About this file
This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection to Geosyntec for environmental site assessment services at the Greater Tampa Cleaners facility located at 8408 N Armenia Ave, Tampa, FL 33604. The task assignment is entered pursuant to Contract Number HW683 and is identified as TA Number DC026A. The Department Project Manager is Brittany Plyler (850-245-8851), and the Contractor's Project Manager is Olivia Cain (727-330-9961). The project was signed on January 18-19, 2023, with a completion date of March 31, 2023.
Geosyntec will conduct a Site Assessment Work Plan (SAWP) and provide project management services for the drycleaning site under a fixed unit rate of $5,000.00, representing the total TA value. The deliverable—a Site Assessment Work Plan and Project Management documentation—is due February 28, 2023, with invoicing upon submittal and FDEP approval of subtasks 1 and 2. The SAWP task list includes information portal review, site visits, completed site visit checklists, site narrative with conceptual site model, figures showing site features and proposed sampling locations, sampling plans, proposed schedule, and cost estimates for subsequent assessment phases. The work plan incorporates PFAS screening guidance and does not require EDR reports, offsite property surveys, or potable well surveys.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW683
DC026A Completion March 31, 2023
This Task Assignment authorizes Geosyntec to conduct a Site Assessment Work plan for Greater Tampa Cleaners in accordance with the attached Site Assessment Work Plan Task List.
Brittany Plyler 850-245-8851 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Geosyntec
Geosyntec
Olivia Cain 727-330-9961
ERIC_4774
8408 N Armenia Ave, Tampa, FL 33604
Greater Tampa Cleaners
✔ $ 5,000.00
$ 5,000.00
Scope of Work
Todd Kafka
Contact Manager
Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.
Date: 2023.01.19 09:54:31 -05'00'
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.01.18 13:54:09 -05'00'
N/A
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Murphy_SL Highlight
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Site Assessment Work Plan; Project Management 02/28/2023
Submittal and FDEP approval of the Subtasks 1 & 2: Upon submittal and FDEP approval of the Site Assessment Work Plan + Project Management $ 5,000.00
$ 5,000.00
HW683
DC026A
Site Assessment Work Plan (SAWP) Task List
Site Review:
1. Information Portal/ERIC/OCULUS Review
a. Review applicable documents
b. Application
c. Site Screening Report
d. Other assessment data
e. Permitting/Compliance/Enforcement history
2. Additional information as available and as needed
a. Google maps, aerial photographs, topographical maps, building/planning department records, land use maps, insurance maps
b. Other regulatory agency records
c. Contact DC operator for operations history. May be able to find operator even if DC is no longer operating
Site Visit:
1. Complete Drycleaning Site Visit Checklist
2. Verify Site Screening Report information, especially sample location(s)
3. Identify likely source/release areas (machine location, service door, floor drains, lint trap, sewer line, septic tank, dumpster, ASTs/USTs). Look for evidence on floors/walls for former machine location.
4. Identify above/below ground utilities and potential impediments to assessment activities
5. Verify accuracy of site map, revise as necessary
6. Interview operator/owner for site history
7. Discuss work plan elements with property owner and get direction regarding approach to tenants, and schedule.
SAWP:
1. Completed Drycleaning Site Visit Checklist
2. Site summary/narrative – Initial conceptual site model (brief text)
- Current status and history of DC operations
- Primary solvents used both prior to and after eligibility determination
- Owner/operator/tenant information
- Status of site structures (original, renovated, razed/redeveloped, vacant)
- Historical site assessment/remediation information
- Anticipated lithology, depth to water, and groundwater flow direction
- Known or anticipated source areas -Site Assessment Approach
3. Figures
- Topo
- Site features, aerial view, facility layout, waste storage areas, utilities, etc.
- Proposed sampling locations (soil, MAGS, DPT profiling, MWs, sediment, surface water, sewer/septic/lint trap)
4. Sampling Plan/Checklist (templated, see Word SAWP Summary Checklist) - Including proposed number of samples for soil, MAGs, groundwater, etc.
5. Proposed schedule from approval of SAWP to submittal of SAR
6. Cost Estimate (CE)/Level of Effort (LOE) Worksheets, including subcontractor quotes, as appropriate. The CE/LOE should be submitted upon approval of the SAWP and under separate cover.
Notes: 1) No documents that are available in ERIC or HASPs should be included with the SAWP, 2) No EDR or other ESA-like reports are required, 3) No offsite property owner/use or well survey information is required, 4) No potable well survey, 5) SOW should include PFAS screening (see guidance)