CN-370000-HW683-DC04ACO1.pdf

PDF 3 MB Posted

Attached to
Master Agreement FL|HW683|90e8124b5a65e607dedb86d39c72016e
Contract number
HW683
Issued by
Florida

About this file

This document is a Task Assignment Change Order (TACO) issued by the State of Florida Department of Environmental Protection (FDEP) for contract HW683 with contractor Geosyntec Consultants. The change order amends the original task assignment DC004A for environmental remediation services at Classic Cleaners, a dry cleaning facility located at 3307 SE Federal Highway in Stuart, Martin County, Florida (ERIC_4929). The Department's Project Manager is Evan Miller (850-245-8928), and the contractor's Project Manager is Todd Kafka (561-922-1033 for the original contact and 813-379-4396 for subsequent contact). This TACO became effective on April 27, 2022.

The change order authorizes a cost increase of $2,309.19 to accommodate additional sampling activities from vapor extraction wells, bringing the total task assignment value from $33,231.06 to $35,540.25, with 169 total labor hours. The work consists of five subtasks: Project Management (Subtask 1); Year 4 Quarter 4 O&M and Reporting covering February through April 2022 (Subtask 2, $6,171.79); Year 5 Quarter 1 O&M and Reporting covering May through July 2022 with additional sampling from eight vapor extraction wells and a required system shutdown for an FDEP bump test (Subtask 3, $26,248.46); Confirmation Soil Sampling (Subtask 4); and six months of utilities from February through July 2022 at cost-plus-fixed-fee arrangement not to exceed $3,000.00 plus a $120 handling fee (Subtask 5, $3,120.00). Deliverables include monthly O&M summary emails, a semi-annual O&M report, GIS tables, and utility invoice documentation, with invoicing scheduled for May 13, 2021, August 26, 2022, and August 31, 2022 respectively.

View the file

Other files

File Type Posted
CN-370000-CN802-T9.pdf PDF
CN-370000-HW683-BF01BCO1.pdf PDF
CN-370000-HW683-BF04C.pdf PDF
CN-370000-HW683-BF04CCO1.pdf PDF
CN-370000-HW683-BIL02A.pdf PDF
CN-370000-HW683-DC001E.pdf PDF
CN-370000-HW683-DC001F.pdf PDF
CN-370000-HW683-DC002D.pdf PDF
CN-370000-HW683-DC002E.pdf PDF
CN-370000-HW683-DC003B.pdf PDF
CN-370000-HW683-DC003C.pdf PDF
CN-370000-HW683-DC003E.pdf PDF
CN-370000-HW683-DC010D.pdf PDF
CN-370000-HW683-DC012A.pdf PDF
CN-370000-HW683-DC012C.pdf PDF
CN-370000-HW683-DC013B.pdf PDF
CN-370000-HW683-DC020A.pdf PDF
CN-370000-HW683-DC020C.pdf PDF
CN-370000-HW683-DC021A.pdf PDF
CN-370000-HW683-DC023A.pdf PDF
CN-370000-HW683-DC024B.pdf PDF
CN-370000-HW683-DC024C.pdf PDF
CN-370000-HW683-DC026A.pdf PDF
CN-370000-HW683-DC027A.pdf PDF
CN-370000-HW683-DC027B.pdf PDF
CN-370000-HW683-DC028A.pdf PDF
CN-370000-HW683-DC02DCO1.pdf PDF
CN-370000-HW683-DC02FCO1.pdf PDF
CN-370000-HW683-DC030C.pdf PDF
CN-370000-HW683-DC031B.pdf PDF
CN-370000-HW683-DC034C.pdf PDF
CN-370000-HW683-DC036A.pdf PDF
CN-370000-HW683-DC037D.pdf PDF
CN-370000-HW683-DC039C.pdf PDF
CN-370000-HW683-DC03CCO2.pdf PDF
CN-370000-HW683-DC03ECO1.pdf PDF
CN-370000-HW683-DC040C.pdf PDF
CN-370000-HW683-DC041D.pdf PDF
CN-370000-HW683-DC043C.pdf PDF
CN-370000-HW683-DC044A.pdf PDF
CN-370000-HW683-DC046A.pdf PDF
CN-370000-HW683-DC047A.pdf PDF
CN-370000-HW683-DC049A.pdf PDF
CN-370000-HW683-DC052A.pdf PDF
CN-370000-HW683-DC053B.pdf PDF
CN-370000-HW683-DC054A.pdf PDF
CN-370000-HW683-DC05BCO3.pdf PDF
CN-370000-HW683-DC06ACO1.pdf PDF
CN-370000-HW683-DC07BCo1.pdf PDF
CN-370000-HW683-DC08BCO2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. ☐ There are no changes to the TA compensation.

☐ The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO ☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. ☐ There are no changes to the TA Expiration Date.

☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. ☐ There are no changes to the Attachments.

☐ Attachment ___ is replaced with Attachment -____.

7. ☐ No Additional Changes.

☐ Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

DC004A 1 HW683

This Task Assignment Change Order authorizes a cost increase due to additional sampling from vapor extraction wells in accordance with the Geosyntec scope of work, cost estimate, and schedule received on 25 April 2022.

Evan Miller 850-245-8928 Contractor Contractor

Contractor Contractor

Contractor

Geosyntec Andrew Galvin 561-922-1033

ERIC_4929

Classic Cleaners

✔ $ 32,540.25 $ 30,231.06

$ 3,000.00 3000.00

$ 35,540.25 $ 33,231.06 ✔ Completion

Completion 0

✔ 1 1 1

Todd Kafka

Contract Manager

Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.

Date: 2022.04.29 16:18:38 -04'00'

Brian Dougherty

Digitally signed by Brian Dougherty Date: 2022.04.27 13:04:48 -04'00'

04/27/2022

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01_18

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW683

DC004A

$ 35,540.25

Subtask 2- Submittal of Year 4 Quarter 4: Feb - Apr O&M summary emails

Subtask 1,3,4- Submittal of Year 5 Quarter 1: May - July O&M summary emails, Semi-Annual O&M report, ADaPT and GIS Tables; Project Management

Subtask 5- Submittal of utility invoices for 6 months; Utilities (Cost Plus Fixed Fee) = not to exceed $3,000.00; Utilities Handling Fee = $120

Subtask 2- FDEP receipt and approval of Year 4 Quarter 4: Feb - Apr O&M summary emails

Subtask 5- FDEP receipt and approval of utility invoices for 6 months; Utilities (Cost Plus Fixed Fee) = not to exceed $3,000.00; Utilities Handling Fee = $120

Subtask 1,3,4- FDEP receipt and approval of Year 5 Quarter 1: May - July O&M summary emails, Semi-Annual O&M report, ADaPT and GIS Tables; Project Management

05/13/2021

08/26/2022

08/31/2022

$ 26,248.46

$ 6,171.79

$ 3,120.00

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

To:

From:

Date:

HW683 Contract Negotiation File Classic Cleaners Stuart, Martin County

ERIC_4929

Evan Miller, Project Manager April 27, 2022

Subject: Negotiation Summary HW683

DC004A-1

This Task Assignment authorizes Geosyntec

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2: Year 4 Quarter 4: February 2022 (Y4, M10) to April 2022 (Y4, M12) O&M and Reporting There is a cost reduction of $350 to account for a change in analytical costs as well as sample shipping costs.

Subtask 3: Year 5 Quarter 1: May 2022 (Y5, M1) to July 2022 (Y4, M3) O&M and Reporting Geosyntec will additionally collect samples from VEW01, VEW03, VEW04, VEW05, VEW06, VEW07, VEW08 and VEW09 during the May O&M event. In addition, prior to the May O&M event, the system will be shut down for two weeks in order to preform an FDEP requested bump test.

Subtask 4: Confirmation Soil Sampling No Changes

Subtask 5: Utilities No Changes

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $35,540.25 with 169 labor hours.

Geosyntec may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

Printed on recycled paper.

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 1/18/2022

Task #: HW550-DC032K SubTask 1 Project Management SubTask 6

Site: Classic Cleaners SubTask 2 Y4 Qtr 4 - Feb 22- Apr 22 SubTask 7

Activity/Phase: 6 Month O&M / Y4Q4 & Y5Q1 SubTask 3 Y5 Qtr 1 - May 22 - Jul 22 SubTask 8

Project Manager: A. Galvin SubTask 4 Confirmation Soil Sampling SubTask 9

SubTask 5 Utilities SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$37.50 Project Manager A. Galvin 20 20.2 $68.75 Principal T. Kafka 7 3 3 1 0 0 0 0 0 0 $72.60 Principal K. Warner 10 3 5 2 0 0 0 0 0 0 $46.15 Project Professional M. Hensley 4 0 3 1 0 0 0 0 0 0 $37.50 Senior Staff Professional A. Galvin 38 6 30 2 0 0 0 0 0 0 $33.89 Senior Staff Professional J. Udvardy 73 24 40 9 0 0 0 0 0 0 $32.21 Senior Staff Professional A. Langteau 7 0 7 0 0 0 0 0 0 0 $30.05 Staff Professional R. Temple 8 0 0 8 0 0 0 0 0 0 $27.88 Administrative Assistant A. Acosta 2 0 2 0 0 0 0 0 0 0

Total Hours 169 20 36 90 23 0 0 0 0 0 0

Direct Labor $6,568.07 $755.62 $1,462.41 $3,469.53 $880.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $11,343.06 $1,304.96 $2,525.58 $5,991.88 $1,520.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $17,911.13 $2,060.58 $3,987.99 $9,461.41 $2,401.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $1,080.00 $360.00 $480.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,080.00 $360.00 $480.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $750.00 $0.00 $0.00 $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $200.00 $0.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $3,000.00 $0.00 $0.00 $0.00 $3,000.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $3,950.00 $0.00 $200.00 $750.00 $3,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $215.00 $0.00 $20.00 $75.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $4,165.00 $0.00 $220.00 $825.00 $3,120.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $5,603.00 $0.00 $2,730.00 $2,873.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $1,310.00 $0.00 $1,010.00 $300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $6,913.00 $0.00 $3,740.00 $3,173.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $320.00 $120.00 $160.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $235.00 $0.00 $0.00 $235.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $315.00 $0.00 $315.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $200.00 $0.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $2,610.00 $1,305.00 $1,305.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $3,680.00 $1,425.00 $1,980.00 $275.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $33,749.13 $2,060.58 $5,772.99 $15,881.41 $6,914.15 $3,120.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,791.12 $206.06 $398.80 $946.14 $240.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $35,540.25 $2,266.64 $6,171.79 $16,827.55 $7,154.27 $3,120.00 $0.00 $0.00 $0.00 $0.00 $0.00 subtasks (list) cost (by subtasks) Invoice 1 2 $6,171.79 invoice 2 1, 3, 4 $26,248.46 Invoice 3 5 $3,120.00

$35,540.25

REV: 02/03 CEF ARCADIS Page 1

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Classic Cleaners SUBTASK: Y4 Qtr 4 - Feb 22- Apr 22

DATE: 1/18/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 3

Principal K. Warner 3

Professional A. Galvin 6

Senior Staff Professional J. Udvardy 24

TOTAL LABOR 36

VEHICLE TYPE RATE UNIT USEAGE

Car $80.00 Day 0 $0.00 Truck $120.00 Day 3 $360.00 Van $120.00 Day 0 $0.00

Subtotal $360.00

Mileage $0.59 Mile 0 $0.00 Subtotal $0.00

Air Fare $0.00 Round Trip 0 $0.00 Subtotal $0.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

TOTAL SUB $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 - Vapor VOCs $200.00 0 0 $0.00

Subtotal $0.00 Fast Turnaround Charges Percent

24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00

Subtotal $0.00 Shipping

Large Cooler (25 to 50 lbs) $150.00 0 $0.00 Small Cooler (0 to 25 lbs) $110.00 0 $0.00

Subtotal $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

$40.00 Day 3 $120.00 Subtotal $120.00

Other O&M supplies $75.00 Day 3 $225.00 O&M Kit $360.00 Day 3 $1,080.00

Subtotal $1,305.00

TOTAL EQUIPMENT $1,425.00

Quarterly data interpretation (3 hr)

Quarterly O&M data and optimization evaluation (3 hrs)

Monthly data evaluation and summary email (2hrs/event - total 6 hrs)

3 Monthly O&M visits (8 hrs each incl rd trip, prep, field time, breakdown)

FINAL --7/24/96

SUBTASK: Y5 Qtr 1 - May 22 - Jul 22

DATE: 1/18/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 3

Principal K. Warner 5

Project Professional M. Hensley 3

Professional

A. Galvin 30

Senior Staff Professional

J. Udvardy 40

Senior Staff Professional A. Langteau 7

Administrative Assistant A. Acosta 2

TOTAL LABOR 90

VEHICLE TYPE RATE UNIT USEAGE

Car $80.00 Day 0 $0.00

Truck 3 days O&M, 1 day GW sampling $120.00 Day 4 $480.00

Van $120.00 Day 0 $0.00 Subtotal $480.00

Mileage $0.59 Mile 0 $0.00 Subtotal $0.00

Air Fare $0.00 Round Trip 0 $0.00 Subtotal $0.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

IDW

Drum T&D Erwin Remediation $100/drum x 2 $200.00 $200.00

$0.00 $0.00 Subtotal $200.00

TOTAL SUB $200.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs - GW 8 MWs + 1 DUP +1

IDW $73.00 9 1 $730.00

TO-15 - Vapor VOCs $200.00 10 0 $2,000.00 Subtotal $2,730.00

Fast Turnaround Charges Percent 24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00

Subtotal $0.00 Shipping

Large Cooler (25 to 50 lbs) $150.00 6 $900.00 Small Cooler (0 to 25 lbs) $110.00 1 $110.00

Subtotal $1,010.00

TOTAL LAB $3,740.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Analytical Related

Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00 Water Level Meter $25.00 Day 1 $25.00 YSI 556 MPS $105.00 Day 0 $0.00

Subtotal $315.00 IDW Related

Drum $100.00 ea 2 $200.00 Subtotal $200.00

Expendables $40.00 Day 4 $160.00

Subtotal $160.00

Other O&M supplies $75.00 Day 3 $225.00 O&M Kit $360.00 Day 3 $1,080.00

Subtotal $1,305.00

TOTAL EQUIPMENT $1,980.00

Report formatting and PDF compilation

Quarterly data interpretation (3 hr)

Quarterly PE evaluation of O&M data (3), PE certification of Annual Report (2)

Generate groundwater elevation contour map, update historical groundwater quality figure, generate ROI figure

Monthly data evaluation and summary email (2 hrs/event - 6 hrs); update GW and air result tables (2 hrs); draft groundwater contour and spider plot figures (2 hrs); Annual SVE O&M Report (20 hrs)

3 O&M visits (8 hrs each incl rd trip, prep, field time, breakdown, 24 hrs); GW sampling event:

rd trip mobe (2 hrs), GW equip calibration (pre, post) (1 hr); collect water levels at 8 wells (1 hr), sample 8 wells @ 1 5 hrs/well (12 hrs);

44 data pts (10 air samples, 16 soil samples, 8 GW samples, 2 dupes, 8 water levels =@ 8 min ea = 6 hrs); GIS checker and submittal (1 hrs)

SUBTASK: Confirmation Soil Sampling

DATE: 1/18/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 1

Principal K. Warner 2

Project Professional M. Hensley 1

Professional A. Galvin 2

Senior Staff Professional J. Udvardy 9

Staff Professional R. Temple 8

TOTAL LABOR 23

VEHICLE TYPE RATE UNIT USEAGE

Car $80.00 Day 0 $0.00 Truck $120.00 Day 2 $240.00 Van $120.00 Day 0 $0.00

Subtotal $240.00

Mileage $0.59 Mile 0 $0.00 Subtotal $0.00

Air Fare $0.00 Round Trip 0 $0.00 Subtotal $0.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Surveying GeoTek Utility Locate $750.00 $750.00

Subtotal $750.00

TOTAL SUB $750.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs - Soil $73.00 17 0 $1,241.00 VOHs - SPLP $73.00 17 0 $1,241.00 encore sampler $16.00 17 0 $272.00 5035 prep $7.00 17 0 $119.00

TDS $16.00 0 0 $0.00

TRPH $88.00 0 0 $0.00

PFAS $315.00 0 0 $0.00

Subtotal $2,873.00 Fast Turnaround Charges Percent

24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00

Subtotal $0.00 Shipping

Large Cooler (25 to 50 lbs) $150.00 2 $300.00 Small Cooler (0 to 25 lbs) $110.00 0 $0.00

Subtotal $300.00

TOTAL LAB $3,173.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Drilling Related

Monitoring Well Installation Kit $325.00 Day 0 $0.00 Soil Assessment Kit $175.00 Day 0 $0.00 Soil Sampling Kit (Through Concrete) $235.00 Day 1 $235.00

Subtotal $235.00 Analytical Related

Groundwater Sampling Kit $290.00 Day 0 $0.00 Water Level Meter $25.00 Day 0 $0.00 YSI 556 MPS $105.00 Day 0 $0.00

Subtotal $0.00 IDW Related

Drum $100.00 Day 0 $0.00 Subtotal $0.00

Expendables $40.00 Day 1 $40.00

Subtotal $40.00

Other $0.00 Day 0 $0.00

Subtotal $0.00

TOTAL EQUIPMENT $275.00

Data interpretation

PE data evaluation and interpretation (2 hr)

Generate soil results figure

Update soil results table and draft soil results figure

Soil sampling event: rd trip mobe (2 hrs), field preparation (2 hrs), 4 soil sampling locations below building slab (2 hrs x 2 = 4 hrs), sample dropoff/shipping (1 hr)

Soil sampling event: rd trip mobe (2 hrs), oversee utility locate (2 hrs), 4 soil sampling locations below building slab (2 hrs x 2 = 4 hrs), SUBTASK: Utilities

DATE: 1/18/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Utilities Processing Fee $20/month x 6 months $120.00 $120.00 FPL estimate (usage) $500/ment x 6 months $3,000.00 $3,000.00

Subtotal $3,120.00

TOTAL SUB $3,120.00

LABORATORY COSTS

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Task #: HW550-DC032K SubTask 1 Project Management SubTask 6

Site: Classic Cleaners SubTask 2 Y4 Qtr 4 - Feb 22- Apr 22 SubTask 7

Activity/Phase: 6 Month O&M / Y4Q4 & Y5Q1 SubTask 3 Y5 Qtr 1 - May 22 - Jul 22 SubTask 8

Project Manager: A. Galvin SubTask 4 Confirmation Soil Sampling SubTask 9

SubTask 5 Utilities SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$37.50 Project Manager A. Galvin 0 0.1 $68.75 Principal T. Kafka 0 0 0 0 0 0 0 0 0 0 $72.60 Principal K. Warner 0 0 0 0 0 0 0 0 0 0 $46.15 Project Professional M. Hensley 0 0 0 0 0 0 0 0 0 0 $37.50 Senior Staff Professional A. Galvin 0 0 0 0 0 0 0 0 0 0 $33.89 Senior Staff Professional J. Udvardy 0 0 0 0 0 0 0 0 0 0 $32.21 Senior Staff Professional A. Langteau 1 0 1 0 0 0 0 0 0 0 $30.05 Staff Professional R. Temple 0 0 0 0 0 0 0 0 0 0 $27.88 Administrative Assistant A. Acosta 0 0 0 0 0 0 0 0 0 0

Total Hours 1 0 0 1 0 0 0 0 0 0 0

Direct Labor $36.40 $4.19 $0.00 $32.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $62.87 $7.24 $0.00 $55.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $99.27 $11.43 $0.00 $87.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,600.00 ($200.00) $1,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $600.00 ($150.00) $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,200.00 ($350.00) $2,550.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $2,299.27 $11.43 ($350.00) $2,637.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $9.92 $1.14 $0.00 $8.78 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $2,309.19 $12.57 ($350.00) $2,646.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 subtasks (list) cost (by subtasks) Invoice 1 2 ($350.00) invoice 2 1, 3, 4 $2,659.19 Invoice 3 5 $0.00

$2,309.19

SUBTASK: Y4 Qtr 4 - Feb 22- Apr 22

DATE: 1/18/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 0

Principal K. Warner

Professional A. Galvin

Senior Staff Professional J. Udvardy

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Car $80.00 Day 0 $0.00 Truck $120.00 Day 0 $0.00 Van $120.00 Day 0 $0.00

Subtotal $0.00

Mileage $0.59 Mile 0 $0.00 Subtotal $0.00

Air Fare $0.00 Round Trip 0 $0.00 Subtotal $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

TOTAL SUB $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO-15 - Vapor VOCs $200.00 -1 0 ($200.00)

Subtotal ($200.00) Fast Turnaround Charges Percent

24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00

Subtotal $0.00 Shipping

Large Cooler (25 to 50 lbs) $150.00 -1 ($150.00) Small Cooler (0 to 25 lbs) $110.00 0 $0.00

Subtotal ($150.00)

TOTAL LAB ($350.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

$40.00 Day 0 $0.00 Subtotal $0.00

Other O&M supplies $75.00 Day 0 $0.00 O&M Kit $360.00 Day 0 $0.00

Subtotal $0.00

TOTAL EQUIPMENT $0.00

SUBTASK: Y5 Qtr 1 - May 22 - Jul 22

DATE: 1/18/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 0

Principal K. Warner 0

Project Professional M. Hensley 0

Professional

A. Galvin 0

Senior Staff Professional

J. Udvardy 0

Senior Staff Professional A. Langteau 1

Administrative Assistant A. Acosta 0

TOTAL LABOR 1

VEHICLE TYPE RATE UNIT USEAGE

Car $80.00 Day 0 $0.00 Truck $120.00 Day 0 $0.00 Van $120.00 Day 0 $0.00

Subtotal $0.00

Mileage $0.59 Mile 0 $0.00 Subtotal $0.00

Air Fare $0.00 Round Trip 0 $0.00 Subtotal $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

IDW

Drum T&D $0.00 $0.00

$0.00 $0.00 Subtotal $0.00

TOTAL SUB $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs - GW $73.00 $0.00 TO-15 - Vapor VOCs Influent (1) +VEWs (8) $200.00 9 0 $1,800.00

Subtotal $1,800.00 Fast Turnaround Charges Percent

24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00

Subtotal $0.00 Shipping Large Cooler (25 to 50 lbs) max 2 air samples/cooler $150.00 5 $750.00 Small Cooler (0 to 25 lbs) $110.00 $0.00

Subtotal $750.00

TOTAL LAB $2,550.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Analytical Related

Shallow Groundwater Sampling Kit $290.00 Day $0.00 Water Level Meter $25.00 Day $0.00 YSI 556 MPS $105.00 Day 0 $0.00

Subtotal $0.00 IDW Related

Drum $100.00 ea $0.00 Subtotal $0.00

Expendables $40.00 Day $0.00

Subtotal $0.00

Other O&M supplies $75.00 Day $0.00 O&M Kit $360.00 Day $0.00

Subtotal $0.00

TOTAL EQUIPMENT $0.00

8 data pts (8 air samples =@ 8 min ea = 1 hr)

FDEP COST ESTI MATEContractor: Geosyntec Consultants

Task #: HW550-DC032K SubTask 1 Project Management SubTask 6

Site: Classic Cleaners SubTask 2 Y4 Qtr 4 - Feb 22- Apr 22 SubTask 7

Activity/Phase: 6 Month O&M / Y4Q4 & Y5Q1 SubTask 3 Y5 Qtr 1 - May 22 - Jul 22 SubTask 8

Project Manager: A. Galvin SubTask 4 Confirmation Soil Sampling SubTask 9

SubTask 5 Utilities SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$37.50 Project Manager A. Galvin 20 20.0 $68.75 Principal T. Kafka 7 3 3 1 0 0 0 0 0 0 $72.60 Principal K. Warner 10 3 5 2 0 0 0 0 0 0 $46.15 Project Professional M. Hensley 4 0 3 1 0 0 0 0 0 0 $37.50 Senior Staff Professional A. Galvin 38 6 30 2 0 0 0 0 0 0 $33.89 Senior Staff Professional J. Udvardy 73 24 40 9 0 0 0 0 0 0 $32.21 Senior Staff Professional A. Langteau 6 0 6 0 0 0 0 0 0 0 $30.05 Staff Professional R. Temple 8 0 0 8 0 0 0 0 0 0 $27.88 Administrative Assistant A. Acosta 2 0 2 0 0 0 0 0 0 0

Total Hours 168 20 36 89 23 0 0 0 0 0 0

Direct Labor $6,531.67 $751.43 $1,462.41 $3,437.32 $880.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $11,280.19 $1,297.72 $2,525.58 $5,936.25 $1,520.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $17,811.86 $2,049.15 $3,987.99 $9,373.57 $2,401.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $1,080.00 $360.00 $480.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,080.00 $360.00 $480.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $750.00 $0.00 $0.00 $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $200.00 $0.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $3,000.00 $0.00 $0.00 $0.00 $3,000.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $3,950.00 $0.00 $200.00 $750.00 $3,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $215.00 $0.00 $20.00 $75.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $4,165.00 $0.00 $220.00 $825.00 $3,120.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $4,003.00 $200.00 $930.00 $2,873.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $710.00 $150.00 $260.00 $300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $4,713.00 $350.00 $1,190.00 $3,173.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $320.00 $120.00 $160.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $235.00 $0.00 $0.00 $235.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $315.00 $0.00 $315.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $200.00 $0.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $2,610.00 $1,305.00 $1,305.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $3,680.00 $1,425.00 $1,980.00 $275.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $31,449.86 $2,049.15 $6,122.99 $13,243.57 $6,914.15 $3,120.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,781.20 $204.92 $398.80 $937.36 $240.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $33,231.06 $2,254.07 $6,521.79 $14,180.93 $7,154.27 $3,120.00 $0.00 $0.00 $0.00 $0.00 $0.00 subtasks (list) cost (by subtasks) Invoice 1 2 $6,521.79 invoice 2 1, 3, 4 $23,589.27 Invoice 3 5 $3,120.00

$33,231.06

12802 Tampa Oaks Blvd., Suite 151 Tampa, Florida 33637

PH 813.558.0990

FAX 813.558.9726

www.geosyntec.com

FR2925F/Classic Cleaners_Year 4 Q4 & Year 5 Q1 O&M_DC004A-1

25 April 2022

Mr. Evan Miller Environmental Manager Florida Department of Environmental Protection Waste Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400

Subject: Scope of Work and Level of Effort TACO-1 6 Months O&M / Y4Q4 &Y5Q1 - Soil Vapor Extraction System Classic Cleaners (ERIC_4929) 3307 SE Federal Highway Stuart, Martin County, Florida 34997 FDEP Task Assignment No. DC004A

Dear Mr. Miller:

Geosyntec Consultants, Inc. (Geosyntec) has prepared this Scope of Work (SOW) and proposed Level of Effort (LOE) for an additional six months of operations and maintenance (O&M) of the soil vapor extraction (SVE) system at Classic Cleaners (Site) (Facility ID- ERIC 4929) located in Stuart, Florida. Recent vapor sampling results illustrated no rebound of volatile organic halocarbons (VOHs) in the SVE effluent, indicating residual impacts have been liberated from the vadose zone following three months of cycling the SVE System on/off. The SVE system startup occurred in April 2018.

Task Assignment DC032J added six months of O&M to the Year 4 scope (quarter 2 and 3 for Year 4). Therefore, for ease of reference, this LOE is subdivided into subtasks for quarter 4 for Year 4 and quarter 1 for Year 5. This LOE also includes confirmation soil sampling as a separate subtask.

The major scope elements are outlined below as they will pertain to multiple subtasks in some cases. Each subtask will be outlined separately thereafter.

