This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Geosyntec Consultants for groundwater monitoring services at the Former Trophy Cleaners site located at 2790A Gulf to Bay Boulevard in Clearwater, Pinellas County, Florida (ERIC_5301). The Task Assignment DC024A is issued under Contract Number HW683 and was executed on September 27, 2022, with a completion date of March 28, 2023. The document includes the Negotiation Summary, Cost Estimate Form, Level of Effort worksheets, Scope of Work, and quotes for Induce Disposal Water (IDW) disposal services from three vendors.
The contract authorizes Geosyntec to conduct annual groundwater monitoring activities divided into four subtasks: Project Management; Site Access Agreements (8 hours at $40.87/hour); Semi-Annual Groundwater Monitoring including collection of groundwater levels from 22 monitoring wells and samples from 9 wells (27 hours); and preparation of an Annual Groundwater Monitoring Report signed by a Florida-licensed professional (29 hours). The total contract value is $10,245.44 based on 72 labor hours with an overhead rate of 172.70% and a completion fee applied. Invoicing is divided into two payments: $980.78 due upon FDEP receipt and approval of executed access agreements by October 26, 2022, and $9,264.66 due upon FDEP receipt and approval of the Groundwater Monitoring Report and IDW manifests by December 28, 2022. IDW disposal costs ($110.00 per 55-gallon drum through Erwin Remediation) and laboratory analysis costs for volatile organic halocarbons ($657.00) are included in the total contract value.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW683
DC024A Completion March 28, 2023
This Task Assignment authorizes Geosyntec to conduct annual groundwater monitoring as well as obtain site access in accordance with the Geosyntec scope of work, cost estimate, and schedule received on 19 September 2022.
Evan Miller 850-245-8928 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Geosyntec
Geosyntec
Olivia Cain 727-330-9961
ERIC_5301
2790A Gulf to Bay Boulevard Clearwater, Pinellas County, Florida
Former Trophy Cleaners
✔ $ 10,245.44
$ 10,245.44
Scope of Work
Todd Kafka
Contract Manager
Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.
Date: 2022.09.27 15:15:47 -04'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2022.09.27 11:50:22 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2- Submittal of Executed Access Agreements 10/26/2022
Subtask 1,3,4- Submittal of Groundwater Monitoring Report, IDW Manifests 12/28/2022
Subtask 2- FDEP receipt and approval of Executed Access Agreements $ 980.78
Subtask 1,3,4- FDEP receipt and approval of Groundwater Monitoring Report, IDW Manifests $ 9,264.66
$ 10,245.44
HW683
DC024A
Printed on recycled paper.
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
To: HW683 Contract Negotiation File Former Trophy Cleaners Clearwater, Pinellas County
ERIC_5301
From: Evan Miller, Project Manager Date: September 27, 2022 Subject: Negotiation Summary
HW683 DC024A
This Task Assignment authorizes Geosyntec to conduct annual groundwater monitoring as well as obtain site access agreements in accordance with the Geosyntec scope of work, cost estimate, and schedule received on 19 September 2022.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2 – Site Access Agreements As part of SOW/LOE preparation, access agreements were evaluated to determine (i) what agreements are in place and (ii) that the existing owners associated with each agreement are current. A new Access Agreement will be required for the Site property (Parcel 17-29- 16- 00000-240-0200) which was sold in August 2013. Additionally, the monitoring wells located in the grassy area west of the Site building are part of Parcel 17-29-16-00000-240-0110 owned by Grow Financial Credit Union and an Off-Site Access Agreement will be required to access these monitoring well locations.
Subtask 3 – Semi-Annual Groundwater Monitoring This Subtask includes costs associated with annual groundwater monitoring activities tentatively scheduled for October/November 2022. Activities will be completed following receipt of the executed Access Agreements.
Groundwater levels will be collected from 22 monitoring wells in the Site-wide monitoring well network including 17 not sampled during the first say of field activities. Measurements will be collected over a 24- hour period to generate groundwater elevation contour maps to evaluate groundwater flow directions. Geosyntec has included effort to remove water from around and within the manhole prior to sampling at monitoring well MW001 due to the presence of standing water historically noted there.
Groundwater monitoring well samples will be collected from 9 monitoring wells.
MEMORANDUM
Former Trophy Cleaners September 27, 2022 Page Two
The samples will be stored on ice and shipped to the analytical laboratory under chain of custody for analysis under standard turnaround times.
Purge water generated during sampling activities will be containerized in one 55-gallon drum for transportation off site for disposal as non-hazardous waste. Geosyntec has assumed that no oversight is required for drum pickup.
Subtask 4 – Annual Groundwater Monitoring Report Geosyntec will prepare a Groundwater Monitoring Report documenting the results of the groundwater monitoring event. The report will contain tables summarizing field/laboratory groundwater data, figures showing groundwater flow direction(s), and a summary of the field activities completed. A final signed waste manifest for IDW transport and disposal will also be included in the Groundwater Monitoring Report. The report will be signed and sealed by a Florida licensed professional geologist or engineer.
Prior to field work, Geosyntec will obtain an updated Access Agreement from the current real property owner of the Former Trophy Cleaners (ERIC_5301) site.
The DEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $10,245.44 with 72 labor hours.
Geosyntec may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.
FDEP COST ESTI MATEContractor: Geosyntec Consultants
Date: 9/19/2022
Task #: Pending SubTask 1 Project Management SubTask 6
Site: Former Trophy Cleaners SubTask 2 Site Access Agreements SubTask 7
Activity/Phase: Annual Groundwater Mon SubTask 3 Annual Groundwater Monitoring SubTask 8
Project Manager: O. Cain SubTask 4 Groundwater Monitoring Report SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$40.87 Project Manager O. Cain 8 7.8 $76.92 Principal T. Kafka 3 0 0 3 0 0 0 0 0 0 $46.15 Project Professional M. Hensley 5 0 0 5 0 0 0 0 0 0 $40.87 Professional O. Cain 31 8 3 20 0 0 0 0 0 0 $33.17 Senior Staff Professional A. Langteau 1 0 0 1 0 0 0 0 0 0 $29.33 Staff Professional M. Mohr 24 0 24 0 0 0 0 0 0 0
Total Hours 72 8 8 27 29 0 0 0 0 0 0
Direct Labor $2,786.09 $320.52 $326.96 $826.53 $1,312.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 172.70% $4,811.58 $553.54 $564.66 $1,427.42 $2,265.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $7,597.67 $874.06 $891.62 $2,253.95 $3,578.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost Estimate Page 1 of 2 Cost Estimate
FDEP COST ESTI MATEContractor: Geosyntec Consultants
Date: 9/19/2022
Task #: Pending SubTask 1 Project Management SubTask 6
Site: Former Trophy Cleaners SubTask 2 Site Access Agreements SubTask 7
Activity/Phase: Annual Groundwater Mon SubTask 3 Annual Groundwater Monitoring SubTask 8
Project Manager: O. Cain SubTask 4 Groundwater Monitoring Report SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $240.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $110.00 $0.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $110.00 $0.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $11.00 $0.00 $11.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $121.00 $0.00 $121.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $657.00 $0.00 $657.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $0.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $767.00 $0.00 $767.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $0.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $580.00 $0.00 $580.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $0.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $760.00 $0.00 $760.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $9,485.67 $874.06 $891.62 $4,141.95 $3,578.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $759.77 $87.41 $89.16 $225.40 $357.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $10,245.44 $961.47 $980.78 $4,367.35 $3,935.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Invoice #1 (Subtask 2) $980.78 Invoice #2 (Subtasks 1, 3, 4) $9,264.66
Total $10,245.44
Cost Estimate Page 2 of 2 Cost Estimate
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Former Trophy Cleaners SUBTASK: Site Access Agreements
DATE: 9/19/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Professional O. Cain 8
TOTAL LABOR 8
Coordinate access with property owners, draft access agreements for each off-site property (4 hr/site x 2 sites = 8 hr)
9/20/2022 Page 1 of 3 Subtask 2
SUBTASK: Annual Groundwater Monitoring
DATE: 9/19/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Professional O. Cain 3
Staff Professional M. Mohr 24
TOTAL LABOR 27
VEHICLE TYPE RATE UNIT USAGE
Van $120.00 Day 2 $240.00 Subtotal $240.00
TOTAL VEHICLE $240.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
IDW
Erwin Remediation Non-hazardous liquid IDW (1 drum x $110/drum) $110.00 $110.00
Subtotal $110.00
TOTAL SUB $110.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOCs $70.00 0 0 $0.00 VOHs $73.00 9 0 $657.00
Subtotal $657.00 Shipping
Large Cooler (25 to 50 lbs) $150.00 0 $0.00 Small Cooler (0 to 25 lbs) $110.00 1 $110.00
Subtotal $110.00
TOTAL LAB $767.00
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Analytical Related
Groundwater Sampling Kit $290.00 Day 2 $580.00 Subtotal $580.00
IDW Related Drum $100.00 Drum 1 $100.00
Subtotal $100.00 Expendables
$40.00 Day 2 $80.00 Subtotal $80.00
TOTAL EQUIPMENT $760.00
Field preparation (2 hr). IDW profiling and manifesting (1 hr).
Field preparation (2 hr). Collect depth to water measurements (3 hr). Manage standing water on MW001 (1 hr). Calibrate sampling equipment (0.5 hr/day x 2 days = 1 hr).
Monitoring well sampling (1.5 hr/well x 9 wells = 13 hr). IDW management (1 hr). Sample management (2 hr). Compiling field notes (1 hr).
9/20/2022 Page 2 of 3 Subtask 3
SUBTASK: Groundwater Monitoring Report
DATE: 9/19/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal T. Kafka 3
Project Professional M. Hensley 5
Professional O. Cain 20
Senior Staff Professional A. Langteau 1
TOTAL LABOR 29
Closure strategy assessment with Site Owner; evaluated monitoring data and develop path forward strategy
Groundwater elevation contours and groundwater results figures
Conditional closure discussions with the Site Owner (2 hr). Preparation of Groundwater Monitoring Report (18 hr).
ADaPT QA/QC of analytical data (0.5 hr/report x 1 lab report = 1 hr)
9/20/2022 Page 3 of 3 Subtask 4
Trophy Cleaners (ERIC_5301)_HW683 SOW_Annual GMR_2022-09
12802 Tampa Oaks Blvd, Suite 151 Tampa, Florida 33637
PH 813.558.0990
FAX 813.558.9726
www.geosyntec.com
19 September 2022
Mr. Evan Miller Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject: Scope of Work and CEF/LOE – Annual Groundwater Monitoring Former Trophy Cleaners 2790A Gulf to Bay Boulevard Clearwater, Pinellas County, Florida FDEP Facility ID ERIC_5301
Dear Mr. Miller, Geosyntec Consultants, Inc. (Geosyntec) has prepared this statement of work (SOW), Cost Estimate Form (CEF), and Level of Effort (LOE) for annual groundwater monitoring activities at the Former Trophy Cleaners Site (Site) located in Clearwater, Florida. A copy of the CEF and LOE is provided as Attachment A. Assessment activities proposed in this SOW are consistent with recommendations provided in the December 2021 Annual Groundwater Monitoring Report approved by the Florida Department of Environmental Protection on 21 February 2022.
Subtask 1 – Project Management
Subtask 2 – Site Access Agreements
As part of SOW/LOE preparation, access agreements were evaluated to determine (i) what agreements are in place and (ii) that the existing owners associated with each agreement are current. On 8 September 2022, Geosyntec confirmed that the following access agreements are in place and applicable to this scope:
Agreement with Dr. Herbert E. and Jane B. Wollowick for the property located at 2779 Gulf to Bay Blvd (Parcel ID 17-29-16-03006-000-0203) executed on 10 November 2008.
This is not the Site property and is located south of the Site and Gulf to Bay Blvd.
According to the Pinellas County Property Appraiser’s website, the Site property (Parcel 17-29- 16-00000-240-0200) was sold in August 2013 and a new Access Agreement will be required.
Additionally, the monitoring wells located in the grassy area west of the Site building are part of Parcel 17-29-16-00000-240-0110 owned by Grow Financial Credit Union and an Off-Site Access Agreement will be required to access these monitoring well locations. Subtask 2 includes effort to coordinate and obtained signed access agreements for the two referenced properties.
Subtask 3 – Semi-Annual Groundwater Monitoring
This Subtask includes costs associated with annual groundwater monitoring activities tentatively scheduled for October/November 2022. Activities will be completed following receipt of the executed Access Agreements.
Groundwater levels will be collected from 22 monitoring wells in the Site-wide monitoring well network (MW001 through MW004, MW008, MW009, and MW016 through MW031), including 17 not sampled during the first say of field activities. Measurements will be collected over a 24-hour period to generate groundwater elevation contour maps to evaluate groundwater flow directions. Due to the presence of standing water historically noted at monitoring well MW001 (located in a drainage ditch next to Gulf to Bay Boulevard), we have included effort to remove water from around and within the manhole prior to sampling.
Groundwater monitoring well samples will be collected from 9 monitoring wells (MW001, MW008, MW018, MW019, MW024, MW026, MW027, MW028, and MW031). Groundwater samples will be collected in accordance with FDEP Standard Operating Procedures and submitted for laboratory analysis of volatile organic halocarbons by Environmental Protection Agency Method 8260B. The samples will be stored on ice and shipped to the analytical laboratory under chain of custody for analysis under standard turnaround times.
Purge water generated during sampling activities will be containerized in one 55-gallon drum for transportation off site for disposal as non-hazardous waste. Bid costs prepared by the waste disposal companies are summarized in the following table and included in Attachment B. Based on the bids, Geosyntec recommends selecting Erwin Remediation to haul and dispose of IDW generated during monitoring activities. We have assumed no oversight is required for drum pickup.
IDW Disposal
Disposal Company Non-Hazardous Water
(Per 55-gal. drum)
Clark Environmental $140
Erwin Remediation $110
Universal Environmental Solutions $125
An updated Notice of Contamination Beyond Property Boundaries may be required for the Site, as the previous Notice was prepared in 2010. Geosyntec will provide a copy of the laboratory analytical report to FDEP upon receipt with a recommendation. Should the results of the 2022 groundwater monitoring activities warrant an update, Geosyntec will submit a Work Change Directive and/or Task Assignment Change Order to prepare this update.
Subtask 4 – Annual Groundwater Monitoring Report
Geosyntec will prepare a Groundwater Monitoring Report documenting the results of the groundwater monitoring event. The report will contain tables summarizing field/laboratory groundwater data, figures showing groundwater flow direction(s), and a summary of the field activities completed. A final signed waste manifest for IDW transport and disposal will also be included in the Groundwater Monitoring Report. The report will be signed and sealed by a Florida-licensed professional geologist or engineer.
Effort in this Subtask also includes the expected effort needed to use the ADaPT files to quality control the groundwater sampling laboratory results (anticipated 1 lab report). Additionally, effort has been included to discuss conditional closure options with the Site owner prior to report submittal.
Invoice and Deliverable Schedule:
Geosyntec proposes the following deliverables and Period of Performance schedule below.
Subtask Deliverable Deliverable Date Invoice Amount
2 Executed Access Agreements 26 October 2022 $980.78
1, 3, 4 Groundwater Monitoring Report, IDW Manifests
28 December 2022 $9,264.66
Total $10,245.44
The above schedule is based on tasking by 28 September 2022 and executed Off-Site Access Agreements and field notifications submitted by 26 October 2022. Assumes Subtask 3 sampling is conducted in October/November 2022.
As always, it is a pleasure to work with the FDEP. If you require any additional information or have any questions, please contact Olivia Cain at 727-330-9961.
Sincerely, Olivia Cain, P.E. (FL) Todd K. Kafka, P.G. (FL, VA, TN) Engineer Senior Principal Hydrogeologist
Attachments: Attachment A – CEF/LOE Attachment B – IDW Quotes
ATTACHMENT B
1/7/22, 11:18 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19200 1/2
Quote Number: 19200
QUOTE
QUOTED TO: Todd Kafka
QUOTE DATE: 1/7/2022
COMPANY NAME: Geosyntec - 2022 QUOTED BY: Craig Burns
PHONE NUMBER:
Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR
THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.
**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns
863.327.6289 - cburns@clarkenv.com
This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
Name (print) Title
OCain Text Box
OCain Text Box
OCain Text Box $80.00
OCain Text Box $60.00
OCain Text Box $140.00
1/7/22, 11:18 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19200 2/2
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Todd Kafka - Geosyntec Consultants, Inc.
12802 Tampa Oaks Blvd, Ste 151
Tampa, FL 33637
June 14, 2022
Re: Non-Hazardous Drum Disposal Quote
Mr. Kafka:
The price for the transportation and disposal (T&D) of drums of non-hazardous soil, mud and water is listed below.
Non-Hazardous Chlorinated VOHs, Petroleum and Metals:
Description Rate Unit
T&D - Non-Haz Soil $ 110.00 Per Drum
T&D - Non-Haz Mud/Water $ 110.00 Per Drum
Non-Hazardous PFAS Impacted:
Description Rate Unit
Profile Fee $ 350.00 Per Site
T&D - Non-Haz PFOS/PFAS Impacted Soil $ 120.00 Per Drum
T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 130.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
This quote is valid for 90 days.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com OCain Rectangle