This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Geosyntec Consultants for annual groundwater monitoring services at the Oak Hill Cleaners site (FDEP Facility ID ERIC_4544) located in Jacksonville, Florida. The task assignment is issued pursuant to Contract Number HW683 and carries assignment number DC025A with a completion date of June 30, 2023. The primary contacts are Evan Miller for FDEP and Blaine Dawson for Geosyntec.
The contract authorizes Geosyntec to conduct annual groundwater monitoring activities across three subtasks: Project Management, Groundwater Sampling, and preparation of a Groundwater Monitoring Report. The groundwater sampling subtask includes coordination of site access agreements, replacement of deteriorated monitoring well pads for wells MW002 and MW009 by a licensed drilling contractor, collection of 20 groundwater samples from the monitoring well network via passive diffusion bags and conventional peristaltic pump sampling, and analysis of volatile organic halocarbons by EPA Method 8260B. Investigation-derived water from purge activities will be disposed of in a 55-gallon drum. The total task assignment value is $14,080.30 based on 86 labor hours, structured as a fixed unit rate arrangement. Invoicing is scheduled in two phases: $9,683.28 upon submittal of groundwater sampling field notes and IDW manifest by January 6, 2023, and $4,397.02 upon submittal of the Groundwater Monitoring Report by March 31, 2023. The scope of work, cost estimate, and detailed level of effort worksheets provided by Geosyntec on October 7, 2022, are incorporated by reference as Attachment 1.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW683
DC025A Completion June 30, 2023
This Task Assignment authorizes Geosyntec to conduct annual groundwater monitoring at the Oak Hill Cleaners site in accordance with the Geosyntec scope of work, cost estimate, and schedule received on 07 October 2022.
Evan Miller 850-245-8928 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Geosyntec
Geosyntec
Blaine Dawson 904-450-4271
ERIC_4544
7628-1 103rd Street, Jacksonville, Florida 32210
Oak Hill Cleaners
✔ $ 14,080.30
$ 14,080.30
Scope of Work
Todd Kafka
Contract Manager
Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.
Date: 2022.10.11 14:20:10 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2022.10.11 12:08:15 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2- Submittal of groundwater sampling field notes and IDW manifest 01/06/2023
Subtask 1, 3- Submittal of Groundwater Monitoring Report; Project Management 03/31/2023
Subtask 2- Submittal of groundwater sampling field notes and IDW manifest $ 9,683.28
Subtask 1, 3- Submittal of Groundwater Monitoring Report; Project Management $ 4,397.02
$ 14,080.30
HW683
DC025A
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
To: HW683 Contract Negotiation File Oak Hill Cleaners Jacksonville, Duval County
ERIC_4544
From: Evan Miller, Project Manager Date: October 7, 2022 Subject: Negotiation Summary
HW683 DC025A
This Task Assignment authorizes Geosyntec to conduct annual groundwater monitoring at the Oak Hill Cleaners site in accordance with the Geosyntec scope of work, cost estimate, and schedule received on 07 October 2022.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2 – Groundwater Sampling Effort to coordinate and obtain a current, signed access agreement for the subject Site is included in this subtask.
Before groundwater sampling, a licensed drilling contractor will replace the monitoring well pads and manholes for monitoring wells MW002 and MW009 as they have deteriorated enough to restrict access.
20 groundwater samples from the current network will be collected per the recommendations in the March 2022 Annual Groundwater Monitoring Report. Depth to water measurements will be collected within a 24-hour period from 31 monitoring wells (including the 11 monitoring wells that will not be sampled in this SOW) during sampling or initial gauging. Fourteen monitoring wells included in the current annual groundwater sampling plan will be sampled via PDBs.
Conventional sampling will be performed on monitoring wells MW008, MW010, MW013, MW022, MW023, and MW025 using a peristaltic pump.
Any purge water generated will be containerized in one 55-gallon drum. IDW will be staged near the rear of the facility.
Subtask 3 – Groundwater Monitoring Report An Annual Groundwater Monitoring Report documenting the results of the depth to groundwater measurements and VOH concentrations will be prepared by Geosyntec. The report will contain
MEMORANDUM
Oak Hill Cleaners October 7, 2022 Page Two tables summarizing field/laboratory groundwater data, figures showing groundwater flow direction(s), and a summary of the groundwater monitoring event.
Prior to field work, Geosyntec will obtain an updated Access Agreement from the current real property owner of the Oak Hill Cleaners (ERIC_4544) site.
The DEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $14,080.30 with 86 labor hours.