RED text represents TACO-1 changes.

Classic Cleaners – Y4/Q4 & Y5/Q1 O&M 25 April 2022

FR2925F/Classic Cleaners_Year 4 Q4 & Year 5 Q1 O&M_DC004A-1

SCOPE OF WORK

Monthly SVE System O&M Tasks

Geosyntec personnel will conduct 6 monthly O&M visits to the Site beginning in February 2022 through July 2022, unless the SVE system is shutoff sooner. During each O&M visit, Geosyntec personnel will perform the following tasks:

• record vacuum, pressure, and temperature readings at the SVE blower;

• record air flow rates at the blower and 8 vapor extraction wells (VEWs);

• record vacuum readings at the 8 VEWs, MW001, MW007, VMP001, and VMP002;

• drain fluids accumulated in the moisture separator, dispose of any resulting fluids in a

55-gallon drum as investigation derived waste (IDW), and collect a VOC sample for waste characterization;

• collect groundwater level measurements in MW001 (inside the massage parlor) and MW007 (inside Classic Cleaners);

• perform required air sampling;

• inspect and clean the equipment compound; and

• perform periodic equipment maintenance activities recommended by equipment manufacturers.

The results of the monthly system O&M activities will be documented in a site-specific O&M log, which will be submitted to the FDEP with the monthly O&M summary emails.

Air Sampling

Geosyntec will collect air samples with a summa canister from the influent during the May and July 2022 monthly O&M events. Samples will also be collected from VEW01, VEW03, VEW04, VEW05, VEW06, VEW07, VEW08 and VEW09 during the May O&M event. Prior to the May O&M event, the system will be shut down for two weeks in order to preform an FDEP requested bump test. The samples will be analyzed at a fixed-base laboratory for VOHs by EPA Method TO- 15.

Groundwater Sampling

A comprehensive round of groundwater samples was last collected from the 8 site monitoring wells in January 2022. An additional comprehensive round will be collected in July 2022, unless the data is needed sooner for shutdown evaluation, etc. Prior to collecting groundwater samples, FR2925F/Classic Cleaners_Year 4 Q4 & Year 5 Q1 O&M_DC004A-1 depth to water measurements will be collected from each monitoring well. The groundwater samples will be laboratory analyzed for VOHs using EPA Method 8260B. Results of the groundwater sampling events will be documented in the O&M report for the same reporting period.

Confirmation Soil Sampling

Geosyntec will mobilize two staff to the Site to collect confirmation soil samples from four soil boring locations (SB007, SB002, SB019, and SB020) located within the massage parlor and dry cleaners. These locations were previously sampled by Geosyntec in 2016 and were reported to the FDEP in Geosyntec’s 2017 Site Assessment Report (SAR). Prior to soil sampling, an interior utility locate utilizing ground penetrating radar (GPR) will be conducted by a subcontractor around the sampling locations. Geosyntec recommends using GeoTek for the utility locate based on their lowest cost/best value shown in Attachment A. Geosyntec will core through the concrete at each boring location using a 6-inch diameter core barrel and electric-powered core drill. Alike to previous soil sampling conducted during Geosyntec’s Site assessment activities, soil samples will be collected with a hand auger from the following depth intervals: 0-0.5 feet below ground surface (ft bgs), 0.5-2 ft bgs, 2-4 ft bgs and 4-6 ft bls. The soils will be screened using a PID at approximately 1 to 2 ft (or less) intervals. Each soil boring will be visually logged following the completion of soil PID screening and sample collection activities. Soil cuttings from these sampling activities will be returned to the borehole and completed with a concrete patch.

All soil samples will laboratory analyzed for VOHs by EPA Method 8260B and will include SPLP leachate extraction for VOH analysis by EPA Method 8260B. The SPLP samples will be placed on hold pending the results from the soil samples; Geosyntec will analyze the SPLP samples that exhibit leachability SCTL exceedances for VOHs (e.g., 30 ug/kg PCE). Geosyntec will email FDEP with its determination of the number of SPLP samples to be analyzed.

Results of the soil confirmation sampling event will be compared to 2016 sampling results and will be documented in the O&M report for the same reporting period.

IDW Generation and Management

Two drums of IDW are assumed to be generated for groundwater IDW and moisture captured in moisture separator. Based on 2021 pricing for IDW transportation and disposal, Geosyntec recommends using Erwin Remediation based on their lowest cost/best value shown in Attachment A. A VOH sample is required to establish a new profile with the vendor ($73).

FR2925F/Classic Cleaners_Year 4 Q4 & Year 5 Q1 O&M_DC004A-1

Reporting

An Annual O&M Report will be prepared and submitted in August 2022 to document the results since July 2022. The O&M report will include, at a minimum, the following:

• results of laboratory analyses of air, soil, and groundwater samples collected during the reporting period (tabular and graphical form);

• O&M activities performed during the reporting period;

• the calculated mass of PCE (and daughter products, if detected) removed by the SVE system during the reporting period, and cumulative total removed since startup;

• the SVE system hours of operation during the reporting period;

• information regarding the depth to groundwater;

• information regarding any repairs and/or modifications made to the SVE system;

• vacuum ROI data (tabular and illustrated); and

• recommendations and conclusions pertaining to the continued operation and/or optimization of the SVE system.

Utilities

Monthly electrical utility bills have been estimated at $500 based on the previous year’s average monthly invoices from Florida Power & Light. Geosyntec discontinued use of the modem telephone alarm service due to required upgrades and the fact that the daily cycling will interfere with many of the alarm functions.

LOE SUBTASKS

Subtask 1: Project Management

Subtask 2: Year 4 Quarter 4: February 2022 (Y4, M10) to April 2022 (Y4, M12) O&M and Reporting

Geosyntec will perform 3 months of O&M and provide FDEP with monthly email summaries.

Subtask 3: Year 5 Quarter 1: May 2022 (Y5, M1) to July 2022 (Y4, M3) O&M and Reporting

Geosyntec will perform 3 months of O&M and provide FDEP with monthly email summaries, collect a sitewide round of groundwater samples from 8 site monitoring wells, and prepare the Annual O&M Report for submittal in August 2022. IDW manifests will be included for drums of

FR2925F/Classic Cleaners_Year 4 Q4 & Year 5 Q1 O&M_DC004A-1 groundwater generated during the 6-month period. The report will include the air monitoring, groundwater monitoring, and confirmation soil sampling results generated during the 6-month period unless the schedule is modified at a later date.

Subtask 4: Confirmation Soil Sampling

Geosyntec will perform confirmation soil sampling as described above. The soil sampling results will be reported to the FDEP in the monthly email summary for the month in which the samples were collected.

Subtask 5: 6 Months Utilities – February 2022 through July 2022

Invoice and Deliverable Schedule:

Subtask Deliverable Deliverable Due Date

Invoice Amount

2 Year 4 Quarter 4: Feb - Apr O&M summary emails 5/13/21 $6,171.79

1,3,4 Year 5 Quarter 1: May - July O&M summary emails, Semi-Annual O&M report, ADaPT and GIS Tables 8/26/22 $26,248.46

5 Utilities (6 mos, Feb 22 - July 22) 8/31/22 $3,120.00 Total $35,540.25

As always, we appreciate the opportunity to continue working on this project for the FDEP. Please contact us at 813.379.4396 if you have any questions.

Sincerely, Andrew Galvin, P.E. (FL) Todd K. Kafka, PG (FL, VA, TN) Engineer Senior Principal Hydrogeologist

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW683

DC004A January 31, 2023

This Task Assignment authorizes GEO to conduct operation and maintenance for six months in accordance with the GEO scope of work, cost estimate, bid documentation, and schedule received on January 20, 2022

The payment of utilities is the only part of this Task Assignment that is Cost Plus Fixed Fee.

Evan Miller 850-245-8928 Geosyntec

Todd Kafka 813-379-4396

ERIC_4929

3307 SE Federal Highway Stuart, Martin County

Classic Cleaners

$ 30,231.06

$ 3,000.00

$ 33,231.06

Scope of Work

Geosyntec

Todd Kafka

Contract Manager

1-27-22

Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.

Date: 2022.01.27 10:03:39 -05'00'

William E. Burns, jr.

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.01.26 17:11:01 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Final CEF.pdf
Final CEF
Final LOEs.pdf
Subtask 2
Subtask 3
Subtask 4
Subtask 5
Delta CEF.pdf
TACO #1 CEF
Delta CEF.pdf
TACO #1 CEF
Delta LOEs.pdf
Subtask 2 CO1
Subtask 3 CO1
Original CEF.pdf
Original CEF
Original CEF.pdf
Original CEF
Classic Cleaners_Year 4 Q4 Year 5 Q1 OM_DC004A-1.pdf
SCOPE OF WORK
Monthly SVE System O&M Tasks
Air Sampling
Groundwater Sampling
Confirmation Soil Sampling
IDW Generation and Management
Reporting
Utilities
LOE subtasks
Subtask 1: Project Management
Subtask 2: Year 4 Quarter 4: February 2022 (Y4, M10) to April 2022 (Y4, M12) O&M and Reporting
Subtask 3: Year 5 Quarter 1: May 2022 (Y5, M1) to July 2022 (Y4, M3) O&M and Reporting
Subtask 4: Confirmation Soil Sampling
Subtask 5: 6 Months Utilities – February 2022 through July 2022

File details come from the government source that posted it. Updated .