This Task Assignment (TA) BIL03A is issued by the State of Florida Department of Environmental Protection (FDEP) to Geosyntec Consultants, Inc. under Contract Number HW683. The task assignment is effective through January 26, 2024, and involves environmental consulting services for the Jackson Square property located at 4151 Lafayette Street in Marianna, Florida. The project is undertaken pursuant to the State and Tribal Response Program (SRP) grant administered by FDEP. Nancy Murchison serves as the FDEP Project Manager, while Kevin Warner is the Contractor's Project Manager.
The scope of work consists of two primary subtasks: project management and preparation of a Quality Assurance Project Plan (QAPP) including a site visit. The site visit is designed to identify the location of a former dry-cleaning facility within the 3,300 square-foot building, determine optimal locations for soil borings and Modified Active Gas Sampling (MAGS), and identify on-site utilities. Geosyntec will prepare a comprehensive QAPP work plan for conducting site assessment activities to characterize chlorinated volatile organic compounds (CVOCs) contamination in soil and groundwater. The fixed unit rate for this task assignment is $7,865.11, with deliverables due by November 28, 2023. Payment is contingent upon approval of the QAPP and project management completion. The cost estimate includes 44 hours of labor from multiple staff levels, vehicle rental of $120.00, and a completion fee, with no subcontractor costs, laboratory costs, or field expenses included.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW683
BIL03A Completion January 26, 2024
This Task Assignment (TA) is issued in accordance with the Cost Proposal (CP) submitted by Geosyntec Consultants on October 11, 2023. This TA involves Project Management, a site visit, and preparing a Quality Assurance Project Plan (QAPP).
Nancy Murchison 850-245-8979 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Geosyntec Consultants, Inc.
Geosyntec Consultants, Inc.
Kevin Warner 850-518-1833
ERIC_18453
4151 Lafayette Street, Marianna, Florida
City of Marianna-Jackson Square
✔ $ 7,865.11
$ 7,865.11
Scope of Work
Joseph L. Applegate, P.G.
Sr. Principal Hydrogeologist
Joseph Applegate Digitally signed by Joseph Applegate Date: 2023.10.27 10:12:15 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2023.10.18 08:56:30 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Site Visit and Submittal of Work Plan/QAPP/Project Management 11/28/2023
Approval of QAPP/Project Management (Subtask 1 and 2) $ 7,865.11
$ 7,865.11
HW683
BIL03A
www.FloridaDEP.gov
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Geosyntec Consultants, Inc HW683 Contract File
FROM: Nancy Murchison, Project Manager
DATE: October 17, 2023
SUBJECT: Negotiation Summary – SRP28
Task Assignment (TA) – BIL03A Jackson Square, City of Marianna – ERIC_18360 File Review Letter of Findings, QAPP/Workplan and HASP
This Task Assignment authorizes Geosyntec Consultants, to complete a site visit and the preparation and submittal of a Quality Assurance Project Plan for the referenced site.
Due to multiple businesses in the 3300 square foot building the exact location of the drycleaning facility is unknown. The 4 hours for the Site Visit includes identifying the former drycleaner and the location of the drycleaning machine. The site visit will also include identifying where soil borings can be placed and the best area for modified active gas sampling can be conducted. The information obtained from the site visit will be used and detailed in the QAPP.
The FDEP project manager agrees to the scope of work and proposed cost. The final cost associated with this task assignment is $7865.11 with 44 hours.
http://www.floridadep.gov/
FDEP COST ESTI MATEContractor: Geosyntec Consultants
Date: 10/11/2023
Task #: QAPP Work Plan SubTask 1 Project Management SubTask 6
Site: Jackson Square, Marianna SubTask 2 QAPP Work Plan & Site Visit SubTask 7
Activity/Phase: QAPP Work Plan & Site Visit SubTask 3 SubTask 8
Project Manager: K.Warner SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$77.26 Project Manager K. Warner 4 3.8 $83.14 Principal J. Applegate 2 2 0 0 0 0 0 0 0 0 $77.26 Principal K. Warner 14 14 0 0 0 0 0 0 0 0 $59.13 Senior Professional B. Baldwin 0 0 0 0 0 0 0 0 0 0 $51.44 Project Professional M. Hensely 6 6 0 0 0 0 0 0 0 0 $32.69 Senior Staff Professional T. Barnett 20 20 0 0 0 0 0 0 0 0 $37.28 Adminstrative Assistant P. Gallagher 2 2 0 0 0 0 0 0 0 0
Total Hours 48 3.8 44.0 0.0 0 0 0 0 0 0 0
Direct Labor $2,581.96 $297.04 $2,284.92 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $4,459.05 $512.99 $3,946.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $7,041.01 $810.03 $6,230.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
FDEP COST ESTI MATEContractor: Geosyntec Consultants
Date: 10/11/2023
Task #: QAPP Work Plan SubTask 1 Project Management SubTask 6
Site: Jackson Square, Marianna SubTask 2 QAPP Work Plan & Site Visit SubTask 7
Activity/Phase: QAPP Work Plan & Site Visit SubTask 3 SubTask 8
Project Manager: K.Warner SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $7,161.01 $810.03 $6,350.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $704.10 $81.00 $623.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $7,865.11 $891.03 $6,974.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost from Prior CEF: Manual Entry Cost from Delta CEF; Manual Entry
Cost (Prior + Delta): $0.00 Auto-Calculated Rounding Error: $7,865.11 Auto-Calculated
Final Total Cost: $7,865.11 Auto-Calculated
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Jackson Square, Marianna SUBTASK 2: QAPP Work Plan & Site Visit
DATE: 10/11/2023
LABOR CATEGORY
STAFF-TITLE HOURS
Principal J. Applegate 2
Principal Engineer K. Warner 14
Sr Staff Geologist T. Barnett 20
Project Professional M. Hensley 6
Admin Assistant Pam Gallagher 2
TOTAL LABOR 44
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 per day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
*PROVIDE TIME REQUIRED FOR EACH PERSON
WORK DESCRIPTION
Final Draft QAPP Work Plan(1 hr), scope meeting with FDEP (1 hr)
Scope development (3 hrs), Site Visit (4 hrs + 2 hrs travel), QAPP Work Plan Preparation/Review (4 hrs), and scope meeting with FDEP (1 hr)
QAPP Work Plan Preparation (10 hrs), Tables (2 hrs), Figures (2 hrs), Site Visit (4 hrs +2 hrs travel)
Figures (6 hrs)
Formatting anf finalizing QAPP Work Plan
FINAL --7/24/96
2039 Centre Pointe Blvd, Suite 301 Tallahassee, Florida 32308
PH 850-765-9312
www.geosyntec.com
Jackson Square QAPP Work Plan Proposal and Site Visit
11 October 2023
Ms. Nancy Murchison and Billy Hessman Brownfields and CERCLA Administration Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4535 Room 310-D Tallahassee, FL 32399-2400
Subject: Proposal and Level of Effort/Cost Estimate Form QAPP Work Plan for Site Assessment and Site Visit Jackson Square 4154 Lafayette Street Marianna, Florida 32446
Dear Ms. Murchison and Mr. Hessman:
We are pleased to submit this attached Cost Estimate Form and proposed Level of Effort (CEF/LOE) to prepare a Quality Assurance Project Plan (QAPP) to conduct a Site Assessment for the subject property located at 4154 Lafayette Street, Marianna, FL, (“the Site”). The City of Marianna submitted an SRP Grant Application to address contamination on the property and the FDEP accepted the application on 3 October 2023; the FDEP requested that Geosyntec prepare a proposal and LOE/CEF to proceed with a QAPP Work Plan preparation for the site assessment at the Site.
Background
The Jackson Square property was formerly used a commercial shopping center that contained several retail businesses that leased spaces. The shopping center buildings were constructed at the Site in 1960. According to information provided in the Phase I ESA, a dry-cleaning facility began operating at the site in 1975. It is not known how long the dry-cleaning facility operated at the Site. The buildings on the property were damaged by Hurricane Michael in October 2018.
Currently, there are no tenants in the buildings.
Ms. Murchison and Mr. Hessman
Jackson Square QAPP and Site Visit
The Jackson Square property is located in downtown Marianna and the City is encouraging redevelopment of this blighted area. The Jackson Square property has been acquired by a private party for redevelopment of commercial uses that include potential uses as retail gasoline, medical facility, and other potential developments. The cause of the soil and groundwater contamination at the property is unknown. As noted in the Phase II ESA report prepared by MDM, chlorinated ethenes including tetrachloroethene (PCE) and trichloroethene (TCE) were present in groundwater samples collected from four temporary monitoring wells at the site. These compounds may be present as a result releases from the former dry cleaner operations. Four temporary monitoring wells installed during the Phase II were located on the north, west, south and east sides of the sites and were removed subsequent to the Phase II assessment.
The Site is in early redevelopment stages and the purpose of this project is to prepare a work plan to conduct additional site assessment activities to help support remediation, eventual site closure for soil and groundwater impacts to the property and support future site redevelopment. The intent of the proposed additional assessment is to characterize the vertical and horizontal extent of chlorinated solvents (CVOCs) in soil and groundwater, determine groundwater flow directions, and collect soil and groundwater data to support remediation in accordance with FDEP’s Site Cleanup Rule, 62-780 F.A.C. and USEPA Data Quality Objectives. Work will be conducted under the State and Tribal Response Program (SRP) grant administered by FDEP. The associated scope of work consists of the following tasks.
Subtask 1 – Project Management
Subtask 2 – Prepare Quality Assurance Project Plan Work Plan and Site Visit
Pursuant to USEPA’s applicable requirements, Geosyntec will prepare a Quality Assurance Project Plan (QAPP) specific to this Site and the proposed activities. The QAPP will include information on project planning elements, data generation and acquisition, quality assurance related to site assessment data quality objectives, data validation, and proposed additional soil and groundwater assessment. Sampling tables and figures will be prepared that show the locations, number of soil samples and monitoring wells, as well as field screening and laboratory analytical methods that will be employed during site assessment activities.
This work plan focuses on providing site assessment for determining historical operations (dry-cleaning and/or other) source areas that potentially impacted soil and groundwater at the Site with the ultimate goal of delineation of the vertical and horizontal extent of CVOCs in soil and groundwater. As noted above, PCE and TCE were detected above their respective GCTLs in the four temporary groundwater monitoring wells as shown on Figure 4 of the Phase II ESA report.
TCE was detected above its SCTL in a soil sample collected at a depth of 25 feet below land surface from the borehole for SWTW as shown on Figure 3 of the Phase II ESA report.
Geosyntec anticipates conducting soil borings within the buildings in an effort to identify sources of PCE and TCE contamination, DPT soil and groundwater sampling at multiple locations at the Site to determine the extent of soil and groundwater contamination and installing multiple monitoring wells to determine the groundwater quality and groundwater flow directions, as well as providing additional groundwater characterization. In addition, as warranted, Modified Active Gas Sampling (MAGS) testing will be specified in the QAPP to determine potential CVOCs source areas. The proposed assessment will be confined to the Jackson Square property.
A potable groundwater supply well is present within ½ mile to the west of the site. Other potable supply wells will be identified during the assessment. Soil and groundwater investigation derived waste that is generated during assessment activities will be characterized and disposed of properly.
Geosyntec will prepare a site assessment report based on the data collected during the assessment.
The QAPP work plan will also provide key personnel assigned to site assessment activities and regulatory, program, and project managers, key site personnel, and schedules to conduct site assessment activities.
Geosyntec plans to conduct a Site Visit to determine accessibility of existing buildings on-Site for conducting soil borings and potential MAGS testing. Based on the Phase I and II Reports, the location of the former dry-cleaning operation is not well known. Therefore, multiple indoor locations may require testing to determine the source of CVOCs in soil. In addition, on-Site utilities including sewer and water corridors will be identified in the QAPP to determine if contaminant preferential pathways may exist at the Site.
We anticipate completing the Site Visit within 10 days of authorization of this proposal and LOE and completing a QAPP Work Plan within five to six weeks of authorization.
Invoice and Deliverable Schedule:
Subtask Deliverable Deliverable Due Date Invoice Amount 2 QAPP Work Plan and Site Visit 30 November 2023 $6,974.08 1 Project Management 30 November 2023 $ 891.03
Total: $7,865.11
A copy of associated Level of Effort/Cost Estimate Form has been included with this proposal.
As always, we appreciate the opportunity to conduct this project for the FDEP and for the benefit of the City of Marianna. Please contact Kevin Warner at 850.528.2269 or Joe Applegate at
850.556.8419 if you have any questions.
Sincerely, Kevin Warner, P.E. (FL) Principal Engineer
Joseph L. Applegate, P.G. (FL)
Senior Principal Hydrogeologist Attachment(s): LOE Cost Estimate Form
| HW683_BIL03A TA |
| Jackson Square Marianna Negotiation Summary |
| LOE Jackson Square_QAPP Work Plan_Site Visit_Proposal_10_11_2023 |
| Subtask 2 |
| Cost Estimate |
| Formula Sheet |
Jackson Square QAPP Work Plan_Proposal_October 2023