Geosyntec may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 10/7/2022
Task #: SubTask 1 Project Management SubTask 6
Site: Oak Hill Cleaners SubTask 2 Groundwater Sampling SubTask 7
Activity/Phase: Monitored Natural Attenu SubTask 3 GMR SubTask 8
Project Manager: Evan Miller SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$45.43 Project Manager B. Dawson 8 7.6 $76.92 Principal T. Kafka 1 0 1 0 0 0 0 0 0 0 $45.43 Project Professional B. Dawson 12 8 4 0 0 0 0 0 0 0 $46.15 Project Professional M. Hensley 4 0 4 0 0 0 0 0 0 0 $33.17 Senior Staff Professiona A. Langteau 1 0 1 0 0 0 0 0 0 0 $30.29 Staff Professional D. McGill 59 39 20 0 0 0 0 0 0 0 $37.26 Administrative Assistant P. Gallagher 1 0 1 0 0 0 0 0 0 0
Total Hours 86 8 47 31 0 0 0 0 0 0 0
Direct Labor $3,010.57 $346.35 $1,544.75 $1,119.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $5,199.25 $598.15 $2,667.78 $1,933.32 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $8,209.82 $944.50 $4,212.53 $3,052.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost Estimate Page 1 of 2 Cost Estimate
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 10/7/2022
Task #: SubTask 1 Project Management SubTask 6
Site: Oak Hill Cleaners SubTask 2 Groundwater Sampling SubTask 7
Activity/Phase: Monitored Natural Attenu SubTask 3 GMR SubTask 8
Project Manager: Evan Miller SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $1,250.00 $1,250.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $175.00 $175.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $1,425.00 $1,425.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $142.50 $142.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $1,567.50 $1,567.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,533.00 $1,533.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $260.00 $260.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,793.00 $1,793.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,109.00 $1,109.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,329.00 $1,329.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $13,259.32 $944.50 $9,262.03 $3,052.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $820.98 $94.45 $421.25 $305.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $14,080.30 $1,038.95 $9,683.28 $3,358.07 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost Estimate Page 2 of 2 Cost Estimate
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Oak Hill Cleaners SUBTASK: Groundwater Sampling
DATE: 10/7/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Professional B. Dawson 8
Staff Professional D. McGill
TOTAL LABOR 47
VEHICLE TYPE RATE UNIT USEAGE
Truck $120.00 Day 3 $360.00 Subtotal $360.00
TOTAL VEHICLE $360.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Drilling (Conventional) Preferred Drilling Solutions $1,250.00 $1,250.00
$0.00 $0.00 Subtotal $1,250.00
IDW
Hulls $175.00 $175.00
$0.00 $0.00 Subtotal $175.00
TOTAL SUB $1,425.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs 20 MWs + 1 IDW $73.00 21 0 $1,533.00
Subtotal $1,533.00 Shipping
Large Cooler (25 to 50 lbs) $150.00 1 $150.00 Small Cooler (0 to 25 lbs) $110.00 1 $110.00
Subtotal $260.00
TOTAL LAB $1,793.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Analytical Related
Groundwater Sampling Kit $290.00 Day 2 $580.00 Water Level Meter $25.00 Day 1 $25.00 PDB Diffusion Sampler (2" well) $36.00 Each 14 $504.00
Subtotal $1,109.00 IDW Related
Drum $100.00 Drum 1 $100.00 Subtotal $100.00
Expendables $40.00 Day 3 $120.00
Subtotal $120.00
TOTAL EQUIPMENT $1,329.00
New site access agreement procurement (4); Property owner notification (1); Evaluating and interpreting field data (1); Prepare field package (1); Prepare and sign IDW manifest (1)
Field preparation (2); Mob 3 days @ 1 hr/day (3); Oversee monitoring well pad replacement (4); 17 water level measurements from MWs not sampled first day (2); Collect 14 PDB samples for analysis and redeploy PDB (1 hr/well = 14 hr); Calibration of equipment 2 days @ 0.5 hr/day (1);
Sampling 6 monitoring wells @ 1.5 hrs each (9); Sample management/shipping (2); IDW Management (1); Prepare field package (1)
10/7/2022 Page 1 of 2 Subtask 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Oak Hill Cleaners
SUBTASK: GMR
DATE: 10/7/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 1
Project Professional M. Hensley 4
Project Professional B. Dawson 4
Senior Staff Professional A. Langteau 1
Staff Professional D. McGill 20
Administrative Assistant P. Gallagher 1
TOTAL LABOR 31
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Report formatting and PDF compilation
Develop recommendations and path forward
Updating of GMR figures
GMR preparation
GIS database data checker and submittal
GMR preparation
10/7/2022 Page 2 of 2 Subtask 3
2022 Oak Hill Cleaners SOW
1200 Riverplace Boulevard, Suite 710 Jacksonville, Florida 32207
PH 904.858.1818
FAX 904.396.1143
www.geosyntec.com
7 October 2022
Mr. Evan Miller Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject: Annual Groundwater Monitoring Scope of Work and Level of Effort Oak Hill Cleaners 7628-1 103rd Street, Jacksonville, Florida 32210 FDEP Facility ID ERIC_4544
Dear Mr. Miller, Geosyntec has prepared this Scope of Work (SOW) and Cost Effort Form/Level of Effort (CEF/LOE) for annual groundwater monitoring activities at the Oak Hill Cleaners (Site) (Facility ID ERIC_4544) located in Jacksonville, Florida.
Subtask 1 – Project Management
Blaine Dawson is the project manager, and hours are computed directly in the CEF.
Subtask 2 – Groundwater Sampling
On 7 October 2022, Geosyntec identified that a Site Access Agreement was executed with the real property owner (Equity One [Florida Portfolio], Inc.) on 1 March 2011, for the Oak Hill Cleaners Site (ERIC_4544). On 30 December 2013, Equity One (Florida Portfolio), Inc., sold the property for $10.00 to SUSO 2 Oak Hill LP; however, there is no access agreement with this entity, although Geosyntec has been interfacing with CBRE Property Management regarding access and notifications since our first involvement in 2015. Subtask 2 includes effort to coordinate and obtain a current, signed access agreement for the subject Site.
Prior to groundwater sampling, this subtask includes costs for a licensed drilling contractor to replace the monitoring well pads and manholes for monitoring wells MW002 and MW009. Their deteriorating condition has restricted access to the monitoring wells and may compromise the integrity of future sampling efforts. It is assumed that no changes to the top of casing elevation will be required as part of this effort, so no surveying effort has been included. Bid costs prepared by the drilling companies are summarized in the following table and included in Attachment A.
