About this file

Document Summary

This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Geosyntec Consultants for groundwater monitoring services at the Former Trophy Cleaners site located at 2790A Gulf to Bay Boulevard in Clearwater, Pinellas County, Florida (ERIC_5301). The Task Assignment DC024A is issued under Contract Number HW683 and was executed on September 27, 2022, with a completion date of March 28, 2023. The document includes the Negotiation Summary, Cost Estimate Form, Level of Effort worksheets, Scope of Work, and quotes for Induce Disposal Water (IDW) disposal services from three vendors.

The contract authorizes Geosyntec to conduct annual groundwater monitoring activities divided into four subtasks: Project Management; Site Access Agreements (8 hours at $40.87/hour); Semi-Annual Groundwater Monitoring including collection of groundwater levels from 22 monitoring wells and samples from 9 wells (27 hours); and preparation of an Annual Groundwater Monitoring Report signed by a Florida-licensed professional (29 hours). The total contract value is $10,245.44 based on 72 labor hours with an overhead rate of 172.70% and a completion fee applied. Invoicing is divided into two payments: $980.78 due upon FDEP receipt and approval of executed access agreements by October 26, 2022, and $9,264.66 due upon FDEP receipt and approval of the Groundwater Monitoring Report and IDW manifests by December 28, 2022. IDW disposal costs ($110.00 per 55-gallon drum through Erwin Remediation) and laboratory analysis costs for volatile organic halocarbons ($657.00) are included in the total contract value.

View the file

Other files

File Type Posted
CN-370000-HW683-BF02A.pdf.crdownload CRDOWNLOAD file
CN-370000-HW683-BF02ACO1.pdf PDF
CN-370000-HW683-BF02B.pdf PDF
CN-370000-HW683-BF04CCO2.pdf PDF
CN-370000-HW683-BIL01B.pdf PDF
CN-370000-HW683-BIL01C.pdf PDF
CN-370000-HW683-BIL03A.pdf PDF
CN-370000-HW683-CSS01.pdf PDF
CN-370000-HW683-CSS02B.pdf PDF
CN-370000-HW683-DC002B.pdf PDF
CN-370000-HW683-DC002C.pdf PDF
CN-370000-HW683-DC003D.pdf PDF
CN-370000-HW683-DC003F.pdf PDF
CN-370000-HW683-DC005A.pdf PDF
CN-370000-HW683-DC005B.pdf PDF
CN-370000-HW683-DC005C.pdf PDF
CN-370000-HW683-DC008C.pdf PDF
CN-370000-HW683-DC009D.pdf PDF
CN-370000-HW683-DC010B.pdf PDF
CN-370000-HW683-DC014B.pdf PDF
CN-370000-HW683-DC015A.pdf PDF
CN-370000-HW683-DC017B.pdf PDF
CN-370000-HW683-DC017D.pdf PDF
CN-370000-HW683-DC018A.pdf PDF
CN-370000-HW683-DC019E.pdf PDF
CN-370000-HW683-DC01ACO2.pdf PDF
CN-370000-HW683-DC01B.pdf PDF
CN-370000-HW683-DC020D.pdf PDF
CN-370000-HW683-DC025A.pdf PDF
CN-370000-HW683-DC025C.pdf PDF
CN-370000-HW683-DC028B.pdf PDF
CN-370000-HW683-DC028C.pdf PDF
CN-370000-HW683-DC029C.pdf PDF
CN-370000-HW683-DC029F.pdf PDF
CN-370000-HW683-DC029G.pdf PDF
CN-370000-HW683-DC02ECO2.pdf PDF
CN-370000-HW683-DC030A.pdf PDF
CN-370000-HW683-DC030B.pdf PDF
CN-370000-HW683-DC031A.pdf PDF
CN-370000-HW683-DC032B.pdf PDF
CN-370000-HW683-DC034A.pdf PDF
CN-370000-HW683-DC036C.pdf PDF
CN-370000-HW683-DC037A.pdf PDF
CN-370000-HW683-DC042B.pdf PDF
CN-370000-HW683-DC043B.pdf PDF
CN-370000-HW683-DC044C.pdf PDF
CN-370000-HW683-DC048A.pdf PDF
CN-370000-HW683-DC04A.pdf PDF
CN-370000-HW683-DC04ACO1.pdf PDF
CN-370000-HW683-DC05BCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW683

DC024A Completion March 28, 2023

This Task Assignment authorizes Geosyntec to conduct annual groundwater monitoring as well as obtain site access in accordance with the Geosyntec scope of work, cost estimate, and schedule received on 19 September 2022.

Evan Miller 850-245-8928 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Geosyntec

Geosyntec

Olivia Cain 727-330-9961

ERIC_5301

2790A Gulf to Bay Boulevard Clearwater, Pinellas County, Florida

Former Trophy Cleaners

✔ $ 10,245.44

$ 10,245.44

Scope of Work

Todd Kafka

Contract Manager

Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.

Date: 2022.09.27 15:15:47 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2022.09.27 11:50:22 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 2- Submittal of Executed Access Agreements 10/26/2022

Subtask 1,3,4- Submittal of Groundwater Monitoring Report, IDW Manifests 12/28/2022

Subtask 2- FDEP receipt and approval of Executed Access Agreements $ 980.78

Subtask 1,3,4- FDEP receipt and approval of Groundwater Monitoring Report, IDW Manifests $ 9,264.66

$ 10,245.44

HW683

DC024A

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

To: HW683 Contract Negotiation File Former Trophy Cleaners Clearwater, Pinellas County

ERIC_5301

From: Evan Miller, Project Manager Date: September 27, 2022 Subject: Negotiation Summary

HW683 DC024A

This Task Assignment authorizes Geosyntec to conduct annual groundwater monitoring as well as obtain site access agreements in accordance with the Geosyntec scope of work, cost estimate, and schedule received on 19 September 2022.

Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.

Subtask 2 – Site Access Agreements As part of SOW/LOE preparation, access agreements were evaluated to determine (i) what agreements are in place and (ii) that the existing owners associated with each agreement are current. A new Access Agreement will be required for the Site property (Parcel 17-29- 16- 00000-240-0200) which was sold in August 2013. Additionally, the monitoring wells located in the grassy area west of the Site building are part of Parcel 17-29-16-00000-240-0110 owned by Grow Financial Credit Union and an Off-Site Access Agreement will be required to access these monitoring well locations.

Subtask 3 – Semi-Annual Groundwater Monitoring This Subtask includes costs associated with annual groundwater monitoring activities tentatively scheduled for October/November 2022. Activities will be completed following receipt of the executed Access Agreements.

Groundwater levels will be collected from 22 monitoring wells in the Site-wide monitoring well network including 17 not sampled during the first say of field activities. Measurements will be collected over a 24- hour period to generate groundwater elevation contour maps to evaluate groundwater flow directions. Geosyntec has included effort to remove water from around and within the manhole prior to sampling at monitoring well MW001 due to the presence of standing water historically noted there.

Groundwater monitoring well samples will be collected from 9 monitoring wells.

MEMORANDUM

Former Trophy Cleaners September 27, 2022 Page Two

The samples will be stored on ice and shipped to the analytical laboratory under chain of custody for analysis under standard turnaround times.

Purge water generated during sampling activities will be containerized in one 55-gallon drum for transportation off site for disposal as non-hazardous waste. Geosyntec has assumed that no oversight is required for drum pickup.

Subtask 4 – Annual Groundwater Monitoring Report Geosyntec will prepare a Groundwater Monitoring Report documenting the results of the groundwater monitoring event. The report will contain tables summarizing field/laboratory groundwater data, figures showing groundwater flow direction(s), and a summary of the field activities completed. A final signed waste manifest for IDW transport and disposal will also be included in the Groundwater Monitoring Report. The report will be signed and sealed by a Florida licensed professional geologist or engineer.

Prior to field work, Geosyntec will obtain an updated Access Agreement from the current real property owner of the Former Trophy Cleaners (ERIC_5301) site.

The DEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $10,245.44 with 72 labor hours.

Geosyntec may invoice following the schedule established in the Deliverables and Invoice Schedule Attachment, which accompanies the Task Assignment Notification Form.

FDEP COST ESTI MATEContractor: Geosyntec Consultants

Date: 9/19/2022

Task #: Pending SubTask 1 Project Management SubTask 6

Site: Former Trophy Cleaners SubTask 2 Site Access Agreements SubTask 7

Activity/Phase: Annual Groundwater Mon SubTask 3 Annual Groundwater Monitoring SubTask 8

Project Manager: O. Cain SubTask 4 Groundwater Monitoring Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$40.87 Project Manager O. Cain 8 7.8 $76.92 Principal T. Kafka 3 0 0 3 0 0 0 0 0 0 $46.15 Project Professional M. Hensley 5 0 0 5 0 0 0 0 0 0 $40.87 Professional O. Cain 31 8 3 20 0 0 0 0 0 0 $33.17 Senior Staff Professional A. Langteau 1 0 0 1 0 0 0 0 0 0 $29.33 Staff Professional M. Mohr 24 0 24 0 0 0 0 0 0 0

Total Hours 72 8 8 27 29 0 0 0 0 0 0

Direct Labor $2,786.09 $320.52 $326.96 $826.53 $1,312.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $4,811.58 $553.54 $564.66 $1,427.42 $2,265.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $7,597.67 $874.06 $891.62 $2,253.95 $3,578.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost Estimate Page 1 of 2 Cost Estimate

FDEP COST ESTI MATEContractor: Geosyntec Consultants

Date: 9/19/2022

Task #: Pending SubTask 1 Project Management SubTask 6

Site: Former Trophy Cleaners SubTask 2 Site Access Agreements SubTask 7

Activity/Phase: Annual Groundwater Mon SubTask 3 Annual Groundwater Monitoring SubTask 8

Project Manager: O. Cain SubTask 4 Groundwater Monitoring Report SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $240.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $110.00 $0.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $110.00 $0.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $11.00 $0.00 $11.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $121.00 $0.00 $121.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $657.00 $0.00 $657.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $0.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $767.00 $0.00 $767.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $0.00 $80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $580.00 $0.00 $580.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $0.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $760.00 $0.00 $760.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $9,485.67 $874.06 $891.62 $4,141.95 $3,578.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $759.77 $87.41 $89.16 $225.40 $357.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $10,245.44 $961.47 $980.78 $4,367.35 $3,935.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Invoice #1 (Subtask 2) $980.78 Invoice #2 (Subtasks 1, 3, 4) $9,264.66

Total $10,245.44

Cost Estimate Page 2 of 2 Cost Estimate

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Former Trophy Cleaners SUBTASK: Site Access Agreements

DATE: 9/19/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Professional O. Cain 8

TOTAL LABOR 8

Coordinate access with property owners, draft access agreements for each off-site property (4 hr/site x 2 sites = 8 hr)

9/20/2022 Page 1 of 3 Subtask 2

SUBTASK: Annual Groundwater Monitoring

DATE: 9/19/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Professional O. Cain 3

Staff Professional M. Mohr 24

TOTAL LABOR 27

VEHICLE TYPE RATE UNIT USAGE

Van $120.00 Day 2 $240.00 Subtotal $240.00

TOTAL VEHICLE $240.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

IDW

Erwin Remediation Non-hazardous liquid IDW (1 drum x $110/drum) $110.00 $110.00

Subtotal $110.00

TOTAL SUB $110.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOCs $70.00 0 0 $0.00 VOHs $73.00 9 0 $657.00

Subtotal $657.00 Shipping

Large Cooler (25 to 50 lbs) $150.00 0 $0.00 Small Cooler (0 to 25 lbs) $110.00 1 $110.00

Subtotal $110.00

TOTAL LAB $767.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Analytical Related

Groundwater Sampling Kit $290.00 Day 2 $580.00 Subtotal $580.00

IDW Related Drum $100.00 Drum 1 $100.00

Subtotal $100.00 Expendables

$40.00 Day 2 $80.00 Subtotal $80.00

TOTAL EQUIPMENT $760.00

Field preparation (2 hr). IDW profiling and manifesting (1 hr).

Field preparation (2 hr). Collect depth to water measurements (3 hr). Manage standing water on MW001 (1 hr). Calibrate sampling equipment (0.5 hr/day x 2 days = 1 hr).

Monitoring well sampling (1.5 hr/well x 9 wells = 13 hr). IDW management (1 hr). Sample management (2 hr). Compiling field notes (1 hr).

9/20/2022 Page 2 of 3 Subtask 3

SUBTASK: Groundwater Monitoring Report

DATE: 9/19/2022

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 3

Project Professional M. Hensley 5

Professional O. Cain 20

Senior Staff Professional A. Langteau 1

TOTAL LABOR 29

Closure strategy assessment with Site Owner; evaluated monitoring data and develop path forward strategy

Groundwater elevation contours and groundwater results figures

Conditional closure discussions with the Site Owner (2 hr). Preparation of Groundwater Monitoring Report (18 hr).

ADaPT QA/QC of analytical data (0.5 hr/report x 1 lab report = 1 hr)

9/20/2022 Page 3 of 3 Subtask 4

Trophy Cleaners (ERIC_5301)_HW683 SOW_Annual GMR_2022-09

12802 Tampa Oaks Blvd, Suite 151 Tampa, Florida 33637

PH 813.558.0990

FAX 813.558.9726

www.geosyntec.com

19 September 2022

Mr. Evan Miller Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400

Subject: Scope of Work and CEF/LOE – Annual Groundwater Monitoring Former Trophy Cleaners 2790A Gulf to Bay Boulevard Clearwater, Pinellas County, Florida FDEP Facility ID ERIC_5301

Dear Mr. Miller, Geosyntec Consultants, Inc. (Geosyntec) has prepared this statement of work (SOW), Cost Estimate Form (CEF), and Level of Effort (LOE) for annual groundwater monitoring activities at the Former Trophy Cleaners Site (Site) located in Clearwater, Florida. A copy of the CEF and LOE is provided as Attachment A. Assessment activities proposed in this SOW are consistent with recommendations provided in the December 2021 Annual Groundwater Monitoring Report approved by the Florida Department of Environmental Protection on 21 February 2022.

Subtask 1 – Project Management

Subtask 2 – Site Access Agreements

As part of SOW/LOE preparation, access agreements were evaluated to determine (i) what agreements are in place and (ii) that the existing owners associated with each agreement are current. On 8 September 2022, Geosyntec confirmed that the following access agreements are in place and applicable to this scope:

Agreement with Dr. Herbert E. and Jane B. Wollowick for the property located at 2779 Gulf to Bay Blvd (Parcel ID 17-29-16-03006-000-0203) executed on 10 November 2008.

This is not the Site property and is located south of the Site and Gulf to Bay Blvd.

According to the Pinellas County Property Appraiser’s website, the Site property (Parcel 17-29- 16-00000-240-0200) was sold in August 2013 and a new Access Agreement will be required.

Additionally, the monitoring wells located in the grassy area west of the Site building are part of Parcel 17-29-16-00000-240-0110 owned by Grow Financial Credit Union and an Off-Site Access Agreement will be required to access these monitoring well locations. Subtask 2 includes effort to coordinate and obtained signed access agreements for the two referenced properties.

Subtask 3 – Semi-Annual Groundwater Monitoring

This Subtask includes costs associated with annual groundwater monitoring activities tentatively scheduled for October/November 2022. Activities will be completed following receipt of the executed Access Agreements.

Groundwater levels will be collected from 22 monitoring wells in the Site-wide monitoring well network (MW001 through MW004, MW008, MW009, and MW016 through MW031), including 17 not sampled during the first say of field activities. Measurements will be collected over a 24-hour period to generate groundwater elevation contour maps to evaluate groundwater flow directions. Due to the presence of standing water historically noted at monitoring well MW001 (located in a drainage ditch next to Gulf to Bay Boulevard), we have included effort to remove water from around and within the manhole prior to sampling.

Groundwater monitoring well samples will be collected from 9 monitoring wells (MW001, MW008, MW018, MW019, MW024, MW026, MW027, MW028, and MW031). Groundwater samples will be collected in accordance with FDEP Standard Operating Procedures and submitted for laboratory analysis of volatile organic halocarbons by Environmental Protection Agency Method 8260B. The samples will be stored on ice and shipped to the analytical laboratory under chain of custody for analysis under standard turnaround times.

Purge water generated during sampling activities will be containerized in one 55-gallon drum for transportation off site for disposal as non-hazardous waste. Bid costs prepared by the waste disposal companies are summarized in the following table and included in Attachment B. Based on the bids, Geosyntec recommends selecting Erwin Remediation to haul and dispose of IDW generated during monitoring activities. We have assumed no oversight is required for drum pickup.

IDW Disposal

Disposal Company Non-Hazardous Water

(Per 55-gal. drum)

Clark Environmental $140

Erwin Remediation $110

Universal Environmental Solutions $125

An updated Notice of Contamination Beyond Property Boundaries may be required for the Site, as the previous Notice was prepared in 2010. Geosyntec will provide a copy of the laboratory analytical report to FDEP upon receipt with a recommendation. Should the results of the 2022 groundwater monitoring activities warrant an update, Geosyntec will submit a Work Change Directive and/or Task Assignment Change Order to prepare this update.

Subtask 4 – Annual Groundwater Monitoring Report

Geosyntec will prepare a Groundwater Monitoring Report documenting the results of the groundwater monitoring event. The report will contain tables summarizing field/laboratory groundwater data, figures showing groundwater flow direction(s), and a summary of the field activities completed. A final signed waste manifest for IDW transport and disposal will also be included in the Groundwater Monitoring Report. The report will be signed and sealed by a Florida-licensed professional geologist or engineer.

Effort in this Subtask also includes the expected effort needed to use the ADaPT files to quality control the groundwater sampling laboratory results (anticipated 1 lab report). Additionally, effort has been included to discuss conditional closure options with the Site owner prior to report submittal.

Invoice and Deliverable Schedule:

Geosyntec proposes the following deliverables and Period of Performance schedule below.

Subtask Deliverable Deliverable Date Invoice Amount

2 Executed Access Agreements 26 October 2022 $980.78

1, 3, 4 Groundwater Monitoring Report, IDW Manifests

28 December 2022 $9,264.66

Total $10,245.44

The above schedule is based on tasking by 28 September 2022 and executed Off-Site Access Agreements and field notifications submitted by 26 October 2022. Assumes Subtask 3 sampling is conducted in October/November 2022.

As always, it is a pleasure to work with the FDEP. If you require any additional information or have any questions, please contact Olivia Cain at 727-330-9961.

Sincerely, Olivia Cain, P.E. (FL) Todd K. Kafka, P.G. (FL, VA, TN) Engineer Senior Principal Hydrogeologist

Attachments: Attachment A – CEF/LOE Attachment B – IDW Quotes

ATTACHMENT B

1/7/22, 11:18 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19200 1/2

Quote Number: 19200

QUOTE

QUOTED TO: Todd Kafka

QUOTE DATE: 1/7/2022

COMPANY NAME: Geosyntec - 2022 QUOTED BY: Craig Burns

PHONE NUMBER:

Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR

THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.

**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns

863.327.6289 - cburns@clarkenv.com

This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.

Name (print) Title

OCain Text Box

OCain Text Box

OCain Text Box $80.00

OCain Text Box $60.00

OCain Text Box $140.00

1/7/22, 11:18 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19200 2/2

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Todd Kafka - Geosyntec Consultants, Inc.

12802 Tampa Oaks Blvd, Ste 151

Tampa, FL 33637

June 14, 2022

Re: Non-Hazardous Drum Disposal Quote

Mr. Kafka:

The price for the transportation and disposal (T&D) of drums of non-hazardous soil, mud and water is listed below.

Non-Hazardous Chlorinated VOHs, Petroleum and Metals:

Description Rate Unit

T&D - Non-Haz Soil $ 110.00 Per Drum

T&D - Non-Haz Mud/Water $ 110.00 Per Drum

Non-Hazardous PFAS Impacted:

Description Rate Unit

Profile Fee $ 350.00 Per Site

T&D - Non-Haz PFOS/PFAS Impacted Soil $ 120.00 Per Drum

T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 130.00 Per Drum

The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

This quote is valid for 90 days.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com OCain Rectangle

OCain Rectangle

CEF.pdf
Cost Estimate
LOEs.pdf
Subtask 2
Subtask 3
Subtask 4