CN-370000-HW683-DC017C.pdf

PDF 3 MB Posted

Attached to
Master Agreement FL|HW683|90e8124b5a65e607dedb86d39c72016e
Contract number
HW683
Issued by
Florida

About this file

This document is a Task Assignment (TA) issued by the State of Florida Department of Environmental Protection (FDEP) to Geosyntec Consultants for groundwater monitoring services at the Maitland Plaza site (ERIC_5057) located in Maitland, Florida. The Task Assignment is executed under the underlying Contract Number HW683 and is identified as TA Number DC017C. The Department Project Manager is Brittany Plyler, and the Contractor's Project Manager is Olivia Cain. The contract involves the procurement of environmental consulting services for a state remediation project.

Geosyntec will conduct groundwater monitoring activities consisting of three subtasks: Project Management (Subtask 1), Monitoring Well Sampling (Subtask 2), and preparation of a Groundwater Monitoring Report (Subtask 3). The scope includes collecting depth-to-water measurements from all 33 monitoring wells and laboratory analytical samples from 16 wells for volatile organic halogens analysis using EPA Method 8260, as well as arranging for investigation-derived waste disposal through Erwin Remediation at a cost of $390.00. The total fixed-unit-rate Task Assignment value is $16,614.37, representing 96 labor hours. The single deliverable and invoice milestone is the submission and FDEP receipt and approval of the Groundwater Monitoring Report and Final IDW Manifest, with a due date of February 29, 2024, and full payment upon approval. The task was effective upon signature on November 27, 2023, with a completion date of April 30, 2024.

View the file

Other files

File Type Posted
CN-370000-HW683-BF01A.pdf PDF
CN-370000-HW683-BF01B.pdf PDF
CN-370000-HW683-BF02A.pdf PDF
CN-370000-HW683-BF02ACO2.pdf PDF
CN-370000-HW683-BF04A.pdf PDF
CN-370000-HW683-BF04BCO1.pdf PDF
CN-370000-HW683-BF2BCO1.pdf PDF
CN-370000-HW683-BIL01A.pdf PDF
CN-370000-HW683-CSS02.pdf PDF
CN-370000-HW683-CSS02A.pdf PDF
CN-370000-HW683-DC002F.pdf PDF
CN-370000-HW683-DC004B.pdf PDF
CN-370000-HW683-DC004E.pdf PDF
CN-370000-HW683-DC005D.pdf PDF
CN-370000-HW683-DC005E.pdf PDF
CN-370000-HW683-DC007A.pdf PDF
CN-370000-HW683-DC007B.pdf PDF
CN-370000-HW683-DC008A.pdf PDF
CN-370000-HW683-DC008B.pdf PDF
CN-370000-HW683-DC008D.pdf PDF
CN-370000-HW683-DC009A.pdf PDF
CN-370000-HW683-DC009B.pdf PDF
CN-370000-HW683-DC009G.pdf PDF
CN-370000-HW683-DC010C.pdf PDF
CN-370000-HW683-DC011B.pdf PDF
CN-370000-HW683-DC011C.pdf PDF
CN-370000-HW683-DC011D.pdf PDF
CN-370000-HW683-DC012B.pdf PDF
CN-370000-HW683-DC016B.pdf PDF
CN-370000-HW683-DC017A.pdf PDF
CN-370000-HW683-DC018B.pdf PDF
CN-370000-HW683-DC019A.pdf PDF
CN-370000-HW683-DC019B.pdf PDF
CN-370000-HW683-DC019C.pdf PDF
CN-370000-HW683-DC019D.pdf PDF
CN-370000-HW683-DC01ACO1.pdf PDF
CN-370000-HW683-DC025B.pdf PDF
CN-370000-HW683-DC026B.pdf PDF
CN-370000-HW683-DC029A.pdf PDF
CN-370000-HW683-DC029E.pdf PDF
CN-370000-HW683-DC02ACO1.pdf PDF
CN-370000-HW683-DC02E.pdf PDF
CN-370000-HW683-DC031C.pdf PDF
CN-370000-HW683-DC032A.pdf PDF
CN-370000-HW683-DC032C.pdf PDF
CN-370000-HW683-DC035A.pdf PDF
CN-370000-HW683-DC036B.pdf PDF
CN-370000-HW683-DC037B.pdf PDF
CN-370000-HW683-DC038A.pdf PDF
CN-370000-HW683-DC039A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW683

DC017C Completion April 30, 2024

This Task Assignment authorizes Geosyntec to conduct Groundwater Monitoring in accordance with the Geosyntec scope of work, cost estimate, and schedule received on November 15, 2023.

Brittany Plyler 850-245-8851 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Geosyntec

Geosyntec

Olivia Cain 727-330-9961

ERIC_5057

110 North Orlando Avenue, Maitland, FL 32751

Maitland Plaza

✔ $ 16,614.37

$ 16,614.37

Scope of Work

Todd Kafka

Contract Manager

Todd Kafka, P.G. Digitally signed by Todd Kafka, P.G.

Date: 2023.11.27 11:25:44 -05'00'

Kelly Crain

Kelly Crain Digitally signed by Kelly Crain Date: 2023.11.27 10:52:58 -05'00'

N/A

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Murphy_SL Highlight

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Subtask 1, 2, 3: Groundwater Monitoring Report and Final IDW Manifest; PM 02/29/2024

Subtask 1, 2, 3: Submittal and FDEP Receipt and Approval of the Groundwater Monitoring Report and Final IDW Manifest; PM $ 16,614.37

$ 16,614.37

HW683

DC017C

Printed on recycled paper.

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

To: HW683 Contract Negotiation File Maitland Plaza Maitland, Florida

ERIC_5057

From: Brittany Plyler, Project Manager Date: November 16, 2023 Subject: Negotiation Summary

HW683_DC017C

This Task Assignment authorizes Geosyntec to conduct Groundwater Monitoring in accordance with the Geosyntec scope of work, cost estimate, and schedule received on November 15, 2023.