Based on the bids, Geosyntec recommends selecting Preferred Drilling Solutions to replace the monitoring well pads prior to annual sampling activities.
Well Pad Replacement
Jim Stidham & Associates $1,750
Preferred Drilling Solutions $1,250
Partridge Well Drilling No Bid
Geosyntec will collect 20 groundwater samples from the current monitoring well network per the recommendations in the March 2022 Annual Groundwater Monitoring Report. Depth to water measurements will be collected within a 24-hour period from 31 monitoring wells (including the 11 monitoring wells that will not be sampled in this SOW) during sampling or initial gauging.
Fourteen monitoring wells included in the current annual groundwater sampling plan (MW001, MW002, MW004, MW006, MW014 through MW018, and MW026 through MW031) will be sampled via PDBs. New PDBs will be deployed in each of these same 14 monitoring wells following sample collection for the next annual/biennial event. Conventional sampling will be performed on monitoring wells MW008, MW010, MW013, MW022, MW023, and MW025 using a peristaltic pump. The 20 groundwater samples will be analyzed by a fixed-based lab for volatile organic halocarbons (VOHs) by Environmental Protection Agency (EPA) Method 8260B.
Purge water generated during sampling activities will be placed in a 55-gallon drum and manifested for off-site disposal. IDW will be staged in the rear of the facility. To confirm compliance with the existing non-hazardous IDW groundwater profile with our selected IDW waste hauler Hull’s Environmental Services, an IDW groundwater sample will be collected for VOHs via EPA Method 8260 from the purge water drum. Bid costs prepared by the waste disposal companies are summarized in the following table and included in Attachment A.
IDW Disposal Costs
Water
(per 55-gal. drum)
Universal Environmental Solutions $215
HEPACO, LLC $691.27
Hulls Environmental Services $175
Subtask 3 – Groundwater Monitoring Report
Geosyntec will prepare an Annual Groundwater Monitoring Report documenting the results of the depth to groundwater measurements and VOH concentrations. The report will contain tables summarizing field/laboratory groundwater data, figures showing groundwater flow direction(s), and a summary of the groundwater monitoring event. The report will be signed and sealed by a Florida-licensed professional geologist or engineer. Labor has been included to use the ADaPT files to quality control the groundwater sampling laboratory results (anticipate 1 lab report). A final signed waste manifest for IDW transport and disposal will also be included in the Groundwater Monitoring Report.
Invoice and Deliverable Schedule:
Subtask Deliverable Deliverable Due Date Invoice Amount
Submittal of groundwater sampling field notes and IDW manifest
6 January 2023 $9,683.28
1, 3 Submittal of Groundwater
Monitoring Report 31 March 2023 $4,397.02
Total $14,080.30
As always, it is a pleasure to work with the FDEP. If you require any additional information or have any questions, please contact Blaine Dawson at 904.450.4271.
Sincerely, Blaine Dawson, P.G.
Senior Geologist
Todd K. Kafka, P.G.
Sr. Principal Hydrogeologist
Attachments A – Subcontractor Cost Evaluation and Quotes
Quantity Unit Rate Quantity Unit Rate Quantity Unit Rate
Mobilization 1 Each 550 1 Days 700
Well Pad Repair 2 Each 350 2 Days 525
1 Drum $175 1 Drum $215 1 Drum $191
1 Stopage $500
Note: The selected subcontractor is highlighted in yellow.
Subcontractor Evaluation: Oak Hill Cleaners, Jacksonville, Florida
Well Pad Repair
No Bid
Preferred JSA Partridge
$1,250.00 $1,750.00 N/A
Hepaco, LLC
$175.00 $215.00 $691.27
IDW DISPOSAL
Hulls UES
Preferred Drilling Solutions, Inc.
8820 66th St, Pinellas Park, FL 33782
Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com
Date: 9/23/22 FAC ID#: ERIC_4544
*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner
Unit Unit Rate Number of Units Extended Price
Rig Type: Auger/Mud Rotary_____
Split Spoon Collection (continuous or 5' intervals) (can be used in conjunction with well installation)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Borehole Grouting
4 - inch borehole diameter per foot $0.00 6 - inch borehole diameter per foot $0.00 8 - inch borehole diameter per foot $0.00
1" - 2" Well Installation (includes steam cleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
4" Well Installation (includes steam cleaning decon, screen, riser, sand pack, seal and grout)
<50 foot boring depth per foot $0.00 50 foot to 100 foot boring depth per foot $0.00 >100 foot boring depth per foot $0.00
Double Cased Well $0.00
6" Surface Casing per foot $0.00 per well $0.00 and saw/jackhammer prep.)
