuttings and development water will be drummed.
Staging of soil and water drums and cleaning drilling areas to client’s specifications.
ESTIMATED COSTS
Payless Dry Cleaner Hanley Road Tampa – Mobilization Two Scope – Estimated Costs
Task Quantity Units Rate Extended
Mob/Demob, Vehicles, Fuel and Permitting
Drilling Crew Shallow Monitoring Well Materials (prepacked screens, casing, caps, expendable points, sand and grout) Deep Monitoring Well Materials (screen, casing, caps, plug, sand and grout)
Completions
Drums
LS= Lump Sum, EA= Each
Project Estimated at 2 Work Days
CONDITIONS and EXCLUSIONS
Project budgeted as five work days, 8 hours onsite if necessary per day. This is an estimate and actual days to complete the job will be included on the final invoice.
Drums must be staged on hard surface such as asphalt or concrete.
Drums are an estimate, actual number of drums used will be included on the final invoice.
Wells will be developed up to 30 minutes, any additional development is client’s responsibility.
Site access is client’s responsibility.
Respectfully Submitted, Action EnvironmentalX Jonathan Abbott Drilling Division Manager
SITE LINES LLC
Utility Locating 1143 59th Avenue North (727) 432-9482 St. Petersburg, FL 33703 bhardy@sitelinesllc.com
Mr. Nick Barnes, P.E.
GeoSyntec 12802 Tampa Oaks Boulevard, Suite 151 Tampa, FL 33637
May 29, 2024
Dear Mr. Barnes:
Thank you for contacting Site Lines LLC regarding the private utility locate at your project site. Attached is our proposal in response to your inquiry.
Please review the proposal to ensure I have accurately captured the project details.
If you agree to the proposal, including the terms and conditions, and the statement of work, please sign, initial and date where indicated. Upon signing, the proposal will serve as the Agreement of the parties as to the above-referenced Project.
If you have any questions, please feel free to contact me. I look forward to working with you.
Sincerely, William L. Hardy II Geophysicist President
Enclosure
Payless Dry Cleaners Site – 6718 Hanley Road, Tampa, Florida
Site Lines (“Company”) will use Ground Penetrating Radar (GPR) and conventional electromagnetic (EM) pipe and cable locators to determine the location of underground utilities at the site identified by Geosyntec (“Client”). Of specific concern is the utilities within the area of approximately 9 proposed soil borings/monitoring well locations.
The estimated depth and location of utilities identified during the investigation will be marked on the ground surface using spray paint or other method to be agreed upon by the parties. The American Public Works Association Uniform Color Codes for the marking of underground utilities will be use. No other report shall be prepared unless requested.
The fee to complete the project as described within this proposal is: Eight Hundred Dollars [$800.00]
Client shall pay Company in full within thirty (30) days of the invoice date, unless the parties have agreed to another payment arrangement in writing. If during the investigation, Company determines that the goals of the project cannot be achieved with the resources available to Company, Company will notify Client as soon as reasonably possible. Under such circumstances, Company will charge Client only for time expended and materials used to date.
Client is responsible for all site access, maintenance of traffic (MOT), site clearing and/or any other logistical considerations necessary to conduct the utility locate.
Client will also provide all pertinent maps of the project site, including those that show the boundaries of the utility locate, pertinent landmarks, and known utilities (if available). Company is not a substitute for Chapter 556, Florida Statutes.
Accordingly, Client is responsible for calling Sunshine State One Call of Florida
(811) before undertaking any invasive activities, whether through Company, any other entity, or on its own.
A GSSI SIR-4000 GPR system will be used with a 900, 400, or 270 megahertz antenna configuration depending on site conditions and desired targets. The GPR will assist in locating nonmetallic and metallic utilities. Physical surface conditions, subsurface conditions and technical limitations effect the ability of GPR to resolve targeted utilities and/or subsurface structures. Depth and/or diameter of the utility, soil type, moisture/ionic content of the soil, and electrical properties of the soil compared to that of the utility can prevent the GPR from identifying utilities at the site. The diameter of a utility cannot be determined by GPR data. Estimated depths of utilities are directly affected by soil conditions and the material of the utility. A margin of error of +/- 20-25% in depth should be expected when performing invasive activities.
An RD 8000 will be used for the EM survey. Electromagnetic induction which transmits a signal directly into the desired target and passive power detection which locates naturally occurring magnetic fields in energized lines will be identified by detecting and following the signals with a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .