This is a Task Assignment (TA) document issued under Contract Number HW683 between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants, Inc. The TA authorizes environmental assessment and remediation activities at the Jack Sheehan's Drive-In Cleaners site located at 1501 S. Lake Avenue, West Palm Beach, Florida 33401 (ERIC Site 5123). The FDEP Department Project Manager is Sarah Aduwa, and the Contractor's Project Manager is Melissa Shook. The task assignment is effective through July 24, 2026.
Geosyntec will conduct groundwater monitoring, soil sampling, PFAS sampling, and prepare a Supplemental Site Assessment Report (SSAR) in accordance with their scope of work, cost estimate, and schedule received on December 8, 2025. The total TA value is $27,540.15, comprised of $27,120.15 in fixed unit rate costs and $420.00 in cost reimbursement. The work is organized into five subtasks: project management, monitoring well and soil sampling, IDW (investigative-derived waste) management, PFAS sampling and field deliverable, and report preparation. Key deliverables include a PFAS field deliverable due March 13, 2026 ($900.59), and submittal of the Site Assessment Report and IDW manifests due April 20, 2026 ($26,639.56). The assessment will include sampling from seven monitoring wells, collection of 20 soil samples from four locations, laboratory analysis for VOCs, PAH, and TRPH, and disposal of non-hazardous IDW through Erwin Remediation at $740.00. Total labor is budgeted at 130 hours across multiple staff categories.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
HW683
DC036C July 24, 2026
This Task Assignment authorizes Geosyntec to conduct Groundwater Monitoring and
PFAS sampling at Jack Sheehan’s Drive-In site in accordance with Geosyntec’s scope of work, cost estimate and schedule received on December 8, 2025.
Sarah Aduwa 850-245-8973 Geosyntec
Melissa Shook 321-451-5480
ERIC 5123
1501 S. Lake Avenue West Palm Beach, Florida 33401
Jack Sheehan’s Drive-In Cleaners
$ 27,120.15
$ 420.00
$ 27,540.15
Scope of Work
Geosyntec
Todd Kafka
Contract Manager
Todd K. Kafka, PG (FL) Digitally signed by Todd K. Kafka, PG (FL) Date: 2025.12.19 10:19:56 -05'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.12.17 10:49:24 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
To: HW683 Contract Negotiation File Jack Sheehan’s Drive-In Cleaners West Palm Beach, Florida
ERIC_5123
From: Sarah Aduwa, Project Manager Date: December 10, 2025 Subject: Negotiation Summary
HW683_DC036C
This Task Assignment authorizes Geosyntec to conduct Groundwater Monitoring and PFAS sampling at Jack Sheehan’s Drive-In site in accordance with Geosyntec’s scope of work, cost estimate and schedule received on December 8, 2025.
Melissa Shook is the Project Manager.
Subtask 2 – 5 : Geosyntec personnel will collect groundwater samples from the 7 Site monitoring wells. Depth-to-water measurements (DTW) will be collected from the monitoring wells to evaluate groundwater flow direction. The monitoring wells will be sampled using a peristaltic pump in general accordance with FDEP Standard Operating Procedures (SOPs), assuming the DTW and drawdown do not exceed the suction limit of the peristaltic pump. Based on an assumed depth-to-water (DTW) of 8 ft BLS, a minimum of four soil samples (0-0.5 ft BLS, 0.5-2 ft BLS, 2-4 ft BLS, 4-6 and 6-8 feet below land surface [ft BLS] or water table) will be collected from each of the 4 proposed soil sample locations (20 samples total). Soil samples will be collected by a hand auger.
Following completion of field activities, Geosyntec will proceed with the preparation and submittal of a Supplemental Site Assessment Report (SSAR) documenting assessment activities and summarizing analytical results.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost is $27,540.15 with 130 labor hours.
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Jack Sheehan's Drive In Cleaners #1 SUBTASK: Soil Sampling and MW Sampling
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Professional A. Kelly 4
Professional M. Shook
Staff Professional
S. Ableson 30
TOTAL LABOR 66
VEHICLE TYPE RATE UNIT USEAGE
Truck (2 staff x 3 days) $120.00 Day 6 $720.00
TOTAL VEHICLE $720.00
PER DIEM STAFF RATE UNIT USEAGE
M. Shook Per Diem $36.00 Day 3 $108.00 M. Shook Hotel $140.00 Day 3 $420.00
TOTAL PER DIEM $528.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Other
GPR Locate Bloodhound $651.50 $651.50 Subtotal $651.50
TOTAL SUB $651.50
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOH - Water Full list $110.00 7 0 $770.00 VOH - Soil 4 locations x 5 depth intervals $110.00 20 0 $2,200.00 VOHs - Water SPLP (50% of total samples) $110.00 10 0 $1,100.00 SPLP Extraction 50% of total samples $45.00 10 0 $450.00 PAH - Water abbrevaited PAH 8270D list $110.00 7 0 $770.00
TRPH FLO-PRO $88.00 7 0 $616.00
Subtotal $5,906.00 Shipping
Large Cooler (25 to 50 lbs.) $150.00 0 $0.00 Subtotal $0.00
TOTAL LAB $5,906.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Drilling Related Photoionization meter $88.00 Day 2 $176.00 Soil Sampling Kit (Through Concrete) $235.00 Day 2 $470.00
Subtotal $646.00 Analytical Related
$290.00 Day 1 $290.00 Encore Samplers $16.00 Each 20 $320.00
Subtotal $610.00 Expendables
Expendables $40.00 Day 3 $120.00 Subtotal $120.00
Other GPS $175.00 Day 0 $0.00
Subtotal $0.00
TOTAL EQUIPMENT $1,376.00
11/8/2025
Shallow Groundwater Sampling Kit
Analytical data import and data management (3 hr.) prepare soil results table (1 hr.)
Property owner and tenant notification (1 hr.). Evaluating and interpreting field data (1 hr./day x 2 days = 2 hr.). Prepare field package (4 hr.).
Soil Sampling: Mob/demob from Titusville (8 hrs.). Oversee Utility Location and UST Mapping (5 hrs.). Concrete coring at 4 locations (4 hrs.). Indoor soil sampling at 10 intervals (5 hrs.), Soil sample location measurements (1 hr) IDW management (2 hr.).
Soil Sampling: Field Prep (1 hr). Indoor soil sampling at 10 intervals - 5 hrs.
MW Sampling: Mob/demob (2 hr./day x 3 days = 6 hr.). Instrument calibration (1 hr). Sampling 7 monitoring wells @ 1.5hrs each (10.5 hr.). Sample management/shipping (2 hr.). Compile field notes (2 hr.).
Sample delivery to Eurofins: 2 hrs
12/10/2025 Page 3 of 7 Subtask 2
SUBTASK: IDW Management
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Professional
M. Shook 3
TOTAL LABOR 3
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
IDW
Erwin Remediation $740.00 $740.00
TOTAL SUB $740.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
IDW Related
Drum $100.00 Drum 2 $200.00
Subtotal $200.00
TOTAL EQUIPMENT $200.00
11/8/2025
Characterization and waste profile for transport and disposal of drums (2 hr). Prepare and sign IDW manifest (1 hr).
12/10/2025 Page 4 of 7 Subtask 3
SUBTASK: PFAS Sampling and Field Deliverable
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal
Senior Professional M. Hensley 1
Professional M. Shook 2
Staff Professional S. Ableson 3
TOTAL LABOR 6
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL SUB $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
PFAS FDEP Lab $0.00 7 0 $0.00 Subtotal $0.00
Shipping Large Cooler (25 to 50 lbs) $150.00 1 $150.00
Subtotal $150.00
TOTAL LAB $150.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Drilling Related
TOTAL EQUIPMENT $0.00
11/8/2025
Results figure preparation
Prepare field summary deliverable
Collect PFAS samples from MWs included in Subtask 2 for VOH sampling 0.50 hours/well x 3 wells = 2 hrs.
12/10/2025 Page 5 of 7 Subtask 4
SUBTASK: Supplemental Site Assessment Report
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 2
Senior Professional A. Kelly 2
Project Professional M. Hensley 6
Professional M. Shook 28
Administrative Assistant P. Gallagher 2
TOTAL LABOR 40
11/8/2025
Report formatting and PDF compilation
Develop recommendations and path forward
Prepare soil and monitoring well results table
SSAR figure preparation (5 figures).
SSAR preparation
12/10/2025 Page 6 of 7 Subtask 5
12802 Tampa Oaks Blvd, Suite 151 Tampa, Florida 33637
PH 813.558.0990
www.geosyntec.com
6 December 2025
Ms. Sarah Aduwa Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road, MS 4500 Tallahassee, Florida 32399-2400
Subject: Scope of Work and Level of Effort – Supplemental Site Assessment Jack Sheehan’s Drive-in Cleaners 1501 S. Lake Avenue West Palm Beach, Florida 33401 FDEP Site ID No. ERIC_5123
Dear Ms. Aduwa, Geosyntec Consultants, Inc. (Geosyntec) has prepared this Scope of Work and Level of Effort (LOE) for supplemental site assessment activities at the Jack Sheehan’s Drive-in Cleaners site (Site) located in West Palm Beach, Florida (ERIC_5123). Geosyntec prepared this LOE based on Geosyntec’s March 2024 Site Assessment Report (SAR). A description of task breakdown for Site assessment field activities and report preparation is provided below.
SUBCONTRACTOR EVALUATION
Geosyntec obtained three bids from licensed and qualified drilling, and IDW transportation and disposal firms; a cost comparison is provided in Attachment A. Geosyntec recommends the following subcontractors based on lowest cost among the qualified bidders:
IDW transportation and disposal – Erwin Remediation (2 drums; one soil one water)
Copies of the bids from each subcontractor are included in Attachment B.
SITE ACCESS
As part of SOW/LOE preparation, Geosyntec undertook a comprehensive review of existing access agreements. This review aimed to determine (i) existing agreements for properties requiring access for the proposed work and (ii) the current authorizing parties. Geosyntec identified the Site property and each parcel encompassed by the site property which may be effected by the proposed activities, ensuring full compliance with all necessary access requirements.
1. The Site property, is composed of three parcels (Parcel ID: 74-43-43-28-05-000-2150, 74- 43-43-28-05-000-2130, and 74-43-43-28-05-000-2170) all of which were sold to AND &
Jack Sheehan’s Drive-In Cleaners #1
Associates LLC on 01 March 2006. The existing agreement for this property was authorized in 3 April 2023 by Robert D'uva (AND & Associates LLC) but only covers 74- 43-43-28-05-000-2150 located at 1510 Lake Ave, West Palm Beach, Florida; therefore, an amendment to the current Site Access Agreement is required.
Subtask 1 – Project Management
Melissa Shook will serve as the Geosyntec project manager, and her hours are directly computed in the LOE/SOW.
Subtask 2 – Monitoring Well Sampling and Soil Sampling
Utility Clearing and UST Mapping: Geosyntec will observe utility locating at the Site performed by Bloodhound. Additionally, the underground storage tank (UST) will be investigated further with the intent of determining (i) approximate footprint via GPR, (ii) filling mechanism and associated piping with visual observations of aboveground utilities and GPR and (iii) approximate depth of tank and/or contents with an oil-water interface probe. Geosyntec will open manholes of the UST and of nearby manholes as a part of this effort but will not make attempts to locate the UST or associated piping with invasive methods. Findings will be documented via field notes and photographs.
Groundwater sampling: Geosyntec personnel will collect groundwater samples from the 7 Site monitoring wells. Depth-to-water measurements (DTW) will be collected from the monitoring wells to evaluate groundwater flow direction. The monitoring wells will be sampled using a peristaltic pump in general accordance with FDEP Standard Operating Procedures (SOPs), assuming the DTW and drawdown do not exceed the suction limit of the peristaltic pump. The samples will be stored on ice and shipped to a NELAP approved, fixed-based analytical laboratory under chain of custody for analysis under standard turnaround times. The groundwater samples will be analyzed for (i) VOCs by EPA Method 8260, (ii) Acenaphthene, Acenaphthylene, 1-methylnaphthalene, 2-methylnaphthalene, and naphthalene via EPA method 8270D and (iii) TRPH via FLO-PRO.
Soil Sampling: Soil sampling will be performed at up to 4 locations, as presented on Figure 1 of this SOW. Based on an assumed depth-to-water (DTW) of 8 ft BLS, a minimum of four soil samples (0-0.5 ft BLS, 0.5-2 ft BLS, 2-4 ft BLS, 4-6 and 6-8 feet below land surface [ft BLS] or water table) will be collected from each of the 4 proposed soil sample locations (20 samples total).
Soil samples will be collected by a hand auger. A concrete core drill will be used to access soil under the building slab (concrete). Samples will be analyzed for the presence of VOCs via EPA Method 8260, by a National Environmental Laboratory Accreditation Program (NELAP) accredited, fixed-base laboratory, . Supplemental soil samples will be collected from each location and depth interval (via Encore samplers) for analysis of VOCs by the synthetic precipitation leaching procedure (SPLP) should VOC concentrations exceed the leachability-based soil cleanup target levels. For budgetary purposes, it is assumed that approximately half of the proposed soil samples will be analyzed by SPLP for VOCs. Interior sampling locations will be transcribed using as-builts based on Site features.
Subtask 3 activities will be performed by 2 Geosyntec staff members assuming 3 days for well sampling, soil sampling, IDW management, and close out tasks at the Site. We have assumed 10-hours per day including round trip mobilization.
Subtask 3 – IDW Management
Geosyntec will review the generation of a waste characterization profile as well as the preparation of IDW manifests. Geosyntec will coordinate disposal arrangements for up to 2 drums of non-hazardous IDW. We have assumed field oversight of the drum pickup is not necessary. Erwin Remediation was selected as the transportation and disposal subcontractor due to lowest cost (subcontractor evaluation included in Attachment A).
For this cost estimate, we have assumed the IDW will be impacted by PFAS. Geosyntec will submit a WCD or TACO to FDEP for any change of scope.
Subtask 4 – PFAS Sampling and Field Deliverable
During Subtask 2 mobilization, Geosyntec personnel will collect samples from seven monitoring wells (MW001 through MW007) for PFAS analysis. Samples will be preserved on ice and sent to the FDEP Laboratory following proper chain of custody procedures.
Geosyntec will prepare an email deliverable with attachments that include: a figure showing PFAS groundwater results (PFOA, PFOS, and their combined concentrations for each well, without isoconcentration lines), the certified analytical laboratory report, a figure showing analytical results, equipment calibration logs, and groundwater sampling forms. This email will be submitted to the FDEP within two working days after receiving the final certified laboratory report from the FDEP Laboratory.
Geosyntec expects the final laboratory report to be emailed to Melissa Shook (melissa.shook@geosyntec.com) by the FDEP Laboratory. The completed email deliverable will be submitted to Sarah Aduwa, Safa Shariat, Jennifer Farrell, Breck Dalton, Mubeen Darji, and Doris Brown.
Additionally, the reporting of the PFAS results will also be incorporated into Subtask 5. Costs for analysis and integration into the Subtask 5 deliverable are covered under Subtask 4.
Subtask 5 – Supplemental Site Assessment Report
Following completion of field activities, Geosyntec will proceed with the preparation and submittal of a Supplemental Site Assessment Report (SSAR) documenting assessment activities and summarizing analytical results. This subtask includes costs to generate a SSAR that summarizes the analytical results of the assessment activities outlined above and complies with the requirements of Chapter 62-780.600, FAC. The costing included in the CEF/LOE includes the following figures:
USGS Site Topographic Map with Potable well survey
Site Layout
Summary of Soil Analytical Results
Summary of Groundwater Elevations
Summary of Monitoring Well Analytical Results
Deliverable and Invoicing Schedule:
Subtask Deliverable Deliverable Due Date*
Invoice Amount
4 PFAS Field Deliverable 3/13/2026 $900.
1,2,3,5 Submittal of Site Assessment Report and IDW
Manifests 4/20/2026 $26,639.56
TA End Date: 5/28/2026 Total $27,540.15
*Assumes TA is approved by 23 December 2025.
Geosyntec appreciates the opportunity to provide this proposal and cost estimate to you and the FDEP. Please contact us if you have any questions or require additional information.
Sincerely, Melissa Shook Professional
Todd K. Kafka, P.G.
Sr. Principal Hydrogeologist
Figure 1 Attachment A – Subcontractor Cost Evaluation and Quotes Attachment B – Subcontractor Quotes
FIGURE 1
ATTACHMENT A
SUBCONTRACTOR COST
EVALUATION
ATTACHMENT B
SUBCONTRACTOR QUOTES
From: Larry Hall To: Blaine Dawson Subject: RE: Updated Generic IDW Quote Date: Friday, August 8, 2025 9:45:00 AM
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."
Yes- if it is sampled for and has any hit it will have to go to a hazardous waste facility.
From: Blaine Dawson <BCDawson@Geosyntec.com> Sent: Friday, August 8, 2025 9:41 AM To: Larry Hall <lhall@hullsenvironmental.com> Subject: Re: Updated Generic IDW Quote
Good morning Larry, Is PFAS waste having to go hazardous now?
Thank you, Blaine
Get Outlook for iOS
From: Larry Hall <lhall@hullsenvironmental.com> Sent: Friday, August 8, 2025 9:09:19 AM To: Blaine Dawson <BCDawson@Geosyntec.com> Subject: RE: Updated Generic IDW Quote
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."
Blaine, See pricing below.
Thanks, Larry Hall
Yes- if it is sampled for and has any hit it will have to go to a hazardous waste facility.
From: Blaine Dawson <BCDawson@Geosyntec.com> Sent: Thursday, August 7, 2025 11:04 AM To: Larry Hall <lhall@hullsenvironmental.com> Subject: Updated Generic IDW Quote
Good morning Larry, In light of the update you recently provided about LES, I was hoping you might be able to prepare an updated IDW disposal quote (previous version attached) for use as part of future proposals. Please see the below list of scenarios I need updated waste disposal costs for through the remainder of 2025. We will reach out again at the beginning of 2026 for updated rates.
Scenario 1
FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has not been investigated for at the site. $260.00 per drum solid or liquid less than 50 miles- Add $95 per additional 50 miles
Scenario 2
FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the laboratory's method detection limit but is below the current provisional groundwater cleanup target level of 70 ng/L. $915.20 per drum solid or liquid- Transportation per drum/load up to 10 drums- $380.00
Scenario 3
FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the current provisional groundwater cleanup target level of 70 ng/L. $915.20 per drum solid or liquid- Transportation per drum/load up to 10 drums -$380.00
Scenario 4
FDEP PRP site where VOA concentrations are below hazardous levels for both soils and groundwater. $260.00 per drum solid or liquid less than 50 miles- Add $95 per each additional 50 miles
Please let me know if you have any questions or if you need anything else from me to support your efforts on this. If any of the above scenarios requires additional analytical results beyond those described, please let me know so I can include those in the overall cost evaluation. I really appreciate your help with this!
Thank you, Blaine Dawson, PG (FL,TN) Senior Geologist detection limit but is below the current provisional groundwater cleanup target level of 70 $915.20 per drum solid or liquid- Transportation per drum/load up to 10 drums- $380.00
From: Tony Burgess To: Blaine Dawson Subject: Re: IDW Management Quotes Date: Monday, September 22, 2025 2:27:31 PM
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."
Blaine, We went through the scenarios described below.
Please contact me with any additional questions or concerns.
Scenario 1 FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has not been investigated for at the site.
NonHaz - $225.00/55 Liquids/Solids – No PFAS F002 - $625.00/55 Liquids and Solids – No PFAS Scenario 2 FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the laboratory's method detection limit but is below the current provisional groundwater cleanup target level of 70 ng/L.
PFAS only - $625.00/55 Liquids and Solids F002 & PFAS - $7.40/Lb with $625.00/55 Min – Liquids F002 & PFAS - $4.40/Lb with $625.00/55 Min – Solids Scenario 3 FDEP drycleaner site where VOC concentrations are below hazardous levels for both soils and groundwater, and PFAS has been detected at concentrations above the current provisional groundwater cleanup target level of 70 ng/L.
PFAS only - $625.00/55 Liquids and Solids F002 & PFAS - $7.40/Lb with $625.00/55 Min – Liquids F002 & PFAS - $4.40/Lb with $625.00/55 Min – Solids Scenario 4 FDEP PRP site where VOA concentrations are below hazardous levels for both soils and groundwater.
NonHaz - $225.00/55 Liquids/Solids – No PFAS F002 - $625.00/55 Liquids and Solids – No PFAS Please add:
Energy/Insurance------------20% (Total Ticket) Transportation----------------$450.00/stop
York Environmental Services PO Box 600532 Jacksonville, FL 32260 Phone: (904) 718-0883 cleanup target level of 70 ng/L.
PFAS only - $625.00/55 Liquids and Solids
Energy/Insurance------------20% (Total Ticket)Energy/Insurance------------20% (Total Ticket) Transportation----------------$450.00/stop
GeoTek Services, LLC
22 October 2025
To: Melissa Shook
Geosyntec Consultants, Inc.
6770 South Washington Avenue, Suite 3 Titusville, Florida 32780
From: GeoTek Services, LLC 4060 Sparrow Hawk Road Melbourne, Florida 32934
RE: Utility Locating Services – Jack Sheehan #1, WPB, Florida
Ms. Shook, GeoTek Services is pleased to respond to your request for Utility Locating services at Jack Sheehan #1 located in West Palm Beach, Florida. We will scan a (10’ x 10’) area around the four proposed bore locations with the goal of locating underground utilities. We can only scan the easily accessible open areas for utilities. Note that we cannot scan beneath fixed objects such as vehicles, structures, obstructions. We will scan as close as reasonably possible to fixed objects such as curbs, landscaping, or obstructions, etc. Our deliverable will be marking paint or flags indicating the horizontal location of potential underground utilities. It is the client’s responsibility to protect and preserve all marks.
We will use both Electromagnetic Induction instruments as well as Ground Penetrating Radar (GPR) to detect objects below the surface. Due to the nature of sub-surface detection and the physical laws governing radio wave propagation, some buried objects may not be detectable due to depth, obscuration, or a weak radar signature. GeoTek Services will use industry standard best practices to locate sub-surface objects, however some objects may not be detectable. Geotek Services does not guarantee that all underground objects can be found. GeoTek Services assumes no liability for any damages.
We request access to any as-built site plans of the scan areas prior to rendering services. We also request all grassy areas to be mowed prior to scanning. Our fixed price quote for this effort is $750.00. No out-of-pocket expenses are expected for this project. This quote is valid for sixty days.
Best Regards, Martin (Bud) Connor GeoTek Services, LLC
4060 Sparrow Hawk Road Melbourne, FL 32934-8525 info@GeoTekServices.com 321.473.7498
ESTIMATE
Blood Hound Corporate Headquarters 6500 Technology Center Dr., Suite 200 Indianapolis, IN 46278
Email: BHI@bhug.com bhug.com Website: Phone #: 888-858-9830 888-858-9829 Fax #:
Corporate Headquarters 6500 Technology Center Dr., Suite 200 Indianapolis, IN 46278
Email: BHI@bhug.com bhug.com Website: Phone #: 888-858-9830 888-858-9829 Fax #:
Corporate Headquarters 6500 Technology Center Dr., Suite 200 Indianapolis, IN 46278
Email: BHI@bhug.com bhug.com Website: Phone #: 888-858-9830 888-858-9829 Fax #:
By signing this Estimate the client acknowledges that they accept the scope of work listed on the estimate, as well as the service rates provided and are providing Blood Hound with a Notice To Proceed (NTP) for the listed Project. If the scope of work should change while the work is in progress, any changes will be documented on the technician’s field notes and signed off on by the client. Signing this estimate also acknowledges that the client agrees to the terms and conditions as they relate to payment for services rendered.
Signature: ______________________________________________________________________________________
Printed Name: ___________________________________________________________________________________
Date Signed: ____________________________________________________________________________________
Payment is due at the time of service, unless you already have an account with us. If you do have an account with us, payment terms are Net 30 days, unless otherwise stated in a pre-approved contract. To learn more, please call the office at 888-858-9830.
PRICE MAY VARY BASED ON ACTUAL TIME ON SITE. The above pricing is based only on the information supplied by the customer.
If a site walk through has not been conducted, this may affect the price.
Please send all POs / Contracts to .BHUGContracts@bhug.com
We look forward to working with you.
File details come from the government source that posted it. Updated .