1"- 2" Well Abandonment (includes grouting) per foot $0.00 3"- 4" Well Abandonment (includes grouting) per foot $0.00 5"- 6" Well Abandonment (includes grouting) per foot $0.00 2' x 2' Well Pad Removal and Patch each $0.00
Mobilization roundtrip $550.00 1 $550.00
Per Diem per man / per night $0.00 DOT Approved 55-gal Drum each $0.00 Permits (Drilling or abandonment only) each $0.00 Well Pad and Manhole Removal and Reinstallation each $350.00 2 $700.00
$0.00
$0.00 Additional Development Time per hour $0.00 Additional Decontamination Time per hour $0.00 Standby/Delay/Difficult Access Time per hour $0.00
TOTAL QUOTE PRICE $1,250.00
Project No.:
Signature and Title of Person Submitting Quote: _________________________________ Austin Bonacum, Project Estimator Date: 9/23/22
Days to Complete Scope of Work: 0.5
7628 103rd St, Jacksonville, Duval County, FL
Well Completion (includes 30 minute development, MH w/ cover, concrete pad, locking well cap, DRILLING
MISCELLANEOUS
Consultant Name: Geosyntec Consultants
Site Name & Location: Oak Hill Cleaners
PROPOSED SCOPE OF WORK:
Remove and reinstall (2) well pads with 8" manholes
Geosyntec, Oak Hill Cleaners, Jacksonville, FL
547 North Monroe Street, Suite 201 Tallahassee, Florida 32301
Phone: 850-222-3975 Email: driller@jsna.com
Client Information Project Information
Company: Geosyntec Location: Date: 9/23/2022 Client Rep: Blaine Dawson
Phone: Project Type: Crew: 2-man Email: bcdawson@geosyntec.com Rig/Equip: Duration: 1 Day
Proposed Scope of Work
Column1 Column2 Column3 Column4 Column5 Column6 Quantity Price Unit Cost Total Drilling Services 8" to 16" Manhole, Pad Removal and Replacement 2 $525.00 Each $1,050.00
Subtotal $1,050.00 Moblization Job Prep and Mob/Demob - Drilling Services 1 $700.00 LS $700.00
Subtotal $700.00
Total Cost $1,750.00
Ben Rush Acceptance of Above Rates Date JSA Drilling Division Phone: 850-445-3459 Email: brush@jsna.com
This is a cost estimate subject to our stand terms and conditions, not a fixed price bid. Due to the variable nature of subsurface conditions, site acess constraints, and/or site specific information not made known to JSA prior to mobilization, work will be billed on the above unit costs unless otherwise agreed in writing. The client will be responsible for loss or damage to any and all equipment and any associated extra costs, as a result of adverse, risky or unknown site conditions, by requesting field staff to attempt work that is normally beyond the capabilities of the equipment. The client is responsible for any disposal of Investigation Derived Waste (IDW) generated during services unless otherwise stated. At JSA's discretion, a restock fee may be imposed on the invoice for well materials not utilized due to changes in scope by client. Payment terms are net 30 days upon receipt of invoice unless otherwise stated in writing prior to initiation of work.
Jim Stidham & Associates, Inc.
JSA Drilling Division
COST PROPOSAL
Oak Hill Cleaners Jacksonville, Duval County, Florida Abandonment/Repair Other
Remove and replace (2) 8" flush mounted monitoring well manholes and concrete pads. Includs disposal of removed manhole and pad.
mailto:bcdawson@geosyntec.com
Jim Stidham & Associates, Inc. (“JSA”)
TERMS AND CONDITIONS
ACCEPTANCE & CONSIDERATION& TERM: By authorizing Jim Stidham & Associates, Inc. (JSA) to commence work, Client agrees to these terms and conditions and JSA agrees to perform work and/or extend credit in exchange.
PAYMENT & INTEREST: Invoices will be submitted by JSA once a month with payment due from Client within 30 days of the invoice date. At JSA’s discretion, interest at the rate of 1½% per month (18% per annum) will be charged on the principal amount owing after the due date.
DISCLAIMER OF WARRANTY: JSA will exercise reasonable skill and judgment in performing its work. All express or implied guarantees, representations and warranties, including, without limitation, any implied warranty of merchantability, fitness for a particular purpose, whether written or oral, are hereby excluded and are expressly disclaimed by JSA. JSA does not warrant any specific results of any kind. To the extent an implied guarantee, representation, or warranty, cannot be excluded, JSA’S LIABILITY, IF ANY, IS LIMITED TO THE AMOUNT PAID BY CLIENT TO JSA, AND SHALL IN NO EVENT EXCEED THAT AMOUNT.
LIMITATION OF LIABILITY: JSA shall not be liable to Client or any other party for damages of any type, including, but not limited to, indirect, consequential, incidental, special, or punitive damages, whether arising out of contract, negligence, tort, warranty, strict liability or any other legal theory. JSA’S LIABILITY, IF ANY, IS LIMITED TO
THE AMOUNT PAID BY CLIENT TO JSA, AND SHALL IN NO EVENT EXCEED THAT AMOUNT.
NOTICE OF CLAIM: Any and all claims related to or arising from JSA’s work shall be made in writing to JSA within one (1) year after JSA’s completion of its work. Any subsequent claims are waived.
DELAYS/CONDITIONS BEYOND JSA’S CONTROL: JSA shall not be liable for delays in performance beyond JSA’s control, including, but not limited to, acts of third parties, inability to obtain permits, fire, earthquake, flood, windstorm or other natural disasters, labor stoppages, lockouts, strikes or other differences with employees, war, riot, embargoes, or stoppages created by any government agency or authority. JSA’s liability, if any, is limited as provided in the limitation of liability provision.
JOB SITE SAFETY: JSA is not responsible for providing safety monitoring for the site on behalf of Client or any other trade on site. If JSA observes that safety monitoring is not being performed in strict compliance with the site-specific health and safety plan, applicable federal, state or local laws, and/or as contractually required, JSA may cease operations and go on standby until safety monitoring is resumed. JSA shall be entitled to an equitable adjustment in its contract price, including standby time, and for time to perform its work.