Geosyntec confirmed on November 15, 2023, that Subtask 1 consists of the calculated project management labor, based upon 13% of the direct labor costs in this proposal, and includes fringe, overhead, other direct costs (ODCs) and completion fees.

Subtask 2: This subtask includes the labor and expenses for the completion of a groundwater monitoring event. Geosyntec will measure DTW from all 33 wells, and samples from 16 wells which will be submitted for VOHs. Erwin Remediation will haul and dispose of investigation derived waste (IDW) generated during monitoring well sampling.

Subtask 3: Geosyntec will prepare a Groundwater Monitoring Report documenting the VOH results of the groundwater monitoring event.

The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost is $16,614.37 with 96 labor hours.

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 11/15/2023

Task #: Pending SubTask 1 Project Management SubTask 6

Site: SubTask 2 Monitoring Well Sampling SubTask 7

Activity/Phase: Monitoring SubTask 3 Groundwater Monitoring Report SubTask 8

Project Manager: O.Cain SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$49.04 Project Manager O. Cain 9 9.4 $86.54 Principal T. Kafka 2 0 2 0 0 0 0 0 0 0 $51.44 Project Professional M. Hensley 8 0 8 0 0 0 0 0 0 0 $49.04 Project Professional O. Cain 26 6 20 0 0 0 0 0 0 0 $33.65 Senior Staff Professiona A. Ogunkoya 31 31 0 0 0 0 0 0 0 0 $32.45 Staff Professional M. Mohr 20 20 0 0 0 0 0 0 0 0

Total Hours 96 9 57 30 0 0 0 0 0 0 0

Direct Labor $4,013.52 $461.73 $1,986.39 $1,565.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 172.70% $6,931.36 $797.41 $3,430.50 $2,703.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $10,944.88 $1,259.14 $5,416.89 $4,268.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Maitland Plaza

Cost Estimate Page 1 of 4 Cost Estimate

FDEP COST ESTIMATEContractor: Geosyntec Consultants

Date: 11/15/2023

Task #: Pending SubTask 1 Project Management SubTask 6

Site: SubTask 2 Monitoring Well Sampling SubTask 7

Activity/Phase: Monitoring SubTask 3 Groundwater Monitoring Report SubTask 8

Project Manager: O.Cain SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10

Maitland Plaza

Travel Vehicle Rental $600.00 $600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $498.00 $498.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,098.00 $1,098.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $390.00 $390.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $390.00 $390.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $39.00 $39.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $429.00 $429.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,168.00 $1,168.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,278.00 $1,278.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,450.00 $1,450.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $200.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,770.00 $1,770.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $15,519.88 $1,259.14 $9,991.89 $4,268.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,094.49 $125.91 $541.69 $426.89 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $16,614.37 $1,385.05 $10,533.58 $4,695.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Cost from Prior CEF: Manual Entry Invoice 1 $0.00 Cost from Delta CEF; Manual Entry Invoice 2 $16,614.37

Cost (Prior + Delta): $0.00 Auto-Calculated Rounding Error: $16,614.37 Auto-Calculated

Final Total Cost: $16,614.37 Auto-Calculated

Cost Estimate Page 2 of 4 Cost Estimate

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Maitland Plaza SUBTASK: Monitoring Well Sampling

DATE: 11/15/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Professional O. Cain 6

Senior Staff Professional A. Ogunkoya 31

Staff Professional M. Mohr 20

TOTAL LABOR 57

VEHICLE TYPE RATE UNIT USEAGE

Truck Okunkoya $120.00 Day 3 $360.00 Van Mohr $120.00 Day 2 $240.00

Subtotal $600.00

TOTAL VEHICLE $600.00

PER DIEM STAFF RATE UNIT USEAGE

Okunkoya Hotel $130.00 Day 2 $260.00 Mohr Hotel $130.00 Day 1 $130.00 Okunkoya Per Diem $36.00 Day 2 $72.00 Mohr Per Diem $36.00 Day 1 $36.00

TOTAL PER DIEM $498.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

IDW

Erwin Remediation PFAS-Impacted Waste ($195/drum) $390.00 $390.00

Subtotal $390.00

TOTAL SUB $390.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs 16 MWs $73.00 16 0 $1,168.00

Subtotal $1,168.00 Shipping

Small Cooler (0 to 25 lbs) $110.00 1 $110.00 Subtotal $110.00

TOTAL LAB $1,278.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Analytical Related

Groundwater Sampling Kit (2 ppl, 2 k $290.00 Day 5 $1,450.00 Subtotal $1,450.00

IDW Related Drum $100.00 Drum 2 $200.00

Subtotal $200.00 Expendables

$40.00 Day 3 $120.00 Subtotal $120.00

TOTAL EQUIPMENT $1,770.00

Prepare Field Package and RPO/tenant notifications (2 hr). Evaluate field data (0.5 hr/day x 3 days = 2 hr). Waste profile and IDW manifesting (2 hr).

Field kick off meeting and field package preparation (2 hr). Rd trip Mobilization from Clearwater (5 hr). Collect depth-to-groundwater measurements from 16 MWs (4 hr).

Calibration of instruments (0.5 hr/day x 3 days = 2 hr). Sample 10 wells @ 1.5 hrs/well (15 hr). Sample management/shipping (1 hr). IDW management (1 hr). Compiling field notes (2

Field kick off meeting and field package preparation (2 hr). Rd trip Mobilization from Clearwater (5 hr). Calibration of instruments (0.5 hr/day x 2 days = 1 hr). Collect depth-to-groundwater measurements from 17 MWs (4 hr). Sample 6 wells @ 1.5 hrs/well (9 hr).

11/15/2023 Page 3 of 4 Subtask 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Maitland Plaza SUBTASK: Groundwater Monitoring Report

DATE: ########

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Principal T. Kafka 2

Project Professional M. Hensley 8

Project Professional O. Cain 20

TOTAL LABOR 30

Evaluating and interpreting groundwater data, develop conclusions and recommendations, and PG sign/seal of Groundwater Monitoring Report

Prepare figure package for Groundwater Monitoring Report

Prepare Groundwater Monitoring Report

11/15/2023 Page 4 of 4 Subtask 3

19321 U.S. Highway 19 North Building C, Suite 200 Clearwater, FL 33764

PH 813-792-4820

www.geosyntec.com

Maitland Plaza (ERIC_5057)_HW683 SOW_GMR_2023-11

November 15, 2023

Ms. Brittany Plyler Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, FL 32399-2400

Subject: Scope of Work and CEF/LOE – Groundwater Monitoring

Maitland Plaza 110 North Orlando Avenue Maitland, FL 32751 FDEP Site ID No. ERIC_5057

Dear Ms. Plyer:

Geosyntec Consultants, Inc. (Geosyntec) has prepared this proposed Scope of Work (SOW), Level of Effort (LOE), and Cost Estimating Form (CEF) to conduct annual groundwater monitoring for volatile organic halogens (VOHs) at the Maitland Plaza/Utopia Cleaners Site located in Maitland, Florida (ERIC_5057). A description of task breakdown for field activities and report preparation is provided below. A CEF/LOE is provided as Attachment A.

Subtask 1 – Project Management

Costs associated with this subtask are directly computed.

Subtask 2 – Monitoring Well Sampling

This subtask includes the labor and expenses for the completion of a groundwater monitoring event. Geosyntec will mobilize to the Site in November 2023 to collect depth-to-water (DTW) measurements and groundwater samples from the Site-wide monitoring well network. Geosyntec will measure DTW from all 33 wells within a 24-hour period; each well is a flush mount that will require bailing of the manholes. Geosyntec will collect laboratory analytical samples from 16 wells in accordance with FDEP Standard Operating Procedures (SOPs) and submitted for laboratory analysis of VOHs by Environmental Protection Agency Method 8260. A summary of the proposed wells for sampling are listed below; please refer to the figures in Attachment C for the most recent groundwater quality results.

http://www.geosyntec.com/

Shallow Monitoring Wells (15 to 30 ft BLS)

Deeper Monitoring Wells (40 to 50 ft BLS)

Vertical Delineation Monitoring Well (60 to 70 ft BLS)

GMW-001

GMW-003

GMW-004

MW-8R

MW-12

MW-33

MW-38

MW-48

DW-3

GMW-002

GMW-005 (PCE > GCTL)

GMW-007

GMW-008

GMW-009

GMW-010 (offsite PCE > GCTL)

GMW-006

Based on the historic DTW at the Site (approximately 13 to 23 ft BLS), it is assumed that a peristaltic pump will be used to purge and sample each monitoring well. Following the collection of the monitoring well samples, purge water will be stored in 55-gallon drum on Site. Based on per- and polyfluoroalkyl substances (PFAS) screening completed as part of Task Assignment HW028A, it is assumed that the drum will need to be disposed of as PFAS-impacted waste. Bid costs prepared by the waste disposal companies are included in Attachment B. Based on the bids, Geosyntec recommends selecting Erwin Remediation to haul and dispose of investigation derived waste (IDW) generated during monitoring well sampling activities. It is assumed that oversight of the IDW pickup will not be required.

Subtask 3 – Groundwater Monitoring Report

Geosyntec will prepare a Groundwater Monitoring Report documenting the VOH results of the groundwater monitoring event. The report will contain tables summarizing field/laboratory groundwater data, figures showing groundwater flow direction(s), and a summary of the field activities completed. The report will be signed and sealed by a Florida-licensed professional geologist or engineer.

Invoice and Deliverable Schedule

Subtask Deliverable Due Date Invoice Amount

1, 2, 3 Groundwater Monitoring Report and Final IDW Manifest February 29, 2024 $16,614.37

Total $16,614.37 The above schedule assumes monitoring well samples are collected in December 2023.

CLOSURE

Please review and contact us if you have any questions or require additional information. As always, it is a pleasure to work with the FDEP.

Sincerely, Olivia Cain, P.E. (FL) Todd K. Kafka, P.G. (FL) Project Engineer Senior Principal Hydrogeologist

Attachments: Attachment A – CEF-LOE Attachment B – IDW Bids Attachment C – PCE and TCE Analytical Results – Jan 2023

ATTACHMENT B

IDW Quotes

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Ms. Olivia Cain Geosyntec Consultants, Inc.

19321 US Highway 19 North Building C, Suite 200 Clearwater, FL 33764

April 6, 2023

Re: Non-Hazardous Drum Disposal of PFOS/PFAS Impacted Materials

Ms. Cain:

The price for the transportation and disposal (T&D) of 55-gallon drums of non-hazardous soil, mud, and water is listed below:

Impacted with Non-Hazardous Petroleum or Chlorinated Solvents:

Description Rate Unit

T&D - Non-Haz Soil $ 110.00 Per Drum

T&D - Non-Haz Mud/Water $ 110.00 Per Drum

Impacted with Non-Hazardous PFAS/PFOS:

Description Rate Unit

Profile Fee (Charged once per site) $ 350.00 Per Site

T&D - Non-Haz PFOS/PFAS Impacted Soil $ 195.00 Per Drum

T&D - Non-Haz PFOS/PFAS Impacted Mud/Water $ 195.00 Per Drum

Dry cleaning sites will require 8260-VOH lab analysis and PFAS sites will require the full FDEP lab analysis for IDW waste characterization.

Respectfully, Robert Donado Erwin Remediation, Inc.

Email: robert@erwinremediation.com

02/20/2023

Maria Cristina Lemes

Geosyntec

Professional

12802 Tampa Oaks Blvd Suite 151

Tampa, FL, 33637

Maria.Lemes@geosyntec.com

18139812628

Subject: IDW 55 Gallon Drums Florida

Quote Number: QT-1081

Dear Maria Cristina, Thank you for the opportunity to provide this proposal for IDW Non-Haz 55 gallon drums located at Florida

Locations.

HEPACO is the premier environmental contractor with coverage from 45 offices. We specialize in emergency response, industrial services, remediation, and waste services. HEPACO serves a multitude of customers including transportation companies, energy companies, environmental consultants, industrial facilities, terminals, environmental service companies, general contractors, property owners, and many other public and private-sector clients.

HEPACO, with its well-rounded and cross-trained staff, can effectively and efficiently complete this project and appreciates the opportunity. We stand firmly behind our work and always strive to deliver exceptional value and a high level of service at reasonable pricing.

Scope of Work

HEPACO will provide the following:

Pickup and Transport IDW 55 gallon drums Non-Haz in Florida

Dispose of IDW Non-Haz 55 gallon drums

Assumptions

HEPACO assumes the following:

Pricing is based on Hourly transport rate and disposal. Pricing will vary due to hours required for transport.

All work will be completed in one mobilization unless otherwise noted

If groundwater is encountered, additional costs for transportation, disposal, management, and/or containment will apply accordingly to the HEPACO Time and Materials Rate Sheet.

Costs do not include any required permitting unless otherwise noted

Client will provide any required sampling/analysis, technical reports, surveying, compaction testing and/or private utility locating services unless otherwise noted

All disposal costs are based on final profile approval and waste acceptance by the disposal facility

Client is responsible for any additional cost associated with non-conforming waste as determined by the disposal facility

Customer is responsible for disposal costs unless otherwise noted

Quantities are speculative. Except for minimums, all billing will be based on actual quantities.

Price

A pricing itemization is provided in Attachment A.

HEPACO Basic Conditions:

All projects require a two (2) week notice to proceed. HEPACO will make every effort possible to meet all our client’s requests; however, HEPACO cannot guarantee a project start date with less than two (2) weeks’ notice to proceed.

This proposal is contingent upon credit approval and valid for thirty days

For any additional work beyond the original scope of work, time and material rates will apply.

Except for minimums, billing will be based on actual quantities at unit costs (see Attachment A).

A four (4)-hour minimum will apply to all unit costs quoted by the hour

Unit costs quoted by the day will be billed at the full day rate for any work on site. There will be no partial billing for partial workdays.

Unit costs quoted by the day apply up to eight hours per day. After eight hours per day, the day rate will be pro-rated for additional hours.

Unit costs are based on a non-union work force, no prevailing wages, no overtime work, and no performance bond.

Additional costs related to unexpected, concealed, or unknown conditions or any delays at the project site shall be incurred by customer.

HEPACO will not be held responsible if underground or above ground structures, cables, conduits, site features, property, materials, or equipment are destroyed, damaged, or rendered inoperable during the project.

Pricing includes HEPACO’s standard insurance coverage. Adding additional insured or increased coverages will be at additional cost and will be quoted on a case-by-case basis.

Again, thank you for the opportunity and we look forward to completing this project.

Sincerely, Kevin Hamilton

Kevin Hamilton

HEPACO Territory Account Manager

Subject: IDW 55 Gallon Drums Florida

Quote Number: QT-1081

By signing below the customer acknowledges that they have received, reviewed, and agree to the HEPACO

Proposal

Owner or Owner Agent:

Signature:

Date of Acceptance:

Print Name

Owner or Owner Agent

ATTACHMENT A

PRICING ITEMIZATION TABLE

PRICING ITEMIZATION TABLE

FEES

Fee Calculated As Total Dollar Amount

Energy, Security and Recovery Fee Percentage of Total $82.15

Estimated Total Quote Cost: $629.82

Item Name or Description Estimated Quantity Unit Cost Units of Measure Total Line-Item Cost

FLATBED W/LIFT GATE PRICED PER

HOUR 1 $76.32 HOUR $76.32

TRUCK DRIVER PER HOUR 1 $69.60 HOUR $69.60

NON-HAZ LIQUIDS DISPOSAL (PER

DRUM) 1 $141.75 DRUM $141.75

NON-HAZ SOLIDS DISPOSAL (PER

DRUM) 1 $210.00 DRUM $210.00

LTL WASTE TRANSPORTATION PER

DRUM 1 $50.00 COST + $50.00

Todd Kafka this appears to be 15% surcharge

4390 28th St N, St. Petersburg, FL 33714

Office: 727-610-2080

02/07/2023

GEOSYNTEC CONSULTANTS

1200 Riverplace Blvd Suite 710 Jacksonville, Florida 32207

Dear Blaine, Hull's Environmental Services, Inc. (Hull's) is pleased to submit the enclosed Quote for the Scope of Work described, along with our Standard Terms & Conditions. We appreciate the opportunity to quote this work and are prepared to perform the work upon your approval.

Please do not hesitate to call me if you have any questions. To accept the quote, please sign and date the final page of the quote.

Sincerely, Jamie Michael Vice President Business Development Hull’s Environmental Services

QUOTE

Customer GEOSYNTEC CONSULTANTS

Project Street Address Various Locations

Project State FL

Project City Various Cities

Project Zip Various Zips

Quote Number Q212512TPA

Quote Date Feb 07, 2023 05:44:07 PM

Hull's Rep Jamie Michael

SCOPE OF WORK

Waste T&D for Hazardous Drum Pickup and Disposal for FDEP Drycleaner and Hazardous Waste sites across the State of Florida:

Laboratory analysis will be provided for each location Off-spec waste will be returned to original location at the expense of customer

Customer agrees to execute third-party authorization for Hull's to act as agent for waste transportation & disposal Rates include manfiests

Fuel costs are included in rates Transportation billed according to actual round trip elapsed time; portal to site to TSDF to portal

Item description Quantity Unit Rate Amount

Drum, Disposal, Perchloroethylene/ Trichloroethylene Soil (D039, F002) 1.00 Drum $ 660.00 $ 660.00

Drum, Disposal, Perchloroethylene/ Trichloroethylene Water (D039, F002)

1.00 Drum $ 860.00 $ 860.00

Drum, Disposal, PFAS containing soil (D001, D002) 1.00 Drum $ 1,100.00 $ 1,100.00

Drum, Disposal, PFAS containing water (D001, D002) 1.00 Drum $ 1,100.00 $ 1,100.00

Transportation, Stake Body (or Equivalent), Driver/ Field Technician (Billed for Actual Time)

1.00 Hour $ 100.00 $ 100.00

TOTAL $ 3,820.00

Unit Pricing Disclaimer

Unit price quotations are designed to provide an estimated cost when complexity, duration and resource needs for a particular scope of work are difficult to determine due to factors like training requirements, location, weather conditions, materials, supplies, market fluctuations, unforeseen circumstances, and other characteristics. As such, Hull’s Environmental Services and client acknowledge that this is a unit price contract , that such unit prices vary from project to project and can ultimately alter the final cost of a project.

UNIT PRICING

STANDARD TERMS AND CONDITIONS

Acceptance and Formation of Contract: All written proposals shall be valid for a period of thirty (30) days. The cancellation or expiration of any contract hereunder shall not affect either Party’s obligations under any orders issued and accepted prior to such expiration or cancellation.

By issuance of a notice to proceed with the work, whether oral or written, Customer agrees to the terms and conditions stated herein. Any terms proposed in Customer's acceptance of this proposal which add to, vary from, or conflict with the proposal or these terms and conditions, are hereby rejected. Any such proposed terms shall be void and the terms in the proposal and these terms and conditions shall constitute the complete and exclusive statement of the terms and conditions of the contract between Hull’s Environmental Services, Inc. (“Hull’s”) and Customer.

Project Documents: Hull’s proposal includes and incorporates Hull’s Rate Schedule which is in effect at the time of performance of the work, all documents provided to Hull’s by or on behalf of Customer and all documents provided to Customer or its representative by or on behalf of Hull’s. The term “Customer” refers to the party with whom Hull’s is contracting. This document is incorporated by reference to the Contract as specified therein and is an integral part of the Contract.

Scope of Work and Price: All work performed hereunder shall be performed and invoiced in accordance with Hull’s written proposal, Hull’s Rate Schedule which is in effect at the time of performance of the work, the other Project Documents, and the terms and conditions stated herein as each may be applicable to the type of work performed. In the event that the scope of work, schedule, or material changes, Customer agrees to pay Hull’s on a time and material basis in accordance with Hull’s then current Rate Schedule or other unit rates, whichever is applicable, unless a revised proposal is prepared by Hull’s and accepted by Customer. Emergency response services shall be performed and invoiced in accordance with Hull’s current Rate Schedule. Unless expressly set forth, Hull’s proposal does not include state or local sales tax. If any such taxes are applicable and the client does not provide a Direct Pay or Tax Exemption Certificate for this work, such taxes will be added to the invoiced amount as a separate line item.

General Conditions of Work: Customer is responsible for furnishing to Hull’s all pertinent data and information concerning the work to be performed hereunder, the nature of the work site and the nature of the conditions to be remediated, including special hazards or risks involved with such work, premises, site or conditions. Unless otherwise stated in Hull’s proposal, all pricing is based upon the following general conditions:

(a) Hull’s will not incur any waiting or standby time for reason beyond Hull’s control; (b) access to, from and at the work site will not be restricted or limited; (c) there will be no overhead, underground, aboveground or other obstructions, rocks, pipelines, or utilities that would impede Hull’s work;

(d) the work site and all access ways shall be suitable for the size and weight of all vehicles and equipment utilized to perform the work; (e) all wastes shall conform to the representations of Customer and the Project Documents; (f) all non-emergency response related work will be performed Monday through Friday during daytime business hours between 8:00 a.m. and 4:00 p.m. (work performed outside of this time frame will be charged at 1.5 times the standard rates or as otherwise provided in Hull’s then current Rate Schedule; work performed on Sundays and holidays will be charged at two times the standard rates); (g) Customer is responsible for all damage to equipment and its components not caused by the direct fault of Hull’s; and (h) Customer is responsible for all costs associated with overloading of containers or trucks including citations, damages to equipment or property, loss of revenue, etc., unless loaded by Hull’s. Any variance in these conditions is considered a change in the scope of work unless expressly otherwise stated in Hull’s proposal. If any of the waste contains materials which do not conform to the descriptions provided by Customer and/or in the Waste Profile Sheets ("non-conforming waste"), Hull’s may, at its option, properly dispose of it, return it to Customer or require Customer to remove and dispose of the non-conforming waste at Customer's expense and reimburse Hull’s for any expenses that it has incurred. Customer is expressly prohibited from allowing any other carrier to move Hull’s equipment without the prior written consent of Hull’s. The equipment that Hull’s furnishes to Customer will remain on its property until moved by Hull’s. Customer will be responsible for any loss or damage resulting from its handling of the equipment, except for normal wear and tear. Customer will not overload by weight or volume, move or alter the equipment and will take reasonable precautions to prevent others from doing the same. Customer will use the equipment only for its intended purpose. If the equipment is inaccessible or overloaded by weight or volume, Hull’s service will be subject to an additional charge as outlined in Hull’s then current Rate Schedule or other unit rates as applicable. Hull’s will not be responsible for damage to Customer's driving surfaces resulting from weight of vehicles or equipment.

Invoicing and Payment: Customer shall make payments due under each invoice within fifteen (15) days of the invoice date. Interest shall begin to accrue on the invoice due date for payments not received by such date at the smaller of (i) the maximum lawful interest rate or (ii) one and one-half (1½%) percent per month. The individual signing the proposal incorporating these terms personally guarantees payment of any charges incurred thereunder. All payments will be first applied to interest, if any. In the event payment is not timely made and Hull’s files a lien or bond claim on Customer’s account, Customer will be assessed an administrative charge of $500.00 plus any applicable costs provided for in paragraph 6. However, Customer expressly agrees that Hull’s is a beneficiary to, and may impose a lien on, any and all of Customer’s insurance policies and/or proceeds. Customer expressly acknowledges that its obligation to pay all amounts incurred hereunder is absolute and is not conditioned upon availability of funding, insurance, or any other reasons.

Disputes and Waiver of Rights: In the event that Customer disputes any portion of any invoice, Customer shall provide Hull’s written notice of the disputed items within fifteen (15) days of the invoice date. The written notice must specifically state the portion in dispute and describe the dispute in such detail that Hull’s has full notice of the dispute. Customer hereby agrees that failure to provide such written notice within fifteen (15) days of the invoice date constitutes waiver of any such dispute and full payment of the invoice shall be provided to Hull’s. Customer agrees that it will not claim any dispute after the fifteen (15) day period that has not been timely specified in writing to Hull’s. Further, Customer agrees that the non-disputed portion of the invoice will be paid within fifteen (15) days of the invoice date. In the event that a lawsuit arises out of any matter related to this contract and Hull’s prevails, Customer agrees to pay Hull’s attorneys’ fees and costs, including, but not limited to, in-house counsel at the rate of $300.00 per hour and outside counsel, plus court costs and expenses. Further, Customer agrees to pay Hull’s for its’ personnel at twice the rate stated in its’ rate sheet for any time spent preparing the case or testifying at a deposition or trial.

Title to Waste: The parties hereto agree that Hull’s is not and shall not be considered the owner or generator of, and shall not take title to, any waste materials or substances remediated, removed or otherwise handled by Hull’s on behalf of Customer. Customer hereby authorizes Hull’s to sign waste manifests and profiles as agent for the generator.

Indemnity: Each party hereto agrees to indemnify, defend and hold harmless the other party hereto and the other party’s shareholders, directors, officers, employees and agents, from and against any and all claims, demands, causes of action and liabilities of any nature, whether for damages to property, business interests, or persons or for death, arising out of or related to the performance of this Contract and/or the conditions to which this Contract pertains, to the extent that any such claims, demands, causes of action and/or liability is attributable to the breach of contract, negligence, or other fault of the indemnifying party. The indemnification by each party shall survive the termination of this Agreement.

Notwithstanding the foregoing, where the work or services provided by Hull’s consists of or is related to emergency response, Hull’s does not waive any right or ability it may have to assert responder immunity pursuant to any applicable Federal, state and/or local laws and ordinances and/or any lawful order, regulation and/or rules thereunder and shall not be liable for any claims where such responder immunity applies.

Assignment: Customer may not assign, transfer or otherwise vest in any other company, entity or person, any of its rights or obligations under the Agreement without the prior written consent of Hull’s, which consent shall not be unreasonably withheld.

Jurisdiction and Venue: The substantive laws of the State of Florida, without regard to conflicts of laws principles that would require application of any other law, shall govern all matters arising out of, or relating to, this Agreement and all of the transactions it contemplates, including without limitation its validity, interpretation, formation, construction, breach, performance, termination and enforcement. The Parties mutually consent to the exclusive jurisdiction of the federal and state courts in the State of Florida and agree that any action, suit or proceeding concerning, related to or arising out of this Agreement and the negotiation of this Agreement will be brought only in a federal or state court in the State of Florida and the Parties agree that they will not raise any defense or objection or file any motion based on lack of personal jurisdiction, improper venue, inconvenience of the forum or the like in any case filed in a federal or state court in the State of Florida.

ADDITIONAL TERMS AND CONDITIONS

DISPOSAL PRICING SUBJECT TO CHANGE AFTER 30 DAYS. CUSTOMER WILL BE NOTIFIED OF A

CHANGE IN DISPOSAL PRICING.

CUSTOMER ACCEPTANCE

The undersigned agrees to and accepts the terms and conditions presented in this Quote. This quote shall be in effect for 30 days from this date. This agreement between GEOSYNTEC CONSULTANTS and Hull’s Environmental Services (Hull’s) covers all work, goods or services (which terms are used interchangeably herein) ordered by Customer and supplied by Hull’s for the work described in Hull’s Quote Q212512TPA dated 02/07/2023 and made part of this agreement by reference.

SIGNATURE

1633711010678_s_ph

Date 1633712759891_s_ph

4390 28th St N, St. Petersburg, FL 33714

Office: 727-610-2080

02/27/2023

GEOSYNTEC CONSULTANTS

1200 Riverplace Blvd Suite 710 Jacksonville, Florida 32207

Dear Blaine, Hull's Environmental Services, Inc. (Hull's) is pleased to submit the enclosed Quote for the Scope of Work described, along with our Standard Terms & Conditions. We appreciate the opportunity to quote this work and are prepared to perform the work upon your approval.

Please do not hesitate to call me if you have any questions. To accept the quote, please sign and date the final page of the quote.

Sincerely, Jamie Michael Vice President Business Development Hull’s Environmental Services

QUOTE

Customer GEOSYNTEC CONSULTANTS

Project Street Address Various Locations

Project State FL

Project City Various Cities

Project Zip Various Zips

Quote Number Q212587TPA

Quote Date Feb 27, 2023 02:36:18 PM

Hull's Rep Jamie Michael

SCOPE OF WORK

Waste T&D for non-hazardous drum pickup and disposal within the State of Florida. Assumptions are as follows:

Laboratory analysis will be provided for each location

Customer agrees to execute third-party authorization for Hull's to act as agent for waste transportation & disposal

Fuel costs are included in rates Off-spec waste will be returned to original location at the expense of customer

Rates include manfiests Transportation billed according to actual round trip elapsed time; portal to site to TSDF to portal

Item description Quantity Unit Rate Amount

Disposal - 55 Gal Drum, Soil or Water, Non-Hazardous, IDW 1.00 Drum $ 175.00 $ 175.00

Disposal - 55 Gal Drum, Soil or Water, Non-Hazardous, IDW, >Qty 5 1.00 Drum $ 150.00 $ 150.00

Transportation, Stake Body (or Equivalent), Driver/ Field Technician (Billed for Actual Time)

1.00 Hour $ 100.00 $ 100.00

TOTAL $ 425.00

Unit Pricing Disclaimer

Unit price quotations are designed to provide an estimated cost when complexity, duration and resource needs for a particular scope of work are difficult to determine due to factors like training requirements, location, weather conditions, materials, supplies, market fluctuations, unforeseen circumstances, and other characteristics. As such, Hull’s Environmental Services and client acknowledge that this is a unit price contract , that such unit prices vary from project to project and can ultimately alter the final cost of a project.

UNIT PRICING

STANDARD TERMS AND CONDITIONS

Acceptance and Formation of Contract: All written proposals shall be valid for a period of thirty (30) days. The cancellation or expiration of any contract hereunder shall not affect either Party’s obligations under any orders issued and accepted prior to such expiration or cancellation.

By issuance of a notice to proceed with the work, whether oral or written, Customer agrees to the terms and conditions stated herein. Any terms proposed in Customer's acceptance of this proposal which add to, vary from, or conflict with the proposal or these terms and conditions, are hereby rejected. Any such proposed terms shall be void and the terms in the proposal and these terms and conditions shall constitute the complete and exclusive statement of the terms and conditions of the contract between Hull’s Environmental Services, Inc. (“Hull’s”) and Customer.

Project Documents: Hull’s proposal includes and incorporates Hull’s Rate Schedule which is in effect at the time of performance of the work, all documents provided to Hull’s by or on behalf of Customer and all documents provided to Customer or its representative by or on behalf of Hull’s. The term “Customer” refers to the party with whom Hull’s is contracting. This document is incorporated by reference to the Contract as specified therein and is an integral part of the Contract.

Scope of Work and Price: All work performed hereunder shall be performed and invoiced in accordance with Hull’s written proposal, Hull’s Rate Schedule which is in effect at the time of performance of the work, the other Project Documents, and the terms and conditions stated herein as each may be applicable to the type of work performed. In the event that the scope of work, schedule, or material changes, Customer agrees to pay Hull’s on a time and material basis in accordance with Hull’s then current Rate Schedule or other unit rates, whichever is applicable, unless a revised proposal is prepared by Hull’s and accepted by Customer. Emergency response services shall be performed and invoiced in accordance with Hull’s current Rate Schedule. Unless expressly set forth, Hull’s proposal does not include state or local sales tax. If any such taxes are applicable and the client does not provide a Direct Pay or Tax Exemption Certificate for this work, such taxes will be added to the invoiced amount as a separate line item.

General Conditions of Work: Customer is responsible for furnishing to Hull’s all pertinent data and information concerning the work to be performed hereunder, the nature of the work site and the nature of the conditions to be remediated, including special hazards or risks involved with such work, premises, site or conditions. Unless otherwise stated in Hull’s proposal, all pricing is based upon the following general conditions:

(a) Hull’s will not incur any waiting or standby time for reason beyond Hull’s control; (b) access to, from and at the work site will not be restricted or limited; (c) there will be no overhead, underground, aboveground or other obstructions, rocks, pipelines, or utilities that would impede Hull’s work;

(d) the work site and all access ways shall be suitable for the size and weight of all vehicles and equipment utilized to perform the work; (e) all wastes shall conform to the representations of Customer and the Project Documents; (f) all non-emergency response related work will be performed Monday through Friday during daytime business hours between 8:00 a.m. and 4:00 p.m. (work performed outside of this time frame will be charged at 1.5 times the standard rates or as otherwise provided in Hull’s then current Rate Schedule; work performed on Sundays and holidays will be charged at two times the standard rates); (g) Customer is responsible for all damage to equipment and its components not caused by the direct fault of Hull’s; and (h) Customer is responsible for all costs associated with overloading of containers or trucks including citations, damages to equipment or property, loss of revenue, etc., unless loaded by Hull’s. Any variance in these conditions is considered a change in the scope of work unless expressly otherwise stated in Hull’s proposal. If any of the waste contains materials which do not conform to the descriptions provided by Customer and/or in the Waste Profile Sheets ("non-conforming waste"), Hull’s may, at its option, properly dispose of it, return it to Customer or require Customer to remove and dispose of the non-conforming waste at Customer's expense and reimburse Hull’s for any expenses that it has incurred. Customer is expressly prohibited from allowing any other carrier to move Hull’s equipment without the prior written consent of Hull’s. The equipment that Hull’s furnishes to Customer will remain on its property until moved by Hull’s. Customer will be responsible for any loss or damage resulting from its handling of the equipment, except for normal wear and tear. Customer will not overload by weight or volume, move or alter the equipment and will take reasonable precautions to prevent others from doing the same. Customer will use the equipment only for its intended purpose. If the equipment is inaccessible or overloaded by weight or volume, Hull’s service will be subject to an additional charge as outlined in Hull’s then current Rate Schedule or other unit rates as applicable. Hull’s will not be responsible for damage to Customer's driving surfaces resulting from weight of vehicles or equipment.

Invoicing and Payment: Customer shall make payments due under each invoice within fifteen (15) days of the invoice date. Interest shall begin to accrue on the invoice due date for payments not received by such date at the smaller of (i) the maximum lawful interest rate or (ii) one and one-half (1½%) percent per month. The individual signing the proposal incorporating these terms personally guarantees payment of any charges incurred thereunder. All payments will be first applied to interest, if any. In the event payment is not timely made and Hull’s files a lien or bond claim on Customer’s account, Customer will be assessed an administrative charge of $500.00 plus any applicable costs provided for in paragraph 6. However, Customer expressly agrees that Hull’s is a beneficiary to, and may impose a lien on, any and all of Customer’s insurance policies and/or proceeds. Customer expressly acknowledges that its obligation to pay all amounts incurred hereunder is absolute and is not conditioned upon availability of funding, insurance, or any other reasons.

Disputes and Waiver of Rights: In the event that Customer disputes any portion of any invoice, Customer shall provide Hull’s written notice of the disputed items within fifteen (15) days of the invoice date. The written notice must specifically state the portion in dispute and describe the dispute in such detail that Hull’s has full notice of the dispute. Customer hereby agrees that failure to provide such written notice within fifteen (15) days of the invoice date constitutes waiver of any such dispute and full payment of the invoice shall be provided to Hull’s. Customer agrees that it will not claim any dispute after the fifteen (15) day period that has not been timely specified in writing to Hull’s. Further, Customer agrees that the non-disputed portion of the invoice will be paid within fifteen (15) days of the invoice date. In the event that a lawsuit arises out of any matter related to this contract and Hull’s prevails, Customer agrees to pay Hull’s attorneys’ fees and costs, including, but not limited to, in-house counsel at the rate of $300.00 per hour and outside counsel, plus court costs and expenses. Further, Customer agrees to pay Hull’s for its’ personnel at twice the rate stated in its’ rate sheet for any time spent preparing the case or testifying at a deposition or trial.

Title to Waste: The parties hereto agree that Hull’s is not and shall not be considered the owner or generator of, and shall not take title to, any waste materials or substances remediated, removed or otherwise handled by Hull’s on behalf of Customer. Customer hereby authorizes Hull’s to sign waste manifests and profiles as agent for the generator.

Indemnity: Each party hereto agrees to indemnify, defend and hold harmless the other party hereto and the other party’s shareholders, directors, officers, employees and agents, from and against any and all claims, demands, causes of action and liabilities of any nature, whether for damages to property, business interests, or persons or for death, arising out of or related to the performance of this Contract and/or the conditions to which this Contract pertains, to the extent that any such claims, demands, causes of action and/or liability is attributable to the breach of contract, negligence, or other fault of the indemnifying party. The indemnification by each party shall survive the termination of this Agreement.

Notwithstanding the foregoing, where the work or services provided by Hull’s consists of or is related to emergency response, Hull’s does not waive any right or ability it may have to assert responder immunity pursuant to any applicable Federal, state and/or local laws and ordinances and/or any lawful order, regulation and/or rules thereunder and shall not be liable for any claims where such responder immunity applies.

Assignment: Customer may not assign, transfer or otherwise vest in any other company, entity or person, any of its rights or obligations under the Agreement without the prior written consent of Hull’s, which consent shall not be unreasonably withheld.

Jurisdiction and Venue: The substantive laws of the State of Florida, without regard to conflicts of laws principles that would require application of any other law, shall govern all matters arising out of, or relating to, this Agreement and all of the transactions it contemplates, including without limitation its validity, interpretation, formation, construction, breach, performance, termination and enforcement. The Parties mutually consent to the exclusive jurisdiction of the federal and state courts in the State of Florida and agree that any action, suit or proceeding concerning, related to or arising out of this Agreement and the negotiation of this Agreement will be brought only in a federal or state court in the State of Florida and the Parties agree that they will not raise any defense or objection or file any motion based on lack of personal jurisdiction, improper venue, inconvenience of the forum or the like in any case filed in a federal or state court in the State of Florida.

ADDITIONAL TERMS AND CONDITIONS

DISPOSAL PRICING SUBJECT TO CHANGE AFTER 30 DAYS. CUSTOMER WILL BE NOTIFIED OF A

CHANGE IN DISPOSAL PRICING.

CUSTOMER ACCEPTANCE

The undersigned agrees to and accepts the terms and conditions presented in this Quote. This quote shall be in effect for 30 days from this date. This agreement between GEOSYNTEC CONSULTANTS and Hull’s Environmental Services (Hull’s) covers all work, goods or services (which terms are used interchangeably herein) ordered by Customer and supplied by Hull’s for the work described in Hull’s Quote Q212587TPA dated 02/27/2023 and made part of this agreement by reference.

SIGNATURE

1633711010678_s_ph

Date 1633712759891_s_ph

ATTACHMENT C

VOHs Figures – January 2023

Former Utopia Cleaners (1958-1962) 110 N Orlando Avenue, Suite 3

Former Mobil #02-CRC (at least 1964 - 2000) and Current Classic II Inc.

(car dealership) 111 North Orlando Avenue

N o rt h

O rl a n d o

A v e n u e

East Horatio Avenue

Current Business Complex 431 East Horatio Avenue Maitland, FL. 32751

Maitland Plaza Shopping Center

Suite 13 - Former Virginia's Drycleaners/Laundry (1964-1969)

MW-29 (15-30)

MW-5 (17-27)

MW-48 (20-30)

MW-27 (15-30)

MW-36 (25-30)

MW-31 (15-30)

MW-7 (15-25)

MW-30 (15-30)

MW-4 (17-27)

MW-12 (15-25)

MW-22 (15-30)

MW-28 (15-30)

MW-37 (15-30)

MW-38 (15-30)

MW-43 (15-25)

MW-44 (15-25)

MW-45 (15-25)

GMW-003

GMW-004

GMW-001

MW-33 (15-30)

MW-32 (15-30)

MW-8R (20-30)

Path: (Titusville-01\DATA) \\Titusville-01\Data\0GIS\FR3799_Maitland\MXDs\202301\GW_results_Sh_202301.mxd 24 January 2023. Last Edited by: csaville

0 40 Feet

³ Maitland Plaza

ERIC_5057

110 N. Orlando Avenue Maitland, FLorida 32789

Summary of PCE and TCE Analytical Results in Groundwater (15 to 30 ft BLS)

Figure

Tampa, FL January 2023

Legend

&<…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .