CN-370000-HW683-DC031B.pdf

PDF 6 MB Posted

Attached to
Master Agreement FL|HW683|90e8124b5a65e607dedb86d39c72016e
Contract number
HW683
Issued by
Florida

View the file

Other files

File Type Posted
CN-370000-HW683-BF01A.pdf PDF
CN-370000-HW683-BF01B.pdf PDF
CN-370000-HW683-BF02A.pdf PDF
CN-370000-HW683-BF02ACO2.pdf PDF
CN-370000-HW683-BF04A.pdf PDF
CN-370000-HW683-BF04BCO1.pdf PDF
CN-370000-HW683-BF2BCO1.pdf PDF
CN-370000-HW683-BIL01A.pdf PDF
CN-370000-HW683-CSS02.pdf PDF
CN-370000-HW683-CSS02A.pdf PDF
CN-370000-HW683-DC002F.pdf PDF
CN-370000-HW683-DC004B.pdf PDF
CN-370000-HW683-DC004E.pdf PDF
CN-370000-HW683-DC005D.pdf PDF
CN-370000-HW683-DC005E.pdf PDF
CN-370000-HW683-DC007A.pdf PDF
CN-370000-HW683-DC007B.pdf PDF
CN-370000-HW683-DC008A.pdf PDF
CN-370000-HW683-DC008B.pdf PDF
CN-370000-HW683-DC008D.pdf PDF
CN-370000-HW683-DC009A.pdf PDF
CN-370000-HW683-DC009B.pdf PDF
CN-370000-HW683-DC009G.pdf PDF
CN-370000-HW683-DC010C.pdf PDF
CN-370000-HW683-DC011B.pdf PDF
CN-370000-HW683-DC011C.pdf PDF
CN-370000-HW683-DC011D.pdf PDF
CN-370000-HW683-DC012B.pdf PDF
CN-370000-HW683-DC016B.pdf PDF
CN-370000-HW683-DC017A.pdf PDF
CN-370000-HW683-DC018B.pdf PDF
CN-370000-HW683-DC019A.pdf PDF
CN-370000-HW683-DC019B.pdf PDF
CN-370000-HW683-DC019C.pdf PDF
CN-370000-HW683-DC019D.pdf PDF
CN-370000-HW683-DC01ACO1.pdf PDF
CN-370000-HW683-DC025B.pdf PDF
CN-370000-HW683-DC026B.pdf PDF
CN-370000-HW683-DC029A.pdf PDF
CN-370000-HW683-DC029E.pdf PDF
CN-370000-HW683-DC02ACO1.pdf PDF
CN-370000-HW683-DC02E.pdf PDF
CN-370000-HW683-DC031C.pdf PDF
CN-370000-HW683-DC032A.pdf PDF
CN-370000-HW683-DC032C.pdf PDF
CN-370000-HW683-DC035A.pdf PDF
CN-370000-HW683-DC036B.pdf PDF
CN-370000-HW683-DC037B.pdf PDF
CN-370000-HW683-DC038A.pdf PDF
CN-370000-HW683-DC039A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW683

DC031B Completion April 30, 2024

This Task Assignment authorizes Geosyntec to conduct site assessment activities at Pelican Dry Cleaners in accordance with the Geosyntec scope of work, cost estimate, and schedule received on June 19, 2023.

Brittany Plyler 850-245-8851 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Geosyntec

Geosyntec

Fabio Fortes 703-606-8538

ERIC_5292

2141 Drew Street Clearwater, Florida 33765

Pelican Dry Cleaners

✔ $ 96,871.36

$ 96,871.36

Scope of Work

Todd Kafka

Contract Manager

Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.

Date: 2023.06.21 13:55:47 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2023.06.21 13:46:36 -04'00'

N/A

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2:Field deliverable for Multi-Media Sampling and Interior Monitoring Well Installation 10/31/2023

Subtask 3: Field deliverable for exterior monitoring well installation, final surveyor report, and groundwater sampling 12/29/2023

Subtask 1,4,5: Submittal of Site Assessment Report and IDW Manifests;PM 02/28/2024

Subtask 2: Submittal and FDEP approval of the Field deliverable for Multi-Media Sampling and Interior Monitoring Well Installation $ 61,315.40

Subtask 3: Submittal and FDEP approval of the Field deliverable for exterior monitoring well installation, final surveyor report, and groundwater sampling $ 20,798.97

Subtask 1,4,5: Submittal and FDEP approval of the Site Assessment Report and IDW Manifests;PM $ 14,756.99

$ 96,871.36

HW683

DC031B

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

To: HW683 Contract Negotiation File Pelican Dry Cleaners Pinellas County, Florida

ERIC_5292

From: Brittany Plyler, Project Manager Date: June 21, 2023 Subject: Negotiation Summary

HW683_DC031B

This Task Assignment authorizes Geosyntec to conduct site assessment activities at Pelican Dry Cleaners in accordance with the Geosyntec scope of work, cost estimate, and schedule received on June 19, 2023.

Geosyntec confirmed on June 21, 2023, that Subtask 1 consists of the calculated project management labor, based upon 13% of the direct labor costs in this proposal, and includes fringe, overhead, other direct costs (ODCs) and completion fees.

Subtask 2: This subtask includes cost for the first phase of site assessment activities, which includes a private underground utility survey, one lithology boring (SB003), soil sampling (SB001-SB007, MAGS001-MAGS005), up to 12 locations proposed locations (36 samples total), 5 MAGS well installation (MAGS001-MAGS005) and sampling, one vapor monitoring point (VMP001) will be installed, direct push technology (DPT) groundwater sampling at about 8 locations (DPT001-DPT008), and interior monitoring well installation (MW001).

These data will be provided to FDEP for evaluation to select the locations of proposed monitoring wells to be installed in Subtask 3.

Subtask 3: Once the final monitoring well strategy has been established with FDEP, Geosyntec will re-mobilize to the Site to install and sample the monitoring wells. Geosyntec personnel will observe the installation of up to 4 exterior monitoring wells to evaluate groundwater quality.

Additional water-table monitoring wells will be installed up gradient, side gradient, and down gradient of the facility using the DPT drilling method, while one well will be a vertical extent well depending on SB003 data.

This subtask includes costs for a Florida professional land surveyor to survey the newly installed monitoring wells. Geosyntec will also collect groundwater samples from the site monitoring wells which will be analyzed for VOCs. Subtask 3 activities will be performed by 1 Geosyntec staff member assuming 2 days for drilling oversight.

Printed on recycled paper.

MEMORANDUM

Pelican Dry Cleaners June 21, 2023 Page Two

Subtask 4: This subtask includes cost for IDW. One composite liquid and one composite soil sample will be collected and analyzed for VOCs and metals using the Toxic Characteristic Leaching Procedure.

Subtask 5: This subtask includes cost for the preparation and submittal of the Site Assessment Report (SAR) that that summarizes the analytical results of the assessment activities outlined above and complies with the requirements of Chapter 62-780.600, FAC.

The FDEP Project manager confirmed site access on June 21, 2023.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost is $96,871.36 with 408 labor hours.

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 6/15/2023

Task #: Pending SubTask 1 Project Management SubTask 6

Site: SubTask 2 Multi-Media Sampling and interior MW Install SubTask 7

Activity/Phase: Site Assessment SubTask 3 MW Install, GW Sampling, and Surveying SubTask 8

Project Manager: Fabio Fortes SubTask 4 IDW Management SubTask 9

SubTask 5 Site Assessment Report SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$40.38 Project Manager F. Fortes 46 45.6 $86.54 Principal T. Kafka 7 4 1 0 2 0 0 0 0 0 $64.90 Senior Professional S. Wang 15 10 5 0 0 0 0 0 0 0 $48.56 Project Professional M. Hensley 19 9 4 0 6 0 0 0 0 0 $40.38 Professional F. Fortes 84 33 8 3 40 0 0 0 0 0 $39.98 Professional M. Lemes 99 99 0 0 0 0 0 0 0 0 $36.06 Senior Staff Professional K. Pierce 46 0 46 0 0 0 0 0 0 0 $28.85 Staff Professional O. Hollingsworth 90 88 0 2 0 0 0 0 0 0 $27.88 Administrative Assistant A. ACosta 2 0 0 0 2 0 0 0 0 0

Total Hours 408 46 243 64 5 50 0 0 0 0 0

Direct Labor $16,004.05 $1,841.17 $9,261.56 $2,587.08 $178.84 $2,135.40 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $27,639.00 $3,179.70 $15,994.71 $4,467.89 $308.86 $3,687.84 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $43,643.05 $5,020.87 $25,256.27 $7,054.97 $487.70 $5,823.24 $0.00 $0.00 $0.00 $0.00 $0.00

Pelican Dry Cleaners

Cost Estimate Page 1 of 6 Cost Estimate

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 6/15/2023

Task #: Pending SubTask 1 Project Management SubTask 6

Site: SubTask 2 Multi-Media Sampling and interior MW Install SubTask 7

Activity/Phase: Site Assessment SubTask 3 MW Install, GW Sampling, and Surveying SubTask 8

Project Manager: Fabio Fortes SubTask 4 IDW Management SubTask 9

SubTask 5 Site Assessment Report SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Pelican Dry Cleaners

Travel Vehicle Rental $1,800.00 $1,200.00 $480.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,800.00 $1,200.00 $480.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $23,110.00 $15,945.00 $7,165.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $2,920.00 $0.00 $2,920.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $1,320.00 $0.00 $0.00 $1,320.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Private Utility Locate $750.00 $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $28,100.00 $16,695.00 $10,085.00 $1,320.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $2,810.00 $1,669.50 $1,008.50 $132.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $30,910.00 $18,364.50 $11,093.50 $1,452.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $10,527.00 $9,482.00 $365.00 $680.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $10,527.00 $9,482.00 $365.00 $680.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $440.00 $240.00 $160.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $3,195.00 $2,255.00 $940.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $642.00 $642.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $1,350.00 $1,350.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $5,627.00 $4,487.00 $1,100.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $92,507.05 $5,020.87 $58,789.77 $20,093.47 $2,779.70 $5,823.24 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $4,364.31 $502.09 $2,525.63 $705.50 $48.77 $582.32 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $96,871.36 $5,522.96 $61,315.40 $20,798.97 $2,828.47 $6,405.56 $0.00 $0.00 $0.00 $0.00 $0.00

Cost from Prior CEF: Manual Entry invoice 1 ST 2 $61,315.40 Cost from Delta CEF; Manual Entry Invoice 2 ST 3 $20,798.97

Cost (Prior + Delta): $0.00 Auto-Calculated Invoice 3 ST 1, 4, 5 $14,756.99 Rounding Error: $96,871.36 Auto-Calculated $96,871.36

Final Total Cost: $96,871.36 Auto-Calculated

Cost Estimate Page 2 of 6 Cost Estimate

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Pelican Dry Cleaners SUBTASK: Multi-Media Sampling and interior MW Install

DATE: 6/15/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 4

Senior Professional S. Wang 10

Project Professional M. Hensley 9

Professional F. Fortes

Professional

M. Lemes 99

Staff Professional

O. Hollingsworth 88

TOTAL LABOR 243

VEHICLE TYPE RATE UNIT USAGE

Truck Hollingsworth/Lemes/Forte $120.00 Day 2 $240.00 Truck Hollingsworth $480.00 Week 1 $480.00 Van Lemes $480.00 Week 1 $480.00

Subtotal $1,200.00

TOTAL VEHICLE $1,200.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Drilling (Conventional)

PDS ######### $15,945.00

$0.00 $0.00 Subtotal $15,945.00

Other GeoTek, LLC $750.00 $750.00

$0.00 Subtotal $750.00

TOTAL SUB $16,695.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs - Soil 12 borings x 3 samples/boring $73.00 36 0 $2,628.00 VOHs - DPT Water 8 borings x 5 samples/boring $73.00 40 0 $2,920.00 VOHs - Water SPLP (50% of total samples) $73.00 18 0 $1,314.00 SPLP Extraction all samples due to holding times $45.00 36 0 $1,620.00 TO-15 - Soil Gas 5 MAGs $200.00 5 0 $1,000.00

Subtotal $9,482.00

TOTAL LAB $9,482.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Drilling Related

Soil Vapor Sampling Kit $290.00 day 2 $580.00 Soil Assessment Kit $700.00 Week 1 $700.00 MW installation kit $325.00 day 3 $975.00

Subtotal $2,255.00 Analytical Related

$0.00 Encore Sampler $16.00 Each 36 $576.00 Air Sampling Summa Canister $33.00 Day 2 $66.00

Subtotal $642.00 Expendables

$40.00 Day 6 $240.00 Subtotal $240.00

Other GPS $175.00 Day 2 $350.00 Vacuum Gauges $19.00 Day 2 $38.00 Differential Pressure Gauge $18.00 Day 2 $36.00 Regenerative Blower $180.00 Day 2 $360.00 Air Flow Meter $33.00 Day 2 $66.00 Portable Generator $250.00 Day 2 $500.00

Subtotal $1,350.00

TOTAL EQUIPMENT $4,487.00

Evaluating and interpreting field data (2 hr). Prepare for and conduct teleconference with FDEP to discuss soil, MAGS, and DPT groundwater results (2 hr)

Analytical data import and data management (4 hr); prepare soil vapor, DPT GW, and soil data tables (6 hr)

Preparation of soil, MAGS, and DPT groundwater results figures

Property owner and tenant notification (1 hr). Mob/demob from Tampa (2 hrs), Day 1 field kickoff/oversight (8 hrs). Healthy & Safety Plan preparation (2 hr). Evaluating and interpreting field data (1 hr/day x 5 days = 5 hr). Prepare draft MAGS, DPT groundwater, soil figures (3 hr). MAGS data tables and data evaluation (4 hr). Prepare field deliverable package (3 hr). Prepare for and conduct teleconference with FDEP to discuss soil, MAGS, and DPT groundwater results (4 hr). Prepare email summary of meeting minutes (1 hr)

Site Assessment: Field preparation (1 hr). Mob/demob from Tampa (2 hr/day x 5 day = 10 hr).

Calibration of instruments (0.5 hr/day x 5 days = 3 hr). Fieldwork oversight: soil, DPT sampling, MAGS well installation, interior MW installation (10 hr x 5 days = 50 hrs). Interior as-built sketch (2 hr). Field GPS of exterior sample locations (4 hr). Prepare field forms documentation (3 hr). MAGS Event:

MAGS equipment setup (0.5 hr/well x 5 wells = 3 hrs). MAGS testing with step test (2 hr/well x 5 wells

Utility Locating: Mark borings, oversee utility locate, and suvey utilities including mob (8 hr). Site Assessment: Mob/demob from Tampa (2 hr/day x 5 days = 10 hr).Fieldwork oversight: soil, DPT sampling, MAGS well installation, interior MW installation (10 hr x 5 days = 50 hrs). MAGS Event:

Field preparation, including purchasing MAGS supplies and picking up blower (4 hr). MAGS equipment setup (0.5 hr/well x 5 wells = 3 hrs). MAGS testing with step test (2 hr/well x 5 wells = 10 hr). IDW management (1 hr). Sample management (1 hr). Compile field notes (1 hr)

6/21/2023 Page 3 of 6 Subtask 2

SUBTASK: MW Install, GW Sampling, and Surveying

DATE: 6/15/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 1

Senior Professional S. Wang 5

Project Professional M. Hensley 4

Professional F. Fortes 8

Senior Staff Professional K. Pierce

TOTAL LABOR 64

VEHICLE TYPE RATE UNIT USEAGE

Truck Pierce $120.00 Day 4 $480.00 Subtotal $480.00

TOTAL VEHICLE $480.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Drilling (Conventional) PDS DPT drilling $7,165.00 $7,165.00

Subtotal $7,165.00

Surveying SurvTech Solutions $2,920.00 $2,920.00

Subtotal $2,920.00

TOTAL SUB $10,085.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs - Water 5 MW $73.00 5 0 $365.00

Subtotal $365.00

TOTAL LAB $365.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Drilling Related

Monitoring Well Installation Kit $325.00 Day 2 $650.00 Groundwater Sampling Kit $290.00 Day 1 $290.00

Subtotal $940.00 Expendables

$40.00 Day 4 $160.00 Subtotal $160.00

TOTAL EQUIPMENT $1,100.00

Evaluating and interpreting field data

Analytical data import and data management (3 hr); prepare MW results/parameter tables (2 hr

Prepare monitoring well results figure (2 hr) and GW elevation contour map (2)

Property owner and tenant notification (1 hr). Evaluating and interpreting field data (3 hr).

Prepare field deliverable package (3 hr). Monitoring well results draft figure generation (1 hr).

MW Install: Field preparation (1 hr). Mob/demob (2 hr/day x 2 days = 4 hr). Oversight of monitoring well installations (8 hr/day x 2 days = 16 hr). IDW management (1 hr). Prepare field package (2 hr). GW Sampling: Mob/demob (2 hr/day x 1 day = 2 hr). instrument calibration (0.5 hr/day x 1 day = 0.5 hr). Sampling 5 monitoring wells @ 1.5hrs each (8 hr).

IDW sampling and management (2.5 hr). Sample management/shipping (2 hr). Compile field notes (1 hr) MW Survey: Mob/demob from Tampa (2 hr) Oversee monitoring well survey (4

6/21/2023 Page 4 of 6 Subtask 3

SUBTASK: IDW Management

DATE: 6/15/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Professional F. Fortes 3

Staff Professional O. Hollingsworth 2

TOTAL LABOR 5

VEHICLE TYPE RATE UNIT USEAGE

Van Hollingsworth $120.00 Day 1 $120.00 Subtotal $120.00

TOTAL VEHICLE $120.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

IDW

Erwin Remediation 12 drums x $110/drum (non-PFAS) $1,320.00 $1,320.00

Subtotal $1,320.00

TOTAL SUB $1,320.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TCLP VOCs (Soil) $210.00 1 0 $210.00 TCLP Metals (Soil) $135.00 1 0 $135.00 TCLP VOCs (Aqueous) $205.00 1 0 $205.00 TCLP Metals (Aqueous) $130.00 1 0 $130.00

Subtotal $680.00

TOTAL LAB $680.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

$40.00 Day 1 $40.00 Subtotal $40.00

TOTAL EQUIPMENT $40.00

Characterization and waste profile for transport and disposal of drums (2 hr). Prepare and sign IDW manifest (1 hr).

IDW sampling with mobilization

6/21/2023 Page 5 of 6 Subtask 4

SUBTASK: Site Assessment Report

DATE: 6/15/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 2

Project Professional M. Hensley 6

Professional F. Fortes 40

Administrative Assistant A. ACosta 2

TOTAL LABOR 50

Report formatting and PDF compilation

Develop recommendations and path forward

SAR figure preparation, including a well survey, and cross section

SAR preparation

6/21/2023 Page 6 of 6 Subtask 5

12802 Tampa Oaks Blvd, Suite 151 Tampa, Florida 33637

PH 813.558.0990

www.geosyntec.com

19 June 2023

Ms. Brittany Plyler Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4520 Tallahassee, Florida 32399-2400

Subject: Scope of Work and Level of Effort – Site Assessment Pelican Dry Cleaners 2141 Drew Street Clearwater, Florida 33765 FDEP Site ID No. ERIC_5292

Dear Ms. Plyler, Geosyntec Consultants, Inc. (Geosyntec) has prepared this Scope of Work and Level of Effort (LOE) for site assessment activities at the Pelican Dry Cleaners site (Site) located in Clearwater, Florida (ERIC_5292). Geosyntec prepared this LOE based on Geosyntec’s 28 April 2023 Site Assessment Work Plan (SAWP), approved by FDEP. A description of task breakdown for Site assessment field activities and report preparation is provided below.

SUBCONTRACTOR EVALUATION

Geosyntec obtained three bids from licensed and qualified utility locating, drilling, and IDW transportation and disposal firms; a cost comparison is provided in Attachment A. The drilling work was bid as a single project with two mobilizations so that the total price was used in the evaluation. Geosyntec recommends the following subcontractors based on lowest cost among the qualified bidders:

• Underground utility locating – GeoTek

• Soil sampling, MAGS installation, DPT groundwater sampling, and MW installation – Preferred Drilling Solutions (PDS) (6.5 total field days)

• IDW transportation and disposal – Erwin Remediation

SurvTech Solutions, Inc. is recommended for surveying the five (5) monitoring wells. Copies of the bids from each subcontractor are included in Attachment A.

For ease of reference, Table 1 and Figures from the SAWP are attached as a summary of the field activities and samples to be collected.

Ms. Brittany Plyer 19 June 2023

Subtask 1 – Project Management

Fabio Fortes (Tampa Bay) will be the Geosyntec Project Manager. His labor hours are directly computed.

Subtask 2 – Multi-Media Sampling (Soil, DPT groundwater, soil vapor) and Interior Monitoring Well Installation

Subtask 2 includes labor for field preparation, completion of one offsite access agreement needed for the Site Assessment, and preparation of a Site Health and Safety Plan. Geosyntec personnel will mobilize to the Site to observe the first phase of site assessment activities, which includes a private underground utility survey, lithology boring, soil sampling, MAGS well installation and sampling, direct push technology (DPT) groundwater sampling, and interior monitoring well installation.

Utility locating: Geosyntec will observe utility locating at the Site performed by GeoTek.

Identified utilities will be mapped by Geosyntec staff using a Global Position System (GPS) unit following the private underground utility survey.

Lithology boring: One soil boring (at SB003 location) will be advanced using a DPT drill rig to a depth of approximately 50-feet below land surface (ft BLS) or refusal, whichever is encountered first, to characterize the Site-specific lithology. This data will be used to assist in the selection of soil samples and DPT groundwater sampling intervals.

Soil Sampling: Soil sampling will be performed at up to 12 locations (SB001 through SB007, and MAGS001 through MAGS005) as presented on Figure 3 in the FDEP-approved SAWP. Based on an assumed depth-to-water (DTW) of 5 ft BLS, a minimum of three soil samples 0-0.5 ft BLS, 0.5-2 ft BLS, and 2-4 feet below land surface [ft BLS] or water table) will be collected from each of the 12 proposed soil sample locations (36 samples total). Soil samples will be collected by hand auger. A concrete core drill will be used to access soil under the building slab (concrete) and driveway/parking lot (asphalt). Samples will be analyzed for the presence of VOCs via EPA Method 8260 by a National Environmental Laboratory Accreditation Program (NELAP) accredited, fixed-base laboratory. Soil samples will be screened with a photoionization detector (PID) organic vapor analyzer. Supplemental soil samples will be collected from each location and depth interval (via Encore samplers) for analysis of VOCs by the synthetic precipitation leaching procedure (SPLP) should VOC concentrations exceed the leachability-based soil cleanup target levels. For budgetary purposes, it is assumed that approximately half of the proposed soil samples will be analyzed by SPLP for VOCs. Exterior soil samples will be surveyed with a GPS and interior sampling locations will be transcribed using as-builts based on Site features.

MAGS well installation: Five, 2-inch (in.) diameter Schedule 40 polyvinyl chloride (PVC) MAGS wells (MAGS001 through MAGS005) will be installed by hand auger to a depth of approximately 4 ft BLS (or 1-ft above the static water level if the depth to groundwater is different than historically observed). Each MAGS well will be installed with 1-ft of riser and 10-ft of 0.01-in.

slotted well screen extending from approximately 1 to 4 ft BLS. A 20/30 grade environmental sand filter pack will be placed from the bottom of the boring to the top of the well screen. The remaining annular space will be grouted to just below the top of casing.

One vapor monitoring point (VMP001) will be installed by hand auger to monitor the vacuum radius of influence (ROI) and to assess the absence/presence of vapors in the vadose zone.

MAGS well testing: Each MAGS well will be tested for a period calculated to remove one, 10 to 15-ft radius of soil vapor volume using a blower. The test duration is expected to be approximately 1 hour. The vacuum and flow rates used at each MAGS well will be based on the results of a step test at one interior location. The step test will include a minimum of three steps at increasing vacuums to evaluate optimum airflow rates. Vacuum will be monitored at adjacent MAGS wells at approximate 15-minute intervals, as practical, during MAGS testing. After the completion of the study, the MAGS wells will be left in place, capped, and covered with a flush-mount manhole so that they may be converted into soil vapor extraction wells and resampled as necessary in the future.

During testing, soil vapor will be monitored with an organic vapor analyzer equipped with a photoionization detector (PID) utilizing a 10.6 electronic volt lamp. Soil vapor samples will be collected at the end of each MAGS test using a batch-certified “clean” Summa canister provided by the analytical laboratory. The soil vapor samples will be sent to a fixed-based laboratory for analysis of VOCs by the TO-15 method.

DPT groundwater sampling: Geosyntec personnel will observe the collection of DPT groundwater samples at up to 8 locations (DPT001 through DPT008), as shown on Figure 3 of the SAWP.

Groundwater samples will be collected at 4-ft intervals approximately every 10 feet (i.e., 5 to 9 ft BLS, 15 to 19 ft BLS, 25 to 29 ft BLS, 35 to 39 ft BLS, 45 to 49 ft BLS), resulting in 5 samples x 8 locations (40 samples). Sampling intervals may be adjusted based on observed depth to water and Site lithology. Groundwater samples submitted to a NELAP-approved fixed-based laboratory will be analyzed for the presence of VOCs by EPA Method 8260 (full list). No field duplicates will be collected.

Interior monitoring well installation: One monitoring well (MW001) will be installed inside the facility adjacent to the former drycleaning machine. MW001 will be installed manually with a hand auger. The monitoring well target depth will be approximately 12 ft BLS and will be constructed of 1-inch diameter PVC, screened between 7 and 12 ft BLS. A pre-pack screen will be used for hand auger installations.

Field GPS and Interior Mapping: Exterior sampling locations (e.g., DPT groundwater, soil samples, select MAGS wells) will be surveyed throughout the week with a field GPS by Geosyntec personnel. Interior sampling locations will be transcribed using as-builts based on Site features.

Field Deliverable and Draft Summary Figure: Geosyntec has included costs to manage the data generated during this subtask and to develop the following to facilitate discussion with FDEP:

• One figure and table to summarize VOC laboratory analytical results from the DPT groundwater samples;

• One figure and table to summarize VOC laboratory analytical results from soil samples;

and

• One figure and table to summarize VOC laboratory analytical results from MAGS samples.

These data will be provided to FDEP for evaluation to select the locations of proposed monitoring wells to be installed in Subtask 3; data gaps will be addressed during Subtask 3, if practical. If fixed-based laboratory analytical results of soil and DPT groundwater samples indicate that additional sampling will be required to complete delineation, Geosyntec will propose additional sampling locations and corresponding depths. The data will be managed in a database.

Subtask 2 activities will be performed by 2 Geosyntec staff members assuming 1 day for utility locating and mark the borings location (1 Geosyntec staff), 5 days for drilling oversight, 1 day for MAGS well sampling and testing, and close-out tasks at the Site. We have assumed 10-hour per day.

Subtask 3 – Exterior Monitoring Well Installations, Surveying, and Groundwater Sampling

Monitoring well installations: Once the final monitoring well strategy has been established with FDEP, Geosyntec will re-mobilize to the Site to install and sample the monitoring well network.

Geosyntec personnel will observe the installation of up to 4 exterior monitoring wells to evaluate groundwater quality; the tentative locations are presented on Figure 3 of the SAWP. We have assumed the existing utility survey will be sufficient for siting the proposed monitoring well locations; however, should the spray paint be worn away or if there is any uncertainty in utility locations relative to drilling locations, Geosyntec will submit a WCD or TACO to FDEP for a focused utility locating at the drilling locations.

Additional water-table monitoring wells MW002 through MW004 will be installed upgradient, side gradient, and downgradient of the facility using the DPT drilling method. The wells will be constructed of 1-in. diameter Schedule 40 PVC pipe with 10 ft of 0.010-in. slotted well screen, filter pack consisting of 20/30 silica sand, and at least a 0.5-ft thick, fine sand (30/65 silica sand) seal. The remaining annular space will be grouted to land surface with Portland Cement Type I/II and monitoring wells will be completed at the surface with a flush-mount 8-in. manhole and a locking monitoring well cap.

Geosyntec will install one vertical extent monitoring well (MW005) to a depth of 40 feet, if DPT groundwater sampling results warrant vertical delineation. The well will also be constructed with a 10-ft screen depending upon the lithologic information from SB003.

The monitoring wells will be developed until the discharge is relatively sediment-free and sampled no sooner than 24 hours after development.

Monitoring Well Survey: This subtask includes costs for a Florida professional land surveyor to survey the five (5) newly installed monitoring wells. Cost has been included for Geosyntec to oversee the survey.

Groundwater sampling: Geosyntec personnel will collect groundwater samples from the 5 Site monitoring wells. Depth-to-water measurements (DTW) will be collected from the monitoring wells to evaluate groundwater flow direction. The monitoring wells will be sampled using a peristaltic pump in general accordance with FDEP Standard Operating Procedures (SOPs), assuming the DTW and drawdown do not exceed the suction limit of the peristaltic pump. The samples will be stored on ice and shipped to a NELAP approved, fixed-based analytical laboratory under chain of custody for analysis under standard turnaround times. The groundwater samples will be analyzed for VOCs by EPA Method 8260.

Subtask 3 activities will be performed by 1 Geosyntec staff member assuming 2 days for drilling oversight, and 1 day for well sampling, IDW sampling, and close out tasks at the Site. We have assumed 10-hours per day.

Field Deliverable and Draft Summary Figure: Geosyntec has included costs to generate one figure and table that summarize VOC laboratory analytical results from groundwater monitoring well samples. These data will be provided to FDEP for evaluation. The deliverable will include the final surveyor report, monitoring well installation field forms, and groundwater sampling forms.

Subtask 4 – IDW Management

IDW Sampling: The IDW will be sampled prior to profiling. One composite liquid and one composite soil sample will be collected and analyzed for VOCs and metals using the Toxic Characteristic Leaching Procedure. Geosyntec will review the generation of a waste characterization profile as well as the preparation of IDW manifests. Geosyntec will coordinate disposal arrangements for up to 12 drums of non-hazardous IDW. Analytical costs are included to establish the soil and groundwater profiles required by the selected waste hauler. We have assumed field oversight of the drum pickup is not necessary.

For this cost estimate, we have assumed the IDW will not be impacted by PFAS (screening to be performed under HW028A) and Geosyntec will submit a WCD or TACO to FDEP for any change of scope.

Subtask 5 – Site Assessment Report

Following completion of field activities, Geosyntec will proceed with the preparation and submittal of a Site Assessment Report (SAR) documenting assessment activities and summarizing analytical results. This subtask includes costs to generate a SAR that summarizes the analytical results of the assessment activities outlined above and complies with the requirements of Chapter 62-780.600, FAC. The costing included in the CEF/LOE includes the following figures:

• USGS Site Topographic Map

• Potable Well Survey

• Site Layout

• Site Utility Map

• Lithologic Cross Section (1 transect)

• Summary of Soil Analytical Results from 0-0.5, 0.5-2, and 2-4 ft BLS (3 figures)

• Summary of DPT Groundwater Sampling Analytical Results

• Summary of Groundwater Elevations

• Summary of Monitoring Well Analytical Results

Deliverable and Invoicing Schedule:

Subtask Deliverable Deliverable Due Date*

Invoice Amount

Field deliverable for Multi-Media Sampling and

Interior Monitoring Well Installation 10/13/23 $61,315.40

Field deliverable for exterior monitoring well installation, final surveyor report, and groundwater sampling

12/08/23 $20,798.97

1, 4, 5 Submittal of Site Assessment Report and IDW Manifests 02/23/24 $14,756.99

Total $96,871.36 *Assumes TA is approved by 14 July 2023.

Geosyntec appreciates the opportunity to provide this proposal and cost estimate to you and the FDEP. Please contact us if you have any questions or require additional information.

Sincerely, Fabio Fortes, P.E.

Professional Engineer

Todd K. Kafka, P.G.

Sr. Principal Hydrogeologist

Figures and Table 1 Attachment A – Subcontractor Cost Evaluation and Quotes

FIGURES AND TABLE 1

!!H

&<!!H

!!H

!!H

!!H

Drew St.

N S ta rc re s t

D r.

N M a in

A v e

SB007

DPT008

DPT007

DPT006

DPT005

DPT004

Path: prj1(\\Tampa-01) J:\_GIS\P\Pelican Dry Cleaners\MXDs\Site_Investigation_Map.mxd 26 April 2023. Last Edited by: Fabio.Fortes

Pelican Dry Cleaners 116 N Main Avenue Clearwater, Florida

Site Investigation Map

0 50

Feet

³ Figure

Tampa, FL April 2023

Legend

&< Proposed Shallow Monitoring Well Location

&< Proposed Deep Monitoring Well Location

Direct Push Technology (DPT) Groundwater

Profilling Location

!!H Proposed Modified Active Gas (MAGS) Location

"/ Proposed Vacuum Monitoring Point (VMP)

!( Proposed Soil Boring Location

!( Historical Soil Sample Location

Property Boundary

Former Dry Cleaning Facily

European Goodies Deli Location

Approximate Former Dry Cleaning Machine Location

Approximate Former Filter Cartridge Storage

Approximate Former Spotting Board

Former Boiler Room

Washer location

Industrial Refrigerator Location

Office

Restroom

Door

Power Line (overhead)

!!H

!!H

!!H

!!H

!!H

"/ SB006

MAGS005

VMP001

MW004

MW003

MW002

MW001

MW005

DPT003

DPT002

DPT001

MAGS002

MAGS003

MAGS004

MAGS001

SB005

SB001

SB002

SB003

(Lithology Boring)

SB004

Historical Soil Sample

FACILITY LAYOUT

Notes:

1. Parcel boundaries from the Pinellas County GIS open data website https://new-pinellas-egis.opendata.arcgis.com/

2. Aerial Photo Source: 2023 Aerial Photo Source: Nearmap website.

³ 0 15

Feet

Trash Dumpsters Location

TABLE 1: SAMPLING LOCATIONS, MATRICES, ANALYTES, RATIONALE, AND CRITERIA

Peliacan Dry Cleaners (ERIC_5292)

Location ID Sample ID Matrix Approximate Depth

(ft BLS)* Sampling Method Rationale Criteria

SB001 (0.5') Soil 0-0.5 HA VOC L-SCTLs

SB001 (2') Soil 0.5-2 HA VOC L-SCTLs

SB001 (4') Soil 2-4 HA VOC L-SCTLs

SB002(0.5') Soil 0-0.5 HA VOC L-SCTLs

SB002 (2') Soil 0.5-2 HA VOC L-SCTLs

SB002 (4') Soil 2-4 HA VOC L-SCTLs

SB003 (0.5') Soil 0-0.5 HA VOC L-SCTLs

SB003 (2') Soil 0.5-2 HA VOC L-SCTLs

SB003 (4') Soil 2-4 HA VOC L-SCTLs

SB004 (0.5') Soil 0-0.5 HA VOC L-SCTLs

SB004 (2') Soil 0.5-2 HA VOC L-SCTLs

SB004 (4') Soil 2-4 HA VOC L-SCTLs

SB005 (0.5') Soil 0-0.5 HA VOC L-SCTLs

SB005 (2') Soil 0.5-2 HA VOC L-SCTLs

SB005 (4') Soil 2-4 HA VOC L-SCTLs

SB006 (0.5') Soil 0-0.5 HA VOC L-SCTLs

SB006 (2') Soil 0.5-2 HA VOC L-SCTLs

SB006 (4') Soil 2-4 HA VOC L-SCTLs

SB007 (0.5') Soil 0-0.5 HA VOC L-SCTLs

SB007 (2') Soil 0.5-2 HA VOC L-SCTLs

SB007 (4') Soil 2-4 HA VOC L-SCTLs

MAGS001 (0.5') Soil 0-0.5 HA VOC L-SCTLs

MAGS001 (2') Soil 0.5-2 HA VOC L-SCTLs

MAGS001 (4') Soil 2-4 HA VOC L-SCTLs

MAGS002 (0.5') Soil 0-0.5 HA VOC L-SCTLs

MAGS002 (2') Soil 0.5-2 HA VOC L-SCTLs

MAGS002 (4') Soil 2-4 HA VOC L-SCTLs

MAGS003 (0.5') Soil 0-0.5 HA VOC L-SCTLs

MAGS003 (2') Soil 0.5-2 HA VOC L-SCTLs

MAGS003 (4') Soil 2-4 HA VOC L-SCTLs

MAGS004 (0.5') Soil 0-0.5 HA VOC L-SCTLs

MAGS004 (2') Soil 0.5-2 HA VOC L-SCTLs

MAGS004 (4') Soil 2-4 HA VOC L-SCTLs

MAGS005 (0.5') Soil 0-0.5 HA VOC L-SCTLs

MAGS005 (2') Soil 0.5-2 HA VOC L-SCTLs

MAGS005 (4') Soil 2-4 HA VOC L-SCTLs

MAGS001 MAGS001 Soil Vapor 1-4 Peristaltic Pump Rear of the former drycleaning facility VOC TO-15

MAGS002 MAGS002 Soil Vapor 1-4 Peristaltic Pump South of the former drycleaning facility VOC TO-15

MAGS003 MAGS003 Soil Vapor 1-4 Peristaltic Pump Near former drycleaning machine location

VOC TO-15

MAGS004 MAGS004 Soil Vapor 1-4 Peristaltic Pump Inside the restroom / near the washer and former boiler location

VOC TO-15

MAGS005 MAGS005 Soil Vapor 1-4 Peristaltic Pump Inside of the former drycleaning facility VOC TO-15

Front (East) of the former drycleaning facility

Rear of the former drycleaning facility/ near stormwater accumulation

Inside of the former drycleaning facility

Near former drycleaning machine location

Inside former boiler room

Rear of the former drycleaning facility

Rear of the former drycleaning facility

Inside the restroom / North of the former drycleaning facility

MAGS001 Rear of the former drycleaning facility

South of the former drycleaning facility

Near former drycleaning machine location

MAGS002

MAGS003

MAGS005

Modified Active Gas Sampling (5 samples)

MAGS004

Inside the restroom / near the washer and former boiler location

Soil Sampling (12 Locations, 36 Samples)

SB001

SB002

SB003

SB004

SB005

SB006

SB007

TABLE 1: SAMPLING LOCATIONS, MATRICES, ANALYTES, RATIONALE, AND CRITERIA

Peliacan Dry Cleaners (ERIC_5292)

Location ID Sample ID Matrix Approximate Depth

(ft BLS)* Sampling Method Rationale Criteria

Soil Sampling (12 Locations, 36 Samples)

DPT001 (5-9') Groundwater 5-9 DPT / Grab VOC GCTLs

DPT001 (15-19') Groundwater 15-19 DPT / Grab VOC GCTLs

DPT001 (25-29') Groundwater 25-29 DPT / Grab VOC GCTLs

DPT001 (35-39') Groundwater 35-39 DPT / Grab VOC GCTLs

DPT001 (45-49') Groundwater 45-49 DPT / Grab VOC GCTLs

DPT002 (5-9') Groundwater 5-9 DPT / Grab VOC GCTLs

DPT002 (15-19') Groundwater 15-19 DPT / Grab VOC GCTLs

DPT002 (25-29') Groundwater 25-29 DPT / Grab VOC GCTLs

DPT002 (35-39') Groundwater 35-39 DPT / Grab VOC GCTLs

DPT002 (45-49') Groundwater 45-49 DPT / Grab VOC GCTLs

DPT003 (5-9') Groundwater 5-9 DPT / Grab VOC GCTLs

DPT003 (15-19') Groundwater 15-19 DPT / Grab VOC GCTLs

DPT003 (25-29') Groundwater 25-29 DPT / Grab VOC GCTLs

DPT003 (35-39') Groundwater 35-39 DPT / Grab VOC GCTLs

DPT003 (45-49') Groundwater 45-49 DPT / Grab VOC GCTLs

DPT004 (5-9') Groundwater 5-9 DPT / Grab VOC GCTLs

DPT004 (15-19') Groundwater 15-19 DPT / Grab VOC GCTLs

DPT004 (25-29') Groundwater 25-29 DPT / Grab VOC GCTLs

DPT004 (35-39') Groundwater 35-39 DPT / Grab VOC GCTLs

DPT004 (45-49') Groundwater 45-49 DPT / Grab VOC GCTLs

DPT005 (5-9') Groundwater 5-9 DPT / Grab VOC GCTLs

DPT005 (15-19') Groundwater 15-19 DPT / Grab VOC GCTLs

DPT005 (25-29') Groundwater 25-29 DPT / Grab VOC GCTLs

DPT005 (35-39') Groundwater 35-39 DPT / Grab VOC GCTLs

DPT005 (45-49') Groundwater 45-49 DPT / Grab VOC GCTLs

DPT006 (5-9') Groundwater 5-9 DPT / Grab VOC GCTLs

DPT006 (15-19') Groundwater 15-19 DPT / Grab VOC GCTLs

DPT006 (25-29') Groundwater 25-29 DPT / Grab VOC GCTLs

DPT006 (35-39') Groundwater 35-39 DPT / Grab VOC GCTLs

DPT006 (45-49') Groundwater 45-49 DPT / Grab VOC GCTLs

DPT007 (5-9') Groundwater 5-9 DPT / Grab VOC GCTLs

DPT007 (15-19') Groundwater 15-19 DPT / Grab VOC GCTLs

DPT007 (25-29') Groundwater 25-29 DPT / Grab VOC GCTLs

DPT007 (35-39') Groundwater 35-39 DPT / Grab VOC GCTLs

DPT007 (45-49') Groundwater 45-49 DPT / Grab VOC GCTLs

DPT008 (5-9') Groundwater 5-9 DPT / Grab VOC GCTLs

DPT008 (15-19') Groundwater 15-19 DPT / Grab VOC GCTLs

DPT008 (25-29') Groundwater 25-29 DPT / Grab VOC GCTLs

DPT008 (35-39') Groundwater 35-39 DPT / Grab VOC GCTLs

DPT008 (45-49') Groundwater 45-49 DPT / Grab VOC GCTLs

MW001 MW001 Groundwater 7-12 Peristaltic Pump Near former drycleaning machine VOC GCTLs, PFAS

Provisional GCTLs

MW002 MW002 Groundwater 5-15 Peristaltic Pump Rear of the former drycleaning facility VOC GCTLs, PFAS

Provisional GCTLs

MW003 MW003 Groundwater 5-15 Peristaltic Pump South of the former drycleaning facility VOC GCTLs, PFAS

Provisional GCTLs

MW004 MW004 Groundwater 5-15 Peristaltic Pump Front (East) of the former drycleaning facility

VOC GCTLs, PFAS

Provisional GCTLs

MW005 MW005 Groundwater 30-40 Peristaltic Pump Rear of the former drycleaning facility VOC GCTLs, PFAS

Provisional GCTLs

Drum Number Sample ID Matrix IDW Source Rationale Criteria

Composite IDW-1 Soil Waste Characterization NA

Composite IDW-2 Water Waste Characterization NA

Notes:

1. ft BLS indicates feet below land surface. 8. DPT indicates direct-push technology.

2. SB indicates soil boring 9. GCTL indicates groundwater cleanup target levels.

3. LSB indicates lithology soil boring 10. MW indicates monitoring well.

4. MAGS indicates modified active gas sampling. 11. IDW indicates investigation derived waste.

5. HA indicates hand auger. 12. NA indicates not applicable.

6. VOCs indicates volatile organic carbons. 13. ND indicates not determinated.

7. L-SCTLs indicates leachability based soil cleanup target levels.

Drilling, decon, purge water

14. * Geosyntec will review the depth of groundwater and lithology data from the preliminary assessment tasks and revise the depths of subsequent soil sampling, MAGS, DPT groundwater samples, and MW installation. For the purpose of this table, the water table has been assumed to be at 5 ft

IDW Source

Soil Cuttings

DPT001

DPT002

Rear of the former drycleaning facility

South of the former drycleaning facility

DPT008

Parking lot - West of the former drycleaning facility

Front (East) of the former drycleaning facility

Parking lot - South of the former drycleaning facility

Parking lot - Northeast of the former drycleaning facility

Parking lot - Southwest of the former drycleaning facility

Parking lot - North of the former drycleaning facility

DPT Groundwater Sampling (8 locations, 40 samples)

Monitoring Wells (5 samples)

Investigation Derived Waste Sample

DPT003

DPT004

DPT005

DPT006

DPT007

ATTACHMENT A

SUBCONTRACTOR COST

EVALUATION AND QUOTES

Quantity Unit Rate Quantity Unit Rate Quantity Unit Rate Daily Rate 5 Days 2100 Days per diem 0 Days 475 Days mobilization 1 Lump Sum 675 1 Lump Sum 1925 materials/footage 1 Lump Sum 1645 1 Lump Sum 21645

Permits 2 Each 75 Each Miscellaneous 1 Lump Sum 1850 Lump Sum

Drum 9 Drums 125 Drums

Quantity Unit Rate Quantity Unit Rate Quantity Unit Rate Daily Rate 1 Days 2250 Days

Half-day Rate 1 half day 1750 half day per diem 0 Days 475 Days mobilization 1 Lump Sum 675 1 Lump Sum 1925 materials/footage 1 Lump Sum 1590 1 Lump Sum 6700

Miscellaneous 1 Lump Sum 450 Lump Sum Permits 1 Each 75 Each

Drum 3 Drums 125 Drums

Quantity Unit Rate Quantity Unit Rate Quantity Unit Rate 1 Lump Sum 1300 1 Lump Sum 750 1 Lump Sum 2050

1 Liquid IDW Cost 110 1 Liquid IDW Cost 860 1 Liquid IDW Cost 141.75 1 Solid IDW Cost 110 1 Solid IDW Cost 660 1 Solid IDW Cost 210

1 Lump Sum 2920

Note: The selected subcontractor is highlighted in Blue.

PDS Cascade

No Submmited

No Submmited

Subcontractor Evaluation: Pelican Dry Cleaning, Clearwater, Florida

Drilling - First Mobilization - Soil Sampling, DPT Groundwater profiling, and MAGS Installation PDS Cascade GW Protection

$15,945.00 $23,570.00 N/A

GW Protection

Hepaco

Drilling - Second Mobilization - Monitoring Well Installation PDS Cascade GW Protection

$7,165.00

$23,110.00 $32,195.00 N/A

$8,625.00 N/A

DRILLING COMPANIES TOTAL

$2,920.00

SURVEYING (Professional Service)

UNDERGROUND UTILITY LOCATE

GPRSGeoView GeoTek

$220.00 $860.00 $351.75

$1,300.00 $750.00 $2,050.00

IDW DISPOSAL (Only Chlorinated Solvents) Erwin Hulls

SurvTech Solutions

Drilling Quotes

Preferred Drilling Solutions, Inc.

8820 66th St. North, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

DIRECT PUSH TECHNOLOGY QUOTE FORM

Date: 6/7/23 FAC ID#: ERIC_5292

Unit Unit Rate Number of Units Extended Price whole day $2,100.00 5 10,500.00$ half day $1,600.00 -$ per foot $25.00 20 500.00$ each $115.00 1 115.00$ each $50.00 1 50.00$ each $35.00 3 105.00$ per well $125.00 7 875.00$ roundtrip $675.00 1 675.00$ per crew / per night $475.00 -$ each $70.00 -$ each $125.00 9 1,125.00$ per day $100.00 5 500.00$ each $75.00 2 150.00$ lump sum $350.00 1 350.00$ per day $100.00 5 500.00$ per day $100.00 5 500.00$

TOTAL QUOTE PRICE $15,945.00

Notes: 1. Includes saw cuts, development, standby time, and decon.

Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: ___________________________________Austin Bonacum, Estimator Date: 6/7/23

Days to Complete Scope of Work: 5

Direct Push Daily Rate 1 - on-site day

Equipment Type: Geoprobe 8040DT, Geoprobe 3230DT, 7822DT

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Steam Cleaner

Decon Pad

Concrete Core Drill with 4" core bit

Refurbished - DOT Approved 55-gal Drum

Per Diem

Mobilization

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)

New - DOT Approved 55-gal Drum

Permits

Site Name and Location: Pelican Dry Cleaners

Consultant Name: Geosyntec Consultants

PROPOSED SCOPE OF WORK:

(1) DPT boring to 50' (or refusal), drum cuttings, grout and restore grade

(12) Hand auger borings to the water table (estimated at 5'), convert 5 to MAGS wells, drum cuttings, grout and restore grade

Event 1

PDS to supply concrete core drill w/ 4" bit

2141 Drew Street, Clearwater, Pinellas County, FL

Well Completion (includes MH w/ cover, concrete, and locking well cap)

Well Riser (includes all materials) ID 1"

Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"

Pre-Packed Well Screen (includes all materials) ID 1" 5' Length

2" Well Install (includes all materials)

Direct Push Half-Day Rate 1 - on-site half day

(1) 1" x 4' VMP wells with 3' .010 screen, installed via hand auger, drum cuttings, pad and 4" manhole

(1) Interior 1" x 12' MW with 5' .010 prepacked screen, installed via hand auger, drum cuttings, pad and 4" manhole

Drum cuttings, development water, and decon fluids in NEW drums

Decon pad, decon all down hole tooling with steam cleaner

(8) DPT borings to 50' (or refusal), grab groundwater sampling at up to (5) intervals per boring, drum soil & water, grout and restore grade

(5) 2" x 4' MAGs wells with 3' .010 screen, installed via hand auger, drum cuttings, pad and 4" manhole

Preferred Drilling Solutions, Inc.

8820 66th St. North, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

DIRECT PUSH TECHNOLOGY QUOTE FORM

Date: 6/9/23 FAC ID#: ERIC_5292

Unit Unit Rate Number of Units Extended Price whole day $2,250.00 1 2,250.00$ half day $1,750.00 1 1,750.00$ per foot $25.00 -$ each $115.00 -$ each $50.00 8 400.00$ each $35.00 9 315.00$ per well $125.00 7 875.00$ roundtrip $675.00 1 675.00$ per crew / per night $475.00 -$ each $70.00 -$ each $125.00 3 375.00$ per day $100.00 -$ each $75.00 1 75.00$ lump sum $350.00 1 350.00$ per day $100.00 1 100.00$ per day $100.00 -$

TOTAL QUOTE PRICE $7,165.00

Notes: 1. Includes saw cuts, development, standby time, and decon.

Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: ___________________________________Austin Bonacum, Estimator Date: 6/9/23

2141 Drew Street, Clearwater, Pinellas County, FL

Well Completion (includes MH w/ cover, concrete, and locking well cap)

Well Riser (includes all materials) ID 1"

Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"

Pre-Packed Well Screen (includes all materials) ID 1" 5' Length

2" Well Install (includes all materials)

Direct Push Half-Day Rate 1 - on-site half day

Decon pad, decon all down hole tooling with steam cleaner

Drum cuttings, development water, and decon fluids in NEW drums

Site Name and Location: Pelican Dry Cleaners

Consultant Name: Geosyntec Consultants

PROPOSED SCOPE OF WORK:

(3) 1" x 15' MW's with 10' .010 screen, installed via 3.25" rods, soil sampling as needed, drum soil & water, pad and 8" manhole

(1) 1" x 40' MW's with 10' .010 screen, installed via 3.25" rods, soil sampling as needed, drum soil & water, pad and 8" manhole

Event 2

Days to Complete Scope of Work: 1.5

Direct Push Daily Rate 1 - on-site day

Equipment Type: Geoprobe 8040DT, Geoprobe 3230DT

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Steam Cleaner

Decon Pad

Concrete Core Drill with 8" core bit

Refurbished - DOT Approved 55-gal Drum

Per Diem

Mobilization

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

GeoProbe Consumables (includes tubing, points, liners, concrete patch, asphalt patch, and grouting)

New - DOT Approved 55-gal Drum

Permits

Cascade Remediation Services • 3020 Avondale Mill Rd #B • Macon, GA 31216 • 9517435497

Cascade will provide a 66/78 Series Track Mounted Geoprobe Unit with a 2 Man crew to provide the following.

MOB #1

- Collect continuous soil samples at One (1) location to 50' BLG

- Collect soil samples at Twelve (12) locations to 5' BLG using a Hand augur.

- Install Five (5) 2" MAG…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .