This document is a Task Assignment (TA) under Contract HW683 between the State of Florida Department of Environmental Protection (FDEP) and Geosyntec Consultants, Inc. The task assignment authorizes work at the Super Drycleaner site located at 5702 Lake Worth Road in Greenacres, Palm Beach County, Florida (FDEP ID: ERIC_5142). The TA is numbered DC003F with a completion date of September 30, 2026. Key personnel include Sarah Aduwa as the FDEP Project Manager and Nick Barnes as Geosyntec's Project Manager.

The scope of work consists of three subtasks: Project Management, Well Abandonment and SVE System Decommissioning Activities, and Report Preparation. Geosyntec will oversee the abandonment of seven groundwater monitoring wells, three vapor extraction wells, and four vacuum monitoring points by a state-licensed water well driller, as well as coordinate the decommissioning of the soil vapor extraction (SVE) system including removal of approximately 325 feet of PVC piping, electrical components, fencing, and related infrastructure. Upon completion, Geosyntec will prepare a letter report documenting these activities with photographic logs and disposal manifests. The total task assignment value is $22,131.09 based on a fixed unit rate, encompassing 67 labor hours. The single deliverable—the Well Abandonment and System Decommissioning Letter Report—is due August 18, 2026, with invoice payment of the full amount due upon FDEP approval of the report. The cost estimate includes labor, travel, subcontractor services (well abandonment, SVE decommissioning, and waste disposal), laboratory analysis, and field equipment expenses.

View the file

Other files

File Type Posted
CN-370000-HW683-BF02C.pdf PDF
CN-370000-HW683-BF04B.pdf PDF
CN-370000-HW683-BIL1BCO1.pdf PDF
CN-370000-HW683-BIL1BCO2.pdf PDF
CN-370000-HW683-CSS01A.pdf PDF
CN-370000-HW683-CSS01B.pdf PDF
CN-370000-HW683-DC001C.pdf PDF
CN-370000-HW683-DC001D.pdf PDF
CN-370000-HW683-DC003A.pdf PDF
CN-370000-HW683-DC004C.pdf PDF
CN-370000-HW683-DC004D.pdf PDF
CN-370000-HW683-DC005F.pdf PDF
CN-370000-HW683-DC008E.pdf PDF
CN-370000-HW683-DC009C.pdf PDF
CN-370000-HW683-DC009E.pdf PDF
CN-370000-HW683-DC009F.pdf PDF
CN-370000-HW683-DC011A.pdf PDF
CN-370000-HW683-DC011E.pdf PDF
CN-370000-HW683-DC011F.pdf PDF
CN-370000-HW683-DC013A.pdf PDF
CN-370000-HW683-DC014A.pdf PDF
CN-370000-HW683-DC016A.pdf PDF
CN-370000-HW683-DC017C.pdf PDF
CN-370000-HW683-DC018C.pdf PDF
CN-370000-HW683-DC01A.pdf PDF
CN-370000-HW683-DC020B.pdf PDF
CN-370000-HW683-DC024A.pdf PDF
CN-370000-HW683-DC029B.pdf PDF
CN-370000-HW683-DC029D.pdf PDF
CN-370000-HW683-DC02A.pdf PDF
CN-370000-HW683-DC02CCO1.pdf PDF
CN-370000-HW683-DC02CCO2.pdf PDF
CN-370000-HW683-DC02DCO2.pdf PDF
CN-370000-HW683-DC02ECO1.pdf PDF
CN-370000-HW683-DC02FCO2.pdf PDF
CN-370000-HW683-DC033A.pdf PDF
CN-370000-HW683-DC034B.pdf PDF
CN-370000-HW683-DC037C.pdf PDF
CN-370000-HW683-DC038B.pdf PDF
CN-370000-HW683-DC038C.pdf PDF
CN-370000-HW683-DC03CCO1.pdf PDF
CN-370000-HW683-DC041A.pdf PDF
CN-370000-HW683-DC041B.pdf PDF
CN-370000-HW683-DC041C.pdf PDF
CN-370000-HW683-DC042A.pdf PDF
CN-370000-HW683-DC044B.pdf PDF
CN-370000-HW683-DC046B.pdf PDF
CN-370000-HW683-DC050A.pdf PDF
CN-370000-HW683-DC050B.pdf PDF
CN-370000-HW683-DC051A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW683

DC003F Completion September 30, 2026

This Task Assignment authorizes Geosyntec to conduct SVE system decommissioning and well abandonment activities at Super Drycleaner site in accordance with Geosyntec’s scope of work, cost estimate and schedule received on April 21, 2026.

Sarah Aduwa 850-245-8973 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Geosyntec

Geosyntec

Nick Barnes 813-557-1165

ERIC 5142

5702 Lake Worth Road Green acres, Palm Beach County, Florida

Super Drycleaner

✔ $ 22,131.09

$ 22,131.09

Scope of Work

Todd Kafka

Contract Manager

Todd K. Kafka, PG (FL) Digitally signed by Todd K. Kafka, PG (FL) Date: 2026.04.30 15:16:37 -04'00'

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2026.04.28 16:01:52 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtasks 1,2,3 - Well Abandonment and System Decommissioning Letter Report;

PM 08/18/2026

Subtasks 1,2,3 - FDEP approval of Well Abandonment and System Decommissioning Letter Report; PM $ 22,131.09

$ 22,131.09

HW683

DC003F

To: HW683 Contract Negotiation File

Super Drycleaner Greenacres, Palm Beach County, Florida

ERIC_5142

From: Sarah Aduwa, Project Manager Date: April 22, 2026 Subject: Negotiation Summary

HW683_DC003F

This Task Assignment authorizes Geosyntec to conduct SVE system decommissioning and well abandonment activities at Super Drycleaner site in accordance with Geosyntec’s scope of work, cost estimate and schedule received on April 21, 2026.

Nick Barnes is the Project Manager.

Subtask 1 – Project Management

Subtask 2 – Well Abandonment and SVE System Decommissioning Activities Geosyntec personnel will mobilize to the Site to observe the abandonment of seven groundwater monitoring wells, three vapor extraction wells (VEWs), and four vacuum monitoring points (VMPs) by a State licensed water well driller. This subtask also includes labor and expenses to decommission the SVE system.

Subtask 3 – Reporting Upon completion of the activities described above, Geosyntec will prepare a brief letter report that documents the well abandonment and SVE system decommissioning activities and includes a photographic log of the activities and the GAC disposal manifest.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task assignment. The final cost is $22,131.09 with 67 labor hours.

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 4/20/2026

Task #: Pending SubTask 1 Project Management SubTask 6

Site: Super Drycleaner SubTask 2 Decommissioning and Well Abandonment Activities SubTask 7

Activity/Phase: Decommissioning SubTask 3 Report Preparation SubTask 8

Project Manager: N. Barnes SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$63.75 Project Manager N. Barnes 6 5.8 $105.00 Principal T. Kafka 2 0 2 0 0 0 0 0 0 0

$63.75 Project Professional N. Barnes 15 5 10 0 0 0 0 0 0 0 $61.29 Project Professional M. Hensley 2 0 2 0 0 0 0 0 0 0 $38.10 Professional R. Temple 28 28 0 0 0 0 0 0 0 0 $36.62 Senior Staff Professional S. Ableson 14 14 0 0 0 0 0 0 0 0

Total Hours 67 6 47 14 0 0 0 0 0 0 0

Direct Labor $3,241.19 $372.88 $1,898.23 $970.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $5,597.53 $643.96 $3,278.24 $1,675.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $8,838.72 $1,016.84 $5,176.47 $2,645.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost Estimate Page 1 of 4 Cost Estimate

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 4/20/2026

Task #: Pending SubTask 1 Project Management SubTask 6

Site: Super Drycleaner SubTask 2 Decommissioning and Well Abandonment Activities SubTask 7

Activity/Phase: Decommissioning SubTask 3 Report Preparation SubTask 8

Project Manager: N. Barnes SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $4,175.00 $4,175.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$6,200.00 $6,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $10,485.00 $10,485.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $1,048.50 $1,048.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $11,533.50 $11,533.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $300.00 $300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $410.00 $410.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $25.00 $25.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $105.00 $105.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $21,247.22 $1,016.84 $17,584.97 $2,645.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $883.87 $101.68 $517.65 $264.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $22,131.09 $1,118.52 $18,102.62 $2,909.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost from Prior CEF: Manual Entry Cost from Delta CEF; Manual Entry

Cost (Prior + Delta): $0.00 Auto-Calculated Rounding Error: $22,131.09 Auto-Calculated

Final Total Cost: $22,131.09 Auto-Calculated

Cost Estimate Page 2 of 4 Cost Estimate

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Super Drycleaner SUBTASK: Decommissioning and Well Abandonment Activities

DATE: 4/20/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Professional N. Barnes 5

Professional R. Temple 28

Sr. Staff Professional S. Ableson 14

TOTAL LABOR 47

VEHICLE TYPE RATE UNIT USEAGE

Truck Temple $120.00 day 2 $240.00 Ableson $120.00 day 1 $120.00

Subtotal $360.00

TOTAL VEHICLE $360.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Drilling (Conventional) Action Environmental Well Abandonment Activities $4,175.00 $4,175.00

Subtotal $4,175.00

IDW

Erwin Remediation GAC drum disposal $110.00 $110.00

Subtotal $110.00

Other Action Environmental SVE Decommissioning Activities $6,200.00 $6,200.00

Subtotal $6,200.00

TOTAL SUB $10,485.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TCLP VOCs $170.00 1 $170.00 TCLP Metals $130.00 1 $130.00

Subtotal $300.00 Shipping

$0.00 Small Cooler (0 to 25 lbs) $110.00 1 $110.00

Subtotal $110.00

TOTAL LAB $410.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Drilling Related

Water Level Indicator $25.00 Day 1 $25.00 Subtotal $25.00

Expendables $40.00 Day 2 $80.00

Subtotal $80.00

TOTAL EQUIPMENT $105.00

Field preparation and field kickoff meeting (1 hr). Round trip mobilization (2 hr x 2 day = 4 hr). Oversee SVE system decommissioning activites, and collect GAC IDW sample (2 days x 10 hrs/day = 20 hours), prepare field documentation package and photo log (3 hrs)

Field preparation and field kickoff meeting (1 hr). Round trip mobilization (2 hr x 1 day = 2 hr). Oversee well abandonment activites (10 hrs), compile and upload field notes and photographic documentation (1 hr).

RPO/tenant notifications (1 hr), FP&L notification/coordination (1 hr), Task Hazard Analysis updates (1 hr), Provide technical support to site personnel daily (0.5 hr/day x 2 days = 1 hr), Review and signature of waste profile and manifest, including pickup scheduling (1 hr).

4/22/2026 Page 3 of 4 Subtask 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Super Drycleaner SUBTASK: Report Preparation

DATE: 4/20/2026

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 2

Senior Professional M. Hensley 2

Project Professional N. Barnes 10

TOTAL LABOR 14

System Decommissioning and Well Abandoment Report and PG sign/seal

Prepare figures for SVE System Decommissioning and Well Abandoment Report

Prepare SVE System Decommissioning Report and Well Abandonment Report including photo log (10 hrs), 4/22/2026 Page 4 of 4 Subtask 3

12802 Tampa Oaks Blvd.

Suite 151

Tampa, Florida 33543

PH 813.558.0990

www.geosyntec.com

21 April 2026

Ms. Sarah Aduwa Florida Department of Environmental Protection Waste Site Cleanup Program 2600 Blair Stone Road Tallahassee, FL 32399-2400

Subject: Scope of Work and CEF/LOE Well Abandonments and SVE System Decommissioning Super Drycleaner 5702 Lake Worth Road Greenacres, Palm Beach County, Florida

FDEP ID ERIC_5142

Dear Ms. Aduwa:

Geosyntec Consultants, Inc. (Geosyntec) has prepared the following scope of work (SOW) and level of effort (LOE) for completing soil vapor extraction (SVE) system decommissioning and well abandonment activities at the Super Drycleaner (herein, the “Site”) located in Greenacres, Florida. A Site Rehabilitation Completion Report (SRCR) was submitted on 10 November 2025 and a Site Rehabilitation Completion Order (SRCO) was issued on 17 February 2026.

On 17 April 2026, Geosyntec confirmed the Site Access Agreement (SAA) was executed with David Associates V, LLC, on 11 July 2017 as the real property owner of the Site located at the above address. The Palm Beach County Property Appraiser database indicates the property owner since 7 September 2000 is David Associates V, LLC and that the property has not changed ownership since then. As a result, Geosyntec believes the current SAA remains in place.

Subtask 1 – Project Management

Nick Barnes will serve as the Project Manager for the proposed SOW. Costs associated with this subtask are directly computed.

Subtask 2 – Well Abandonment and SVE System Decommissioning Activities

Geosyntec personnel will mobilize to the Site to observe the abandonment of seven groundwater monitoring wells, three vapor extraction wells (VEWs), and four vacuum monitoring points (VMPs) by a State licensed water well driller. Well abandonment permit applications for the monitoring wells will be completed and submitted to the South Florida Water Management District

(SFWMD).

Geosyntec requested quotes from licensed drillers to complete the well abandonment activities.

The quotes are provided in Attachment B of this proposal, and an evaluation of the quotes received is attached. The recommended driller (Action Environmental) will tremie grout the wells in place from the bottom of the well up to land surface. The driller will remove the concrete pads and well vaults. The ground surface will then be patched with neat cement, flush to surrounding grade. Concrete, asphalt, and other debris (e.g. well vault, flush-mount manhole covers) generated during the well abandonments will be disposed of by off-site by the Action Environmental.

Photographs of well abandonment activities will be collected in the field and provided as part of the field package for this effort. Action Environmental anticipates the well abandonment activities can be completed in one day. Geosyntec proposes using one field staff (S. Ableson) to provide oversight for the well abandonment activities for the one day.

This subtask also includes labor and expenses to decommission the SVE system and includes the following:

• Removal of approximately 325 feet of 2-inch diameter Schedule 40 polyvinyl chloride (PVC) conveyance piping and/or hose from above drop ceiling and on building exterior wall to SVE system compound area;

• Removal of conveyance pipe metal hanging straps or Unistrut;

• Sealing exterior walls penetrations by repairing stucco;

• Removal of underground, trenched electrical wiring from conduit (approximately 125 feet) from SVE system to transformer (if feasible). Geosyntec will coordinate with FP&L to disconnect wiring prior to decommissioning;

• Removal of electrical meter/disconnect stand and components;

• Removal and disposal of the chain‐link fencing with privacy slats surrounding SVE system and repairing/patching any holes in concrete or asphalt from fence posts;

• Disposal of all removed PVC pipe, metal hanging straps, Unistrut, electrical components, etc. from the decommissioning activities at a proper disposal facility; and

• Properly preparing the SVE system for long-term storage or transport by sealing or capping all penetrations and closing all valves. It is our understanding that Terracon will utilize this system at another location and will be responsible for transporting the system to that location.

Geosyntec submitted bid requests to three qualified Contractors and received two bids for the decommissioning scope of work. Action Environmental was the lowest responsive bidder for decommissioning the SVE system and is recommended to complete the SOW. The bids are provided in Attachment B. Action Environmental anticipates the decommissioning activities can be completed in two days concurrently with well abandonment and will use two field crews.

Geosyntec proposes using one field staff (R. Temple) to provide oversight for the decommissioning activities over two days.

A sample from the vapor phase granular activated carbon (GAC) drum will be collected by Geosyntec staff, with laboratory analysis for volatile organic compounds (VOCs) and metals via the Toxicity Characteristic Leaching Procedure (TCLP) method. Subcontractor quotes for disposal are provided in Attachment B, with Erwin Remediation, Inc. providing the lowest cost and selected for GAC disposal. It is assumed that no on-Site IDW removal oversight is necessary.

Subtask 3 – Reporting

Upon completion of the activities described above, Geosyntec will prepare a brief letter report that documents the well abandonment and SVE system decommissioning activities and includes a photographic log of the activities and the GAC disposal manifest.

Invoice and Deliverable Schedule

Geosyntec proposes the following deliverables and Period of Performance schedule below.

Subtask Deliverable Deliverable Date Invoice Amount

1, 2, 3 Submittal of Well Abandonment and System Decommissioning Letter Report 08/18/2026 $22,131.09

Total $22,131.09 The above schedule assumes that Geosyntec is tasked for this SOW by May 20, 2026.

CLOSURE

It is a pleasure to work with the FDEP. If you require any additional information or have any questions, please contact us.

Sincerely, Nicholas S. Barnes, P.E. Todd K. Kafka, P.G.

Project Engineer Senior Principal Hydrogeologist

Attachments Attachment A – Cost Estimate Forms Attachment B – Subcontractor Bids and Evaluation

ATTACHMENT A

Cost Estimate Forms

ATTACHMENT B

SUBCONTRACTOR BIDS AND

EVALUATION

Subcontractor Days Cost Action Environmental 1 $4,175.00

JAEE 1 $4,515.00

Preferred Drilling Solutions 1 $4,752.50

Subcontractor Days Cost Action Environmental 2 $8,200*

Product Recovery Management 2.5 $10,827.04 Petrotech Southeast

Subcontractor Erwin Remediation

WRI

Enviroserve

* WRI minimum charge $215 **Enviroserve minimum charge $260

$65 + $80**

Well Abandonments

System Decommissioning

Non-responsive

* Action Environmental will reduce cost by $2,000 if awarded both

System Decommissioning and Well Abandonment scopes.

Subcontractor Bid Evaluation

Cost (1 GAC Drum)

IDW

$110 $125 + transportation*

3007 N. 50th St. Tampa, Florida 813-909-0040/0042 fax

January 14, 2026

Sanneri E. Santiago Borres, PhD

Senior Staff Professional

Geosyntec Consultants, Inc.

12802 Tampa Oaks Blvd, Suite 151 Tampa, Florida 33637 D. 813.379.4397 | M. 813.904.7384 Sanneri.santiago@Geosyntec.com

Re: Greenacres

Dear Dr. Santiago Borres:

In accordance with your request, Action Environmental is pleased to provide you with a cost estimate for the abandonment of seven monitoring wells, three vapor extraction wells, and four vapor monitoring points at 5702 Lake Worth Road in Greenacres, Florida. We understand the scope of work includes the following:

SCOPE OF SERVICES

• Daily pre-job safety meetings to discuss the applicable job hazards.

• The permits required will be obtained through the SFWMD and Palm Beach County by a licensed water well contractor (License 9539).

• Abandonment of seven monitoring wells, three vapor extraction wells and four vapor monitoring points by filling with Portland cement from bottom to top using tremie pipe. Once all wells are abandoned, all manholes and pads will be removed, and all will be resurfaced with concrete.

• Disposal of waste properly offsite by Action.

3007 N. 50th St. Tampa, Florida 813-909-0040/0042 fax

ESTIMATED COSTS

5702 Lake Worth Road Greenacres – Well Abandonment – Estimated Costs

Task Quantity Units Rate Extended

Mob/Demob, Vehicles, and Fuel 1 LS $800.00 $800.00 Permitting 1 LS $100.00 $10.00 Drilling Crew 1 Days $2,150.00 $2,150.00 Abandonment Materials (Portland cement, concrete, etc.) 1 LS $575.00 $575.00 Disposal of Waste 1 LS $550.00 $550.00

TOTAL $4,175.00

LS= Lump Sum, EA= Each Project Estimated at 1 Workdays

CONDITIONS and EXCLUSIONS

• Project budgeted as one workday.

• All waste will be properly disposed of offsite.

• Interior manholes will have surface ring removed and a circular concrete patch.

• Exterior pads will be resurfaced with concrete not asphalt patch.

• Assumes no access to water on-site.

Respectfully Submitted, Action Environmental X Jonathan Abbott Drilling Division Manager

Jonathan Abbott, Drilling Division Manager

Preferred Drilling Solutions, Inc.

8820 66th St, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

Date: 1/13/26 FAC ID#:

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Unit Unit Rate Number of Units Extended Price

Rig Type: Auger/Mud Rotary_____

HSA Drilling & Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation)

<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00

Borehole Grouting

4 - inch borehole diameter per foot $0.00 6 - inch borehole diameter per foot $0.00 8 - inch borehole diameter per foot $0.00

1" - 2" Well Installation (includes screen, riser, sand pack, seal and grout)

<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00

4" Well Installation (includes screen, riser, sand pack, seal and grout)

<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00

Double Cased Well $0.00

6" Surface Casing per foot $0.00 per well $0.00

1"- 2" Well Abandonment (includes grouting) per foot $15.00 253.5 $3,802.50 3"- 4" Well Abandonment (includes grouting) per foot $0.00 5"- 6" Well Abandonment (includes grouting) per foot $0.00 2' x 2' Well Pad Removal and Patch each $0.00

Mobilization roundtrip $750.00 1 $750.00

Per Diem per crew / per night $0.00 DOT Approved 55-gal Drum each $0.00 lump sum $100.00 2 $200.00

$0.00

$0.00

$0.00 Standby/Delay/Difficult Access Time per hour $0.00 Additional Development Time per hour $0.00 Additional Decontamination Time per hour $0.00

TOTAL QUOTE PRICE $4,752.50

Project No.:

Rose Hood, Estimating & Scheduling Mgr Date: 1/13/26Signature and Title of Person Submitting Quote: Rose Hood

Days to Complete Scope of Work: 1

5702 Lake Worth Rd, Greenacres, Palm Beach County, FL

Well Completion (includes MH w/ cover, concrete pad, locking well cap, DRILLING

MISCELLANEOUS

Permits/Well Completion or Abandonment Reports

Consultant Name: Geosyntec Consultants

Site Name & Location: Super Drycleaner

PROPOSED SCOPE OF WORK:

Abandon (6) 0.75" - 1" MWs, depths 15' - 60', total footage: 215', remove pads and manholes, restore grade

Abandon (4) 2" x 5.5' VMPs, remove pads and manholes, restore grade

Abandon (3) 2" x 5.5' VEWs, remove pads and manholes, restore grade

Geosyntec Consultants, Super Drycleaner, Greenacres, FL.xlsx

3007 N.50th St. Tampa, Fl 33619 Ph:813-909-0040/0042 fax

April 15, 2026

Nicholas S. Barnes, PE (FL) Project Engineer

12802 Tampa Oaks Blvd, Suite 151 Tampa, FL 33637 Mobile: 813-557-1165 Direct: 813-379-4388

Re: Super Drycleaner - SVE System Decommissioning 5702 Lake Worth Rd., Greenacres, FL

Dear Mr. Barnes:

In accordance with your request Action Environmental is pleased to provide the following proposal for the removal of the decommissioning of the SVE system located at the Super Drycleaner in Greenacres, Florida.

Scope of Work

• Remove approximately 325 feet of 2-inch diameter Schedule 40 polyvinyl chloride (PVC) conveyance piping and/or hose from above drop ceiling and on building exterior wall to SVE system compound area;

• Remove conveyance pipe metal hanging straps or Unistrut;

• Seal exterior walls penetrations by repairing stucco;

• Remove underground, trenched electrical wiring from conduit (approximately 125 feet) from SVE system to transformer (if feasible). Geosyntec to coordinate with FP&L to disconnect wiring prior to decommissioning;

• Remove electrical meter/disconnect stand and components;

• Remove and dispose chain‐link fencing with privacy slats surrounding SVE system and repair/patch any holes in concrete/asphalt from fence posts;

• Dispose of all PVC pipe, metal hanging straps, Unistrut, electrical components, etc. from the decommissioning activities at proper disposal facility; and

• Properly prepare SVE system for long-term storage by sealing or capping all penetrations and closing all valves.

Cost: $8200

Conditions/Assumptions

• Exterior wall penetrations to be sealed with concrete with concrete – excludes painting.

• Underground wire to be removed by hand and if unable to pull then the wire shall be capped and abandoned.

• Deduct $2000 if Well Abandoment scope is awarded in conjuction with the SVE removal.

Respectfully Submitted, Action Environmental

Josh Pryor Construction Division Manager

Quote #D27863

Apr 16, 2026

Product Recovery Management, Inc

200 20th Street

Butner, NC, 27509, United States

919-957-8990

SHIPPING ADDRESS

Nicholas Barnes

Geosyntec Consultants

5702 Lake Worth Rd

Unit 6

Greenacres FL 33463

United States

Tel. (850) 766-1628

CUSTOMER

Nicholas Barnes

Geosyntec Consultants

12802 Tampa Oaks Blvd

Unit 6

Tampa FL 33637

United States

PAYMENT

Pay online

SCOPE OF WORK This proposal is being presented for PRM to mobilize to the Super

Drycleaner site (FDEP Facility ID ERIC_5142), located at 5702 Lake Worth

Road, Unit 6, Greenacres, Florida, to decommission the existing soil vapor extraction (SVE) system and associated aboveground components. Scope includes removal and disposal of approximately 325 linear feet of 2-inch conveyance piping and/or hose located above drop ceiling and along the exterior of the building, removal of associated metal supports and Unistrut, removal of electrical components including meter/disconnect stand and wiring (following utility disconnect by others), removal of compound fencing, sealing of wall penetrations, and preparation of the SVE system for long-term storage.

PRM will provide up to two and one-half (2.5) days onsite with two (2) technicians to complete decommissioning, removal, loading, disposal coordination, and basic restoration/patchback associated with the above scope.

ITEMS PRICE TAX QTY ITEM TOTAL

Mobilization / Demobilization (>100 miles)

Description: Mobilization for travel to and from site (greater than 100 miles) for SVE system decommissioning activities.

$4,447.86 $0.00 1 $4,447.86 https://admin.shopify.com/store/prm-sample-1/apps/order-printer-emailer/print/draft?id=1025572602041 1/3 tel:919-957-8990 https://shop.prmfiltration.com/8220771/invoices/d9e3da16abc98e95f2e1bd86b10bd727

SVE System Decommissioning (Onsite Labor)

Description: Provide onsite labor for two (2) technicians (up to 2.5 days) to decommission the existing SVE system, perform removal of associated components, and prepare the system for long-term storage. Additional time required beyond the stated duration will be billed accordingly.

$5,000.00 $0.00 1 $5,000.00

Dumpster Rental

Description: Provide dumpster, transportation, and disposal of debris generated from SVE system decommissioning activities including piping, hose, metal supports, fencing, electrical components, and general construction debris.

$845.00 $4.23

$50.70 1 $845.00

FS Misc: Field Supplies and PPE

Description: Materials required to seal and patch wall penetrations and perform minor restoration of interior and exterior surfaces impacted by SVE system removal.

$450.00 $2.25

$27.00 1 $450.00

Subtotal $10,742.86

Shipping $0.00

TOTAL (USD) $10,827.04

By proceeding with your order, you agree to abide by our terms & conditions, and our return policy.

Please note: Due to global volatile pricing and product availability, all prices are valid for 24 hours.

Purchases completed after 24 hours from the date and time an Invoice is delivered are subject to surcharges commensurate to PRM's costs.

Product Recovery Management, Inc.

--Standard Terms and Conditions--

Product Recovery Management, Inc. is herein referenced as PRM. The client reviewing, accepting or approving this and/or other document(s) is referred to as Client or by name in this document. The signer is duly authorized and approved to execute such documents and it is understood that the signer's signature accepts and creates a contract between the Client and PRM where Terms and conditions stipulated in this document or any other relevant PRM generated project documents applies and takes precedence over any previously executed contract documents including but not limited to service or vendor. This document is the Standard Terms and Conditions that applies to Sales and/or Service provided by PRM.

Payment Terms Client agrees to pay all invoices in a timely manner. Standard Terms and Conditions on an Open Credit account are Net 30 Calendar days unless otherwise agreed in writing and agreed to by PRM. Overdue invoices are subject to a late fee of 18% per year or 1.5% per month and service charges are subject to be invoiced monthly. Client agrees to pay for all service charges for late payments.

Should PRM be required to bring legal action to collect any sums due under this agreement, the prevailing party shall be entitled to recover its reasonable attorney fees. Client understands and agrees that not paying invoices in a timely manner may cause irrefutable https://admin.shopify.com/store/prm-sample-1/apps/order-printer-emailer/print/draft?id=1025572602041 2/3 https://shop.prmfiltration.com/pages/terms-of-service https://shop.prmfiltration.com/pages/return-policy damage to PRM. In the event that the client cannot make a payment on time for certain reasons, client is required to contact PRM and give notice to reasons why the payment cannot be made on time and Client must establish to PRM a plan to pay off the overdue invoices.

Client Responsibilities and Understandings PRM is in the business of manufacturing and providing materials with focus in the environmental remediation, landfill and process markets. Client understands that PRM accepts Client as the authority and experts of their projects. Responsibility of use of products supplied are the clients responsibility and in no way is PRM responsible for their specific uses. Client understands that misuse or incorrect applications can lead to property or equipment damage or health of personnel onsite as well as potential for death. PRM in no way accepts liability for damages that arise.

Types of Equipment Sold and/or Manufactured by PRM PRM manufactures a wide variety of equipment but most items are specific to the completed systems that PRM manufactures. Since PRMs equipment is for Environmental Protection, many systems are manufactured with special considerations such as metallurgy and chemistry requirements. By accepting this proposal and placing an order relative to one of the clients projects in regards to this equipment, the Client accepts that they understand all of the potential engineering aspects of the equipment including operations and maintenance of such equipment including but not limited to conditions that could be destructive to the equipment and/or it’s performance. The client accepts that performance is based on equipment that meets performance requirements when supplied and that performance may degrade if the condition of the equipment is not kept in optimal operational conditions.

Commodity items - PRM branded and non-branded commodity items that are Industry standard items utilized for a variety of means.

Many of the items sold by PRM can be used for many various market sectors and is not limited to the Environmental markets. These items are used at the client's discretion and should be installed in accordance to good installation practices. PRM is not liable for installations and the safety of those installations.

Environmental Remediation Products - PRM manufactures and sells/leases equipment for the remediation Industry. Client is responsible for implementation and operations of the equipment unless specifically offered otherwise. Client is responsible for the ultimate design of provided systems. PRM is not responsible for performance degradation or damage due to any unknown background constituents in a process stream that may affect equipment. A few examples: (1) a Catalytic Oxidizer may incur catalyst damage for non identified chemical compounds or for concentrations that were not identified properly. Any damages due to these conditions is the Client's responsibility. (2) An air stripping system that is designed for certain volatile chemicals but once operational is found to have surfactants in the stream of any level, altering the performance of the air stripper. (3) Oil Water Separators where surfactants or other chemicals are found to make a standard separator inefficient are not the responsibility of PRM. These issues are the responsibility of the Client. In many cases, site equipment may need to be modified or augmented with additional equipment to meet the site requirements.

Returns PRM accepts returns for items that are deemed defective and/or authorized by PRM. Returns for certain items are not allowed if they are customized for the client. Authorized non-defective returns are subject to a 20% restocking fee and must be in the original packaging and packaged as like new. PRM can not take returns for equipment that has been used in any process where water, air or vapors may have been processed. Client is responsible for return shipping of authorized returns. It is the client’s responsibility to receive prior approval for returns in advance of shipping items back to PRM. Returns must be properly identified with a return authorization number and contact. Returns lost in transit are the responsibility of the Client. All products or equipment shipped back to PRM are required to be fully decontaminated and cleaned prior to shipment back to PRM. Any equipment not properly decontaminated is subject to reasonable cleaning and decontamination fees assessed by PRM. If any contaminated equipment is returned to PRM that results in site contamination, or a requirement to remediate at PRM’s property, client is responsible for those costs incurred to do so and is subject to the liability of potential contamination including, but not limited to, property damage and value

Dispute Resolution In the event that legal action is required by PRM to seek payment for non-payment, Client agrees that jurisdiction and venue will be proper in State Court of North Carolina, Durham County. In the event legal action is taken against Client to collect on a debt or dispute, Client agrees that a Judgment against Client is binding and that that the Client agrees to pay all such fees assessed by Mediation, Arbitration, a Judge or a Jury verdict. Client agrees that the prevailing party in such action will also be entitled to its reasonable attorney fees.

PRM Subsidiary Names- PRM uses Product Recovery Management, Inc. as our formal Corporate name. PRM owns Trade Names that are used for specific industries or market sectors. This is notice that if you are seeing the identification of these Trade names, that you are in fact working directly with Product Recovery Management, Inc. These names include: PrmFiltration.com, pd-blowers.com and

PRM.

Sales and Use Taxes- PRM is registered in AL, AK, AZ, CO, FL, GA, HI, ID, IL, IN, IA, KS, KY, LA, MA, MD, MI, MN, MO, ND, NE, NV, NJ, NM, NY, NC, NH, OH, OK, PA, RI, SC, SD, TN, TX, UT, VA, WA, WV, WI and WY. PRM collects and pays Sales & Use taxes in these regions unless exempted in writing for the project. For States where PRM is not registered, PRM does not collect Sales and Use Taxes unless specifically required and accepted in writing. For those regions, the client is responsible for paying in any required Sales and Use taxes for their project.

https://admin.shopify.com/store/prm-sample-1/apps/order-printer-emailer/print/draft?id=1025572602041 3/3

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Nicholas Barnes Geosyntec Consultants, Inc.

12802 Tampa Oaks Boulevard, Suite 151 Tampa, FL 33637

April 15, 2025

Re: Non-Hazardous Drum Disposal of PFOS/PFAS Impacted Materials

Mr. Barnes:

The price for the transportation and disposal (T&D) of 55-gallon drums of non-hazardous soil, mud, and water is listed below:

Impacted with Non-Hazardous Petroleum or Chlorinated Solvents:

Description Rate Unit

T&D - Non-Haz Soil $ 110.00 Per Drum

T&D - Non-Haz Mud/Water $ 125.00 Per Drum

Impacted with Non-Hazardous PFAS/PFOS:

Description Rate Unit

Profile Fee (Charged once per site) $ 350.00 Per Site

T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum

T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum

Dry cleaning sites will require 8260-VOH lab analysis and PFAS sites will require the full FDEP lab analysis for IDW waste characterization.

This quote is valid for 120 days.

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: Robert@ErwinRemediation.com Office: (850) 466-2358

10/22/2025 02:27 PM PAGE 1 OF 10

Scope of Work

T&D OF DRUMS OR BULK

DRUMS MUST BE ACCESSIBLE/DOT SHIPPABLE

LEVEL SURFACE/VAC TRUCK ACCESSIBILITY REQUIRED

PROFILE APPROVAL REQUIRED- ANALYSIS REQUIRED PENDING WASTE STREAM

DOE VARIABLE FUEL SURCHARGE APPLIED TO TRANSPORTATION

11% EIC TO INVOICE

755 PRARIE INDUSTRIAL PKWY,

MULBERRY, FLORIDA, 33860

QUOTE #: 0053486

DATE: 06/11/2025 PROJECT PROPOSAL

CLIENT

GEOSYNTEC FLORIDA

TBD,

PROJECT DESCRIPTION

T&D BULK/DRUMS

FLORIDA

THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE

CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.

FEE STRUCTURE

TRANSPORTATION

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

VAC TRUCK

NOTES: 4 HOUR MINIMUM

4.00 $153.00 HOUR $612.00

ROLL OFF TRUCK

NOTES: 4 hour minimum

- $150.00 HOUR -

LTL DRUMS 0-50 MILES

NOTES: $140 MINIMUM

4.00 $35.00 55 GAL DRUM $140.00

LTL DRUMS 51-100 MILES

NOTES: $200 MINIMUM

4.00 $50.00 55 GAL DRUM $200.00

LTL DRUMS 101-200

NOTES: $260 MINIMUM

4.00 $65.00 55 GAL DRUM $260.00

VARIABLE 28% FUEL SURCHARGE - $0.28 EACH -

LTL DRUMS > 200 MILES

NOTES: CASE-BY-CASE

- - EACH -

TRANSPORTATION SUBTOTAL: $1,212.00

LABOR

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

VAC TRUCK DECON

NOTES: 1 HOUR MINIMUM

1.00 $275.00 HOUR $275.00

LABOR SUBTOTAL: $275.00

EQUIPMENT

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

10/22/2025 02:27 PM PAGE 2 OF 10

ROLL BOX - $25.00 DAY -

LINERS FOR BOX - $60.00 EACH -

ANALYSIS

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

TCLP BENZENE + 4 METALS - $370.00 EACH -

TCLP BENZENE - $135.00 EACH -

DISPOSAL

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

NON-HAZ BULK SLUDGE

NOTES: 5 TON MINIMUM

5.00 $160.00 TON $800.00

NON-HAZ DRUMS 1.00 $80.00 55 GAL DRUM $80.00

NON-HAZ BULK SOIL

NOTES: 5 TON MINIMUM; $80/TON WITH DEBRIS

- $50.00 TON -

DISPOSAL SUBTOTAL: $880.00

JOB ESTIMATE: $2,367.00

ENVIRONMENTAL FEE: $260.37

TOTAL JOB ESTIMATE: $2,627.37

Job Estimate is for budgetary purposes only. Job will be billed according to time and materials used.

Time and Material Rates shall be charged portal to portal.

Please note that surcharges shall apply for off specification materials.

Applicable taxes and Environmental Fees are not included in our quotation, but shall be charged as applicable to the work.

Durations and Quantities are estimated only, actual fees shall be charged as incurred.

Minimum disposal amounts may apply to bulk disposal.

Tolls are not included in transportation rates

E-manifest fees will apply to hazardous waste manifests

Demurrage charged after one hour loading & unloading

Pricing assumes that drums/pallets are staged on a hard surface, accessible via van truck with liftgate & one driver with drum dolly or pallet jack.

Inaccessible areas (mud, heavy gravel), excessively heavy, deformed, unwieldy drums may require additional labor and equipment to assist. Fees for additional labor and equipment will be charged per EnviroServe's standard T&M rates.

The following materials are not eligible for LTL pricing and require direct or dedicated shipment to the TSDF: Cyanides, DOT Class 4.3 materials, DOT Class 1.4, 1.5 & 1.6 materials, Temperature Controlled/Self Reactive Materials, Odorant Materials (Mercaptans/Thiols), and other reactive/incompatible materials on a case by case basis. High hazardous containers (pails, drums, boxes, cylinders, etc.) will need to be assessed on a case by case basis to determine ability to be transported by EnviroServe.

Pricing for supplies (drums, pails, absorbent pads, etc.) is variable and may be adjusted without notice to account for market increases.

Energy Surcharge shall be applied to entire bill. (Currently 11%)

DOE Variable Fuel Surcharge Applied to Transportation (Currently 28%)

10/22/2025 02:27 PM PAGE 3 OF 10

Conclusions

Our services will be accordingly limited to those activities herein listed unless specific changes, additions or deletions to the scope of work are submitted in writing to this office. If there is any misunderstanding or if you have any questions, please contact the undersigned. Please note that this proposal is valid for 60 days. Pricing is subject to change without notice.

This proposal is not final until the waste stream has been properly characterized, profiled, and accepted by the disposal site.

All services to be performed in accordance with EnviroServe's standard terms and conditions.

Sincerely, CRAIG BURNS

CRAIGBURNS@ENVIROSERVE.COM

(863) 327-6289

ENVIROSERVE

ACCEPTANCE

ISSUANCE OF A PURCHASE ORDER BY CLIENT AND/OR INITIATION OF SERVICES BY ENVIROSERVE FOR THIS PROJECT CONSTITUTES

ACCEPTANCE OF ALL TERMS AND CONDITIONS CONTAINED HEREIN, AS WELL AS AUTHORIZATION FOR THE ABOVE NAMED

ENVIROSERVE REPRESENTATIVE, UNDER CLIENT’S INSTRUCTION AND DIRECTION, TO SIGN WASTE PROFILES, SHIPPING MANIFESTS, AND LDR FORMS ON BEHALF OF SAID NAMED GENERATOR COMPANY.

I HAVE READ AND UNDERSTAND THIS DOCUMENT IN ITS ENTIRETY AND AGREE TO ALL TERMS AND CONDITIONS CONTAINED HERE IN:

BY:

SIGNATURE DATE

TYPED/PRINTED NAME TITLE

PURCHASE ORDER #______________________

GEOSYNTEC FLORIDA

QUOTE #: 0053486

10/22/2025 02:27 PM PAGE 4 OF 10

Terms and Conditions

The following terms and conditions apply to all materials sold and services provided by EnviroServe Inc. (“EnviroServe”) to the Client named on the signature line of this Agreement and are applicable to any subsidiary and/or affiliate of Client that EnviroServe sells materials to or provides services to on such Client’s behalf.

1. Entire and Sole Agreement.

1.1 These terms and conditions, along with any terms provided by EnviroServe in its Quotation, Proposal, or on the face sheet of this Agreement, shall constitute the entire and sole agreement (“Agreement”) between EnviroServe and Client as to the goods sold and/or services provided and shall supersede all prior oral or written agreements by and between EnviroServe and Client. These terms and conditions may not be modified, altered or canceled without the express written agreement signed by both EnviroServe and Client. In the case of any inconsistency between these terms and conditions and any other terms, conditions, or provisions, then the terms and conditions set forth herein shall expressly control. Client expressly waives all provisions contained in any correspondence or forms involved in this transaction which negate, limit, extend or conflict with the terms and conditions stated herein. Client agrees that it has not been induced to enter into this Agreement by any oral or written representation, guaranty or warranty made by EnviroServe, its employees, agents or representatives other than as expressly set forth herein or on the face sheet hereof. If any portion of this

Agreement is deemed to be illegal or unenforceable by a court of law, then the validity of the remaining portions or provision shall not be affected and shall remain in full force and effect. Notwithstanding the preceding sentence, if EnviroServe in its sole discretion determines that the absence of the eliminated provision is contrary to the original intention of the parties, then EnviroServe shall have the right to terminate the Agreement.

1.2 Client's engagement of EnviroServe represents Client's acceptance of this Agreement, which constitutes the entire understanding and supersedes any prior or subsequent communications, representations or agreements of the parties, whether oral or written, including Client's additions or different terms and conditions that may be contained in any purchase order, work order, acknowledgment form, manifest or other document referenced, incorporated, and/or provided by Client to EnviroServe, to which notice of objection is hereby given. Any terms and conditions referenced, incorporated, and/or provided by Client, and any Client additions, subtractions, or edits to the terms and conditions stated herein, are void and of no effect.

1.3 EnviroServe shall perform in accordance with generally accepted industry principles and practices, in a manner consistent with that level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions.

2. Personnel and Safety.

2.1 EnviroServe's personnel endeavor to conduct field activities in such a manner as to protect themselves and others from accidents and injury.

EnviroServe's personnel use their own safety equipment (hard hat, protective clothing and eyewear, respirator, etc.) unless otherwise instructed. Client agrees to notify EnviroServe in writing before the work proceeds in the event Client is aware of a special safety need.

2.2 EnviroServe shall have the right to subcontract any or all of the work covered by the Agreement. Any assignment of this Agreement or any rights hereunder by Client without written consent of EnviroServe shall be void.

2.3 EnviroServe will perform the services as an independent contractor. For the purposes of its performance hereunder, EnviroServe is not a servant, employee or other agent of Client. EnviroServe shall have the exclusive right to determine how its work or services will be accomplished and Client shall have no right to control and shall not control or direct the details, manner or means by which EnviroServe obtains or provides services to Client.

EnviroServe may continue to offer its services to the general public. Except as may be provided for herein, neither party may enter into agreements, make commitments or incur liabilities or obligations on behalf of the other party. Nothing in this Agreement will be deemed to create an agency relationship, partnership or joint venture between EnviroServe and Client, each of which is expressly denied.

2.4 Client warrants to EnviroServe that Client has procured the requisite legal right, title, and interest necessary to provide EnviroServe legal access to the job site ("Site"). EnviroServe will take reasonable precautions to minimize any damage to the Site and adjoining properties. Client shall identify and locate the area to be serviced at the Site and shall identify and accurately mark all pipelines, utilities, and other facilities at or near the work area.

EnviroServe is not charged with knowledge of any latent, concealed, or subsurface site conditions, and shall not be liable for: (i) damage or injury to any subsurface structures (including, but not limited to, utilities, mains, pipes, tanks, and telephone cables, human remains, burial markers, archeological sites, wetlands or hazardous materials or any wastes not identified in the Agreement) or any existing subsurface conditions, or the consequences of such damage or injury, if such structures or conditions were unknown and were not identified or shown, or were incorrectly shown, in information or on plans furnished to or obtained by EnviroServe in connection with the services; (ii) concealed conditions encountered in the performance of the services; (iii) concealed or unknown conditions in an existing structure at variance with the conditions indicated by the Agreement or information furnished to or obtained by EnviroServe; or (iv) unknown subsurface physical conditions that differ materially from those ordinarily encountered. Should EnviroServe encounter such conditions, the Parties shall agree on a revised Scope of Work providing for an equitable adjustment of the price and/or time of performance to account for such unknown or changed conditions. EnviroServe’s duty to defend, indemnify and hold harmless, as provided in this Agreement and otherwise, shall not extend to any losses arising out of, resulting from, or in any way connected with, any such latent, concealed, or subsurface conditions.

2.5 Client agrees to de-energize, lock out, tag out, and ground any electrical equipment consistent with EnviroServe's schedule for services, provide utility services required for the performance of services; provide ventilation capacity, as specified, provide access to workrooms, toilet facilities, first-aid and medical facilities as available, for EnviroServe personnel; re-energize the equipment after servicing by EnviroServe. Client shall be responsible for all loss, damage, or injury to equipment that is de-energized including fuses, cutouts and switches, and shall operate its equipment before, during and after servicing in accordance with state, local and federal laws. Client acknowledges that all equipment may be affected by operating conditions other than those for which the equipment was designed. Client recognizes that equipment is subject to failure at any point and failures may be brought about prematurely by excessive heating, overloading, shock loading, transient voltage surges, among other causes, all of which are within the exclusive control of Client. Client is aware that operating conditions, including examples stated above which contribute to the failure of equipment may exist prior, during and subsequent to the performance of the services.