CN-370000-HW683-BIL01B.pdf

PDF 3 MB Posted

Attached to
Master Agreement FL|HW683|90e8124b5a65e607dedb86d39c72016e
Contract number
HW683
Issued by
Florida

About this file

Task Assignment BIL01B – Former Biscayne Chemical Site

This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Geosyntec Consultants for groundwater assessment and Post Active Remediation Monitoring (PARM) activities at the Former Biscayne Chemical Site located at 690 NW 13th Street, Miami, Miami-Dade County. The work is funded through the State & Tribal Response Program Bipartisan Infrastructure Law (BIL) grant administered by FDEP on behalf of the U.S. Environmental Protection Agency (EPA). The TA was executed on March 20, 2023, with a completion date of August 31, 2023, under underlying Contract Number HW683.

The scope of work comprises four subtasks: (1) Project Management ($4,396.03), (2) Monitoring Well Installations—nine monitoring wells configured as individual wells or clusters with proper casing, screen, and completion specifications ($33,770.96), (3) PARM 7 Groundwater Sampling—sampling of 36 monitoring wells for iron, manganese, and chlorinated volatile organic compounds (CVOCs) with disposal of approximately 15 drums of investigation-derived waste ($21,575.01), and (4) PARM 7 Report preparation documenting field activities, laboratory results, plume maps, and hydrogeologic interpretation ($14,329.17). The total fixed-unit-rate contract value is $74,071.17, with invoicing contingent upon departmental approval of deliverables: field documentation due June 9, 2023 ($55,345.97), and the PARM 7 Report due July 14, 2023 ($18,725.20). Cost justifications included subcontractor quotes from drilling, surveying, utility locate, and waste disposal vendors, with hotel costs exceeding the standard $175 nightly limit approved at $239.62 per night based on Miami market rates.

View the file

Other files

File Type Posted
CN-370000-CN802-T9.pdf PDF
CN-370000-HW683-BF01BCO1.pdf PDF
CN-370000-HW683-BF04C.pdf PDF
CN-370000-HW683-BF04CCO1.pdf PDF
CN-370000-HW683-BIL02A.pdf PDF
CN-370000-HW683-DC001E.pdf PDF
CN-370000-HW683-DC001F.pdf PDF
CN-370000-HW683-DC002D.pdf PDF
CN-370000-HW683-DC002E.pdf PDF
CN-370000-HW683-DC003B.pdf PDF
CN-370000-HW683-DC003C.pdf PDF
CN-370000-HW683-DC003E.pdf PDF
CN-370000-HW683-DC010D.pdf PDF
CN-370000-HW683-DC012A.pdf PDF
CN-370000-HW683-DC012C.pdf PDF
CN-370000-HW683-DC013B.pdf PDF
CN-370000-HW683-DC020A.pdf PDF
CN-370000-HW683-DC020C.pdf PDF
CN-370000-HW683-DC021A.pdf PDF
CN-370000-HW683-DC023A.pdf PDF
CN-370000-HW683-DC024B.pdf PDF
CN-370000-HW683-DC024C.pdf PDF
CN-370000-HW683-DC026A.pdf PDF
CN-370000-HW683-DC027A.pdf PDF
CN-370000-HW683-DC027B.pdf PDF
CN-370000-HW683-DC028A.pdf PDF
CN-370000-HW683-DC02DCO1.pdf PDF
CN-370000-HW683-DC02FCO1.pdf PDF
CN-370000-HW683-DC030C.pdf PDF
CN-370000-HW683-DC031B.pdf PDF
CN-370000-HW683-DC034C.pdf PDF
CN-370000-HW683-DC036A.pdf PDF
CN-370000-HW683-DC037D.pdf PDF
CN-370000-HW683-DC039C.pdf PDF
CN-370000-HW683-DC03CCO2.pdf PDF
CN-370000-HW683-DC03ECO1.pdf PDF
CN-370000-HW683-DC040C.pdf PDF
CN-370000-HW683-DC041D.pdf PDF
CN-370000-HW683-DC043C.pdf PDF
CN-370000-HW683-DC044A.pdf PDF
CN-370000-HW683-DC046A.pdf PDF
CN-370000-HW683-DC047A.pdf PDF
CN-370000-HW683-DC049A.pdf PDF
CN-370000-HW683-DC052A.pdf PDF
CN-370000-HW683-DC053B.pdf PDF
CN-370000-HW683-DC054A.pdf PDF
CN-370000-HW683-DC05BCO3.pdf PDF
CN-370000-HW683-DC06ACO1.pdf PDF
CN-370000-HW683-DC07BCo1.pdf PDF
CN-370000-HW683-DC08BCO2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW683

BIL01B Completion August 31, 2023

The Department approves this Task Assignment (TA), based upon the Cost Proposal and Level of Effort (CP/LOE), for additional groundwater assessment and Post Active Remediation Monitoring (PARM) activities at the below project site, submitted to the Department on March 13, 2023, by Geosyntec Consultants. The final deliverable will be the PARM 7 Report received by the Department no later than July 14, 2023.

Megan Johnson 850.245.8994 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Geosyntec Consultants

Geosyntec Consultants

Andrew Galvin, P.E. 561.922.1033

BF139801015

690 NW 13th Street, Miami, Miami-Dade County

Former Biscayne Chemical Site

✔ $ 74,071.17

$ 74,071.17

Scope of Work

Joseph Applegate, P.G.

Senior Principal Hydrogeologist

Joseph Applegate Digitally signed by Joseph Applegate Date: 2023.03.20 16:21:01 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2023.03.19 17:26:31 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Field documentation of monitoring well installations and PARM 7 groundwater sampling; IDW water characterization profile, IDW manifest. 06/09/2023

PARM 7 Report; Project Management.

07/14/2023

Department approval of field documentation (Subtasks 2 and 3) $ 55,345.97

Department approval of Project Management and PARM 7 Report (Subtasks 1 and

4) $ 18,725.20

$ 74,071.17

HW683

BIL01B

www.FloridaDEP.gov

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Geosyntec Consultants, HW683 Contract File

FROM: Megan Johnson, Contract Manager

DATE: March 15, 2023

SUBJECT: Negotiation Summary – BIL22 Task Assignment (TA) BIL01B

Former Biscayne Chemical – Site ID # BF139801015 Well Installations and Post Active Remediation Monitoring activities

This TA is intended for conducting well installations and post active remediation monitoring (PARM) activities at the Former Biscayne Chemical site, located at 690 NW 13th Street, Miami, Miami-Dade County. The services under this task are being conducted using federal funds from the State & Tribal Response Program Bipartisan Infrastructure Law (BIL) funding cooperative agreement that is administered by the Department on behalf of the U.S. Environmental Protection Agency (EPA).

Subtask 1: Project Management This subtask is a percentage of the overall project fees and has been negotiated as a contract rate. It includes project management, overhead, general and administrative, and fringe. The agreed upon cost of this subtask is $4,396.03.

Subtask 2: Monitoring Well Installations This subtask will include the installation and development of nine monitoring wells in accordance with a Miami-Dade County DERM February 2023 letter. Two monitoring wells will be installed as individual wells and seven of the monitoring wells will be installed as clusters with either two or three monitoring wells within the same boreholes, where applicable, using a rotosonic or HSA-equipped DPT drill rig. Monitoring wells located in clusters will be installed inside an 8-inch diameter borehole. The agreed upon cost of this subtask is $33,770.96.

Subtask 3: PARM 7 Groundwater Sampling This subtask includes the sampling of 36 monitoring wells: 36 groundwater samples will be submitted for laboratory analysis for iron by EPA Method 6010D, 27 groundwater samples for manganese by EPA Method 6010D, and 10 groundwater samples for CVOCs by EPA Method 8260B. Additionally, two QA/QC samples will be collected and analyzed by these methods. Geosyntec will also prepare an IDW water characterization profile, an IDW manifest, and coordinate disposal for approximately 15 drums of purge/development water and drill cuttings generated during the groundwater sampling activities and well installation activities described in Subtask 2 and Subtask 3. The agreed upon cost of this subtask is $21,575.01.

http://www.floridadep.gov/

Negotiation Summary – Task Assignment BIL01B Former Biscayne Chemical – Site ID # BF139801015 March 15, 2023 www.FloridaDEP.gov

Subtask 4: PARM 7 Report Geosyntec will compile the data collected and prepare a PARM 7 Report which will document the field activities and laboratory analytical results. The PARM 7 Report will include a review and interpretation of the groundwater analytical results, plume maps, water table map, and geologic/hydrogeologic data. The agreed upon cost of this subtask is $14,329.17.

Summary The Department’s BIL Contract Manager and Geosyntec’s Contract Manager have both agreed to the scope of work and associated costs. Due to hotel costs exceeding the allowed $175 nightly limit in Miami, justification for a $239.62 nightly rate has been included with the CP/LOE. The final cost associated with this TA is $74,071.17.

Documentation of these costs is included in the Cost Proposal/Level of Effort (CP/LOE) Form and CP/LOE narrative provided by Geosyntec on March 13, 2023 and the TA Form for BIL01B prepared by the Department. The final deliverable for this TA must be received by the Department no later than July 14, 2023.

http://www.floridadep.gov/

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 3/13/2023

Task #: BIL01B Task 1 Project Management SubTask 6

Site: Former Biscayne Chemical Task 2 Monitoring Well Installations SubTask 7

Activity/Phase: Task 3 PARM 7 Groundwater Sampling SubTask 8

Project Manager: A. Galvin/M. Johnson Task 4 PARM 7 Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$38.46 Project Manager A. Galvin 38 38.1 $84.13 Principal J. Applegate 7 2 2 3 0 0 0 0 0 0 $56.30 Senior Professional A. Smith 9 0 0 9 0 0 0 0 0 0 $48.56 Project Professional M. Hensley 37 0 0 37 0 0 0 0 0 0 $38.46 Professional A. Galvin 70 5 9 56 0 0 0 0 0 0 $40.87 Sr. Staff Professional P. Jafari 0 0 0 0 0 0 0 0 0 0 $34.62 Sr. Staff Professional M. Shook 53 0 53 0 0 0 0 0 0 0 $36.06 Site Manager I K. Starling 105 49 56 0 0 0 0 0 0 0 $33.65 Administrative Assistant S. Darling 2 0 0 2 0 0 0 0 0 0

Total Hours 321 38 56 120 107 0 0 0 0 0 0

Direct Labor $12,738.48 $1,465.49 $2,127.50 $4,368.62 $4,776.87 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $21,999.35 $2,530.90 $3,674.19 $7,544.61 $8,249.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $34,737.83 $3,996.39 $5,801.69 $11,913.23 $13,026.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $1,440.00 $480.00 $960.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $3,691.06 $1,414.10 $2,276.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $5,131.06 $1,894.10 $3,236.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Well Installations and PARM 7

CEF Page 1 of 5 CEF

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 3/13/2023

Task #: BIL01B Task 1 Project Management SubTask 6

Site: Former Biscayne Chemical Task 2 Monitoring Well Installations SubTask 7

Activity/Phase: Task 3 PARM 7 Groundwater Sampling SubTask 8

Project Manager: A. Galvin/M. Johnson Task 4 PARM 7 Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Well Installations and PARM 7

Subcontractor (Services Procurement) Drilling - GFA $17,950.00 $17,950.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility locate - GeoTek $750.00 $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 MW Survey - Pulice Land Surveyors $1,500.00 $1,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IDW - Erwin Remediation $1,980.00 $1,650.00 $330.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $22,180.00 $21,850.00 $330.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $2,218.00 $2,185.00 $33.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $24,398.00 $24,035.00 $363.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,780.50 $0.00 $1,780.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $600.00 $0.00 $600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,380.50 $0.00 $2,380.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $320.00 $160.00 $160.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $1,300.00 $1,300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $2,030.00 $0.00 $2,030.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $300.00 $0.00 $300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $3,950.00 $1,460.00 $2,490.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $70,597.39 $3,996.39 $33,190.79 $20,383.69 $13,026.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $3,473.78 $399.64 $580.17 $1,191.32 $1,302.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $74,071.17 $4,396.03 $33,770.96 $21,575.01 $14,329.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

CEF Page 2 of 5 CEF

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Former Biscayne Chemical SUBTASK: 2 Monitoring Well Installations

DATE: 3/13/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal J. Applegate 2