INFORMATION: Client has superior knowledge of the job site, site history, access routes to the job site, known or suspected contaminants, surface and subsurface conditions, etc. The Client is obligated to advise JSA of all or any conditions that may affect JSA’s work. Client agrees to provide JSA with such specifications, plans, site history information, reports, studies or other information on surface and subsurface conditions as will be reasonably required by JSA for safe, proper and timely performance of its work. Client shall locate all underground utilities and structures. Client shall obtain all necessary permits and rights-of-way and indemnify, defend, and hold JSA harmless for its failure to do so and for claims of trespass or damage to property, including underground utilities or structures, which arise out of the performance of JSA’s work.
DISPOSAL: JSA is not, and has no authority to act as a generator, operator, treater, storer, transporter or disposer of hazardous waste, substances, pollutants or contaminants found or identified at the site. JSA shall have no responsibility for the transportation, storage, treatment or disposition of contaminated or potentially contaminated waste materials of any kind which are directly or indirectly generated from JSA’s performance of work, other than hazardous wastes, substances, pollutants or contaminants brought to the work site by JSA. Client or its agents shall be responsible for the disposal of any such waste materials.
CHANGED CONDITIONS: The discovery of any hazardous waste, substance, pollutant, contaminant, underground obstruction, condition or utilities on or under the job site which were not brought to the attention of JSA prior to JSA commencing work, and which create health and safety risks, or requires JSA to perform work outside the original scope or beyond its capabilities, will constitute a materially different site condition entitling JSA to immediately terminate its work (and to receive payment for all work performed up to and including the date of termination). If JSA elects to continue its work, it is entitled to receive an equitable adjustment in its contract price, including standby time, and for time to perform its work.
REMEDIATION TERMS: JSA is not responsible for the remediation design and bears no responsibility for the remediation results or impact to existing conditions.
Notwithstanding anything contained here within this agreement to the contrary, Client indemnifies, holds harmless and shall defend JSA and its affiliates, directors, officers, employees, agents and Subcontractors against any claims or actions, including third party claims or actions, arising from any remediation design, results or impact to existing conditions.
INDEMNIFICATION: Client agrees to indemnify, defend, and hold JSA and its agents harmless from and against any and all claims, demands, causes of action (including third party claims for contribution or indemnification), liability and costs (including attorneys’ fees and other costs of defense) which result from (i) any release or threatened release of any substance (whether hazard or not); (ii) any claim that JSA, or any of its subcontractors was a “generator” or “transporter” of hazardous waste or an “operator” of the job site (as such terms are used or defined under local, state or federal laws or regulations); or (iii) any negligent or wrongful act or omission of Client or others under Client’s control, except the duty to indemnify, defend, and hold harmless shall not apply to the extent any demand or cause of action results solely from JSA’s negligence or willful misconduct.
INCORPORATION CLAUSE: All work performed by JSA is subject to these terms and conditions. All terms and conditions contained in JSA’s bids, proposals, and invoices, as now exist and as may be modified, are expressly incorporated herein by this reference and made a part of the terms and conditions.
INTEGRATION: The terms and conditions stated herein constitute the entire understanding of the parties relating to JSA’s work. All previous proposals, offers, and other communications relative to the work, oral or written, are hereby superseded. Any additional or conflicting provision(s) contained in any purchase order, acknowledgment, contract, or other form of the Client is hereby expressly objected to by JSA and shall not modify these terms and conditions.
ATTORNEYS’ FEES & COSTS: The prevailing party shall be entitled to recover all of its costs, fees and expenses incurred in any dispute regarding collecting the balance due, enforcing the terms and conditions, or pertaining to JSA’s work. Such fees and expenses shall include attorneys’ fees, recording fees, and title report fees whether or not legal proceedings are instituted, and if instituted, shall include all other costs, fees expenses and, including without limitation, court costs and expert witness fees incurred in the trial/arbitration, appellate proceedings, and post-judgment.
APPLICABLE LAW/JURISDICTION & VENUE: Any lawsuit to collect the balance due, enforce the terms and conditions, or that pertains to JSA’s work shall be governed by the laws of the State of Florida, USA. Client agrees that if a lawsuit or action is necessary that it shall be brought in Superior Court for Leon County, Florida. In the event that such lawsuit or action includes enforcement of a real property lien, such action shall be brought in the county and state in which the real property is located.
SEVERABILITY: If any of these terms and conditions are determined to be invalid or unenforceable, such determination shall not affect the validity and enforceability of the remaining terms and conditions.
Blaine Dawson
From: Blaine Dawson Sent: Thursday, September 22, 2022 4:22 PM Subject: RFQ - Monitoring Well Pad Replacement Attachments: Oak Hill Cleaners - Site Map.pdf
Good afternoon, I am requesting a quote for the removal (contractor will be responsible for proper disposal of former pad and manhole material) and reinstallation of two flush-mount monitoring well pads in the rear of a shopping plaza in Jacksonville, FL. There should not be any required adjustments to the casing material, just the replacement of damaged well pads.
I’ve attached a site map illustrating where monitoring wells MW002 and MW009 are located. I apologize for the short notice but I would appreciate bids back by COB Friday, 23 September 2022.
Feel free to contact me with any questions. I appreciate your time regarding this matter!
Thank you, Blaine Dawson, PG (FL,TN) Senior Geologist
1200 Riverplace Boulevard Suite 710 Jacksonville, FL 32207 Phone: 904-450-4271 Mobile: 509-433-1195 www.Geosyntec.com
This electronic mail message contains information that (a) is or may be LEGALLY PRIVILEGED, CONFIDENTIAL, PROPRIETARY IN NATURE, OR OTHERWISE PROTECTED BY LAW FROM DISCLOSURE, and (b) is intended only for the use of the Addressee(s) named herein. If you are not the intended recipient, an addressee, or the person responsible for delivering this to an addressee, you are hereby notified that reading, using, copying, or distributing any part of this message is strictly prohibited. If you have received this electronic mail message in error, please contact us immediately and take the steps necessary to delete the message completely from your computer system.
R I
C K
E
O A
D
ASPHALT PAVEMENT
ASPHALT PAVEMENT
ASPHALT PAVEMENT
DP033
DP032
CONCRETE WALK
MINI-MART
OAK HILL
CLEANERS
MW006
MW009
MW007
PLANET FITNESS
MW024
MW025
MW002
MW004MW022
MW011
MW013
MW010
MW005
MW019
MW015
MW023MW014
MW021
MW016
MW018
MW012
MW001
SB006-R
SB016
DPT004
DPT005
DPT006
DPT002
DPT001
DPT007
DPT003
PUBLIX
SB004-R
SB001-R
SB015
SB005-R
SB017
MW003
MW026
MW027
MW008MW028 MW020
MW029
MW020R
MW031
MW017
MW030
MW017R
DP034
DP031
DP035
DP030
Figure:
MARCH 2022
SITE PLAN
OAK HILL CLEANERS
FDEP FACILITY I.D. ERIC_4544
JACKSONVILLE, DUVAL COUNTY, FLORIDA
JACKSONVILLE, FL
0 120'60'
SCALE IN FEET
N
ACTIVE DRYCLEANING FACILITY
SHALLOW MONITORING WELL LOCATION
INTERMEDIATE MONITORING WELL LOCATION
DEEP MONITORING WELL LOCATION
LEGEND: REFERENCE:
1. BASE MAP TAKEN FROM CADD FILE ORIGINALLY
PREPARED BY ECOLOGY AND ENVIRONMENT, INC.
TITLED "SITE PLAN", DATED 07/22/14, CADD FILE
EE-003077-0082-01-A.DWG.
2. AERIAL PROVIDED BY THE FLORIDA DEPARTMENT OF
TRANSPORTATION WEB SITE, DATED 2013.
ABANDONED MONITORING WELL LOCATION
ROCK AQUIFER MONITORING WELL LOCATION
P:
\J
AX
-C
AD
\O
\F D
EP
O
AK
H
IL
L
C
LN
R S
\F R
-F -1
.D
W G
(3
M ar ch
2) e da vi s
DIRECT PUSH TECHNOLOGY BORING LOCATION
SOIL BORING LOCATION
BCDawson Rectangle
BCDawson Rectangle
Blaine Dawson
From: Larry Hall <lhall@hullsenvironmental.com> Sent: Wednesday, March 23, 2022 8:48 AM To: Blaine Dawson Subject: RE: IDW Management Costs - 2022
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic.
Blaine, Jamie Michael our VP of business development is working on this pricing system wide, until he gets the updated rates completed, we will honor these rates for local runs.
Thanks, Larry Hall
From: Blaine Dawson <BCDawson@Geosyntec.com> Sent: Tuesday, March 22, 2022 3:41 PM To: Larry Hall <lhall@hullsenvironmental.com> Subject: RE: IDW Management Costs ‐ 2022
Hi Larry, I wanted to check in on the below request for IDW costs. We currently have a couple local projects in Jacksonville in which I am developing proposals for our client. As part of the scope of work, we will need IDW management services. We anticipate completion of these tasks by the end of Q2, 2022. Are you okay with using the attached rate sheet for these projects or would Hull’s like to provide updated costs?
Let me know if you have any questions or if you need anything else from me. I really appreciate your help with this!
Thank you, Blaine Dawson, PG (FL,TN) Project Geologist
1200 Riverplace Boulevard Suite 710 Jacksonville, FL 32207 Phone: 904-450-4271 Mobile: 509-433-1195 www.Geosyntec.com
7930 U.S. Highway 301 N, Tampa, FL 33637 Office: 813-985-1247
03/04/2021
GEOSYNTEC CONSULTANTS
12802 Tampa Oaks Blvd Suite 151 Tampa, Florida 33637
Dear Todd, Hull's Environmental Services, Inc. (Hull's) is pleased to submit the enclosed Quote for the Scope of Work described, along with our Standard Terms & Conditions. We appreciate the opportunity to quote this work and are prepared to perform the work upon your approval.
Please do not hesitate to call me if you have any questions. To accept the quote, please sign and date the final page of the quote.
Sincerely, Jamie Michael Director of Business Development Hull’s Environmental Services
QUOTE
Customer GEOSYNTEC CONSULTANTS
Project Street Address Various Locations
Project State FL
Project City Various Cities
Project Zip Various Zips
Quote Number Q210169TPA
Quote Date Mar 04, 2021 03:18:16 PM
Phone Number 813-379-4396
Email TKafka@Geosyntec.com
Hull's Rep Jamie Michael
SCOPE OF WORK
Waste T&D for non-hazardous drum pickup and disposal.
Item description Quantity Unit Rate Amount
Northwest (5 drum minimum - Preferred Pricing) 5.00 Drum $ 175.00 $ 875.00
Northeast (5 drum minimum - Preferred Pricing) 5.00 Drum $ 150.00 $ 750.00
Central (5 drum minimum - Preferred Pricing) 5.00 Drum $ 150.00 $ 750.00
Southwest (5 drum minimum - Preferred Pricing) 5.00 Drum $ 150.00 $ 750.00
Southeast (10 drum minimum - Preferred Pricing) 10.00 Drum $ 225.00 $ 2,250.00
Northwest (1-4 drums) 1.00 Drum $ 200.00 $ 200.00
Northeast (1-4 drums) 1.00 Drum $ 175.00 $ 175.00
Central (1-4 drums) 1.00 Drum $ 175.00 $ 175.00
Southwest (1-4 drums) 1.00 Drum $ 175.00 $ 175.00
Southeast (1-4 drums) 1.00 Drum $ 250.00 $ 250.00
Demurrage - up to 1 hour 1.00 Each $ 0.00 $ 0.00
Demurrage > 1 Hour 1.00 Per Hour $ 75.00 $ 75.00
TOTAL $ 6,425.00
UNIT PRICING
STANDARD TERMS AND CONDITIONS
Acceptance and Formation of Contract: All written proposals shall be valid for a period of thirty (30) days. The cancellation or expiration of any contract hereunder shall not affect either Party’s obligations under any orders issued and accepted prior to such expiration or cancellation.
By issuance of a notice to proceed with the work, whether oral or written, Customer agrees to the terms and conditions stated herein. Any terms proposed in Customer's acceptance of this proposal which add to, vary from, or conflict with the proposal or these terms and conditions, are hereby rejected. Any such proposed terms shall be void and the terms in the proposal and these terms and conditions shall constitute the complete and exclusive statement of the terms and conditions of the contract between Hull’s Environmental Services, Inc. (“Hull’s”) and Customer.
Project Documents: Hull’s proposal includes and incorporates Hull’s Rate Schedule which is in effect at the time of performance of the work, all documents provided to Hull’s by or on behalf of Customer and all documents provided to Customer or its representative by or on behalf of Hull’s. The term “Customer” refers to the party with whom Hull’s is contracting. This document is incorporated by reference to the Contract as specified therein and is an integral part of the Contract.
Scope of Work and Price: All work performed hereunder shall be performed and invoiced in accordance with Hull’s written proposal, Hull’s Rate Schedule which is in effect at the time of performance of the work, the other Project Documents, and the terms and conditions stated herein as each may be applicable to the type of work performed. In the event that the scope of work, schedule, or material changes, Customer agrees to pay Hull’s on a time and material basis in accordance with Hull’s then current Rate Schedule or other unit rates, whichever is applicable, unless a revised proposal is prepared by Hull’s and accepted by Customer. Emergency response services shall be performed and invoiced in accordance with Hull’s current Rate Schedule. Unless expressly set forth, Hull’s proposal does not include state or local sales tax. If any such taxes are applicable and the client does not provide a Direct Pay or Tax Exemption Certificate for this work, such taxes will be added to the invoiced amount as a separate line item.
General Conditions of Work: Customer is responsible for furnishing to Hull’s all pertinent data and information concerning the work to be performed hereunder, the nature of the work site and the nature of the conditions to be remediated, including special hazards or risks involved with such work, premises, site or conditions. Unless otherwise stated in Hull’s proposal, all pricing is based upon the following general conditions:
(a) Hull’s will not incur any waiting or standby time for reason beyond Hull’s control; (b) access to, from and at the work site will not be restricted or limited; (c) there will be no overhead, underground, aboveground or other obstructions, rocks, pipelines, or utilities that would impede Hull’s work;
(d) the work site and all access ways shall be suitable for the size and weight of all vehicles and equipment utilized to perform the work; (e) all wastes shall conform to the representations of Customer and the Project Documents; (f) all non-emergency response related work will be performed Monday through Friday during daytime business hours between 8:00 a.m. and 4:00 p.m. (work performed outside of this time frame will be charged at 1.5 times the standard rates or as otherwise provided in Hull’s then current Rate Schedule; work performed on Sundays and holidays will be charged at two times the standard rates); (g) Customer is responsible for all damage to equipment and its components not caused by the direct fault of Hull’s; and (h) Customer is responsible for all costs associated with overloading of containers or trucks including citations, damages to equipment or property, loss of revenue, etc., unless loaded by Hull’s. Any variance in these conditions is considered a change in the scope of work unless expressly otherwise stated in Hull’s proposal. If any of the waste contains materials which do not conform to the descriptions provided by Customer and/or in the Waste Profile Sheets ("non-conforming waste"), Hull’s may, at its option, properly dispose of it, return it to Customer or require Customer to remove and dispose of the non-conforming waste at Customer's expense and reimburse Hull’s for any expenses that it has incurred. Customer is expressly prohibited from allowing any other carrier to move Hull’s equipment without the prior written consent of Hull’s. The equipment that Hull’s furnishes to Customer will remain on its property until moved by Hull’s. Customer will be responsible for any loss or damage resulting from its handling of the equipment, except for normal wear and tear. Customer will not overload by weight or volume, move or alter the equipment and will take reasonable precautions to prevent others from doing the same. Customer will use the equipment only for its intended purpose. If the equipment is inaccessible or overloaded by weight or volume, Hull’s service will be subject to an additional charge as outlined in Hull’s then current Rate Schedule or other unit rates as applicable. Hull’s will not be responsible for damage to Customer's driving surfaces resulting from weight of vehicles or equipment.
Invoicing and Payment: Customer shall make payments due under each invoice within fifteen (15) days of the invoice date. Interest shall begin to accrue on the invoice due date for payments not received by such date at the smaller of (i) the maximum lawful interest rate or (ii) one and one-half (1½%) percent per month. The individual signing the proposal incorporating these terms personally guarantees payment of any charges incurred thereunder. All payments will be first applied to interest, if any. In the event payment is not timely made and Hull’s files a lien or bond claim on Customer’s account, Customer will be assessed an administrative charge of $500.00 plus any applicable costs provided for in paragraph 6. However, Customer expressly agrees that Hull’s is a beneficiary to, and may impose a lien on, any and all of Customer’s insurance policies and/or proceeds. Customer expressly acknowledges that its obligation to pay all amounts incurred hereunder is absolute and is not conditioned upon availability of funding, insurance, or any other reasons.
Disputes and Waiver of Rights: In the event that Customer disputes any portion of any invoice, Customer shall provide Hull’s written notice of the disputed items within fifteen (15) days of the invoice date. The written notice must specifically state the portion in dispute and describe the dispute in such detail that Hull’s has full notice of the dispute. Customer hereby agrees that failure to provide such written notice within fifteen (15) days of the invoice date constitutes waiver of any such dispute and full payment of the invoice shall be provided to Hull’s. Customer agrees that it will not claim any dispute after the fifteen (15) day period that has not been timely specified in writing to Hull’s. Further, Customer agrees that the non-disputed portion of the invoice will be paid within fifteen (15) days of the invoice date. In the event that a lawsuit arises out of any matter related to this contract and Hull’s prevails, Customer agrees to pay Hull’s attorneys’ fees and costs, including, but not limited to, in-house counsel at the rate of $300.00 per hour and outside counsel, plus court costs and expenses. Further, Customer agrees to pay Hull’s for its’ personnel at twice the rate stated in its’ rate sheet for any time spent preparing the case or testifying at a deposition or trial.
Title to Waste: The parties hereto agree that Hull’s is not and shall not be considered the owner or generator of, and shall not take title to, any waste materials or substances remediated, removed or otherwise handled by Hull’s on behalf of Customer. Customer hereby authorizes Hull’s to sign waste manifests and profiles as agent for the generator.
Indemnity: Each party hereto agrees to indemnify, defend and hold harmless the other party hereto and the other party’s shareholders, directors, officers, employees and agents, from and against any and all claims, demands, causes of action and liabilities of any nature, whether for damages to property, business interests, or persons or for death, arising out of or related to the performance of this Contract and/or the conditions to which this Contract pertains, to the extent that any such claims, demands, causes of action and/or liability is attributable to the breach of contract, negligence, or other fault of the indemnifying party. The indemnification by each party shall survive the termination of this Agreement.
Notwithstanding the foregoing, where the work or services provided by Hull’s consists of or is related to emergency response, Hull’s does not waive any right or ability it may have to assert responder immunity pursuant to any applicable Federal, state and/or local laws and ordinances and/or any lawful order, regulation and/or rules thereunder and shall not be liable for any claims where such responder immunity applies.
Assignment: Customer may not assign, transfer or otherwise vest in any other company, entity or person, any of its rights or obligations under the Agreement without the prior written consent of Hull’s, which consent shall not be unreasonably withheld.
Jurisdiction and Venue: The substantive laws of the State of Florida, without regard to conflicts of laws principles that would require application of any other law, shall govern all matters arising out of, or relating to, this Agreement and all of the transactions it contemplates, including without limitation its validity, interpretation, formation, construction, breach, performance, termination and enforcement. The Parties mutually consent to the exclusive jurisdiction of the federal and state courts in the State of Florida and agree that any action, suit or proceeding concerning, related to or arising out of this Agreement and the negotiation of this Agreement will be brought only in a federal or state court in the State of Florida and the Parties agree that they will not raise any defense or objection or file any motion based on lack of personal jurisdiction, improper venue, inconvenience of the forum or the like in any case filed in a federal or state court in the State of Florida.
ADDITIONAL TERMS AND CONDITIONS
Pricing - 5 drum minimum required for preferred pricing (10 drum for Southeast)
CUSTOMER ACCEPTANCE
The undersigned agrees to and accepts the terms and conditions presented in this Quote. This quote shall be in effect for 30 days from this date. This agreement between GEOSYNTEC CONSULTANTS and Hull’s Environmental Services (Hull’s) covers all work, goods or services (which terms are used interchangeably herein) ordered by Customer and supplied by Hull’s for the work described in Hull’s Quote Q210169TPA dated 03/04/2021 and made part of this agreement by reference.
SIGNATURE
0_s_ph
DATE ________________
BID PROPOSAL FORM 2022
FDEP Drycleaner and Hazardous Waste Sites
Investigation Derived Waste (IDW) Transportation and Disposal
Contractor Company Name: HEPACO, LLC
Contact: Linda Basinger, 813-240-8020, lbasinger@hepaco.com
Region T&D of 1 Non-Hazardous IDW Drum (solid or liquid), Process Code STAB01
T&D of 1 Hazardous IDW Drum (solid or liquid), Process Code STAB02
Northwest $ 191.27 $ 367.36
Northeast $ 191.27 $ 367.36
Central $ 170.00 $ 346.10
Southwest $ 170.00 $ 346.10
Southeast* $ 170.00 $ 346.10
Assumptions and Clarifications:
• Unless otherwise specified within this proposal all terms and conditions will be governed by the most recent Master Services
Agreement between GEOSYNTEC and HEPACO, LLC. In the event that a current agreement is not in place all terms and conditions will be governed by HEPACO’s standard service agreement.
• Price is contingent upon profile approval and process code approval into HEPACO’s preferred disposal facilities.
• A minimum stop fee of $500.00 will apply to all shipments.
• The above rates are for less than truck load quantities (LTL).
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .