This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Geosyntec Consultants for environmental remediation services at the Colonial/Touch of Class site (ERIC_5222) in Greenacres, Palm Beach County, Florida. The task assignment is issued pursuant to Contract Number HW683 and is designated as TA DC002B. The assignment is effective through June 30, 2023, with the FDEP Project Manager identified as Evan Miller and the Contractor's Project Manager as Andrew Galvin.
The task assignment authorizes Geosyntec to conduct six months of operations and maintenance (O&M) of a soil vapor extraction (SVE) system from August 2022 through January 2023, comprising five subtasks: Project Management, Year 2 Quarter 3 O&M and Reporting, Year 2 Quarter 4 O&M and Reporting, Year 3 Quarter 1 O&M and Reporting, and Utilities. The total contract value is $30,949.63, consisting of a fixed unit rate of $29,149.63 and cost reimbursement of $1,800.00. Compensation is structured through four invoices with specific deliverable requirements and due dates: $6,928.16 due October 31, 2022; $15,877.80 due January 31, 2023; $6,223.67 due February 28, 2023; and $1,920.00 due March 31, 2023. The scope includes monthly O&M visits, air and groundwater sampling, investigation derived waste (IDW) management, quarterly reporting via email summaries, an annual O&M report, and utility costs estimated at $300 per month plus a $20 monthly processing fee. An executed Access Agreement with the property owner was confirmed on June 30, 2022.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW683
DC002B Completion June 30, 2023
This Task Assignment authorizes Geosyntec to conduct six months of operations and maintenance (O&M), from August 2022 through January 2023, of the soil vapor extraction (SVE) system in accordance with the Geosyntec scope of work, cost estimate, and schedule received on 29 June 2022.
Evan Miller 850-245-8928 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Geosyntec
Geosyntec
Andrew Galvin 561-922-1033
ERIC_5222
4552 Lake Worth Road Greenacres, Palm Beach County, Florida 33463
Colonial/Touch of Class
✔ $ 29,149.63 ✔ $ 1,800.00
$ 30,949.63
Scope of Work
Todd Kafka
Contract Manager
Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.
Date: 2022.06.30 13:47:38 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.06.30 13:24:26 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2- Submittal of Year 2 Quarter 3: August to September 2022 O&M summary emails 10/31/2022
Subtask 3- Submittal of Year 2 Quarter 4: October 2022 to December 2022 O&M summary emails and Annual O&M report 01/31/2023
Subtask 1,4- Submittal of Year 3 Quarter 1: January 2023 O&M summary email;
Project Management 02/28/2023
Subtask 5- Paid Utility Invoices 03/31/2023
Subtask 2- FFDEP receipt and approval of Year 2 Quarter 3: August to September 2022 O&M summary emails $ 6,928.16
Subtask 3- FDEP receipt and approval of Year 2 Quarter 4: October 2022 to December 2022 O&M summary emails and Annual O&M report $ 15,877.80
Subtask 1,4- FDEP receipt and approval of Year 3 Quarter 1: January 2023 O&M summary email; Project Management $ 6,223.67
Subtask 5- FDEP receipt of utility invoices for 6 months; Utilities (Cost Plus Fixed Fee) = not to exceed $1,800.00; Utilities Handling Fee = $120 $ 1,920.00
$ 30,949.63
HW683
DC002B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
To: HW683 Contract Negotiation File Colonial/Touch of Class Greenacres, Palm Beach County
ERIC_5222
From: Evan Miller, Project Manager Date: June 30, 2022 Subject: Negotiation Summary
HW683 DC002B
This Task Assignment authorizes Geosyntec to conduct six months of operations and maintenance (O&M), from August 2022 through January 2023, of the soil vapor extraction (SVE) system.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Year 2 Quarter 3: August 2022 (Month 20) to September 2022 (Month 21) O&M and Reporting Two months of O&M with monthly email summaries to FDEP, bump test related air sampling in Month 20, and influent air sampling in Month 21. Note that July 2022 O&M is included under TA DC002A, which has been approved by FDEP and is in progress.
Subtask 3: Year 2 Quarter 4: October 2022 (Month 22) to December 2022 (Month 24) O&M and Reporting Three months of O&M with monthly email summaries to FDEP, air sampling in Month 24, annual groundwater sampling in Month 24, and Annual O&M Report.
Subtask 4: Year 3 Quarter 1: January 2023 (Month 25) O&M and Reporting One month of O&M with a monthly email summary to FDEP and bump test related air sampling in Month 25.
Subtask 5: Utilities Six months of O&M utility costs.
Geosyntec and the FDEP confirmed on 30 June 2022, that an Access Agreement with the current real property owner of the Colonial/Touch of Class (ERIC_5222) Site has been executed.
Printed on recycled paper.
MEMORANDUM
Colonial/Touch of Class June 30, 2022 Page Two
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $XXXX with XX labor hours.
Geosyntec may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTIMATEContractor: Geosyntec Consultants
Date: 6/29/2022
Task #: HW550-DC002B SubTask 1 Project Management SubTask 6
Site: Colonial/Touch of Class SubTask 2 Year 2 Quarter 3: Aug 2022 - Sept 2022 O&M and Reporting SubTask 7
Activity/Phase: 6 Months O&M - Year 2/3 SubTask 3 Year 2 Quarter 4: Oct 2022 - December 2022 O&M and Reporting SubTask 8
Project Manager: A. Galvin SubTask 4 Year 3 Quarter 1: January 2023 O&M and Reporting SubTask 9
SubTask 5 Utilities: Aug 2022 - January 2023 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$38.46 Project Manager A. Galvin 18 17.8 $75.00 Principal K. Warner 6 2 3 1 0 0 0 0 0 0 $56.30 Senior Professional A. Smith 12 4 7 1 0 0 0 0 0 0 $46.15 Project Professional M. Hensley 3 0 3 0 0 0 0 0 0 0 $38.46 Senior Staff Professional A. Galvin 36 4 30 2 0 0 0 0 0 0 $33.89 Senior Staff Professional J. Udvardy 75 20 43 12 0 0 0 0 0 0 $32.21 Administrative Assistant S. Darling 2 0 2 0 0 0 0 0 0 0
Total Hours 152 18 30 88 16 0 0 0 0 0 0
Direct Labor $5,937.90 $683.12 $1,206.84 $3,433.04 $614.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $10,254.75 $1,179.75 $2,084.21 $5,928.86 $1,061.93 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $16,192.65 $1,862.87 $3,291.05 $9,361.90 $1,676.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $1,200.00 $360.00 $600.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,200.00 $360.00 $600.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $516.10 $0.00 $516.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $1,800.00 $0.00 $0.00 $0.00 $1,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 telemetry fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $2,316.10 $0.00 $516.10 $0.00 $1,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $171.61 $0.00 $51.61 $0.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,487.71 $0.00 $567.71 $0.00 $1,920.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $3,857.00 $1,200.00 $1,657.00 $1,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $1,760.00 $600.00 $710.00 $450.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $5,617.00 $1,800.00 $2,367.00 $1,450.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $280.00 $80.00 $160.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $315.00 $0.00 $315.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $0.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $3,138.00 $1,068.00 $1,470.00 $600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $3,833.00 $1,148.00 $2,045.00 $640.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $29,330.36 $1,862.87 $6,599.05 $14,941.61 $4,006.83 $1,920.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,619.27 $186.29 $329.11 $936.19 $167.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $30,949.63 $2,049.16 $6,928.16 $15,877.80 $4,174.51 $1,920.00 $0.00 $0.00 $0.00 $0.00 $0.00 subtasks (list) cost (by subtasks) Invoice 1 2 $6,928.16 invoice 2 3 $15,877.80 Invoice 3 1,4 $6,223.67 Invoice 4 5 $1,920.00
REV: 02/03 CEF ARCADIS Page 1
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Colonial/Touch of Class SUBTASK: Year 2 Quarter 3: Aug 2022 - Sept 2022 O&M and Reporting
DATE: 6/29/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal K. Warner 2
Senior Professional A. Smith 4
Senior Staff Professional A. Galvin 4
Senior Staff Professional J. Udvardy 20
TOTAL LABOR 30
VEHICLE TYPE RATE UNIT USEAGE
Car $80.00 Day 0 $0.00 Truck 2 days O&M, 1 mobe for IDW $120.00 Day 3 $360.00 Van $120.00 Day 0 $0.00
Subtotal $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
TOTAL SUB $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TO-15 - Vapor VOCs Aug bump test and Sept influent sampling $200.00 6 0 $1,200.00 Subtotal $1,200.00
Fast Turnaround Charges Percent 24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00
Subtotal $0.00 Shipping summa cans Large Cooler (25 to 50 lbs) $150.00 4 $600.00
Small Cooler (0 to 25 lbs) $110.00 0 $0.00 Subtotal $600.00
TOTAL LAB $1,800.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
IDW Related
Drum $100.00 each 0 $0.00 Subtotal $0.00
Expendables 2 days O&M $40.00 Day 2 $80.00
Subtotal $80.00 Other
O&M supplies $75.00 Day 2 $150.00 O&M Kit $360.00 Day 2 $720.00 Air Sampling Canister (Summa) $33.00 Day 6 $198.00
Subtotal $1,068.00
TOTAL EQUIPMENT $1,148.00
Quarterly O&M data and optimization evaluation (2 hrs)
Quarterly data interpretation (2 hr); Bump test data evaulaution (2 hrs);
Monthly data evaluation and summary email (2 hrs/event - total 4 hrs)
2 O&M visits (8 hrs each incl rd trip, prep, breakdown - total 16 hrs); 1 rd trip mobe to drain moisture separator and manage onsite IDW (4 hrs)
FINAL --7/24/96
SUBTASK: Year 2 Quarter 4: Oct 2022 - December 2022 O&M and Reporting
DATE: 6/29/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal K. Warner 3
Senior Professional A. Smith 7
Project Professional M. Hensley 3
Senior Staff Professional
A. Galvin 30
Senior Staff Professional
J. Udvardy 43
Administrative Assistant S. Darling 2
TOTAL LABOR 88
VEHICLE TYPE RATE UNIT USEAGE
Car $80.00 Day 0 $0.00
Truck 3 days O&M, 1 day GW sampling, 1 mobe for IDW $120.00 Day 5 $600.00
Van $120.00 Day 0 $0.00 Subtotal $600.00
TOTAL VEHICLE $600.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
IDW
Hepaco - Non-Haz Disposal & Transportaion 1 drum $170.00 $170.00 Hepaco - Haz Disposal & Transportaion 1 drum $346.10 $346.10
Subtotal $516.10
TOTAL SUB $516.10
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs - GW 7 MWs + 2 IDW $73.00 9 $657.00 TO-15 - Vapor VOCs Influent and VEWs pre-bump test $200.00 5 0 $1,000.00
Subtotal $1,657.00 Fast Turnaround Charges Percent
24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00
Subtotal $0.00 Shipping summa cans and GW samples Large Cooler (25 to 50 lbs) $150.00 4 $600.00 IDW samples Small Cooler (0 to 25 lbs) $110.00 1 $110.00
Subtotal $710.00
TOTAL LAB $2,367.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Analytical Related
Groundwater Sampling Kit $290.00 Day 1 $290.00 Water Level Meter $25.00 Day 1 $25.00 YSI 556 MPS $105.00 Day 0 $0.00
Subtotal $315.00 IDW Related
Drum $100.00 each 1 $100.00 Subtotal $100.00
Expendables 3 days O&M, 1 day GW sampling $40.00 Day 4 $160.00
Subtotal $160.00 Other
O&M supplies $75.00 Day 3 $225.00 O&M Kit $360.00 Day 3 $1,080.00 Air Sampling Canister (Summa) $33.00 Day 5 $165.00
Subtotal $1,470.00
TOTAL EQUIPMENT $2,045.00
report formatting, PDF assembly and compilation
Quarterly O&M data and optimization evaluation (3 hrs), Groundwater data evaluation (2 hrs); Annual report data evaluation and interpretation (2 hrs); PE certification of Annual Report (3 hrs)
Generate groundwater elevation contour map, update historical groundwater quality figure, genrate ROI figure (3 hrs)
Monthly data evaluation and summary email (2 hrs/event - 6 hrs); update GW and air result tables (2 hrs);
draft groundwater contour and spider plot figures (2 hrs), Annual SVE O&M Report (20 hrs)
3 O&M visits (8 hrs each incl rd trip, prep, breakdown - total 24 hrs); Annual GW sampling event: 1 rd trip mob (2 hrs), GW equip calibration (pre, post) (1 hr), collect water levels at 7 wells (1 hr), and sample 7 wells @ 1.5 hrs/well (11 hrs); 1 rd trip mobe to drain moisture separator and manage onsite IDW (4 hrs)
SUBTASK: Year 3 Quarter 1: January 2023 O&M and Reporting
DATE: 6/29/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal K. Warner 1
Senior Professional A. Smith 1
Senior Staff Professional A. Galvin 2
Senior Staff Professional J. Udvardy 12
TOTAL LABOR 16
VEHICLE TYPE RATE UNIT USEAGE
Car $80.00 Day 0 $0.00 Truck 1 day O&M, 1 mobe IDW $120.00 Day 2 $240.00 Van $120.00 Day 0 $0.00
Subtotal $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
TOTAL SUB $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TO-15 - Vapor VOCs Influent and VEWs (bump test) $200.00 5 0 $1,000.00
Subtotal $1,000.00 Fast Turnaround Charges Percent
24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00
Subtotal $0.00 Shipping summa can Large Cooler (25 to 50 lbs) $150.00 3 $450.00
Small Cooler (0 to 25 lbs) $110.00 0 $0.00 Subtotal $450.00
TOTAL LAB $1,450.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
1 day O&M $40.00 Day 1 $40.00 Subtotal $40.00
Other O&M supplies $75.00 Day 1 $75.00 O&M Kit $360.00 Day 1 $360.00 Air Sampling Canister (Summa) $33.00 Day 5 $165.00
Subtotal $600.00
TOTAL EQUIPMENT $640.00
Quarterly O&M data and optimization evaluation (1 hrs)
Quarterly data interpretation (1 hr)
Monthly data evaluation and summary email (2 hrs/event - 2 hrs)
1 O&M visits (8 hrs each incl rd trip, prep, breakdown - total 8 hrs); 1 rd trip mobe to drain moisture separator and manage onsite IDW (4 hrs)
SUBTASK: Utilities: Aug 2022 - January 2023
DATE: 6/29/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Utilities FPL estimate (usage) electrical $300.00 6 $1,800.00 Processing Fee (electric) 6 months x $20/month $20.00 6 $120.00
Subtotal $1,920.00
TOTAL SUB $1,920.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
12801 Tampa Oaks Blvd., Suite 151 Tampa, Florida 33637
PH 813.558.0990
FAX 813.558.9726
www.geosyntec.com
FR3169C/Colonial TOC_LOE_Year 2_3 OM_DC002B (6 months)
30 June 2022
Mr. Evan Miller Florida Department of Environmental Protection Waste Cleanup Program 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
Subject: 6 Months O&M – Year 2/Year 3 - Soil Vapor Extraction System Colonial/Touch of Class 4552 Lake Worth Road Greenacres, Palm Beach County, Florida 33463 FDEP Facility ID NO. ERIC_5222 FDEP Task Assignment No. DC002B (pending)
Dear Evan:
Geosyntec Consultants, Inc. (Geosyntec) has prepared this Statement of Work (SOW) and Level of Effort (LOE) for six months of operations and maintenance (O&M), from August 2022 through January 2023, of the soil vapor extraction (SVE) system at Colonial/Touch of Class (Site) (Facility ID - ERIC 5222) located in Greenacres, Florida. The SVE system startup occurred 30 November 2020 through 2 December 2020. Monthly O&M has been conducted at the Site since startup, and air and groundwater sampling has been performed in general accordance with Table 6 of the FDEP-approved May 2020 Interim Source Removal (ISR) Work Plan. Note that some additional samples have been requested by FDEP to be collected in Year 2. Geosyntec and the FDEP confirmed on 30 June 2022, that an Access Agreement with the current real property owner of the Colonial/Touch of Class (ERIC_5222) Site has been executed.
This LOE is subdivided into subtasks by quarter. For ease of reference, the major scope elements are outlined below as they will pertain to multiple subtasks in some cases. Each subtask will be outlined separately thereafter.
Colonial/Touch of Class – Year 2/Year 3 O&M LOE
SCOPE OF WORK ELEMENTS
Monthly SVE System O&M Tasks
Geosyntec personnel will conduct 6 monthly O&M visits to the Site beginning in August 2022 (Months 20 to 25 of system operation). Note that the July 2022 O&M (Month 19) is included under TA DC002A, which has been approved by FDEP and is in progress. During each O&M visit, Geosyntec personnel will perform the following tasks:
• record vacuum, pressure, and temperature readings at the SVE blower;
• record air flow rates at the blower and five vapor extraction wells (VEWs);
• record vacuum readings at the five VEWs (VEW-1 through VEW-5), MW001 and
VMP01 through VMP05;
• drain fluids accumulated in the moisture separator and disposing of fluids in a 55-gallon drum as investigation derived waste (IDW; water from the moisture separator at the Site has been sampled, analyzed for volatile organic halocarbons [VOHs] and characterized as non-hazardous);
• collect groundwater level measurements from monitoring wells MW001 through
MW007;
• perform required air sampling;
• inspect and clean the equipment compound; and
• perform periodic equipment maintenance activities recommended by equipment manufacturers.
The results of the monthly system O&M activities will be documented in a site-specific O&M log, which will be submitted to the FDEP with the monthly O&M summary emails.
A FDEP requested bump test will be conducted during the August 2022 O&M event following the off cycle initiated in July 2022. This bump test will consist of collecting vapor samples from the SVE influent and individual VEW wells VEW-1 through VEW-4 upon system restart in accordance with the SVE shutdown procedures. A second bump test will be performed similarly to the first bump test initiated in July 2022 and will consist of collecting air samples from VEW-1 through VEW-4 and the SVE influent during the December 2022 O&M event prior to shutting down the system. If a restart is determined to be performed, air samples from the VEW-1 through VEW-4 and the SVE influent will be collected during the January 2023 O&M event upon system startup. The bump test results will be provided in the monthly summary emails.
Groundwater sampling
In accordance with Table 6 of the approved May 2020 ISR Work Plan, monitoring wells MW001 through MW007 will be sampled annually (December 2022). Prior to collecting groundwater samples, depth to water measurements will be collected from MW001 through MW007. The groundwater samples will be analyzed by a FDOH NELAC certified laboratory for VOHs using EPA Method 8260. Results of the groundwater sampling events will be documented in the O&M report for the same reporting period.
IDW Generation and Management
Two drums of groundwater IDW are assumed to be generated during monitoring well sampling and moisture collected in the moisture separator. IDW from groundwater monitoring well sampling has been previously characterized as hazardous waste, and IDW from moisture collected in the moisture separator has been previously characterized as non-hazardous waste. Cost estimates for IDW transport and disposal are included as Attachment A. Based on the provided estimates, Hepaco has the lowest rates ($170/drum for non-hazardous disposal and $346.10 for hazardous disposal and transportation) and will be used to transport and dispose of IDW from the site. A VOH sample is required to establish a new profile with the vendor ($73/drum).
Air sampling
In accordance with Table 6 of the approved May 2020 ISR Work Plan, air emissions will be monitored by sampling combined influent air from the VEWs on a quarterly basis at the Site (one air sample per quarter). Combined effluent will not be sampled as the granular activated carbon (GAC) was removed from the SVE system on 11 May 2021 following the 7 April 2021 sampling event that continued to show that VOHs were below the Hazardous Air Pollutant (HAP) criteria requiring GAC treatment. Air samples will be collected with a summa canister and analyzed at a fixed-base laboratory for VOHs by EPA Method TO-15.
Reporting
A Year 2 Annual O&M Report (following Month 24 [December 2022]) will be prepared to document the results of O&M activities. The O&M reports will include, at a minimum, the following:
• results of laboratory analyses of air samples (tabular and graphical form);
• results of laboratory analyses of groundwater samples (tabular and illustrative form)
• O&M activities performed during the reporting period;
• the calculated mass of PCE (and daughter products, if detected) removed by the SVE system during the reporting period, and cumulative total removed since startup;
• the SVE system hours of operation during the reporting period;
• information regarding the depth to groundwater;
• information regarding any repairs and/or modifications made to the SVE system;
• vacuum ROI data (tabular and illustrative form); and
• recommendations and conclusions pertaining to the continued operation and/or optimization of the SVE system.
Utilities
Monthly electrical utility bills have been estimated at $300 based on the previous year’s average monthly invoices from Florida Power & Light. The utilities also include a $20 monthly processing fee for electrical service.
LOE SUBTASKS
Subtask 1: Project Management
Subtask 2: Year 2 Quarter 3: August 2022 (Month 20) to September 2022 (Month 21) O&M and Reporting
Two months of O&M with monthly email summaries to FDEP, bump test related air sampling in Month 20, and influent air sampling in Month 21. Note that July 2022 O&M is included under TA DC002A, which has been approved by FDEP and is in progress.
Subtask 3: Year 2 Quarter 4: October 2022 (Month 22) to December 2022 (Month 24) O&M and Reporting
Three months of O&M with monthly email summaries to FDEP, air sampling in Month 24, annual groundwater sampling in Month 24, and Annual O&M Report.
Subtask 4: Year 3 Quarter 1: January 2023 (Month 25) O&M and Reporting
One month of O&M with a monthly email summary to FDEP and bump test related air sampling in Month 25.
Subtask 5: Utilities - August 2022 (Month 20) to January 2023 (Month 25)
Six months of O&M utility costs.
Invoice and Deliverable Schedule:
Subtask Deliverable Deliverable Due
Date Invoice Amount
Year 2 Quarter 3: August to September 2022 O&M summary emails 10/31/22 $6,928.16
Year 2 Quarter 4: October 2022 to December 2022 O&M summary emails and Annual O&M report 1/31/23 $15,877.80
1,4 Year 3 Quarter 1: January 2023 O&M summary email 2/28/23 $6,223.67
5 Utilities 3/31/23 $1,920.00 Total $30,949.63
As always, we appreciate the opportunity to continue working on this project for the FDEP. Please contact me at 561.922.1033 if you have any questions.
Andrew Galvin, P.E. Todd Kafka, P.G.
Engineer Senior Principal Geologist
Attachments
Cost Estimate Form Attachment A – IDW Estimates
SUBCONTRACTOR COST EVALUATION
Site: Colonial/Touch of Class (ERIC_5222), Greenacres, FL
IDW Cost Comparison - 2022
Region Subcontractor
Haz (per drum), solid or liquid comments
FL
SE FL
SE FL
Hepaco $170
UES
Clark Environmental
$230 $150
Non Haz (per drum), solid or liquid
$425 *$385
$346.10 $500 minimum per pickup
*Haz drums will only be quoted on a case by case basis in 2022. In 2021 the cost was $385/drum.
BID PROPOSAL FORM 2022
FDEP Drycleaner and Hazardous Waste Sites
Investigation Derived Waste (IDW) Transportation and Disposal
Contractor Company Name: HEPACO, LLC
Contact: Linda Basinger, 813-240-8020, lbasinger@hepaco.com
Region T&D of 1 Non-Hazardous IDW Drum (solid or liquid), Process Code STAB01
T&D of 1 Hazardous IDW Drum (solid or liquid), Process Code STAB02
Northwest $ 191.27 $ 367.36
Northeast $ 191.27 $ 367.36
Central $ 170.00 $ 346.10
Southwest $ 170.00 $ 346.10
Southeast* $ 170.00 $ 346.10
Assumptions and Clarifications:
• Unless otherwise specified within this proposal all terms and conditions will be governed by the most recent Master Services
Agreement between GEOSYNTEC and HEPACO, LLC. In the event that a current agreement is not in place all terms and conditions will be governed by HEPACO’s standard service agreement.
• Price is contingent upon profile approval and process code approval into HEPACO’s preferred disposal facilities.
• A minimum stop fee of $500.00 will apply to all shipments.
• The above rates are for less than truck load quantities (LTL). In the event that a higher volume of disposal is needed at any particular facility HEPACO will provide a case by case pricing scenario to help reduce overall cost.
• Above rates include a standard energy and insurance fee. In the event that market changes dramatically HEPACO reserves the right to increase or decrease these fees based on the appropriate energy index. In the event that this is required HEPACO will provide a
30 day written notice of the change.
* Excludes Monroe County (Case by case basis determined by volume of IDW)
• Bid costs above should be inclusive of transportation fees, fuel fees, environmental recovery fees, etc.
• No standby time should be included in the above bid costs.
• Assume that the drums are accessible.
• It is assumed that VOH totals results will be provided for profiling. If other analytical results are required, please indicated here:
Branch Locations Serving Florida:
Tampa
Gary Weiss, Project Manager
5371 Hartford St, Tampa gweiss@hepaco.com
813.550.7229 Mbl
Jacksonville
Andy Moats, Project Manager
1830 Clarkson St, Jacksonville amoats@hepaco.com
706.829.0145 Mbl
Panhandle
Chad Cobb, Project Manager
3490 Hurricane Bay Dr, Theodore AL ccobb@hepaco.com
251.293.9598 mailto:gweiss@hepaco.com mailto:amoats@hepaco.com mailto:ccobb@hepaco.com TKafka Highlight
AGalvin Highlight
AGalvin Highlight
Pencil
Pencil
1/7/22, 11:18 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19200 1/2
Quote Number: 19200
QUOTE
QUOTED TO: Todd Kafka
QUOTE DATE: 1/7/2022
COMPANY NAME: Geosyntec - 2022 QUOTED BY: Craig Burns
PHONE NUMBER:
Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR
THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.
**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns
863.327.6289 - cburns@clarkenv.com
This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
Name (print) Title
AGalvin Highlight
AGalvin Highlight
AGalvin Highlight
AGalvin Text Box In 2021 HAZ drum disposal for the Site were quoted by Clark at $385/drum but Clark has indicated that HAZ drum disposal costs in 2022 will only be quoted on a case-by-case basis.
Highlight
1/7/22, 11:18 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19200 2/2
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com
| CEF.pdf |
| Cost Estimate |
| LOEs.pdf |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Colonial TOC_LOE_Year 2_3 OM_DC002B (6 months).pdf |
| SCOPE OF WORK ELEMENTS |
| Monthly SVE System O&M Tasks |
| Groundwater sampling |
| IDW Generation and Management |
| Two drums of groundwater IDW are assumed to be generated during monitoring well sampling and moisture collected in the moisture separator. IDW from groundwater monitoring well sampling has been previously characterized as hazardous waste, and IDW from... |
| Air sampling |
| Reporting |
| Utilities |
| LOE subtasks |
| Subtask 1: Project Management |
| Subtask 2: Year 2 Quarter 3: August 2022 (Month 20) to September 2022 (Month 21) O&M and Reporting |
| Subtask 3: Year 2 Quarter 4: October 2022 (Month 22) to December 2022 (Month 24) O&M and Reporting |
| Subtask 4: Year 3 Quarter 1: January 2023 (Month 25) O&M and Reporting |
| Subtask 5: Utilities - August 2022 (Month 20) to January 2023 (Month 25) |
| Colonial TOC_LOE_Year 2_3 OM_DC002B (6 months).pdf |
| SCOPE OF WORK ELEMENTS |
| Monthly SVE System O&M Tasks |
| Groundwater sampling |
| IDW Generation and Management |
| Two drums of groundwater IDW are assumed to be generated during monitoring well sampling and moisture collected in the moisture separator. IDW from groundwater monitoring well sampling has been previously characterized as hazardous waste, and IDW from... |
| Air sampling |
| Reporting |
| Utilities |
| LOE subtasks |
| Subtask 1: Project Management |
| Subtask 2: Year 2 Quarter 3: August 2022 (Month 20) to September 2022 (Month 21) O&M and Reporting |
| Subtask 3: Year 2 Quarter 4: October 2022 (Month 22) to December 2022 (Month 24) O&M and Reporting |
| Subtask 4: Year 3 Quarter 1: January 2023 (Month 25) O&M and Reporting |
| Subtask 5: Utilities - August 2022 (Month 20) to January 2023 (Month 25) |
File details come from the government source that posted it. Updated .