Sr. Staff Professional A. Galvin 5

Site Manager I

K. Starling 49

TOTAL LABOR 56

VEHICLE TYPE RATE UNIT USEAGE

Truck 1 week for Starling (well installations and mob) $480.00 Week 1 $480.00

Truck $120.00 Day 0 $0.00 Subtotal $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 K. Starling Meals (standard per diem) $36.00 Day 6 $216.00 K. Starling Lodging (4 nights) $239.62 Day 5 $1,198.10

TOTAL PER DIEM $1,414.10

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Drilling (Conventional)

GFA $17,950.00

$0.00 $0.00 Subtotal $17,950.00

Utility Locate GeoTek $750.00 $750.00

Subtotal $750.00

Surveying Pulice Land Surveyors $1,500.00 $1,500.00

Subtotal $1,500.00

IDW

Erwin Remediation (15 non-haz IDW drums) $110 x 15 = $1,650.00 $1,650.00

$0.00 $0.00 Subtotal $1,650.00

TOTAL SUB $21,850.00

LABORATORY COSTS

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Drilling Related

Monitoring Well Installation Kit (for Ken) $1,300.00 week 1 $1,300.00 Expendables

$40.00 Day 4 $160.00 Subtotal $160.00

Other Subtotal $0.00

TOTAL EQUIPMENT $1,460.00

Field and H&S preparation (3 hrs), Evaluate and Interpret Field Data (2 hrs)

Evaluate and Interpret Field Data, Field EHS Review (2 hrs)

Fieldwork - Prep (1 hr), mob (16 hrs), well installations (10 hr x 3 days = 30 hrs), IDW staging/management (2 hrs)

3/15/2023 Page 3 of 5 Subtask 2

SUBTASK: 3 PARM 7 Groundwater Sampling

DATE: 3/13/2023

LABOR CATEGORY

STAFF-TITLE HOURS

Principal J. Applegate 2

Sr. Staff Professional A. Galvin 9

Sr. Staff Professional

M. Bennett 53

Site Manager I

K. Starling 56

TOTAL LABOR 120

VEHICLE TYPE RATE UNIT USEAGE

Truck 1 week for Starling (gw sampling and mob) , 1 week for Bennett (GW sampling and mob) $480.00 week 2 $960.00

Subtotal $960.00

TOTAL VEHICLE $960.00

PER DIEM STAFF RATE UNIT USEAGE

M. Bennett Meals (standard per diem) $36.00 Day 5 $180.00 K. Starling Meals (standard per diem) $36.00 Day 5 $180.00 M. Bennett Lodging (4 nights) $239.62 Day 4 $958.48 K. Starling Lodging (4 nights) $239.62 Day 4 $958.48

TOTAL PER DIEM $2,276.96

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Equipment Procurement

$0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Drilling (Non-Conventional) $0.00 $0.00 $0.00 $0.00

Subtotal $0.00

Mobile Laboratory $0.00 $0.00

Subtotal $0.00

IDW

Erwin Remediation (3 non-haz IDW drums) $110 x 3 = $330.00 $330.00

Subtotal $330.00

TOTAL SUB $330.00

LABORATORY COSTS

CVOCs 10 monitoring well samples plus 2 QAQC samp $73.00 12 0 $876.00 Iron 36 monitoring well samples plus 2 QAQC samp $13.50 38 0 $513.00 Manganese 27 monitoring well samples plus 2 QAQC samp $13.50 29 0 $391.50

Subtotal $1,780.50 Fast Turnaround Charges Percent

24 Hours 110% $0.00 0 $0.00 3 Days 65% $0.00 0 $0.00 1 Week 20% $0.00 0 $0.00

Subtotal $0.00 Shipping

Large Cooler (25 to 50 lbs) $150.00 4 $600.00 Small Cooler (0 to 25 lbs) $110.00 0 $0.00

Subtotal $600.00

TOTAL LAB $2,380.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Subtotal $0.00 Analytical Related

Groundwater Sampling Kit 3 days for Starling, 4 days for Bennett $290.00 Day 7 $2,030.00 Subtotal $2,030.00

IDW Related Drum $100.00 Drum 3 $300.00

Subtotal $300.00 Expendables

$40.00 Day 4 $160.00 Subtotal $160.00

TOTAL EQUIPMENT $2,490.00

*PROVIDE TIME REQUIRED FOR EACH PERSON

WORK DESCRIPTION

Evaluate and Interpret Field Data, Field EHS Review (2 hrs)

Field and H&S preparation (2 hrs), evaluate and interpret field data (2 hrs), prepare field package (3 hrs), preparation of manifests and arrange disposal of IDW (2 hr)

Fieldwork - Prep (0.5 hrs), mob (8 hrs), gw sampling (1.5 hrs/well x 19 wells= 29 hrs), calibration/check GW sampling equipment (1hr/day x 4 days = 4 hrs), preparing sample coolers for shipping (1 hrs x 4 days = 4 hrs), Water level measurments (5.5 hrs), IDW staging/management (2 hr)

Fieldwork - Prep (0.5 hrs), mob (16 hrs), gw sampling (1.5 hrs/well x 17 wells= 26 hrs), calibration/check GW sampling equipment (1hr/day x 3 days = 3 hrs), preparing sample coolers for shipping (1 hrs x 3 days = 3 hrs), Water level measurements (5.5 hrs) IDW staging/management (2 hr)

3/15/2023 Page 4 of 5 Subtask 3

SUBTASK: 4 PARM 7 Report

DATE: 3/13/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal J. Applegate 3

Senior Professional

A. Smith 9

Project Professional

M. Hensley 37

Sr. Staff Professional

A. Galvin 56

Administrative Assistant S. Darling 2

TOTAL LABOR 107

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL SUB $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Other

$0.00 Subtotal $0.00

TOTAL EQUIPMENT $0.00

Report Formatting (2 hrs)

Evaluate Site Closure and Develop Path Forward (3 hr)

Preparing Draft PARM 7 Report Conclusions and Recommendations (4 hrs), Final Report Revisions (2 hrs), PE certification of Final Report (3 hrs)

Draft PARM 7 Tables (5 hrs), Draft PARM 6 Figures (18 hrs), Draft PARM 7 Trend Analyses (8 hrs), Revisions to PARM 7 report based on KTLC Biscayne/TEA/Goldstein Review (3 hrs) & Final Revisions (3 hrs)

Draft PARM 6 Tables (8 hrs), Draft PARM 6 Figures (6 hrs), Draft PARM 6 Trend Analyses (4 hrs), Draft PARM Reporting Text (32 hrs), Revisions based on KTLC Biscayne/TEA/Goldstein Review (4 hrs), & Final Revisions (2 hrs)

3/15/2023 Page 5 of 5 Subtask 4

2039 Centre Pointe Blvd, Suite 301 Tallahassee, Florida 32308

PH 850-556-8419

www.geosyntec.com

Former Biscayne Chemical

13 March 2023

Ms. Megan R. Johnson Brownfields and CERCLIS Screening Program Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4535 Room 310-D Tallahassee, FL 32399-2400

Subject: Proposal and Level of Effort/Cost Estimate Form Well Installations and PARM 7 Former Biscayne Chemical 690 NW 13th Street Miami, Florida 33032 FDEP Brownfield Site ID# BF139801015 FDEP Task Assignment No. BIL01B

Dear Ms. Johnson:

We are pleased to submit this attached Cost Estimate Form and proposed Level of Effort (CEF/LOE) to conduct additional groundwater assessment/Post Active Remediation Monitoring (PARM) activities at the Former Biscayne Chemical Site (Site). The Site is in a critical redevelopment stage and the purpose of this project is to help support site closure for groundwater impacts to the property being redeveloped under a BSRA into affordable housing. The purpose of the additional groundwater assessment is to install additional monitoring wells in accordance with the Miami-Dade County Division of Environmental Resources Management (DERM) PARM 5 comment letter dated 21 February 2023, conduct the PARM 7 groundwater sampling event, and prepare the PARM 7 report.

This work is being conducted so that portions of the property may be redeveloped by KTLC Biscayne, LLC for the conditional closure of the property with allowance for future residential use that includes a major affordable housing development project. Work will be conducted under the State and Tribal Response Program (SRP) grant administered by FDEP. The associated scope of work consists of the following tasks.

Subtask 1 – Project Management

Ms. Johnson 13 March 2023

Former Biscayne Chemical

Subtask 2 – Monitoring Well Installations

The scope of work for this subtask will include the installation and development of nine (9) monitoring wells in accordance with DERM’s 21 February 2023 letter. Two (2) of the monitoring wells will be installed as individual wells and seven (7) of the monitoring wells will be installed as clusters with either two (2) or three (3) monitoring wells within the same boreholes, where applicable, using a rotosonic or HSA-equipped DPT drill rig. Monitoring wells located in clusters will be installed inside an 8-inch diameter borehole. The site lithology will be documented by evaluation of soil cores from the sonic rig from land surface to the final borehole depth at each well cluster location. Each well will be constructed of 1-inch-diameter polyvinyl chloride (PVC) with a 0.006-inch slotted, PVC screen. A 30-65 grade sand filter pack will be installed from the bottom of each well screen to a height of 2 foot above the top of the screen. Annular space located vertically between filter pack materials for individual well screen intervals will be constructed with bentonite chips. Bentonite will be allowed to hydrate to its expansion volume prior to installing the next well screen and filter pack interval. Filter pack sand and bentonite will be added via tremie pipe. Remaining annular space will be grouted to surface. Individual well and clusters will be completed in 8” steel manholes set in 2’ x 2’ concrete pads. Shortly after each well is installed, it will be developed until the water produced is sediment free. The top-of-casing elevations on the new wells will be surveyed by a professional land surveyor (PLS).

We obtained 3 drilling quotes from Cascade, Earth Tech Drilling, and GFA. We have attached the 3 drilling quotes with this proposal. The lowest bid (GFA) will be used and the cost has been included in the level of effort spreadsheet. We also received 3 bids for the monitoring well survey and the low bidder was Pulice Land Surveyors. The low bidder (Pulice) will be used and the cost has been included in the level of effort spreadsheet. We received 3 bids for utility locate and the low bidder was GeoTek. The low bidder (GeoTek) will be used and the cost has been included in the level of effort spreadsheet.

Subtask 3 – PARM 7 Groundwater Sampling

This subtask includes the sampling of thirty-six (36) monitoring wells for iron, manganese, and/or CVOCs. Before collecting a groundwater sample, each monitoring well will be purged using a peristaltic pump until water quality parameters (including pH, temperature, specific conductivity, dissolved oxygen, and turbidity) have stabilized within the acceptable ranges as stated in the FDEP Standard Operating Procedures (SOPs). Thirty-six (36) groundwater samples collected from the monitoring wells will be submitted for laboratory analysis for iron by Environmental Protection Agency (EPA) Method 6010D, twenty-seven (27) groundwater samples collected from the

Ms. Johnson 13 March 2023

Former Biscayne Chemical monitoring wells will be submitted for laboratory analysis for manganese by EPA Method 6010D, and ten (10) groundwater samples collected from the monitoring wells will be submitted for laboratory analysis for CVOCs by EPA Method 8260B. Additionally, two (2) QA/QC samples will be collected and analyzed by these methods. Laboratory analysis will be performed on a standard turn-around time (about two weeks). Groundwater sampling will be conducted in general accordance with the FDEP’s SOPs. Geosyntec will prepare an IDW waste characterization profile, an IDW manifest, and coordinate disposal for approximately 15 drums of purge/development water and drill cuttings (15 drums total) generated during the groundwater sampling activities and well installation activities described in subtask 2 and subtask 3.

Subtask 4 – PARM 7 Report

Geosyntec will compile the data collected and prepare a PARM 7 report which will document the field activities and laboratory analytical results. This PARM 7 report will include a review and interpretation of the groundwater analytical results, plume maps, water table map, and geologic/hydrogeologic data.

Invoice and Deliverable Schedule:

Subtask Deliverable Deliverable Due Date Invoice Amount 2,3 Field Forms and Lab Reports 9 June 2023 $55,345.97 1,4 PARM 7 Report 14 July 2023 $18,725.20

Total: $74,071.17

A copy of associated Cost Estimate Form (LOE) has been included with this proposal.

As always, we appreciate the opportunity to conduct this project for the FDEP and for the benefit of the KTLC Biscayne, LLC. Please contact Andrew Galvin at 561.922.1033 or Joe Applegate at

850.556.8419 if you have any questions.

Sincerely, Andrew Galvin, P.E. (FL) Engineer

Joseph L. Applegate, P.G. (FL)

Senior Principal Hydrogeologist Attachment(s): LOE Cost Estimate Form Subcontractor Quotes

March 7, 2023

Andrew Galvin, PE Engineer Geosyntec Consultants, Inc.

900 Broken Sound Parkway NW, Ste 200 Boca Raton, FL 33487 561-922-1033

Email: AGalvin@geosyntec.com

Re: Biscayne Chemical Site

690 NW 13th Street Miami, FL

Dear Mr. Galvin:

GFA/Universal Engineering Sciences Inc. (GFA/UES) appreciates the opportunity to become a part of your project team. Our professional staff is dedicated to making this project a success, both on schedule and within budget. We are proud of our commitment to maintaining the highest levels of customer service and client satisfaction, and respectfully submit the following for your consideration.

It is our understanding the work will require:

➢ Install one (1) 1”x 15’ pvc well with 10’ of 0.006 slot screen

➢ Install one (1) 1”x 50’ pvc well with 5’ of 0.006 slot screen

➢ Install two (2) locations with two (2) nested 1” pvc wells in the same 8” borehole, screen 5-15 and 25 to 30. 0.006 slot screens

➢ Install one (1) location with three (3) nested 1” pvc wells in the same 8” borehole screen 5-15, 25-30, and 45-50. 0.006 slot screens

➢ Bentonite and fine sand will be used between screen intervals to seal off each zone.

All borings will be continuously cored.

➢ Five (5) 8” bolt down manhole surface completions

➢ Well development at an hourly rate

➢ Est. 8 drums soil and 7 drums water

➢ Assume water is available on site

➢ Rig requires a overhead clearance of 21’

➢ Move debris pile and clear tree limbs

➢ 3 days completion

PROPOSED FEE SCHEDULE

GFA/UES proposes the following fee schedule for subcontracted drilling services.

$1,950.00 Each 1 $1,950.00

$28.00 LF 175 $4,900.00

$500.00 Day 3 $1,500.00 $95.00 Each 15 $1,425.00

$175.00 Hr 15 $2,625.00 $175.00 Each 5 $875.00 $110.00 Each 5 $550.00

$14.50 LF 250 $3,625.00

$250.00 Hr 2 $500.00

$17,950.00ESTIMATED TOTAL:

Support Equipment Drums Well Development 8" bolt down surface completion Permits 1" pvc installation & materials Clearing Time

Mobilization/Demobilization Sonic drilling

Sonic Drill Methods

➢ Assumes site is accessible to Track Mounted Drill Rig

➢ Pricing does not include contaminated water, soil disposal.

CONDITIONS AND QUALIFICATIONS

GFA/UES will provide detailed invoices services rendered. Our terms are C.O.D. (credit cards are accepted) unless a credit application has been approved or credit has been previously established. If credit is established, our terms will be net-30 days. The pricing contained herein is subject to change if this proposal is not authorized within 90 days from the date of this proposal. If more than 90 days have passed since the date of this proposal, please contact us for an updated proposal. Additional items not listed in this proposal will be quoted upon request.

AUTHORIZATION

All services will be conducted in accordance with this proposal and attached Terms and Conditions. To initiate services, please complete and return the included Proposal Acceptance Agreement form. The Terms and Conditions are part of this agreement.

CLOSING

GFA/UES appreciates the opportunity to submit this proposal and looks forward to working with you as a member of the project team. Please contact the undersigned at 954-347-1266 if you have any questions or comments.

From our team to yours, GFA/UES Inc.

Randy H. Conrad

Randy H. Conrad Business Development

2703 NW 19th Street, Pompano Beach, FL 33069

Monitoring Wells Sparge Wells Direct Push

Geotechnical Drilling SONIC Drilling

DATE

CLIENT: PHONE

SITE:

PROPOSED SCOPE OF WORK:

Unit Number

Rate of Units

Sonic Daily Rate per day $3,900.00 2

Sonic Half Day Rate per foot

8" Sonic Over Ride Casing per foot $20.00 110

10" Sonic Casing per foot

Compact Tooling Loader / Water Support per day $550.00 2

1" PVC Well Material (includes all annular backfill) per foot $12.00 250

2" PVC Well Material (includes all annular backfill) per foot

4" PVC Well Material (includes all annular backfill) per foot

6" PVC Well Material (includes all annular backfill) per foot

Coated Bentonite Pellets bucket $90.00 10

8" Bolt-down completion per well $225.00 5

12" Bolt-down completion per well

Bollard (Painted and Installed) each

6" Above Grade Protector (Aluminum) per well

Mobilization (Sonic Drill with all associated equipment) roundtrip $1,200.00 1

Crew Daily Mobilization (to and from site per day) per day $495.00 2

Per Diem per night

Permits each $110.00 2

DOT Approved 55-gal Drum each $80.00 12

Development Time 1/2 hour $75.00 18

Soil Boring Abandonment per foot $10.00

Water meter and usage lump sum $1,200.00 1

Standby / Difficult Moving Time per hour $550.00 0

Days to Complete Scope of Work 2 Submitted By: Charles Bucher TOTAL QUOTE PRICE

$0.00

$0.00

2/28/2023

Biscayne Chemical - 690 NW 13th Street - Miami, FL

Water Source Provided by ETD

(2) Nested Well - 1"x15' w/ 10' .006" Screen & 1"x30' w/ 5' .006" Screen - 8" BD Completion

(561) 922-1033

Drum Soil (estmated at 3 drums) & Dev. Water (Estimated at 1 drum per well)

(1) Nested Well - 1"x15' w/ 10' .006" Screen, 1"x30' & 1"x50' w/ 5' .006" Screen - 8" BD Completion

Geosyntec

Well Development estimated at 1 hr per well - Approx. 1 drum per well

MISCELLANEOUS

Andrew Galvin

(1) MW - 1"x15' w/ 10' .006" Screen - 8" BD Completion

Coated Bentonite Pellets to seal each interval

Sonic Daily Rate (Compact Track) Price Includes a ten hour work day ( 7 to 5 ) Unless otherwise stated in this quote.

(1) MW - 1"x50' w/ 5' .006" Screen - 8" BD Completion

$0.00

$0.00

Well Completion (includes Completion , concrete pad(2'x2' or 10" circle) & lockable well cap

$0.00

6" Borehole on all single wells, 8" Borehole nested wells

Soil Coring/Sampling each borhole

SONIC DRILL Unit Extended Price

$7,800.00

$3,000.00

$0.00

$0.00

$22,045.00

$1,200.00

$0.00

$220.00

$990.00

$960.00

$0.00

$2,200.00

$1,350.00

$0.00

$1,200.00

$0.00

$1,100.00

$900.00

WELL MATERIALS

$0.00

$1,125.00

Geosyntec Consultants 2/28/2023 900 Broken Sound Parkway NW PN230227-122105 Suite 200 Boca Raton, Florida 33487 Biscayne Chemical Site

Andrew Galvin 690 NW 13th St agalvin@geosyntec.com Miami

585.208.3761 Florida

Cascade Rep Contact Information

Scope of Work

Quantity Unit Sales Price Subtotal Mobilization 1 Each 3,000.00$ 3,000.00$ Demobilization 1 Each 3,000.00$ 3,000.00$ Per Diem and Lodging (per worker) 15 Man/Day 225.00$ 3,375.00$ Sonic Rig and Crew Day Rate (up to 10 hours on site) 5 Days 5,200.00$ 26,000.00$ 1" PVC Well Installation 250 Feet 16.00$ 4,000.00$ Flush Mount Completion w/ 2'x2' pad 5 Each 300.00$ 1,500.00$ Steel Bollards if needed Each 100.00$ 55-Gallon DOT Drums ESTIMATE ONLY 12 Each 95.00$ 1,140.00$ Hydrant Meter if needed Lump Sum 1,600.00$ Overtime (over 10 hours on site) Hours 600.00$ Permits as needed 5 Each (at cost) 200.00$ 1,000.00$ Weekend Shift Break if needed Weekend 2,000.00$

Pre-Tax Total

Tax Percentage

Taxes

Quote Total

Florida: 5785 SW 6TH PL STE 101, OCALA FL 34474 ♦ (352) 237-1995

$43,015.00

This quote is based on information provided by you and is valid for 45 days from the bid date. Unless previously agreed, Cascade requires a 2-week notice prior to mobilization. Your firm is responsible for 1) Obtaining any site specific permits, 2) Locating and clearly marking underground installations or utilities, 3) Furnishing dig

Alert numbers at least three working days prior to scheduled start date and proof of private locating services, 4) Obtaining access to site with no overhead wires within 20' of the holes. Cascade Drilling shall not be responsible for damages to underground improvements not clearly and accurately marked. If bedrock, cobbles, flowing sands or other adverse or unsafe drilling conditions are encountered, drilling may continue on a time and materials basis or be terminated at the discretion of Cascade.

Additional costs may apply if scope is significantly changed. Well development by others may void some or all of Cascade warranties of workmanship and materials.

Number

Prepared By Email wburdette@cascade-env.comWill Burdette, Southeast Region Estimator

Drill and install one 1" Sch40 PVC well with 10' of regular .006-slot screen to 15'.

Drill and install one 1" Sch40 PVC well with 5' of regular .006-slot screen to 50'.

Drill and install two nests of 1" Sch40 PVC set at 30' (5' of regular .006-slot screen) and 15' (10' of regular .006-slot screen).

Drill and install one nest of 1" Sch40 PVC set at 50' & 30' (each with 5' of regular .006-slot screen) and 15' (10' of regular .006-slot screen).

All wells will be installed with 6"x8" sonic (including single wells and nested wells ) and have 30/65 sand pack installed to 1' above the screen. Interval between screens will be bentonite chips. At top well (or single well for non-nested), 2' of bentonite chips will be installed over top of sand pack. For 15' wells, the remaining annulus will be filled with concrete during pad construction. For the 50' single-well, the remaining annulus will be filled with bentonite-cement grout. All 5 wells/nests will completed with a 2'x2' concrete pad, 8" flushmount manhole, and developed. All soil/liquid waste will be placed in refurbished 55-gallon drums and staged on site for disposal by others. Option provided for installation of bollards. Installation of bollards will likely result in an additional day on site to complete .

No union/prevailing wages or additional training is expected.

Work schedule will be weekdays with daily work hours of 7am - 5pm including lunch and safety meetings.

Level D PPE is expected.

Cascade estimates 5 days to complete this project. All quantities are estimates. Actual accrued totals will be invoiced. Day rate includes a crew of 3. Additional crew will require additional charges. Cascade expects 5 permits will be required for this project. If additional permits are required, they will be invoiced to Geosyntec at cost.

Description

$43,015.00

Account Name Bid Date Address Quote Number

Quote Revision Date

Bill To Account Project Zip

Project Name

Contact Name Project Address Email Project City Phone Project State

Geosyntec Consultants 2/28/2023 900 Broken Sound Parkway NW PN230227-122105 Suite 200 Boca Raton, Florida 33487 Biscayne Chemical Site

Andrew Galvin 690 NW 13th St agalvin@geosyntec.com Miami

585.208.3761 Florida

Cascade Rep Contact Information

Number

Prepared By Email wburdette@cascade-env.comWill Burdette, Southeast Region Estimator

Account Name Bid Date Address Quote Number

Quote Revision Date

Bill To Account Project Zip

Project Name

Contact Name Project Address Email Project City Phone Project State

Signature of Authorized Cascade Representative

Name & Title of Authorized Cascade Representative

Date Date

Name & Title of Authorized Representative and Company

Signature of Client/Owner Authorized Representative

Cascade will perform the Work as described in this proposal subject to the terms and conditions posted at https://cascade-env.com/resources/other/terms-and-conditions/ unless MSA is already established between Cascade and Client in which case MSA takes precedence over the aforementioned terms and conditions. By signing this proposal, Client agrees that this proposal together with the terms and conditions referenced above constitute a Subcontract. Client acknowledges that

Client has received and agrees with all such documents in the form provided by Cascade. Terms and Conditions are posted and accessible at the website location set forth above.

Kugelmann Land Surveying, Inc.

30 North Tropical Trail, Suite B

Merritt Island, FL 32953 Fax & Phone (321)459-0930 klsinc@cfl.rr.com

Fax for Rate Quote

DATE: 3/06/2023 Ph #: 561-922-1033

TO: Andrew Galvin, P.E.

@ Geosyntec Consultants

FROM: Dave Kugelmann @ KLS

Here is the cost breakdown for the well survey at 690 NW 13th Street, Miami, Miami-Dade County, Florida.

TASK RATE

Mob/Demob $ 1608.00 Survey 12 wells to include horizontal & vertical data $ 540.00

Map preparation $408.00

TOTAL $2,556.00

Let me know if you need us to proceed. Thanks.

10220 U.S. Highway 92 East Phone: 813-621-4929 Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com

Thursday, March 2, 2023

Andrew Galvin GeoSyntec Consultants 900 Broken Sound Parkway NW, Suite 200, Boca Raton, FL 33487

RE: Proposal for Services for Former Biscayne Chemical Monitoring Wells located at 690 NW 13th St, Miami, FL, 33136-2406; Folio No.: N/A; Estimate No.: 230399; Project No.: N/A

Dear Andrew;

SurvTech Solutions, Inc. is pleased to submit the following information for your consideration in selecting a firm to perform the necessary services, as noted above. We feel that you will find SurvTech Solutions, Inc. is well qualified to accomplish all services set forth in the request for proposal. Our outstanding staff of professional, technical, and support personnel has extensive and varied qualifications.

The lump-sum cost for the project will be $4,950.00, with an estimated time frame of 28 days from notice to proceed. Please see attached scope of work for a detailed breakdown of costs and services. If a quicker schedule is needed, please contact us, and we will try to accommodate your schedule.

If this proposal is acceptable, please sign the attached contract and send it to SurvTech Solutions via fax, email, or U.S. Mail. SurvTech cannot start said project without having a signed contract in place. If your firm wishes to use its own in-house contract or purchase order, then please forward them to SurvTech for review and signatures. SurvTech Solutions, Inc. appreciates this opportunity to submit this proposal for services. We look forward to serving GeoSyntec Consultants on this project.

Respectfully submitted, SurvTech Solutions, Inc.

Florida Licensed Business No. 7340

Matthew S. Brooks PSM, LS, PLS V.P. of Contracts Management

PROPOSAL 230399

Monitoring Wells Survey

See Scope of Services Below

$4,950.00

TOTAL $4,950.00

Scope of Services

Standards of Practice:

1. All Surveying and Mapping will be performed per “The Florida Standards of Practice for Surveying and Mapping” and signed and sealed by a Florida Licensed Surveyor and Mapper.

Geodesy & Datums

1. Survey project data will be on the following coordinate system(s) and datum(s):

Horizontal datum (x, y; easting, northing)

SPC NAD1983, Florida East zone state plane coordinates Latitude and Longitude (Geographic Coordinate System)

Note: Both coordinate systems and corresponding values will be reported on final deliverables.

Vertical datum (z; elevation)

NAVD 1988 benchmark (North American Vertical Datum of 1988) NGVD 1929 benchmark (National Geodetic Vertical Datum of 1929)

Note: Both vertical datums and corresponding values will be reported on final deliverables.

Conversion between datums will be reported on final deliverables.

2. Units for the project shall be:

U.S. Survey Feet

Establish Elevations and State Plane Coordinates on Monitoring Wells

1. SurvTech will recover known horizontal and vertical control stations from governmental agencies, such as:

a. National Geodetic Survey (NGS).

b. Department of Transportation (DOT).

c. County Agency.

d. City Agency.

e. Water Management Districts.

f. Department of Environmental Protection (FDEP).

2. Horizontally locate 12 monitoring wells to an accuracy of +/- 0.1 feet, utilizing RTK (real-time kinematic) GPS and/or conventional surveying instruments.

3. Elevate 12 monitoring wells to an accuracy of +/- 0.01 feet, utilizing closed-loop differential leveling.

Survey Deliverables

1. The following deliverables are included in this proposal:

A spreadsheet will be delivered to client in electronic format and as hard copies accompanying a signed and sealed surveyors report. File will be sent by email unless the client specifically requests a CD of the electronic file. SurvTech is NOT preparing a map of the site. The deliverables shall be a Microsoft Excel spreadsheet (.xlsx) format and surveyors report in Adobe (.pdf) format. Hard copies shall be sent only upon request.

Additional Non-Typical Items, Exceptions, and Conditions

1. Please reference attached aerial imagery for approximate project location and site limits.

Exhibit "A" SurvTech Solutions, Inc. Short Form Agreement

General Terms of Agreement for Consulting (Surveying and Mapping) Services

1. Client hereby agrees to retain SurvTech Solutions, Inc. to perform professional land surveying services as described herein. This Agreement applies only to the specific project identified herein.

2. General Responsibility: SurvTech Solutions, Inc. agrees that we shall act as an independent contractor and shall perform the services provided for in this Agreement in accordance with the generally accepted standard of care of SurvTech Solutions, Inc.'s profession.

3. SurvTech Solutions, Inc. agrees to perform the services set forth in attached “Proposal of Services” ("services").

4. Payment: Client shall be invoiced upon completion of the project . . Client agrees to pay invoice(s) within thirty (30) days of its receipt. Client further agrees to pay interest on all amounts invoiced and not paid or objected to for valid cause in writing within said thirty (30) day period at the rate of eighteen (18) percent per annum (or the maximum interest rate permitted under applicable law), until paid. Client agrees to pay SurvTech Solutions, Inc.'s cost of collection of all amounts due and unpaid after ninety

(90) days, including court costs and reasonable attorney's fees. SurvTech Solutions, Inc. shall not be bound by any provision or agreement requiring or providing for arbitration of disputes or controversies arising out of this agreement, any provision wherein SurvTech Solutions, Inc. waives any rights to a mechanics' lien, or any provision conditioning SurvTech Solutions, Inc.’s right to receive payment for its work upon payment to Client by any third party. These General Conditions are notice where required, that SurvTech Solutions, Inc. shall file a lien whenever necessary to collect past due amounts. Failure to make payment within 30 days of invoice shall constitute a release of SurvTech Solutions, Inc. from any and all claims which Client may have whether in tort, contract or otherwise and whether known or unknown at the time.

5. Insurance: For any services provided under this Agreement, SurvTech Solutions, Inc. shall procure and maintain in effect insurance coverage in amounts not less than set forth below.

a. Workers' Compensation and Employers' Liability: Comply with the laws of the State of Florida.

b. General Liability: Comprehensive Liability Insurance for personal and bodily injury, including death and property damage in the amount of $1,000,000 combined single limit each occurrence and $2,000,000 in aggregate.

c. Professional Liability Insurance: SurvTech Solutions, Inc. shall provide Professional Liability Insurance in the amount of $2,000,000.

d. Umbrella Liability Insurance: SurvTech Solutions, Inc. shall provide additional Liability Insurance in the amount of $6,000,000 for Auto Liability and General Liability.

e. Certificates: SurvTech Solutions, Inc. shall provide certificates of insurance upon request evidencing coverage required above. Each certificate shall provide that coverage afforded shall not be canceled nor ordered reduced by the SurvTech Solutions, Inc. except with at least thirty (30) days prior written notice to the Client. Should this occur, SurvTech Solutions, Inc. shall procure and furnish for Client prior to such effective date new certificates conforming to the above coverage requirement.

SurvTech Solutions, Inc. shall not have the right to receive any payment under the Agreement until such certificates are received by Client.

6. Indemnification and Hold Harmless: Client agrees to defend, indemnify and save harmless SurvTech Solutions, Inc. from all claims, including negligence claims, suits, losses, personal injuries, death and property liability resulting from client’s performance of the proposed work, whether such claims or damages are caused in whole or in part by client, and agrees to reimburse SurvTech Solutions, Inc. for expenses in connection with any such claims or suits, including reasonable attorney’s fees.

7. Termination: Client may terminate this Agreement with SurvTech Solutions, Inc. upon written notice if SurvTech Solutions, Inc. breaches his obligations under this Agreement or for any other cause. Client shall compensate SurvTech Solutions, Inc. for performance of services through the period of notice.

8. SurvTech Solutions, Inc. and client mutually waive claims for consequential and incidental damages arising out of or relating to this agreement.

9. Attorney Fees: Should suit be filed to enforce or for the breach of the term of this Agreement, the prevailing party shall be entitled to the award of reasonable attorney's fees.

10. Governing Law: This Agreement shall be governed by the Laws of the State of Florida.

11. Severability: If any provision of this Agreement is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions shall remain in full force and effect and are binding on SurvTech Solutions, Inc. and Client.

CLIENT AND SURVTECH SOLUTIONS, INC.

PROFESSIONAL SERVICES AGREEMENT - (SHORT FORM)

This agreement is made and entered into and made effective Thursday, March 2, 2023 , by and between:

SurvTech Solutions, Inc. Client: GeoSyntec Consultants Name: Matthew Brooks Name: Andrew Galvin Address: 10220 U.S. Highway 92 East Address: 900 Broken Sound Parkway NW, Suite

Address cont: Tampa, Florida 33610 Address cont:

Phone: 813-621-4929 Address cont: Boca Raton, FL 33487 Fax: 813-621-7194 Phone: None Project No.: N/A Email: AGalvin@geosyntec.com

Estimate No.: 230399

The property upon which the services hereinafter described are to be performed is located at 690 NW 13th St, Miami, FL, 33136-2406; Property Appraiser Parcel No.: N/A ("the property")

Services: Surveying and mapping services as described in “Scope of Services” as attached herein.

Fee & Time frame: Payment for the hereinabove described services will be $4,950.00. Estimated time frame is 28 days. All government fees or miscellaneous expenses will be incurred by the Client. SurvTech will notify the client of any such fees or expenses prior to the expenses being incurred.

12. By execution of this agreement Client accepts the terms hereof, acknowledges receipt of a copy hereof, including all exhibits, and authorizes Consultant to proceed with the work. In the event Client is not the owner of the property. Client represents that Client has obtained permission from said owner for Consultant to proceed.

IN WITNESS THEREOF, the parties hereby execute this agreement upon the terms and conditions stated above and on the date first above written.

CONSULTANT: SurvTech Solutions, Inc. CLIENT: GeoSyntec Consultants

By: _______________________________ By: ________________________________

Name: ____________________________ Name: ______________________________

Title: ______________________________ Title: _______________________________

Date: ______________________________ Date: _______________________________

GeoTek Services, LLC

02 March 2023

To: Andrew Galvin

Geosyntec Consultants, Inc.

900 Broken Sound Parkway NW, Suite 200 Boca Raton, Florida 33487

From: GeoTek Services, LLC 4060 Sparrow Hawk Road

Melbourne, Florida 32934

RE: Utility Locating Services – 5 Bore Clusters, 690 NW 13th Street, Miami, FL

Mr. Galvin, GeoTek Services is pleased to respond to your request for Utility Locating services at 690 NW 13th Street located Miami, Florida. We will scan up to a 15’ x 15’ area around the five proposed bore cluster locations with the goal of locating underground utilities. We can only scan the easily accessible open areas for utilities. Note that we cannot scan beneath fixed objects such as landscaping, fencing, buildings. We will scan as close as reasonably possible to fixed objects such as walls, landscaping, fences, etc.

Our deliverable will be crayon, marking paint or flags indicating the location of potential underground utilities. It is the client’s responsibility to protect and preserve all marks.

We will use both Electromagnetic Induction instruments as well as Ground Penetrating Radar (GPR) to detect objects below the surface. Due to the nature of sub-surface detection and the physical laws governing radio wave propagation, some buried objects may not be detectable due to depth, obscuration, or a weak radar signature. GeoTek Services will use industry standard best practices to locate sub-surface objects, however some objects may not be detectable. Geotek Services does not guarantee that all underground objects can be found. GeoTek Services assumes no liability for any damages.

We request access to any as-built site plans of the scan areas prior to rendering services. Our fixed price quote for this effort is $750.00. No out-of-pocket expenses are expected for this project. This quote is valid for sixty days.

Best Regards, Martin (Bud) Connor GeoTek Services, LLC

4060 Sparrow Hawk Road ● Melbourne, FL 32934-8525 ● info@GeoTekServices.com ● 321.473.7498

From: Craig Fusaro To: Andrew Galvin Subject: RE: Quote request for utility locate at the Former Biscayne Chemical Site in Miami Date: Thursday, March 2, 2023 5:38:56 AM

CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authentic. If you suspect fraud, click "Phish Alert Report."

Hi Andrew

Thanks for the quote request. The cost to clear utilities at the boring locations will be $900. If you would like to schedule the project please let me know and thanks for the opportunity.

Regards

Craig A. Fusaro, REM Geophysicist |Business Development Manager Southeast Florida Branch Manager Boca Raton, Florida Office: 561-430-5296 Cell: 727-479-6338

GeoView, Inc.

St. Petersburg – Jacksonville – Orlando – Boca Raton – Boston– Philadelphia

Providing geophysical services to geological/geotechnical, infrastructure/utility, environmental, archaeological & marine investigations.